NRC 2004-0095, August 2004 Monthly Operating Report for Point Beach Nuclear Plant Units 1 and 2: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Committed to Nuclear Excellence                                                  Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC September 15, 2004                                                                          NRC 2004-0095 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report and Revision to Unit 1 Operating Data Reports
 
==References:==
: 1)          Letter from  NMC    to  NRC dated May 11, 2004 (NRC 2004-0049)
: 2)  Letter from  NMC    to  NRC dated June 4, 2004 (NRC 2004-0061)
: 3)  Letter from  NMC    to  NRC dated July 14, 2004 (NRC 2004-0074)
: 4)  Letter from  NMC    to  NRC dated August 12, 2004 (NRC 2004-0080)
In accordance with Point Beach Nuclear Plant (PBNP) Technical Specifications 5.6.3, Enclosure 1 contains the Monthly Operating Report for August 2004 for PBNP, Units 1 and 2.
In Reference 1, the number of reactor critical hours was incorrectly reported. This error was generated due to discrepancies in the definition of what constitutes the unit shutdown time for calculating the number of hours the reactor was critical. This discrepancy added 0.2 hours to the number of Unit 1 reactor critical hours for April 2004 and subsequent year to date reactor critical hours.
Enclosure 2 contains the revised Operating Data Reports showing the correct number of hours the reactor was critical for the months of April through July. This error was discovered prior to generation of the August 2004 Monthly Operating Report. This error does not affect the Unit 2 Operating Data Reports.
This letter contains no new commitments and no revisions to existing commitments.
Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC 6590 Nuclear Road
* Two Rivers, Wisconsin 54241 Telephone: 920.755.2321                                  ___1
 
Document Control Desk Page 2 Enclosures (2) cc:  Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center
 
ENCLOSURE I AUGUST MONTHLY OPERATING REPORT 4 pages follow
 
OPERATING DATA REPORT DOCKET NO. 0    50-266 UNIT NAME      POINT BEACH NUCLEAR PLANT - UNIT 1 DATE            09/02/04 COMPLETED BY    Kim M. Locke TELEPHONE      920-755-6420 REPORTING PERIOD        August - 2004
: 1. DESIGN ELECTRICAL RATING (MWE-NET)                        522.0
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)                    516.0 MONTH      YEAR TO DATE          CUMULATIVE
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL                      744.0            4,295.4            244,441.3
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE                744.0            4,257.7            240,854;4'
: 5. UNIT RESERVED SHUTDOWN HOURS                                0.0                0.0                846.9
: 6. NET ELECTRICAL ENERGY (MWH)                          380,023.5        2,132,723.0        112,027,035.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
 
UNIT SHUTDOWNS DOCKET NO.          50-266 UNIT NAME          POINT BEACH NUCLEAR PLANT - UNIT 1 DATE                09/15/04 COMPLETED BY        Kim M. Locke TELEPHONE          920-755-6420 REPORTING PERIOD: Auaust 2004 (Month/Year)
TYPE                                                METH      OF CAUSE/CORRECTIVE NO.          DATE        F: FORCED            DURATION          REASON (1)        SHUTTING      ACTIONS S: SCHEDULED          (HOU)                                DOWN (2)      COMMENTS N/A          N/A          N/A                  N/A              N/A                N/AN/A (1) Reason                                            (2) Method A. Equipment Failure (Explain)                        1. Manual B. Maintenance or Test                                2. Manual Trip/Scram C. Refueling                                          3. Automatic Trip/Scram D. Regulatory Restriction                            4. Continuation E. Operator Training/license Examination              5. Other (Explain)
F. Administrative G. Operational Error (Explain)
H. Other (Explain)
 
==SUMMARY==
Unit 1 average daily power for the month of August was 510.8 MWe.
There were no LERs issued in August for Unit 1.
 
