|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562'-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
{{#Wiki_filter:8 7 6 5 4 3 2 1 H H SY~GOLS 0 A.MM ET ER 0.
*..::.:_,; IJ1\ TT Tf<I\NS OU CER
(:0
~
VOLTMETER e VAR Tl,ANSOUCER A', REACTOR 6UILD!t.Gi <D @ @
4160V BUS #646
-------'l_~12o~!sA Bil 1<1400SOOIB
- DIVISION I
,-------------~~4-f.\~ C ,T 4160V. BUS #64C AT REACTOR BUILDING Rl400SOOIC (D
e WATTMETER VARMETER B
THERMAL CONVERTF.R
~MMETER SWITCH 1200/SA 8 iJATTHOuRMcTER G'i] VOi TMETER SWITCH
~ ~
0 FREQUENCY METi:R
~ lli'il~E rER TRANSfTR SI,! TCH e HOUR METER §1 RECORD I NG VOL TMf:TER 4160V, ES$. BUS # !!EA AT D!E5El GENl!:RAT!ll'< BUILDING; Rl400S002A '* <D 4160V, ESS, BUS "'12!:B AT OIESE\.. GEl-lERAl'Ol't BUlL~!IH, Rl4005002B (i) @) CURRENT TRhNSDUCER ~ COMPUTER PO I ,IT G
n EA2
' *-~ *l,3-C T EA3 EA4
~
EAS E6Z 1
EB3 ...
1EB4 ~-
EB5 x,z s DllilTAL WA TTMETER VOLTAGE. T,Al~SDUCER G
(~
3-C.T. I 2-C.T.200/5Acfii,-----{ 3-C T r-f--+---< I - i(I). 3-C.T TYPE !TE 271 UNDERVOLTAGE RELAY \,/ITH !NV TIME USED IN ex -Z.H'c>CJ;,;. QOl 1200/SA w
~ 1-C,T,15D/5A ,, 2 (X,L )171>/!>A~ ,, T. 1200/SA 2-C.T.200/5AC!¥'*~5l" 1-C,T.150/5A ,-,J, u- 1 2 '- AD SHEDDING SCHEME.
0
. -~ - TO EA2* ~B7R~ TO EAS ::; ,Y
\6~" roeus
, A TO £B 2 . . , _ t , < . ~ 1 ' - . - T O £BS ~ y" TOeus @ (USES A SUFFIX DERIVED FROM THE BUS !.D,- i.,,£, 27x-11EA T!PE LOR, t
~
7">/'!f,{A. \..Ay I TO BUS ~3 ,..,_
~ ~
INITIATED BY 27 RELAY IN LOAD SHEDDING SCHEME.
r-11
( '()
94 ~y l
1200
--@2 Dtl"F*
(8761
~
11200A l:'N, .-~ 4 1200AIDUMMY BKR. w 1200A':( *@i (i78l / t 1200A~--(_94l TN o'-(4 - 1200AfBKR, UMMY w m 1200A [ --l (&?Bl 0 (MOTOR FD) TYPE !AC66; RANGE 1.5-3A INV, TIME, 10-40A INSTANT (TRF. FD) TYPE IAC53; RANGE 4-16A INV TIME, 20-BOA INSTANT l
~ ~
A " X l X 0 y @) (~~
"3 8 (TRF. NEUT, OVERLOAD RELAY), TYPE IAC53, RANGE 1.5-12 INV, TIME
,,,3 J
~
* ! _.i ax y v.., 2-P.T.
4200-120V 3-CT l1200/5A1:""'--------
69 I A
L 3-CT~
1200/S II J--CT ,-t-- J Z~Y VJ 2-P.T T
3-C,T. ,t_-
1200/SA,r_}H::1<-------- j~l
£ u
~ @ TYPE CV-5, EDG DVERVDL TAGE, RANGE IS 55-140V INV, TIME l-t~, t ~
,l
~ El
~ 12.00JsAtt,.,__ *--- J~Y 4200-120V SEE CECO FDR RELAY MANUFACTURER, MODEL ND & RANGE II
~
!As1
;~
,_J,,'ll-3--
1 u 1 _ ___,,_J-u_~~ ' '---'t 1
~
fl L_.:1*
Si 8
I L. ' TYPE PJCllJ GND PR TECTI N (FDR CKT'S), RANGE IS 0.5-2.0A INSTANT
--o---~>-,_,---1'..~ ,~-"'t3 ---- l~! 4" 1 - u l , *-...::_'",11
'~
~
7 (~v TYPE CV-8; EDG NEUT. GRD PROTECTl N, RANGE IS 199V
~
1-C,T.
