ML20203F855

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1997 for Maine Yankee
ML20203F855
Person / Time
Site: Maine Yankee
Issue date: 11/30/1997
From: Stewart Bailey, Zinke G
Maine Yankee
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GAZ-97-12, MN-97-128, NUDOCS 9712170476
Download: ML20203F855 (5)


Text

MaineYankee PO DOX 408 i WISCASSET MAINE 04578 * (207) 6824321 December 9,1997 MN 97-128 GAZ 97-12 UNIT 1!D STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washingtoa, DC 20555

References:

(a)

License No. DPR 36 (Docket No. 50 309)

(b)

NUREG 0020, Licensed Operating Reactor Status Sunuaary Report

Subject:

Maine Yankee Monthly Statistical Report - November 1997 Gentlemen:

Enclosed please fmd the November 1997 Monthly Statistical Report for Maine Yankee.

If you have t..iy questions, please do not hesitate to contact me.

Very truly yours,

^

George A. Zinke, Manager Regulatory Affairs Enclosures c:

Mr. Ilubert Miller Mr. R. A. Rasmussen Mr. Michael T. Masnik

/

Mr. Michael K. Webb Mr. Patrick J. Dostie Mr. Uldis Vanags

g2ggunyg qf 'Y 7

R lIL,IL,lill.Hi.ll.i.I.Il.l 1,.W7MS07t le WrD J

l OPERATING DATA REPORT Decket No.:

50-309 Date:

08/Oct/97 Completed Dy 8.

J.

BAILEY Telephone:

207-798-4241 1.

Unit Name.......................................

Haine Yankee 2.

Reporting Period................................

November 1997 3.

Licensed Thermal Power (HWt)....................

_Fl00 4.

Nameplate Rating (Gross HWe)....................

920 5.

Design Electrical Rating (Net HWe)..............

870 6.

Maximum Dependable Capacity (Gross HWe).........

900 7.

Maximum Dependable Capacity (Not HWe)...........

860 8.

If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

NO CHANGES 9.

Power Level to Which Restricted, if Any (Net HWe)

10. Reasons for Restrictions, if Any:

TilIS HONTil YEAR-TO-DATE CUHULATIVE

11. Ilours In Reporting Period 720.00 7.296.00
12. Number af Ilours Reactor Was Critical...........

0.00 0.00 163 902.19 2

13. Reactor Reserve Shutdown flours..................

0.00.

0.00 0.00

14. Ilours Generator On-line..

0.00 0.00 159.020.30

15. Unit Reserve Shutdown llours..................

0.00 0.00 0.00

16. Cross Thermal Energy Generated ( HWil )........

0.00_

0.00 377.611.152.00

17. Gross Electrical Energy Generated (HNil)........

0.00 0.00 124.570,384.00

18. Net Electrical Energy Generated (HWil)........

0.00 0.00 119.543.416.00_

19. Unit Service Factor......

0.00_

0.00 72.60

20. Unit Availabilty Factor..

0.00 0.00 72.60

21. Unit Capacity Factor (Using HDC Net)........

0.00 0.00 67.37

22. Unit Capacity Factor (Uning DER Net)........

0.00 0.00 65.96

23. Unit Forced Outage Rate..

0.00 i co.cx) _

RAS

24. Shutdowns Scheduled Over Next 6 Honths:

NONE

25. If Shutdown at End of Report Period, Estimated Date of Startup

a.

Docks:% %

~>L W

\\

Unit ae &

So sit

'>.kee i

Datei

, WES Q '-

-j Complanc,4 $th _8.J.

Dailey

(

Telephones 207-798-4241 Report Month November, 1997 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES Maine Yasikee 19CFR$8 license no longer authorizes operation of the reactor.

o.

d-i

_,+e W.c sw-. Nr y

?

M r

AVRMbGE DAILY UNIT POWER LEVEL FOR NOVEMBER 1997 Docket No.59-399 Unit Maine Yankee Date:

98/Oct/97 Completed By:

S.

J. BAILEY Telephone:

297-798-4241 Dcy Avg. Daily Power Level Day Avg. Daily Power Level (HWa-Net)

(HWe-Net)

'l 9

-16 0

2 e

17 e

3 0

18 8

4 e

19 9

5 0

20 0

6 0

21 9

7 0

22 e

J 8

0 -

23 9

9 9

24 8

10 0

25 0

11 0

26 0

12 0

27 9

13 0

28 0

14 0

29 0

15 6

-30 8-

?

?

l P=q eWNM-s

-e r*ye,n.-ew- - -.

ww-ww a..

w

> e UNIT SJIUTDONNS AND PONER REDUCTIOl' Docket No.:

50-309 FOR NOVEHDER 1997 Unit Haine Yankee Date:

08/Oct/97 Completed By:

S. J.

BAILEY Telephones 207-798-4241 Page:

1 of 1 Number Date l

l l

Type (1)

Duration (flou rs )

Ronson (2)

H l

Hathod (3)

LER #

h l

System Ccdo (4)

Ccaponent Code (5)

NONE Ccuse and Corrective Action 1.

TYPE:

2. REASON: (cont) 4.

SYSTEH CODE:

(F)orced P-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data ll-Other (Explain)

Entry Sheets for 2.

REASON Licensee Event Report A-Equipment Failure

3. HETil0D:

(LER) File (NUREG,3161)

D-Maintenance or Test 1-Hanual C-Refueling 2-Hanual Scram 5.

COMPONENT CODE:

D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &

4-Other (Explain) as above.

License Examination