ML20059N464

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Aug 1990 for Maine Yankee Atomic Power Station
ML20059N464
Person / Time
Site: Maine Yankee
Issue date: 08/31/1990
From: Hall S
Maine Yankee
To:
Shared Package
ML20059N457 List:
References
NUDOCS 9010160013
Download: ML20059N464 (1)


Text

/

OPERATING DATA REPORT DockOt No.:

50-309 Date:

26/Sup/90 Comp'.eted By:

S.

L.

Hall Telephone:

207-622-4868 1.

Unit Name.......................................

Maine' Yankee 2.

R2 porting Period................................

Aunust 1990

3. Licensed Thermal Power (MWt)....................

2700 4.

Nnmeplate Rating (Gross MWe)....................

890 5.

Design Electrical Rating (Net MWe)..............

840 l

6. Maximum Dependable Capacity (Gross MWe).........

870 7.

Maximum Dependable Capacity (Net MWe)...........

- 830 C.

If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

NO CHANGES 9.

Power Level to Which Restricted, if Any (Net MWe)

10. ROasons for Restrictions, i f Any i

THIS MONTH YEAR-TO-DATE CUMULATIVE r

11. Hours In Reporting Period 744.00 5.831.00
12. Number of Hours Reactor 3

Was Critical...........

744.00

13. ROactor Reserve Shutdown 3.842.33 124.855.31 Hours..................

0.00 0.00 0.00

14. Hours Generator On-line..

585.90 3.612.20 121.284.63

- 15. Unit Reserve Shutdown Hours..................

0.00 0.00 0.00 16 Gross Thermal Energy Generated (MWH)........

1.414.733.00

.9.100.170.00 281.312.771.00

17. Gross Electrical Energy Generated (MWH)........

472.870.00 3.052.950.00-92.317.160.00

18. Nat Electrical Energy Generated (MWH)........

457.145.00 2.954.486.00

__88.384.366.00 R

19. Unit Service Factor......

78.75 61.95_

77.72

20. Unit Availabilty Factor..

78.75 61.95 77.72

21. Unit Capacity Factor (Using MDC Net)........

74.03 61.05 71.15

22. Unit Capacity Factor (Using DER Net)........

73.15 60.32 69.45

23. Unit Forced Outage Rate..

0.00 0.75 6.81

24. Shutdowns Scheduled Over Next 6 Months: _NONE
25. If Shutdown at End of Report Period, Estimated Date of Startup:

N/A 9010160013 901010 PDR ADOCK 05000309 R

PDC

,