Monthly Statistical Report October 1993 i

l i

i l

-1 i

l l

4 9312020298 931110 PDR ADDCK 05000309 R

PDR r

r

., J

OPERATING DATA REPORT Docket No.:

50-309 I

Date:

09/Nov/93 Completed By:

S.

J.

BAILEY Telephone

- 207-622-4868 Maine Yankee 1.

Unit Name.......................................

I October 1993 2.

Reporting Period................................

3. Licensed Thermal Power (MWt)....................

2700 920

4. Nameplate Rating (Gross MWe)....................
5. Design Electrical Rating (Net MWe)..............

870 i

6. Maximum Dependable Capacity (Gross MWe).........

900

7. Maximum Dependable Capacity (Net MWe)...........

860

8. If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

NO CHANGES

9. Power Level to Which Restricted, if Any (Net MWe)
10. Reasons for Restrictions, if Any i

THIS MONTH YEAR-TO-DATE CUMULATIVE

11. Hours In Reporting Period 745.00 7,296.00 l

I

12. Number of Hours Reactor I

Was Critical...........

549.90 5,527.80 147,293.01

13. Reactor Reserve Shutdown t

Hours..................

0.00 0.00 0.00 l

14. Hours Generator On-line..

441.90 5,371.00 143,001.00 f

15. Unit Reserve Shutdown Hours..................

0.00 0.00 0.00

16. Gross Thermal Energy Generated (MWH)........

1,025,459.00 13.836,446.00 336,989,369.00 l

17. Gross Electrical Energy Generated (MWH)........

338,968.00 4.616.128.00 110,913.588.00 l

18. Net Electrical Energy Generated (MWH)........

326.559.00 4.469,115.00 106,381.087.00

19. Unit Service Factor......

59.32 73.62 77.80 l

20. Unit Availabilty Factor..

59.32 73.62 77.80

21. Unit Capacity Factor (Using MDC Net)........

50.97 71.23 71.92

22. Unit Capacity Factor (Using DER Net)........

50.38 70.41 70.34

23. Unit Forced Outage Rate..

0.00 2.43 7.28 t

24. Shutdowns Scheduled Over Next 6 Months:

NONE l

25. If Shutdown at End of Report Period, Estimated Date of Startup:

N/A

_m.

r u

Dack0t C3:

53-399 i

Unit Names Maine' Yankee

]

l Dates 110993

[

Completed By:

S.J.

Bailey i

Telephone 207-622-4868 l

l Report Month: October, 1993 i

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES 4

l At the beginning of the month, the plant was in a refueling shutdown.

On October 9, 1993, the reactor was made critical and low power physics l

testing was commenced.

On October 9, 1993, power increase was held at less than 2% for steam generator chemistry.

On October 12, 1993, power was held at less than 2% for reactor coolant pump 83 motor oil leak.

1 On October 12, 1993, power was increased to greater than 2%.

On October 12, 1993, power increase was held at 12% for condenser air-l in-leakage investigation, and Turbine Bearing 37 temperature excursion investigation,.

On October 13, 1993, began raising power to 15%.

i On October 13, 1993, the main generator was phased to the grid.

On October 17, 1993, power was held at 78% due to "A"

circulating water box out of service for circulating water system valve repairs.

On October 18, 1993, power reached 100%.

On October 22, 1993, power was reduced to 70% for repair of heater drain pump control valve.

The unit reached 100% on October 24, 1993, and remained there for the rest of the month.

i i

I

UNIT SHUTDOWNS AND POWER REDUCTIONS Docket No.:

50-309 FOR OCTOBER 1993 Unit Maine Yankee Date:

15/Nov/93 Completed By:

S.

J.

BAILEY Telephone:

207-622-4868 Page:

1 of'1 Nuaber 930731 L.R.

to 70%

Date 930731 931022 Type (1) l S

[

F Duration (Hours) 303.1 44.1 Reason (2) l C

B li Hethod (3) l 4

l 4

LER i l

N/A l

N/A I

i System Code (4)

ZZ HH Cooponent Code (5)

N/A VALVEX-F Continuation from On October 22, previous month.

unit was reduced Unit shutdown for to 70% for repair refueling.

The of heater drain Cause and unit phased on-pump control valve 4

Corrective line October 13.

HD-A-180. The unit j

Action returned to 100%

power on October 24 and remained at 100% for the rest of the month.

1.

TYPE:

2. REASON: (cont) 4.

SYSTEM CODE:

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)

Entry Sheets for 2.

REASON Licensee Event Report A-Equipment Failure 3.

METHOD:

(LER) File (NUREG.0161) j B-Haintenance or Test 1-Manual l

C-Refueling 2-Hanual Scram 5.

COMPONENT CODE:

D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training &

4-Other (Explain) as above.

License Examination O

i 1

i AVERAGE DAILY UNIT POWER LEVEL FOR OCTOBER 1993 Docket No.:

50-309 Unit:

Maine Yankee Date:

09/Nov/93 Completed By:

S.

J.

BAILEY l

Telephone:

207-622-4868 J

Day Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Met).

(MWe-Net) 1 0

16 492 J

2 0

17 658 790 0

18 3

0 19 876 4

872 0

20 5

877 6

0 21 750 7

0 22 8

0 23 647 9

0 24 856 i

10 0

25 878 878 11 0

26 12 0

27 886 13 41 28 882 14 206 29 871 15 351 30 881 31 881

....................