Unit 1 average daily power for the month of January was 512.2 MWe.
Unit 1 average daily power for the month of January was 512.2 MWe.
There were no LERs issued in January for Unit 1.
There were no LERs issued in January for Unit 1.
Line 56: Line 55:


==SUMMARY==
==SUMMARY==
:
Unit 2 average daily power for the month of January was 518.3 MWe.
Unit 2 average daily power for the month of January was 518.3 MWe.
There was one LER issued in January for Unit 2, LER 301/2004-003-00, Reactor Shutdown Required by Containment Penetration TSAC 3.6.3.- This LER describes the discovery of a pinhole steam leak in the body of a steam flow transmitter root valve, which required the unit to be shutdown and cooled down for repairs.}}
There was one LER issued in January for Unit 2, LER 301/2004-003-00, Reactor Shutdown Required by Containment Penetration TSAC 3.6.3.- This LER describes the discovery of a pinhole steam leak in the body of a steam flow transmitter root valve, which required the unit to be shutdown and cooled down for repairs.}}

Latest revision as of 03:27, 15 March 2020

January 2005 Monthly Operating Report for Point Beach Nuclear Plant, Units I and 2
ML050530239
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/10/2005
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2005-0025
Download: ML050530239 (6)


Text

NoE Committed to Nuclear Excellen 5 t" Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC February 10, 2005 NRC 2005-0025 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units I and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report In accordance with Technical Specification 5.6.3, Enclosure 1 contains the Monthly Operating Report for January 2005 for the Point Beach Nuclear Plant, Units 1 and 2.

This letter contains no new commitments and no revisions to existing commitments.

Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center Q

6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

ENCLOSURE 1 MONTHLY OPERATING REPORT 4 pages follow

li OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 02/02/05 COMPLETED BY Kim M. Locke TELEPHONE 920-755-7655 REPORTING PERIOD January - 2005

  • 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. .NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 248,114.3
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 244,527.4
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 381,083.5 381,083.5 113,904,473.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 02/02/05 COMPLETED BY Kim M. Locke TELEPHONE 920-755-7655 REPORTING PERIOD: Januar/ 2 0 0 5 (Month/Year)

TYPE METHOD OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS 5: SCHEDULED(OU) DOWN (2) CoMET N/Ai N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain). 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 1 average daily power for the month of January was 512.2 MWe.

There were no LERs issued in January for Unit 1.

V.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 02/02/05 COMPLETED BY Kim M. Locke TELEPHONE 920-755-7655 REPORTING PERIOD January - 2005

  • 1; DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY. (MWE-NET) 518.0 MONTH YEAR TO DATE -CUMULATIVE
  • 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 242,702.2 4'. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 239,541.2
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2

- 6. NET ELECTRICAL ENERGY (MWH) 385,583.5 385,583.5 113,271,548.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 02/02/05 COMPLETED BY Kim M. Locke TELEPHONE 920-755-7655 REPORTING PERIOD: JanuaI/2005 (Month/Year)

TYPEMETHD OFCAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTOS S: SCHEDULED (HO ) DOWN (2) COMMENTS N N/A NIA N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction. 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of January was 518.3 MWe.

There was one LER issued in January for Unit 2, LER 301/2004-003-00, Reactor Shutdown Required by Containment Penetration TSAC 3.6.3.- This LER describes the discovery of a pinhole steam leak in the body of a steam flow transmitter root valve, which required the unit to be shutdown and cooled down for repairs.