ML20246L235
| ML20246L235 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 03/31/1989 |
| From: | Rivard D Maine Yankee |
| To: | |
| Shared Package | |
| ML20246K982 | List: |
| References | |
| NUDOCS 8905180271 | |
| Download: ML20246L235 (2) | |
Text
i:
l Maine gankee
)
Monthly Statistical Report For March 1989 8905180271 890310 PDR ADOCK 05000309 R
PDC on$
OPERATING DATA REPORT Docket No..
50-309 Dnto:
18/Apr/89 Comploted By:
D. A.
RIVARD Telephone:
207-882-6321 1.
Unit Name.......................................
Maine Yankee 2.
Reporting Period................................
March 1989 3.
Licensed Thermal Power (MWt)....................
2630 4.
Nameplate Rating (Gross MWe)....................
864 5.
Design Electrical Rating (Net MWe)..............
825 6.
Maximum Dependable Capacity (Gross MWe).........
850 7.
Maximum Dependable Capacity (Net MWe)...........
810 l
8.
If Changes in Capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHANGES 9.
Power Level to Which Restricted, if Any (Net MWe)
- 10. Reasons for Restrictions, if Any:
.THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744.00 2,160.00
- 12. Number of Hours Reactor Was Critical...........
744.00 1,969.61 114,772.60
- 13. Reactor Reserve Shutdown Hours..................
0.00 0.00 0.00
- 14. Hours Generator On-line..
744.00 1,918.38 111,460.87
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH)........
1,954,992.00 4,978,472.00 256,051,185.00
- 17. Gross Electrical Energy Generated (MWH)........
662,240.00 1,690,420.00 83,778,780.00
- 18. Net Electrical Energy Generated (MWH)........
641,734.00 1,625,689.00 80,113,863.00
- 19. Unit Service Factor......
100.00 88.81 77.61
- 20. Unit Availability Factor..
100.00 88.81 77.61
- 21. Unit Capacity Factor (Using MDC Net)........
106.49 92.92 70.32 i
- 22. Unit Capacity Factor l
(Using DER Net)........
104.55 91.23 68.56
- 23. Unit Forced Outage Rate..
0.00 11.19 7.14 t
- 24. Shutdowns Scheduled Over Next 6 Months:
NONE_
i
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
N/A I
1
)
i i
i
_ _ _ _ _ _