OPERATING DATA REPORT DOCKET NO.      50-301 UNIT NAME      POINT BEACH NUCLEAR PLANT - UNIT 2 DATE            09/02/04 COMPLETED BY    Kim M. Locke TELEPHONE      920-755-6420 REPORTING PERIOD        August - 2004
: 1. DESIGN ELECTRICAL RATING (MWE-NET)                        522.0
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)                    518.0 MONTH      YEAR TO DATE          CUMULATIVE
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL                      744.0            5,779.9            239,127.6
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE                744.0            5,744.9            235,981.7
: 5. UNIT RESERVED SHUTDOWN HOURS                                0.0                0.0                302.2
: 6. NET ELECTRICAL ENERGY (MWH)                          383,318.5        2,972,770.0        111,473,851.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
 
UNIT SHUTDOWNS DOCKET NO.          50-301 UNIT NAME            POINT BEACH NUCLEAR PLANT - UNIT 2 DATE                09/15/04 COMPLETED BY        Kim M. Locke TELEPHONE            920-755-6420 REPORTING PERIOD: Auzust 2004 (MonthiYear)
TYPEMETHD                                    OFCAUSE/CORRECTIVE NO.          DATE        F: FORCED            DUT              REASON (1)        SHUTTING      ACTIONS S: SCHEDULED          (HOURS)                              DOWN (2)      COMMENTS N/A          N/A        N/A                    N/A              N/A                N/A          N/A (1) Reason                                            (2) Method A. Equipment Failure (Explain)                        l. Manual B. Maintenance or Test                                2. Manual Trip/Scram C. Refueling                                          3. Automatic Trip/Scram D. Regulatory Restriction                            4. Continuation E. Operator Training/license Examination              5. Other (Explain)
F. Administrative G. Operational Error (Explain)
H. Other (Explain)
 
==SUMMARY==
Unit 2 average daily power for the month of August was 515.2 MWe.
There were no LERs issued in August for Unit 2.
 
ENCLOSURE 2 REVISED UNIT 1 APRIL - JULY 2004 MONTHLY OPERATING REPORT 4 pages follow
 
OPERATING DATA REPORT DOCKET NO.      50-266 UNIT NAME      POINT BEACH NUCLEAR PLANT - UNIT 1 DATE            08/18/04 COMPLETED BY  Kim M. Locke TELEPHONE      920-755-6420 REPORTING PERIOD        April - 2004
: 1. DESIGN ELECTRICAL RATING (MWE-NET)                      522.0
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)                    516.0 MONTH      YEAR TO DATE          CUMULATIVE
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL                      50.2              2,234.2            242,380.1
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE                49.5              2,233.5            238,830.2
: 5. UNIT RESERVED SHUTDOWN HOURS                              0.0                  0.0                846.9
: 6. NET ELECTRICAL ENERGY (MWH)                          20,584.5          1,130,453.0        111,024,765.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
 
V OPERATING DATA REPORT DOCKET NO.      50-266 UNIT NAME      POINT BEACH NUCLEAR PLANT - UNIT I DATE            08/18/04 COMPLETED BY    Kim M. Locke TELEPHONE      920-755-6420 REPORTING PERIOD        May - 2004
: 1. DESIGN ELECTRICAL RATING (MWE-NET)                      522.0
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)                    516.0 MONTH      YEAR TO DATE          CUMULATIVE
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL                      0.0              2,234.2            242,380.1
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE                  0.0              2,233.5            238,830.2
: 5. UNIT RESERVED SHUTDOWN HOURS                              0.0                  0.0                846.9
: 6. NET ELECTRICAL ENERGY (MWH)                                0.0          1,128,487.0        111,022,799.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
 
OPERATING DATA REPORT DOCKET NO.      50-266 UNIT NAME      POINT BEACH NUCLEAR PLANT - UNIT I DATE            08/18/04 COMPLETED BY    Kim M. Locke TELEPHONE      920-755-6420 REPORTING PERIOD        June - 2004
: 1. DESIGN ELECTRICAL RATING (MWE-NET)                        522.0
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)                    516.0 MONTH      YEAR TO DATE          CUMULATIVE
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL                      573.2            2,807.4            242,953.3
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE                536.2            2,769.7            239,366.4
: 5. UNIT RESERVED SHUTDOWN HOURS                                0.0                0.0                846.9
: 6. NET ELECTRICAL ENERGY (MWH)                          245,574.5        1,374,061.5        111,268,373.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
 
