IJ]J I With the unit at refueling. shutdown, MOV-SW-103B did not operate electrically during a TID \ flush                  of the Recirc Spray heat exchangers.                                    This valve is one of 4 valves which can Im I admit                  cooling water to the heat exchangers.                                    The* other 3 valves were operable, therefore!
IJ]J I With the unit at refueling. shutdown, MOV-SW-103B did not operate electrically during a TID \ flush                  of the Recirc Spray heat exchangers.                                    This valve is one of 4 valves which can Im I admit                  cooling water to the heat exchangers.                                    The* other 3 valves were operable, therefore!
   ~            I the  health and safety of the general public were not affected.                                                          This is contrary to
   ~            I the  health and safety of the general public were not affected.                                                          This is contrary to
  ]]]] \T.S.-3.14.A.6 and is reportable per T.S.-6.6.2.b(2).
  )))) \T.S.-3.14.A.6 and is reportable per T.S.-6.6.2.b(2).
80 SYSTEM            CAUSE          CAUSE                                                        COMP.            VALVE
80 SYSTEM            CAUSE          CAUSE                                                        COMP.            VALVE
                                       .CODE              CODE        Si.!6C0DE                COMPONENT CDDE                    SU8C0DE            SUSCODE
                                       .CODE              CODE        Si.!6C0DE                COMPONENT CDDE                    SU8C0DE            SUSCODE
Line 36: Line 36:
:24          26 l/ I 27 I OI 3 I 2E        29 L!:_J 30 LQ.J
:24          26 l/ I 27 I OI 3 I 2E        29 L!:_J 30 LQ.J
:;1            3:2 ACT10N    FUTURE              EFFECT        SHUTDOWN                              ~    ATTACHMENT          NPRD-4          PRIME C:OMP.                COMPONENT TAKEN      ACTION            ON PLANT          METJ-;00                HOURS ~            SUBMITIED        FORM SUS.            SUPPLIER              MANUFACTURER
:;1            3:2 ACT10N    FUTURE              EFFECT        SHUTDOWN                              ~    ATTACHMENT          NPRD-4          PRIME C:OMP.                COMPONENT TAKEN      ACTION            ON PLANT          METJ-;00                HOURS ~            SUBMITIED        FORM SUS.            SUPPLIER              MANUFACTURER
    *
               ~@W@
               ~@W@
33          34 w@
33          34 w@
Line 65: Line 64:
}TI] ~CJ,______________N_A_ _ _ _ _ _ _ _ _ _ _ _ _~
}TI] ~CJ,______________N_A_ _ _ _ _ _ _ _ _ _ _ _ _~
0 II    I I I  1* I  I I  I I I N
0 II    I I I  1* I  I I  I I I N
::,
                                                                                                                                                                                             ~
                                                                                                                                                                                             ~
'8 08 s                    10  .-;,<<..,                                                                                                        68    69                              30  ;
'8 08 s                    10  .-;,<<..,                                                                                                        68    69                              30  ;
Line 86: Line 84:
MOV-SW-103B admits service water to the header which supplies cooling~ water to the Recirc Spray heat exchangers. This valve is one of four redundant valves that will supply
MOV-SW-103B admits service water to the header which supplies cooling~ water to the Recirc Spray heat exchangers. This valve is one of four redundant valves that will supply
(
(
the Recirc
the Recirc Spray heat exchangers with service water.
                                            .
Spray heat exchangers with service water.
The redundant MOV-:'s were shown to be functional, therefore the health and safety of the general public were not affected.
The redundant MOV-:'s were shown to be functional, therefore the health and safety of the general public were not affected.
: 3. Cause:
: 3. Cause:

Latest revision as of 12:45, 17 March 2020

LER 80-065/03L-0:on 800917,w/unit at Refueling Shutdown, MOV-SW-103B Did Not Operate Electrically During Flush of Recirculation Spray Heat Exchangers.Cause Undetermined,But Marine Growth Suspected.Valve Manually Cycled
ML18139A754
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/16/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139A602 List:
References
LER-80-065-03L-01, LER-80-65-3L-1, NUDOCS 8010200513
Download: ML18139A754 (2)


Text

. .


~. ------------- -------------------------*--------*-*---------- . **- **------*-*- --*--------**----~-----------------*

'R~ FORM,36c 7-77) e LICENSEE EVENT REPORT

_U.S. NUCLEAR,REGUL~TORY COMMISSION CONIROL BLOCK: I IG) (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

~ lVI ~1~E~Jtc~o~ I i 1JG\ 5OI OI - I O~~cJ~E ,L~s~RO I - IO I O 2!0l: I\1dE~sE\ ~JEi ~l©ls1 c~T s! 0

ON'T .

IE] ~~;~~ LhJG) I oI s Io Io I o I 2 I s I o IG)! o I 9 I 1 I 7 I s l o JG) I 1 I o I 1 I 6 I s I o 10 8 60 61 DOCKE, \/UMBER 68 69 EVENT CAiE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@

IJ]J I With the unit at refueling. shutdown, MOV-SW-103B did not operate electrically during a TID \ flush of the Recirc Spray heat exchangers. This valve is one of 4 valves which can Im I admit cooling water to the heat exchangers. The* other 3 valves were operable, therefore!

