ML20059N462

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for July 1990 for Maine Yankee Atomic Power Station
ML20059N462
Person / Time
Site: Maine Yankee
Issue date: 07/31/1990
From: Hall S
Maine Yankee
To:
Shared Package
ML20059N457 List:
References
NUDOCS 9010160011
Download: ML20059N462 (1)


Text

/

l-s OPERATING DATA' REPORT Docket No. :

50-309 Date:

26/Sep/90 Cornpleted By:

S.

L.

Hall Telephone 207-622-4868 1.

Unit Name.......................................

Maine Yankee 2

R porting Per1od................................

July 1990 3.

Licensed Thermal Power (MWt)....................

2700 4

N!meplate Rating (Gross MWe)....................

890 5.

D: sign Electrical Rating (Net MWe)..............

840 6.

Maximum Dependable Capacity (Gross MWe).........

870 7

M2ximum Dependable Capacity (Net MWe)...........

830 C.

If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons

_NO CHANGES 3.

Power Level to Which Restricted, if Any (Net MWe)

10. Roesons for Restrictions, if Any THIS MONTH YEAR-TO-DATE CUMULATIVE
11. Hours In Reporting Period 744.00 5.087.00
12. Number of Hours Reactor Was Critical...........

744.00 3.098.33 124.111.31

13. R; actor Reserve Shutdown Hours..................

0.00 0.00 0.00

14. Hours Generator On-line..

723.70 3.026.30 120.698.73

! !5. Unit Reserve Shutdown Hours..................

0.00 0.00 0.00

16. Gross Thermal Energy Genurated (MWH)........

1.786.651.00 7.685.437.00 279.898.038.00 l(7. Gross Electrical Energy Generated (MWH)........

598.490.00 2.580.080.00 91.844.290.00

18. Not Electrical Energy

{

Generated (MWH)........

578.726.00 2.497.341.00 87.927.221.00 R

10. Unit Service Factor......

97.27 59.49 77.72 20 Unit Availabilty Factor..

97.27 59.49 77.72

21. Unit Capacity Factor (Using MDC Net)........

93.72 59.15 71.14

22. Unit Capacity Factor (Using DER Net)........

92.60 58.44 69.43 123. Unit Forced Outage Rate..

2.73 0.90-6.84 l

l24. Shutdowns Scheduled Over Next 6 Months:

NONE

25. If Shutdown at End of Report Period, Estimated Date of Startup:

N/A 9010160011 YUlOlO PDR ADOCK 05000309 R

PDC r

n