A
~
TD SYNCH.
BUS lil I*+/--y w,I* t-o.,
-,yi?'
1-c:1.q: (64" 1-C,T, EL; ,, (64 1" TD SYNCH. '-(
,1,~ 1 ~ .'""
~ ,..
NA.
--*1
- -"l ko~~Aq:: 04'...__.,,1~l TYPE CRN-lJ GEN, REV. PYR, RANGE IS 5.DA, 120V i ,
>-11 I 3US SO*SA ' t N
- I ~. -~"J* ,.. :'.jj£ SO~ 5A , ...~_:i:/ i 50-SA ._') 1 . i .
~I '
, I I :11-40 .,,...
_.,.1 Eu
@ UNDER FREJUENCY RELAY, SEE CECO FDR DETAILS 0
.. f i J1
-u::n.~" -*~\
\..:) 1 OJ
,,J>*,
'* H1 3-P.T
>-Ii I
*' f'/flCO-i,CV I.'
2301A Ax!;,,$ 1 1--!" 0 C, ,--~
f1/2 I
I fi¥ R, l
/ -~,
6 I -:;;
- * 'T'"*"""I ** -
I I, '
2301A I \
'°'}& ,---,I <,
C Xlj_ATSH'A'a
'(,,'. ..,l \..:'..J\
"-' 1 **1, (§) TYPE CA-16. BUS DIFFERENTIAL, VARIABLE PERCENTAGE LIFF'L.
L~~
0
,~s.11 F1 ! ' '.J "'
00 *r"' *I ,,I,,_~"-- _j._,,lr,,< '~-1 ['\/\ _,JI I 0 I~ o' .
y "' I -"'
~
'..:::i i? -..
N Ll
~
(S.j ' f11-;r~) TYPE CAJ GEN. DffFE~ENTIAL, 25% SENSITIVITY l7 .,,,,.,
l 'O "J
F *
...J 61-
;: 5 z ,11 r---l ~ARx::________ a* "-
0 "'
f-
_J
_, "w T
- i' I
, .* -~l u ouo c-
_J CJ CJ
@ TYPE D3; GEN. UNDER/LOSS OF EXCITATION, RANGE IS 0-100 MILLIV L TS F
t
(,'
o-,-> ~
1 "">
!D 0 'I:Jl-- . \".,l~l
- i ' '~ *f- ---G~ "' '° u< o ..._,;,,,. ' *' A "° "' 00 c 87~ m i---~L,,~ 0 CJ
'0~ ~
" 0 0 V, 0
<{
u vs~ f @; 3 0
;;;, '.;,_,t,r*- - ,
w,
" "01
~\ :!: ~
0 (/) Cl .J
"'<Iu
- am
- )'"
DW)l "' '" ... g~
=i
_.i ::: ::::<:£
~
0 3 'ii,
."' X fl ' W S,l "-*v I 'H>(lA W
\::'.'.'.)I
~ ...,,
,0 I !I \ l w1f ._1 TEST STUD FURNISHED 3Y DEC
*<zj "
DRl,wOVT TYPE 4160 V. BRtAKER I' f)~ ~ ~.J l x '< 2-P.T_t'__:_;r::.::_
, *** ,,,, t,. t,. I '
TC *
- 4 ~: @~ Tt--.1:..::,:' ~C
'"'- CLASS lE SYGR
--.!:-!_ \ l I
,v i7y\...A...12-P f..7'\ r;;;;~ '"
"u YX i....__SOURCE 0o
- -~ z--x~- 0, (~) 1:: ~t -v~l
- !< ' 2
-y l 01 F ,-IVS 1
'1 _ _.,
-~l I,
C
>V ORAi
('.J
- 91
... "::\.
I .