~ I the health and safety of the general public were not affected. This is contrary to

)))) \T.S.-3.14.A.6 and is reportable per T.S.-6.6.2.b(2).

80 SYSTEM CAUSE CAUSE COMP. VALVE

.CODE CODE Si.!6C0DE COMPONENT CDDE SU8C0DE SUSCODE

~

' 8 I

9 wjA 10 18 ,,iu@ Lu@ lv!A!1Jv!ElxJ8 lJLl@) Lill@

12 1:l 18 19 20 SEQUENTIAL OCCURRENCE REF'ORT REVISION Q LE ?.IRO c-VENT YEAR REPORT NO. CODE TYPE NO.

v..v REPORT' NUMBER I 8 I OI 21 22 I I 23 I Oj 6 1s I

24 26 l/ I 27 I OI 3 I 2E 29 L!:_J 30 LQ.J
1 3
2 ACT10N FUTURE EFFECT SHUTDOWN ~ ATTACHMENT NPRD-4 PRIME C:OMP. COMPONENT TAKEN ACTION ON PLANT METJ-;00 HOURS ~ SUBMITIED FORM SUS. SUPPLIER MANUFACTURER

~@W@

33 34 w@

35 Lu 36 lo lo I ol ol 37 ~

W@

41

  • WC§)

,42 W@ I 43 Pl 31 41 ol

~7 CAUSE DESCRIPTION AND CORRECTIVE ACTlONS @)

CII9J !Because of operational restrictions MOV-SW-103B 1.s not exe.rcised except during refueling

[TIIJ \shutdown. The exact cause* for failure of MQV"""SW'*"l03B cannot be determined, however marine growth is su~pected.

Lill]

8 9 so FACILITY METHOD CF A STATUS  % POWER OTHE:'< ST,O.TUS DISCOVERY DISCOVERY DESCRIPTION '3,,

_2ill Ul.J@ i o I o I, o l@)!...___N_A_ _ _...... ~~l~_I_n_s~p_e_c_t_i_o_n_ _ _ _ _ _ _ _ _ _ _ _ _ _.....,

8 9 10 12 11 44 45 46 80 ACTIVITY CONTENT Q\

RELEASED OF RELEASE AMOUNT OF ,>.CTIVITY \::V .LOCATION OF i'\ELEASE @

~ ~@) ~@._)___N_A..;...,*_ _ _ ___, NA S 9 ,o ,, 4S ao

?ERSONNEL EXPOSURES Q

~ IO NtM~r O 1@i'Y~El@ ...D_Es_c_R_IP-Tl_O_N_o_:::s

_ _ _ _N_;A;.;;,__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __..;

8 9 11 ,2 :3 50

?ERSONNELINJURIES ~

NUMSER DESCRIPTION~

jO !0 \ 0 l@.___________N_A_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

9 11 12 80 LOSS OF OR DAMAGE TO FACILITY "3\

TYPE DESCRIPTION V LU@.___ _ _ _ _ _ _ _ _ _N_A_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____,.____.

9 10 60 PUBLICITY G\ NRC USE ONLY ISSUEDQ DESCRIPTION ~ ,0

}TI] ~CJ,______________N_A_ _ _ _ _ _ _ _ _ _ _ _ _~

0 II I I I 1* I I I I I I N

~

'8 08 s 10 .-;,<<.., 68 69 30  ;

10 2 0 QA-ef,/~ ?OE? .:.PE~ _J_._L_._W_i_ls_o_n_ _ _ _ _ _ __ P~'.OM=:

( 804) 357-3184 C

1-.

ATTACHMENT 1 e

SURRY POWER STATION, UNIT 1 DOCKET NO: 50-280

  • 1.

REPORT NO:

Title of Report:

80-065/031-0 EVENT DATE: 09-17-80 Event

Description:

MOV-'SW-103B Valve Non-function With the unit at refueling shutdown-, MOV-SW-103B did not operate electrically during a flush of the Recirc Spray heat exchangers. This is contrary to T.S.

3.14.A.6 and is reportable per T.S.-6.6. 2. b(2).

2. Probable Consequences:

MOV-SW-103B admits service water to the header which supplies cooling~ water to the Recirc Spray heat exchangers. This valve is one of four redundant valves that will supply

(

the Recirc Spray heat exchangers with service water.

The redundant MOV-:'s were shown to be functional, therefore the health and safety of the general public were not affected.

3. Cause:

There were no electrical or mechanical deficiencies found with MOV-SW-103B when it was inspec-ted subsequent to the aforementioned event. This valve is only cycled during refueling shutdown due to operational restrictions associated with Recirc Spray heat exchangers a?d* therefore could have been

  • 4.

stuck -be-cause--o-f- marine growth_.

  • Immediate Actions:

~ , / '

The immediate actions were to cycle the valve manually (following this cycling the valve operated electrically) and submitt an MR to have the valve inspected.

5. Subsequent Corrective Action:

The subsequent corrective action was to.dissemble and clean the valve.

6. Action to Prevent Recurrence:

According to past records, there have not been a similar occurance involving MOV-SW-103A,B,C, or D, this appears to be an isolated case, therefore no future action is required .

.7. Generic Implications:

None