OPERATING DATA REPORT DOCKET NO.      50-266 UNIT NAME      POINT BEACH NUCLEAR PLANT - UNIT 1 DATE            08/18/04 COMPLETED BY  Kim M. Locke TELEPHONE      920-755-6420 REPORTING PERIOD        July - 2004
: 1. DESIGN ELECTRICAL RATING (MWE-NET)                        522.0
: 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)                    516.0 MONTH      YEAR TO DATE          CUMULATIVE
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL                      744.0            3,551.4            243,697.3
: 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE                744.0            3,513.7            240,110.4
: 5. UNIT RESERVED SHUTDOWN HOURS                                0.0                0.0                846.9
: 6. NET ELECTRICAL ENERGY (MWH)                          378,638.0        1,752,699.5        111,647,011.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997}}

Latest revision as of 12:00, 24 March 2020

August 2004 Monthly Operating Report for Point Beach Nuclear Plant Units 1 and 2
ML042660437
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/15/2004
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0095
Download: ML042660437 (12)


Text

Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC September 15, 2004 NRC 2004-0095 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report and Revision to Unit 1 Operating Data Reports

References:

1) Letter from NMC to NRC dated May 11, 2004 (NRC 2004-0049)
2) Letter from NMC to NRC dated June 4, 2004 (NRC 2004-0061)
3) Letter from NMC to NRC dated July 14, 2004 (NRC 2004-0074)
4) Letter from NMC to NRC dated August 12, 2004 (NRC 2004-0080)

In accordance with Point Beach Nuclear Plant (PBNP) Technical Specifications 5.6.3, Enclosure 1 contains the Monthly Operating Report for August 2004 for PBNP, Units 1 and 2.

In Reference 1, the number of reactor critical hours was incorrectly reported. This error was generated due to discrepancies in the definition of what constitutes the unit shutdown time for calculating the number of hours the reactor was critical. This discrepancy added 0.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to the number of Unit 1 reactor critical hours for April 2004 and subsequent year to date reactor critical hours.

Enclosure 2 contains the revised Operating Data Reports showing the correct number of hours the reactor was critical for the months of April through July. This error was discovered prior to generation of the August 2004 Monthly Operating Report. This error does not affect the Unit 2 Operating Data Reports.

This letter contains no new commitments and no revisions to existing commitments.

Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321 ___1

Document Control Desk Page 2 Enclosures (2) cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center

ENCLOSURE I AUGUST MONTHLY OPERATING REPORT 4 pages follow

OPERATING DATA REPORT DOCKET NO. 0 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 09/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD August - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,295.4 244,441.3
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 4,257.7 240,854;4'
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 380,023.5 2,132,723.0 112,027,035.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 09/15/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Auaust 2004 (Month/Year)

TYPE METH OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOU) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/AN/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 1 average daily power for the month of August was 510.8 MWe.

There were no LERs issued in August for Unit 1.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 09/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD August - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,779.9 239,127.6
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 5,744.9 235,981.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 383,318.5 2,972,770.0 111,473,851.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 09/15/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Auzust 2004 (MonthiYear)

TYPEMETHD OFCAUSE/CORRECTIVE NO. DATE F: FORCED DUT REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) l. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of August was 515.2 MWe.

There were no LERs issued in August for Unit 2.

ENCLOSURE 2 REVISED UNIT 1 APRIL - JULY 2004 MONTHLY OPERATING REPORT 4 pages follow

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD April - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 50.2 2,234.2 242,380.1
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 49.5 2,233.5 238,830.2
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 20,584.5 1,130,453.0 111,024,765.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

V OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT I DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2,234.2 242,380.1
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 0.0 2,233.5 238,830.2
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 0.0 1,128,487.0 111,022,799.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT I DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 573.2 2,807.4 242,953.3
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 536.2 2,769.7 239,366.4
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 245,574.5 1,374,061.5 111,268,373.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 08/18/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD July - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,551.4 243,697.3
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 3,513.7 240,110.4
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 378,638.0 1,752,699.5 111,647,011.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997