Monthly Operating Rept for Nov 1994 for Maine Yankee.W/
ML20149H889
Person / Time
Site: Maine Yankee
Issue date: 11/30/1994
From: Stewart Bailey, Hebert J
Maine Yankee
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JRH-94-286, MN-94-120, NUDOCS 9412300240
Download: ML20149H889 (6)


Text

. -...

p MaineYankee AEttABLE ELECTRICITY SINCE 1972 329 BATH ROAD + BRUNSWICK, MAINE 04o11 * (207) 798-4100

=

December 13, 1994 MN-94-120 JRH-94-286 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20555

References:

(a)

License No. DPR-36 (Docket No. 50-309)

(b) NUREG-0020, Licensed Operating Reactor Status Summary Report

Subject:

Maine Yankee Monthly Statistical Report - November 1994 Gentlemen:

Enclosed please find the November 1994 Monthly Statistical Report for Maine Yankee.

If you have any questions, please do not hesitate to contact me.

Very truly yours, M

6James R. Hebert, Manager Licensing & Engineering Support Department SJB/ jag i

Enclosure c:

Mr. Thomas T. Martin Mr. J. T. Yerokun Mr. E. H. Trottier Mr. Patrick J. Dostie L \\94MN\\94120

/

9412300240 941130 ADOCK0500g9

}

DR

l e'

i Maine Yankee MONTHLY STATISTICAL REPORT November 1994

=

I Dock-L Do 54-W*

OPERATING DATA REPORT

+

Date:

12 / D e c / '+ 4 Completed By:

S.

J.

BAILEY Telephone:

207-798-4241 1.

Unit Name.................

Maine Yankee

'2.

Reporting Period................................

November 1994 3.

Licensed Thermal Power (HWt)....................

2700 4.

Nameplate Rating (Gross HWe)....................

920 5.

Design Electrical Rating-(Net HWe)..............

870 6.

Maximum Dependable Capacity (Gross HWe).........

900 7.

Maximum Dependable Capacity (Net HWe)...........

860 8.

If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

a NO CilANGES 9 ~. Power Level to Which R'estricted, if Any (Net flWe)

10. Reasons for Restrictions, if Any:

THIS HONTH YEAR-TO-DATE CUHULATIVE

11. Hours In Reporting Period 720.00 8,016.00
12. Number of Hours Reactor Was Critical...........

631.40 7.216.10 155.973.11

13. Reactor Reserve Shutdown Hours...................

0.00 0.00 0.00 j

14. Hours Generator On-line..

590.45 6,996.15 151,461.15

15. Unit Reserve Shutdown Hours..................

0.00 0.00 0.00

16. Gross Thermal Energy Generated (HWH)........

1.497,491.00 18,424,283.On 359,320,4?7.00

17. Gross Electrical Energy Generated (HWH)........

503.721.00 6.176.237.00 118.400,807.00

18. Net Electrical Energy Generated (HWH)........

483,860.00 5.980,277.On 113,63?.115.00

19. Unit Service Factor......

82.01 87.28 78.16

20. Unit Availabilty Factor..

R' 01 87.28 78.36

21. Unit Capacity Pact.or (Using HDC Net)...

78.11

85. 7'i 72.76
22. Unit C.ipacity Facto r (Using DER Net)........

77.?4 R 'i. 7 5 71.?O

23. Unit Forced Outage Rate..

18,00 12.72 7.49

24. Shutdowns Scheduled Over Next 6 Honths:

Date Type Duration 2/25/95:

Rsfuelinq 9 weeks 2E. If Chutdcun 4t End of H e t' o r t Perio1, Estimated Dita of Startut'- _

N/A m

Docket. No:

50-309 Unit Name liaine Yankee Date:

941212 Completed By:

3.J.

BAII.EY Telephone:

207-798-4241 Report Month: November, 1994 NARRATIVE SUHHARY OP OPERATING EXPERIENCES On November 2, 1994, the unit was manually shutdown due to steam leak on cross-under pipe leading to C-HSR.

The unit returned to 10 0 "r, on November 9,

1994.

On November 17, 1994, the unit was reduced to S5?, due to turbine driven feedpump, P-2C, lube oil system failure, and failure of motor driven feedpump P-2B to start and packing leak on FW-H-20 after removing P -- 2 C from service.

The unit r e tu rn e tl to 100's on November 19, 1994.

l

..~ -

o UNIT SituTCOWild AND POWER REDUCTIONS Docket.

No.-

50-309 FOH NOVEM B El< 1994 Unit:

Hoine Yenkee tat e 14 / D e c / '3 4 Completed Byi.

3.

J.

BAILEY Telephone:

207-798-4241 Page:

1 ot 1 g

7 Number 04-94-14 j

L.R.

TO 551.

Date ll 941102 l

941117

l j

F

[

F d

Type (1) l Duration 0

ll (Hours) 129.6 j

-Reason (2) ll A

l:

A ll Hethod (3) jl 1

Q 4

il LER #

ll N/A N/A

l System Code-(4)

HB CH Component Code (5)

PIPEXX-E PUMPXX-B Hanual shutdown Turbine driven i

due to steam leak

feedpump, P-- 2 C,

l on cross-under lube oil cystem pipe leading to failuce. Failure Cause and C-HCR.

of motor driven C o r r e c t. i v e l

feedpump P-2B to Ac t. i o n n

start and packing Iafterremoving leak on PW-H-20 P-2C from i

service.

I 1

a _-

1.

TYPE:

2.

It E A.iO N : (cont' 4.

GYSTCit CODE:

(Florced P - 8.dm i n i s t r a t iv e E x h i b i t,

'i - I n:: t r u c t io n s (S)cheduled G-Op-rational Stror Lor Preparation of D a '.a H -O t.h e r ( E::p l a in )

Entry Sheets for REASON Licent:ee Event R e p o r t.

A-Equipment Failure 3.

HUTHOD:

(LSR) File (HUREG.0161)

U -lf a i n t.e nanc e or Tcat 1-Manual C - !!e f u e l i n g "l - H a n u a l Scram t

'OMPONENT COCEt D-Itegulat.ory Restriction J-Automatic Scram E::h ib i t I ~ 3 un -

n:tto E-Opetstor Ttiining 5 4 -O tt.e r ( n.< p l a i n )

as above, l.i c e n e r Examimition

e.

e AVUlt?.GK D A LLY IJII.I T P O W U i. L E V E L POR NOVE!!BER 1994 Docket No.:

50-309 tin i t.

Maine Yankee Date:

08/Dec/94 Completed By.

G.

J.

Ball.UY Teleptione 207-798-4241 Day Avg. Daily Power Level Day Avg. Daily Power Level (HWe-Net)

(HWe-Net) 1 8 6 ')

16 877 2

82 17 648 3

0 18 478 4

0 19 809 5

0 20 876 6

0 21 878 7

103 22 877 8

570 23 877 9

818 24 878 10 879 25 874 11 875 26 877 12 880 27 878 13 876 28 875 14 878 29 877 l 'a 879 30 873

..