Mainel7ankee y
R E t. l A BL E..E L E CT R!Gji Y. SING fL19 72 ED! SON DR:VE + AUGUSTA, MA!NE 04330 * (207) 622 4868 October 12, 1993 MN-93-92 JRH-93-206 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20555
References:
(a)
License No. DPR-36 (Docket No. 50-309)
(b) NUREG-0020, Licensed Operating Reactor Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report - September 1993 Gentlemen:
Enclosed please find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for September 1993. Please contact me should you have any questions.
Very truly yours,
. fY+
gt g f)Games R. Hebert, Manager Licensing & Engineering Support Department SJB/mwf Enclosure 1
c:
Mr. Thomas T. Martin Mr. J. T. Yerokun Mr. E. H. Trottier Mr. Patrick J. Dostie 200o 9310190232 930930 PDR ADOCK 05000309 a
""'~'*
R PDR d) f${
i i
1 1
I j
(
Maine yankee i
\\.
I
\\A i
1 i
1 i
4 1
Monthly S t a t i es t i c a l Report 1
i i
l For September 1993 i
3 i
I
OPERATING DATA REPORT Docket No.:
50-309 Date:
13/Oct/93 Completed By:
S.
J.
BAILEY Telephone 207-622-4868 1.
Unit Name.......................................
Maine Yankee 2.
Reporting Period................................
September 1993 3.
Licensed Thermal Power (HWt)....................
2700 4.
Nameplate Rating (Gross HWe)....................
920 5.
Design Electrical Rating (Net HWe)..............
870 6.
Maximum Dependable Capacity (Gross HWe).........
900 7.
Haximum Dependable Capacity (Het HWe)...........
860 8.
If Changes in Capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHANGES 9.
Power Level to Which Restricted, if Any (Net HWe)
- 10. Reasons for Restrictions, if Any:
1 THIS HONTH YEAR-TO-DATE CUHULATIVE
- 11. Hours In Reporting Period 720.00 6,551.00
- 12. Number of Hours Reactor Was Critical...........
0.00 4,977.90 146.743.11
- 13. Reactor Reserve Shutdown Hours..................
0.00 0.00 0.00
- 14. Hours Generator On-line..
0.00 4,929.10 142.559.10
- 15. Unit Reserve Shutdown Hours..................
0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (HWH)........
0.00 12.810.987.00 335,963,910.00
- 17. Gross Electrical Energy Generated (HWH)........
0.00 4.277,160.00 110,574.620.00
- 18. Net Electrical Energy Generated (HWH)........
0.00 4,142,556.00 106,054.528.00
- 19. Unit Service Factor......
0.00 75,94 77.87
- 20. Unit Availabilty Factor..
0.00 75.24 77.87
- 21. Unit Capacity Factor (Using HDC Net)........
0.00 73.53 72.01
- 22. Unit Capacity Factor (Using DER Net)........
0.00 72.68 70.42
- 23. Unit Forced Outage Rate..
0.00 2.64 7.31
- 24. Shutdowns Scheduled Over Next 6 Honths:
NONE
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
10/13/93 1
A 3
Docket No 50-309 Unit Name:
Haine Yankee Date:
100893 Completed By:
S.J.
BAILEY Telephone:
207-622-4868 i
Report Month: September, 1993 i
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES The unit was shutdown the month of September for cycle 13/14 refueling outage.
l 1
m.
1 m _.
UNIT SHUTDOWNS AND POWER REDUCTIONS Docket No.: 309 3
FOR SEPTEMBER 1993 Unit:
Maine Yankee Date:
08/Oct/93 Completed By:
S.
J.
BAILEY Telephone:
207-622-4868' Pege 1 of 1
' Number 10-93-13 Date l
930731 l
I Type (1) l S
l Duration (Hours) 720
- I Reason (2)
C Method (3) 1 LER 8 N/A l
l System Code (4)
ZZ
{
f Component
[
Code (5)
N/A Unit shutdown for j
cycle 13/14 refueling outage.
l 1
Cause-and Corrective l
Action j
1 1.
TYPE:
2.
REASON: { cont) 4.
SYSTEM CODE:
l (F)orced F-Administrative
-Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation'of Data-H-Other (Explain)
Entry Sheets for
- 2. REASON Licensee Event Report 4
A-Equipment Failure 3.
METHOD:
(LER) File (NUREG.0161) j B-Haintenance or Test 1-Manual C-Refueling 2-Manual Scram 5.
COMPONENT CODE:
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same-source E-Operator Training &
4-Other (Explain) as above.
License Examination i
I
)
I w'
i i
j a
l AVERAGE DAILY UNIT POWER LEVEL FOR SEPTEMBER.1993 Docket No.:
50-309 Unit:
Haine-Yankee Date:
08/Oct/93 Completed By:
S.
J.
BAILEY Telephone 207-622-4868 Day Avg. Daily Power Level Day Avg. Daily Power Level (HWe-Net)
(HWe-Net) 1 0
16 0
2 0
17 0
3 0
18 0
4 0
19 O
i 5
G 20 0
6 0
21 0
7 0
22 0
8 0
23 0
9 0
24 0
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
i 1