ML072670181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML072670181
| number = ML072670181
| issue date = 09/20/2007
| issue date = 09/20/2007
| title = 1 - 09/20/2007 Meeting Presentation Regarding Decommissioning Project Status, Attachments 1 and 2
| title = 09/20/2007 Meeting Presentation Regarding Decommissioning Project Status, Attachments 1 and 2
| author name =  
| author name =  
| author affiliation = Detroit Edison
| author affiliation = Detroit Edison
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Fermi 1 Decommissioning Project Status September 20, 2007 Attachment 1 Reactor Vessel Overview A Fermi I Decommissioning Project Status September 20, 2007 Attachment 2 Page 1 Rotating Plug Work Fermi 1 Decommissioning Project Status September 20, 2007 Attachment 2 Page 2 Reactor Beuiding Piping...... ....... .....7 .... ........... ........ .... .......... .. ............ ............ ............ .. ... ... ... ... ... ... ... ... .... ................ ... .. ... ... ... ... .. ... ... ... ... ... ... .. ....... ................................................................................................................
{{#Wiki_filter:Fermi 1 Decommissioning Project Status September 20, 2007 Reactor Vessel Overview
................
 
..........................................................................
A Fermi I Decommissioning Project Status September 20, 2007 Attachment 2 Page 1 Rotating Plug Work
~ K IH qll F -............
 
H .. ..... ...... ..... ... ..8 ......... ..... ... ....M ........._ _ LI l4* _ _ _ý -(Th \v 1-n-Prinvit oftin.... ... .... ... .... ... .... ... .... ... .... ... .... ... .... ... .... .6l... c4g EFl5-010 Pageo Vk. Nbel~lJsnd 100. 116.118. 28.130-162.150-162.170-178 P-L 06115/2005 Revision 7  
Fermi 1 Decommissioning Project Status September 20, 2007 Page 2 ReactorBeuiding Piping EFl5-010 Pageo
.............
                            . . . . . ..7 ..
Legend Fence Protected Areo Boundary Sump.TL,5 Proposed Shollow/Deep Monitor Well------Termination Boundary Notes 1. Drowing is adopted from the following Detroit Edison Company drawings:-6E721-56 (Perimeter rood ond general building layout)-6E721-43-1 (Scaled dimensions of sodium/gos buildings, reactor ond FARB)-6P721-1074-1 (Sodium tunnel)-6C721-1640-1 (FARB interior)-6E721-57-4 (East sodium gallery)-6E721-57-5 (West sodium gallery)-6P721-1117-1 (Health physics building and drains)-6P721-1118-1 (Radioactive waste discharge line)-6P721-1836-20 (Fission products detector building)2. Monitor Well locations subject to change based on surface conduit positions and hydraulic gradient.I- AS SHOVIN It-1"n 5/23/031 I Dlý DY*-Mg, M1.h19- I- Dy/,L#R SITE PLAN DETROIT EDISON FERMI 1 DETROIT, MI 50 0 50 APPROXIMATE SCALE IN FEET n N. 58793.0002-002 IK PACT -023--8793 1-. 0 1 DITE\FERM 1IWI r1' 2 frW.LCT 02~3-47Q3 I~ 0 I'~~ DTE\FERM i~MI 5I}}
                                                                                          ~     K IH qll                                                                                                 F   -
Vk. Nbel~lJsnd
                                                  ..           ......   ........ .H 100. 116.
          .8 . .. . .......         M .........                                                                                                                                           118. 28.
130-162.
150-162.
170-178
_     _                                               LI l4*       _ _ _ý                                                                           -
P-(Th           \v     1                                                         -n-Prinvit     oftin
                                                                                              .6l...
                                                                                                  .......           c4g L
06115/2005 Revision 7
 
Legend Fence Protected Areo Boundary Sump
                                                                                    .TL,5     Proposed Shollow/Deep Monitor Well
                                                                          -   - -   -   - -   Termination Boundary Notes
: 1. Drowing is adopted from the following Detroit Edison Company drawings:
                                                                              - 6E721-56 (Perimeter rood ond general building layout)
                                                                              - 6E721-43-1 (Scaled dimensions of sodium/gos buildings, reactor ond FARB)
                                                                              - 6P721-1074-1 (Sodium tunnel)
                                                                              - 6C721-1640-1 (FARB interior)
                                                                              - 6E721-57-4 (East sodium gallery)
                                                                              - 6E721-57-5 (West sodium gallery)
                                                                              - 6P721-1117-1 (Health physics building and drains)
                                                                              - 6P721-1118-1 (Radioactive waste discharge line)
                                                                              - 6P721-1836-20 (Fission products detector building)
: 2. Monitor Well locations subject to change based on surface conduit positions and hydraulic gradient.
I-   AS SHOVINIt-                   SITE PLAN 1"n   5/23/031                 DETROIT EDISON I Dlý 50        0          50 DY                         FERMI 1
                                    *-Mg, M1.h19-     I-       Dy/,L#R DETROIT, MI APPROXIMATE SCALE IN FEET   n N.     58793.0002-002 IK 5I PACT -
frW.LCT 023--8793 1-. 0 1 02~3-47Q3 I~   0 I'~~
DITE\FERM 1IWI DTE\FERM i~MI r1'    2}}

Latest revision as of 11:20, 13 March 2020

09/20/2007 Meeting Presentation Regarding Decommissioning Project Status, Attachments 1 and 2
ML072670181
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/20/2007
From:
Detroit Edison
To:
NRC/FSME
References
Download: ML072670181 (4)


Text

Fermi 1 Decommissioning Project Status September 20, 2007 Reactor Vessel Overview

A Fermi I Decommissioning Project Status September 20, 2007 Attachment 2 Page 1 Rotating Plug Work

Fermi 1 Decommissioning Project Status September 20, 2007 Page 2 ReactorBeuiding Piping EFl5-010 Pageo

. . . . . ..7 ..

~ K IH qll F -

Vk. Nbel~lJsnd

.. ...... ........ .H 100. 116.

.8 . .. . ....... M ......... 118. 28.

130-162.

150-162.

170-178

_ _ LI l4* _ _ _ý -

P-(Th \v 1 -n-Prinvit oftin

.6l...

....... c4g L

06115/2005 Revision 7

Legend Fence Protected Areo Boundary Sump

.TL,5 Proposed Shollow/Deep Monitor Well

- - - - - - Termination Boundary Notes

1. Drowing is adopted from the following Detroit Edison Company drawings:

- 6E721-56 (Perimeter rood ond general building layout)

- 6E721-43-1 (Scaled dimensions of sodium/gos buildings, reactor ond FARB)

- 6P721-1074-1 (Sodium tunnel)

- 6C721-1640-1 (FARB interior)

- 6E721-57-4 (East sodium gallery)

- 6E721-57-5 (West sodium gallery)

- 6P721-1117-1 (Health physics building and drains)

- 6P721-1118-1 (Radioactive waste discharge line)

- 6P721-1836-20 (Fission products detector building)

2. Monitor Well locations subject to change based on surface conduit positions and hydraulic gradient.

I- AS SHOVINIt- SITE PLAN 1"n 5/23/031 DETROIT EDISON I Dlý 50 0 50 DY FERMI 1

  • -Mg, M1.h19- I- Dy/,L#R DETROIT, MI APPROXIMATE SCALE IN FEET n N. 58793.0002-002 IK 5I PACT -

frW.LCT 023--8793 1-. 0 1 02~3-47Q3 I~ 0 I'~~

DITE\FERM 1IWI DTE\FERM i~MI r1' 2