ML20116K760: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_ .._ ..._ . ._
    ~.
i l
CENTERIOR ENERGY Donald C. Shetton                                                        300 Madison Avenue Vee Pre 9 dent Nuclear                                                    Toledo, OH A36520001 l                      Davis Besse                                                              (419)249 2300 Docket Number 50-346 License Number NPP-3 Setial Number 2081 November 13, 1992 lini ted States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Subj ec t :      License Amendment Request t a Inctease the Reactor Protection System (RPS) and Anticipatory Reactor Trip System (ARTS)
Channel Functional Test Surveillance Interval and Channel Bypass Allowed-Out-of-Service Time Gentlemen:
Enclosed is an application for an amendment to the Davis-Besse Nuclear Povet Station, Unit 1 (DBNPS), Operating License Number NPF-3, Appendix A., Technical Specifications (TS).          The proposed changes involve TS 3/4.3.1, " Reactor Protection System (RPS) Instrumentation," and TS 3/4.3.2.3, " Anticipatory Reactor Trip System Instrumentation."
The main purpose of the proposed changes is to implement the NRC-approved Babcock and Vilcox (B&V) Topical Report, BAV-10167, l                        " Justification for Increasing the Reactor Trip System On-Line Test Intervals," and supplements, for the DBNPS. The proposed changes revise TS 3/4.3.1, " Reactor Protection System Instrumentation," t.nd 3/4.3.2.3, " Anticipatory Reactor Trip System Instrumentation," tot
: 1. Increase the channel functional test surveillance test interval for most RPS and ARTS instrument channels.
: 2. Allow plant operation to continue indefinitely with one RPS l                                      instrument channel placed in bypass, t
    '                            3-    ^dd "" "*' " St^t***"'    t  P"'*it c "ti""*d Per^ti " I r 'a 1N04G                              hours with two RPS channels inoperable.
: 4. Remove channel functional test surveillance requirements for source and intermediate range neutron flux instrumentation.
                                                                                                      /
opemnng comoames
                                                                                                  /vf)I o
Cwetor.0 E;ectne IHummahng      9211170363 921113                                      //
bedo Edison                    PDR  ADOCK 05000346 p                  PDR
 
l      .'  Docket Number 50-346 License Number NPF-3 Serial Number 2081 Page 2
: 5. Decrease the channel calibration surveillance test interval for the High Flux / Number of Reactor Coolant Pumps On trip from once every eighteen months to quarterly.
: 6. Correct a typographical error in the numbering of page 3/4 3-30c.
Since these Technical Specification changes vould decrease the tikelihood of a spurious channel trip causing a reactor trip with one
;            O strument channel inoperable, and reduce manhours expended on performing channel functional tests, Toledo Edison requests that the Nhc appt ove these changes by May 30, 1993.
Il you have any questions regarding this amendment request, please l            contact Mr. Robert V. Schrauder, Manager - Nuclear Licensing, at (419) 249-2366.
l l
Very tiuly yours, I
i
                ' ,/    ,-                  f l                            /
l Enc os te /
l l            cc:    A. B. Davis, Regional Administrator, NRC Region III
:                    J. B. Hopk. ins, NRC/NRR DB-1 Senior Project Manager S. Stasek, NRC Region III, DB-1 Senior Resident Inspector J. R. Villiams, Chief of Staff, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)
Utility Radiological Safety Board l
l
                                                                                            -}}

Latest revision as of 12:37, 13 July 2020

Forwards Application for Amend to License NPF-3,changing TS 3/4.3.1, RPS Instrumentation & 3/4.3.2.3, Anticipatory RTS Instrumentation, to Implement NRC-approved B&W Topical Rept BAW-10167
ML20116K760
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/13/1992
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116K762 List:
References
2081, NUDOCS 9211170363
Download: ML20116K760 (2)


Text

_ .._ ..._ . ._

~.

i l

CENTERIOR ENERGY Donald C. Shetton 300 Madison Avenue Vee Pre 9 dent Nuclear Toledo, OH A36520001 l Davis Besse (419)249 2300 Docket Number 50-346 License Number NPP-3 Setial Number 2081 November 13, 1992 lini ted States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Subj ec t : License Amendment Request t a Inctease the Reactor Protection System (RPS) and Anticipatory Reactor Trip System (ARTS)

Channel Functional Test Surveillance Interval and Channel Bypass Allowed-Out-of-Service Time Gentlemen:

Enclosed is an application for an amendment to the Davis-Besse Nuclear Povet Station, Unit 1 (DBNPS), Operating License Number NPF-3, Appendix A., Technical Specifications (TS). The proposed changes involve TS 3/4.3.1, " Reactor Protection System (RPS) Instrumentation," and TS 3/4.3.2.3, " Anticipatory Reactor Trip System Instrumentation."

The main purpose of the proposed changes is to implement the NRC-approved Babcock and Vilcox (B&V) Topical Report, BAV-10167, l " Justification for Increasing the Reactor Trip System On-Line Test Intervals," and supplements, for the DBNPS. The proposed changes revise TS 3/4.3.1, " Reactor Protection System Instrumentation," t.nd 3/4.3.2.3, " Anticipatory Reactor Trip System Instrumentation," tot

1. Increase the channel functional test surveillance test interval for most RPS and ARTS instrument channels.
2. Allow plant operation to continue indefinitely with one RPS l instrument channel placed in bypass, t

' 3- ^dd "" "*' " St^t***"' t P"'*it c "ti""*d Per^ti " I r 'a 1N04G hours with two RPS channels inoperable.

4. Remove channel functional test surveillance requirements for source and intermediate range neutron flux instrumentation.

/

opemnng comoames

/vf)I o

Cwetor.0 E;ectne IHummahng 9211170363 921113 //

bedo Edison PDR ADOCK 05000346 p PDR

l .' Docket Number 50-346 License Number NPF-3 Serial Number 2081 Page 2

5. Decrease the channel calibration surveillance test interval for the High Flux / Number of Reactor Coolant Pumps On trip from once every eighteen months to quarterly.
6. Correct a typographical error in the numbering of page 3/4 3-30c.

Since these Technical Specification changes vould decrease the tikelihood of a spurious channel trip causing a reactor trip with one

O strument channel inoperable, and reduce manhours expended on performing channel functional tests, Toledo Edison requests that the Nhc appt ove these changes by May 30, 1993.

Il you have any questions regarding this amendment request, please l contact Mr. Robert V. Schrauder, Manager - Nuclear Licensing, at (419) 249-2366.

l l

Very tiuly yours, I

i

' ,/ ,- f l /

l Enc os te /

l l cc: A. B. Davis, Regional Administrator, NRC Region III

J. B. Hopk. ins, NRC/NRR DB-1 Senior Project Manager S. Stasek, NRC Region III, DB-1 Senior Resident Inspector J. R. Villiams, Chief of Staff, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)

Utility Radiological Safety Board l

l

-