OPERATING DATA REPORT Doc? at No. : 50-309 h *. .

Date: 03/May/89 f  ;,,. .' Completed By: D. A. RIVARD L Telephone: 207-882-6321

1. Unit Name....................................... Mains Yankee

~2. Reporting Period................................ April 1989

'3. Licensed Thermal Power (MWt).................... 2630

'4. Nameplate-Rating (Gross MWe).................... 864

5. Design Electrical Rating (Net MWe).............. 825
6. Maximum Dependable Capacity (Gross MWe)......... 850 I
7. Maximum Dependable Capacity (Net M'We)........... 810
8. If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

NO CHANGES 9.L Power Level to Which Restricted, if Any (Net MWe)

10. Reasons for Restrictions, if Any:

THIS MONTH YEAR-TO-DATE CUMULATIVE 11 1 . Hours In Reporting Period 719.00 2 7 879.00

12. Number of Hours Reactor Was Critical........... 707.58 2,677.19 115,480.18
13. Reactor Reserve Shutdown '

Hours.................. 0.00 O . 00_ , 0.00

14. Hours Generator on-line.. 705.66 2,624.04 112,166.53
15. Unit Reserve Shutdown Hours.................. 0.00 0.00 _

0.00

16. Gross Thermal Energy Generated (MWH)........ 1,834,822.00 6,813,294.00 257,886,007.00
17. Gross Electrical Energy Generated (MWH)........ 623,670.00 2,314,090.00 84,402,450.00
18. Net Electrical Energy Generated (MWH)........ 604,187.00 2,229,876.00 80,718,050.00
19. Unit Service Factor...... 98.14 91.14 77.71
20. Unit Availability Factor., 98.14 91.14 77.71
21. Unit Capacity Factor (Using MDC Net)........ 103.74 95.62 70.49
22. Unit Capacity Factor (Using DER Net)........ 101.86 93.88 68.73
23. Unit Forced Outage Rate.. _ _ _

1.85 8.85 _ _ _

7.11

24. Shutdowns Scheduled Over Next 6 Months: NONE

. 2 5. If Shutdown at End of Report Period, Rstimated Date of Startup: N/A 8905180268 890510 PCR ADOCK 05000309 R PDC s

  • . L' .- Docket No: 50-309 Unit Name: Maine Yankee 3May1989' Date:

Completed By: D.A. Rivard Telephone: 207-882-6321 l

Report Month: April, 1989 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES At the beginning of the month, the unit was operating at 100% power.

On 5 April, the unit. tripped off line during. protective relay testing-on the off site electrical distribution system. The reactor was taken critical later in.the day.

On 6 April,.the main generator was phased to the grid and power raised to'100%.

On 29 April, power was reduced to 75% for turbine valve and excess flow check valve testing, and mussel control. The unit was returned to 100% power.

The unit was maintained at.100% power for the remainder of the month.

s

-AVERAGE' DAILY' UNIT POWER LEVEL 9.'- .. 1FOR APRIL'1989 u .. -

Docket No.: 50-309 l '

Unit: Maine Yankee Date: 03/May/89 Completed By: D. A. RIVARD Telephone: 207-882-6321 ,i Day. Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net) (MWe-Net) 1 ..................... 870 16 .................... 867 2 .................... 864 17: .................... 864 3 .................... 865 18 .................... 868 4 .................... 863 19 .................... 866 5 .................... 418 20 .................... 866-6 .................... 694 21 .................... 869 7 .................... 864 22 .................... 868 8 .................... 862 23 .................... 867-9 .................... 866 24 .................... 869 10 .................... 865 25 .................... 868 11 .................... 866 26 .................... 869 12 .......... ......... 866 27 .................... 866 13 .................... 868 28 .................... 867 14 .................... 867 29 .................... 715 15 .................... 867 30 .................... 860 i,

l 1

) .

1

. . _ _ _ _ _ _ _ _ _ _ _ _ _ J

UNIT SHUTDOWNS AND POWER REDUCTIONS Dockst No.- 50-309 FOR APRIL 1989 Unit: Maine Yankee Dnto: 03/May/89 Completed By: D. A. RIVARD Telephone: 207-882-6321 Page: 1 of 1 I

1 Number 4-89-11 L. R. to 75%

Date H 890405 g 890429 Type (1) J F [ S H

Duration (Hours) 13.3 0 Reason (2) [ G ll B ll Method (3) L 3 4  ;

LER # [ 89-003 [ N/A System Code (4) EA HB Component )

Code (5) j RELAYX-D VALVEX-C j A reactor trip on Power wcs reduced loss of load to 75% for turbine occurred during valve and excess protective relay flow check valve Cause and testing on the off testing, and Corrective site electrical mussel control.

Action distribution The unit was system. The unit returned to 100%

was returned to power.

full power operation.

1. TYPE: 2. REASON: (cont) 4. SYSTEM CODE:

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain) Entry Sheets for

2. REASON Licensee Event Report A-Equipment Failure 3. METHOD: (LER) File (NUREG.0161)

B-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5. ^0MPONENT CODE.

D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training & 4-Other (Explain) as above.

License Examination

.