ML101170575: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML101170575
| number = ML101170575
| issue date = 05/05/2010
| issue date = 05/05/2010
| title = 04/08/2010-Summary of Teleconference with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information (TAC Nos. MC4694 and MC4695)
| title = Summary of Teleconference with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information
| author name = Sanders C
| author name = Sanders C
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1
Line 26: Line 26:
OF APRIL 8,2010, TELECONFERENCE WITH DNC TO DISCUSS GENERIC LETTER 2004-02 SUPPLEMENTAL RESPONSE REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC4694 AND MC4695)
OF APRIL 8,2010, TELECONFERENCE WITH DNC TO DISCUSS GENERIC LETTER 2004-02 SUPPLEMENTAL RESPONSE REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC4694 AND MC4695)
On April 8, 2010, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Dominion Nuclear Connecticut, Inc.
On April 8, 2010, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Dominion Nuclear Connecticut, Inc.
(DNC). The purpose of the meeting was to discuss remaining issues identified during NRC staff review of the Millstone Power Station, Unit Nos. 2 and 3 (MPS2 and MPS3, respectively) supplemental response to Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors." The meeting was intended to give DNC the opportunity to explain its proposed approach for responding to the NRC staff's request for additional information (RAI) dated February 4, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No.
(DNC). The purpose of the meeting was to discuss remaining issues identified during NRC staff review of the Millstone Power Station, Unit Nos. 2 and 3 (MPS2 and MPS3, respectively) supplemental response to Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors." The meeting was intended to give DNC the opportunity to explain its proposed approach for responding to the NRC staff's request for additional information (RAI) dated February 4, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100070068). The meeting was also intended to give the NRC staff the opportunity to provide feedback regarding the licensee's proposed approach and to provide a mechanism for the NRC and DNC to come to mutual agreement on the remaining steps toward resolution of the outstanding GL 2004-02 issues for MPS2 and MPS3.
ML100070068). The meeting was also intended to give the NRC staff the opportunity to provide feedback regarding the licensee's proposed approach and to provide a mechanism for the NRC and DNC to come to mutual agreement on the remaining steps toward resolution of the outstanding GL 2004-02 issues for MPS2 and MPS3.
No proprietary information was discussed at the meeting. No members of the public were in attendance. A list of attendees is provided in the enclosure.
No proprietary information was discussed at the meeting. No members of the public were in attendance. A list of attendees is provided in the enclosure.
The licensee provided draft responses to the NRC staff's remaining issues for the April 8, 2010, teleconference (ADAMS Accession No. ML100980415).
The licensee provided draft responses to the NRC staff's remaining issues for the April 8, 2010, teleconference (ADAMS Accession No. ML100980415).
Line 62: Line 61:


As stated cc w/encls: Distribution via Listserv DISTRIBUTION:
As stated cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpll-2 Resource RidsOgcRp Resource RidsNrrPMMillstone Resource RidsNrrLAABaxter Resource RidsRgnlMailCenter Resource LTrocine, EDO Region 1 CSteger, NRR SSmith, NRR MScott, t\lRR PKlein, NRR MYoder, NRR "ILehning, NRR ADAMS Accession Nos.: Package Meeting Notice/ML100820422; Meeting HandoutlML1009804150 , M  ee rIng SummaryJIML101170575 OFFICE DORLlLPL1-2/PM            DORLlLPL 1-2/LA NRRISSIB/BC DORLlLPL 1-2/BC NAME      CSanders              ABaxter                MScott        HChernoff REnnis for DATE      5/4/10                5/4/10                5/4/10        5/5/10
PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpll-2 Resource RidsOgcRp Resource RidsNrrPMMillstone Resource RidsNrrLAABaxter Resource RidsRgnlMailCenter Resource LTrocine, EDO Region 1 CSteger, NRR SSmith, NRR MScott, t\lRR PKlein, NRR MYoder, NRR "ILehning, NRR ADAMS Accession Nos.: Package Meeting Notice/ML100820422; Meeting HandoutlML1009804150 , M  ee rIng SummaryJIML101170575 OFFICE DORLlLPL1-2/PM            DORLlLPL 1-2/LA NRRISSIB/BC DORLlLPL 1-2/BC NAME      CSanders              ABaxter                MScott        HChernoff REnnis for DATE      5/4/10                5/4/10                5/4/10        5/5/10 Official Record Copy}}
                                          ..
Official Record Copy}}

Latest revision as of 18:18, 21 March 2020

Summary of Teleconference with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information
ML101170575
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/05/2010
From: Sanders C
Plant Licensing Branch 1
To:
Sandeers, Carleen, NRR/DORL, 415-1603
References
GL-04-002, TAC MC4694, TAC MC4695, FOIA/PA-2011-0115
Download: ML101170575 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 5, 2010 LICENSEE: Dominion Nuclear Connecticut, Inc. (DNC)

FACILITY: Millstone Power Station, Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF APRIL 8,2010, TELECONFERENCE WITH DNC TO DISCUSS GENERIC LETTER 2004-02 SUPPLEMENTAL RESPONSE REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC4694 AND MC4695)

On April 8, 2010, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Dominion Nuclear Connecticut, Inc.

