ML20198K020
| ML20198K020 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 09/30/1997 |
| From: | Stewart Bailey, Hebert J Maine Yankee |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| JRH-97-212, MN-97-114, NUDOCS 9710220417 | |
| Download: ML20198K020 (5) | |
Text
MaineYankee Ef LIABLF E LE CTfilelTY BINCE 1972 329 BATH HOAD
- BRUNSWICK. MAINE 04011 * (207) 798 4100 October 9,1997 MN 97114 JRil 97412 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20$55
=
References:
(a)
License No. DPR 36 (Docket No. 50-309)
(b)
NUREG-0020, Licensed Operating Reactor Status Summary Report
Subject:
Maine Yankee Monthly Statist' al Report - September 1997 Gentlemen:
Enclosed please find the September 1997 Monthly Statistical Report for Maine Yankee.
if you have an> questions, please do not hesitate to contact me.
Very truly yours, Nk*
4 James R. liebert, Manager Regulatory Affairs Enclosures g
c:
Mr. Ilubert Miller i
Mr. Richard A. Rasmussen -
.QL Mr. Daniel 11. Dorman-I Mr. Patrick J. Dostic Mr. Uldis Vanags Iill h.ll.ll.lhkhh DR DO 0500 09 n
von
,, n Alp 3)
Ln97MM97114.WPD -
u __
4 l
i OPF. RATING DATA REPORT Docket No.:
50-309 Dates 29/Sep/97 Completed By:
D.
J.
BAILEY Telephones 207-798-4241
- 1. Unit Name.......................................
Haine Yankee 2.
Reporting Period................................
_Septesber 1997 3.
Licensed Thermal Power (HWt)....................
. 2700._
- 4. Nameplate Rating (Gross HWe)....................
920__
- 5. Design Electrical Rating (Net HWe)..............
870 _
G.
Maximum Dependable Capacity (Gross HWe).........
900 7.
Maximum Dopendable Capacity (Net HWe)...........
860 8.
If Changes in capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasonse
_NO CHANGWP 9.
Power Level to Which Restricted, if Any (Net HWe)
- 10. Reasons for Rustrictions, if Any f
THIS HONTH YEAR-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 720.00 6.551.00
- 12. Nuzher of Hours Reactor Has Critical...........
0.00 0.00 163.902.19
- 13. Reactor Reserve Shutdown Hours..................
0.00 0.00 0.00
- 14. Hours Generator On-line..
0. 00__
0.00 159.020.30
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (HWH)........
0.00 0.00 377.611.152.00
- 17. Gross. Electrical Energy Generated (HWH)........
0.00 0.00 124.570.384.00
- 18. Net Electrical Energy Generated (HWH)........
0.00 0.00
_J19.543.416.00
- 19. Unit Service Factor......
0.00 0.00 72.85
- 20. Unit Availabilty Factor..
0.00 0.00 72.85_
- 21. Unit Capacity Factor (Using HDC Net)........
0.00 0.00 67.60
- 22. Unit capacity Factor (Using DER Net)........
0.00 0.00 66.19
- 23. Unit Forced Outage Rate..
0.00 J oo. O O' 9.99 24.' Shutdowns Scheduled Over Next 6 Honths:
NONE
- 25. If Shutdown at End of Report Period, Estimated Date of Startup
_ _ _ _ _ _ _ _ _ _. _ _..... _. _ _. _ _ _ _ _.. _. _.. _ _.. _ _ _ _ _ -. ~. _. _ _ _ _ _. _ _. _. _ _ _ _ _ _. _ _ _,
l a
Docket Non-50-3e9 Unit Name:
Haine Yankee
[
Dates' 9-29-97
. Completed By: 8.J.
Bailey j
Telephone:
i f
Report Months September, 1997
[
l NARRATIVE
SUMMARY
OF OPERATING EXPERJ.ENCWS i
a Maine Yankee 1eCFR50 license no longer authorizes operation'of the l
reactor.
l r
9 I
s 4
I r
t I
f i
?
=
4 AVERAGE DAILY UNIT POWER LEVEL FOR SEPTEMBER 1997 Docket No.:
59-399 Unit Maine Yankee Date 29/SeP/97 Completed By:
S.
J.
BAILEY Telephone:
297-798-4241 Doy Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net)
(MWe-Net) 9 1
9 16 2
9 17 9
3-9 18 9-4 9
19 9
5 9
29 9
6 9
21 9
7 9
22 9
8 9
23 9
9 9
24 9
10 9
25 9
11 9
26 9
12 9
27 9
13 9
28 9
14 9
29 9
15 9
39 9
i l
l e
UNIT SHUTDOWNS AND POWER REDUCTIONS Docket No.:
50-309 FOR SEPTEHDER 1997 Unita Haine Yankee Dato:
08/Oct/97 Completed Dy S.
J.
BAILEY l
Telephone 217-798-4241 Page
.' of 1 1
Number Date l
Type (1) i Duration (Hours)
R0ason (2) l Hothod (3)
LER #
h h
l System Ccde (4)
Component Code (S)
Couse and Corrective Action 1.
TYPE:
2.
REASON: (cont) 4.
SYSTEH CODU:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)
Entry Sheets for 2.
REASON Licensee Event Report A-Equipment Failure 3.
HETHOD:
(LER) File (NUREG.0161)
B-Haintenance or Test 1-Hanual C-Refueling 2-Hanual Scram S.
COMPONENT CODE:
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &
4-Other (Explain) as above.
License Examination