(DNC). The purpose of the meeting was to discuss remaining issues identified during NRC staff review of the Millstone Power Station, Unit Nos. 2 and 3 (MPS2 and MPS3, respectively) supplemental response to Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors." The meeting was intended to give DNC the opportunity to explain its proposed approach for responding to the NRC staff's request for additional information (RAI) dated February 4, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100070068). The meeting was also intended to give the NRC staff the opportunity to provide feedback regarding the licensee's proposed approach and to provide a mechanism for the NRC and DNC to come to mutual agreement on the remaining steps toward resolution of the outstanding GL 2004-02 issues for MPS2 and MPS3.

No proprietary information was discussed at the meeting. No members of the public were in attendance. A list of attendees is provided in the enclosure.

The licensee provided draft responses to the NRC staff's remaining issues for the April 8, 2010, teleconference (ADAMS Accession No. ML100980415).

The following summarizes the discussion of each proposed response:

1.0 Millstone Power Station, Unit NO.2 1.1 Request For Additional Information No.3 The NRC staff stated that the proposed response is acceptable. However, the licensee should include further information (e.g., type of material and thickness, distance above the strainer, whether it covers the entire strainer or overhangs it, and qualitative structural loading design criteria) to describe the cover plate in the final response. The licensee should also state whether the cover plate is safety related.

-2 1.2 Request For Additional Information No.6 The NRC staff stated that DNC should clarify the amount of debris added to the Rig 89 test in its response. DNC stated during the meeting that the Rig 33 test established a basis for a thin bed, then more debris was added to validate that additional head loss did not occur. DNC further stated that the Rig 89 fiber amount used is the Rig 33 amount minus the final Rig 33 debris addition. DNC stated that it will validate the previous statements are consistent with Table 1 of their response, "Millstone 2 Test Debris Load Comparisons between Rig 89 and 33," and will revise the table as necessary.

The NRC staff also stated that the information on scaling between the tests was extraneous and added confusion to the response. The licensee stated that it would remove this information.

1.3 Request For Additional Information Nos. 12 and 13 The NRC staff stated that the proposed responses are acceptable.

1.4 Request For Additional Information Nos. 14 and 15 The NRC staff stated that they would further consider the response and provided feedback at a public teleconference held on April 20, 2010.

2.0 Millstone Power Station, Unit No.3 2.1 Request For Additional Information No.6 The NRC staff stated that part of the proposed response was acceptable. It was determined that the remaining issues would need further discussion.. These issues are related to the test methods for head loss. A follow-up public teleconference will be scheduled to discuss these issues; the call is tentatively planned for May 2010.

Specific sub-item status:

The NRC staff stated that the proposed responses to items 1, 2, and 5 of RAI No.6 are acceptable. Items 3, 4, and 6 are not resolved, and the licensee is considering its path forward. The NRC staff stated the proposed response to item 7 is acceptable, although the NRC staff does not believe that an adequate case has been made to justify that Rig 33 is not representative of MPS3.

2.2 Request For Additional Information No.9 The NRC staff stated that the proposed response is acceptable.

2.3 Request For Additional Information Nos. 14 and 15 The NRC staff stated that the proposed responses are acceptable.

-3 2.4 Request For Additional Information Nos. 16 and 17 The NRC staff stated that they would further consider the response and provided feedback at a public teleconference held on April 20, 2010.

If you have any questions, please contact me at 301-415-1603.

Si7!:J Carleen J. San e , Project Ma Plant Licensin B anch 1-2 Division of Op r ting Reactor Licensing Office of Nucl Reactor Regulation Docket Nos. 50-336 and 50-423

Enclosure:

As stated cc w/encls: Distribution via Listserv

LIST OF ATTENDEES APRIL 8, 2010, TELECONFERECE WITH DOMINION NUCLEAR CONNECTICUT, INC. (DNC)

MILLSTONE POWER STATION, UNIT NOS. 2 AND 3 GENERIC LETTER 2004-02 SUPPLEMENTAL RESPONSE DNC William Bartron William Brown Wanda Craft Dave Dakers Martin Legg Clark Maxson Joseph Rigatti Ronald Tooker Steve Wainio AECL Dave Guzonas - AECL Vendor Dave Rhodes NRC Paul Klein John Lehning Carleen Sanders Michael Scott Stephen Smith Mathew Yoder Enclosure

-3 2.4 Request For Additional Information Nos. 16 and 17 The NRC staff stated that they would further consider the response and provided feedback at a public teleconference held on April 20, 2010.

If you have any questions, please contact me at 301-415-1603.

Sincerely, IRA!

Carleen J. Sanders, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423

Enclosure:

As stated cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpll-2 Resource RidsOgcRp Resource RidsNrrPMMillstone Resource RidsNrrLAABaxter Resource RidsRgnlMailCenter Resource LTrocine, EDO Region 1 CSteger, NRR SSmith, NRR MScott, t\lRR PKlein, NRR MYoder, NRR "ILehning, NRR ADAMS Accession Nos.: Package Meeting Notice/ML100820422; Meeting HandoutlML1009804150 , M ee rIng SummaryJIML101170575 OFFICE DORLlLPL1-2/PM DORLlLPL 1-2/LA NRRISSIB/BC DORLlLPL 1-2/BC NAME CSanders ABaxter MScott HChernoff REnnis for DATE 5/4/10 5/4/10 5/4/10 5/5/10 Official Record Copy