' ,, ~ y , OUT TY 0 E l'OTENT I AL I RANSF. P T'L TEST S,/,
7----
xcr Q 1-"
~".I 1 TO SYMCH.,
BUS vs},-01
.. IRV, l TD SYNCH
. - '/ r_f,.j;."--SU~SCRIPT INDICATFS :-10. OF DEVICES cl 7 I J 1.:.::.fi ~ I CZ)\ "~--* BUS
.; ..J-__y REFER ;* DECO SPEC, 3071-128 STD. °iJ v ~!EXCITER ;:i; I
r EXCITER 11 t CURRENT TEST SI,/,
& .' I & ~ b)-EJ FDR FUSE SIZE & TYPE FDR c9 VOLTAGE 3 -CT ,le
~--01 ~ATOR:i-+---,i.+- I,, L. I... I.. )-"' \/Ot..TAGE
, REGULl'J'OR 3
-C,T., A 1.. 1.. L-. i.o. CURRENT IR,\NSF' PDi..l,R I TY r*IARKS I I s/c 5KV, 3-C ETHYLENE PROPYLENE
& HYPALON JACKETED N NSHIELDED l /I (F), (H,0, (~/91~! (D, 9,@i<f:i\, . . Gov.I. 3-C,T, --NUMGERS OF C,T, 'S. & RATIO I CABLE.
- SHUNTS . EMERG DIESEL TO VOL. TO GOV SHUNTS
~'j ~ ~E~~Lc1tNT r>r GENERATR EMERG DIESEL 10 VOL, 10 cN,. I X 1200/5A 300 HP RHR SERVICE YATER PUMP 'A' E1151C001A AX, i,k A) 1 a. ~E-.FLO.
l x E.D. GENERATOR n11
)..__~ 2850KY, 240D/4160V y 3¢, 60Hi!, 900RPM R3001S001
,Dr z-t-11,
'Y
, AAAJ TRANSFORMER "72EA
'V 'f::-'
7SOKVA, 4160*480/277V, Rl4005036A I r-c"¥-r-:1'-t---f1 300 HP RHR SE RVlCE WATER PIJMPC
EIISICOO!C zA.~)
GEN,FLO~R3001S002 E.D, 2850Kw', 2400/4150V. & EXCIT.
3¢, 60H c. 900 RPM
#12 REGUL.
li zL~"<
, AAAJ TRANSFORMER +72ES z-{;,, 'v v ' Ri400S037A
~
t 75 0 II.VA, 4160-48~277~.
l I~HtT +-- -I**
(;gi TYPE HMAJ PE.~MISSIVE FF-SITE U/F AUX. RELAY TYPE HMA; TRIPS A SPECIFIC POSITION & IS ASSOCIATED YITH A PARTICULAR SCHEME - {. --L LOAD SflEDDING.
E vx 1 c0 .6 3-C.T.
GOO/SA,'1/4*"",--------------~ 1'000/51 Q*
'--j11 \'1; 1 3-C.T.
600/SA 1,
- * - - * - - - - - _ _ _ ____j IIC-OtVSA1I J....' *-jl1 ~~
E I
f j TYPE CVEJ EDG SYNCHRONIZATION I~------18* J
~)1 lr:f3* 1(2¢) CT 600/SA (2 SPAJZ.~ C1 'S '\
, sµo~r£<P4G~O)
TO 4~0V. ~ l BUS72EA ~---
© ~
*li--j:)
~,t>600/SA 1(2¢)CT ( 2 ~PAil<' CT'S)
-~I-ID£,:'r;.p4GMI? BUS 72EB J)'
TD 480V. -,,;::_:j/1
- I'.'~*
I2301A I GOVERNOR CONTROLLER (SD-2510-05) (SD-2510-05) 3-C,T, 3-C,T, 4160\J. BUS *65 f AT REACTOR BUII.D!HG © (D
';<j/ 1200/SA
,-- OfVISION i1 I q,,,, I ,i(Jl200/SA 4160V, SUS "'6SF AT REACTOR BUILDlliG
- t::ES 4 ,_
NOTES E- Q" Ri400SOOIE FS Rl"IDOSOOI!'
NEUTRAi GROUNii') -:p1io'iiit~ ~ t2o~i;A TRAMSFORME'R )
!Ok.VA, J,6 J 64 l NEUTRAL GROUl<Dj TRANSFORMER
!OKVA, !¢'
C
~ <f:)t 1.1'.l.l. BRFN([~S ARE 12001\ COliTINUOUS RATING UNLESS ,JTHERl,IISE illDIC/\f[O,
~
4160 -240\/, ..f. - 4l60--240V, .J.. -
r,*t ;' ,CABlf SIZES /\ND C~l"PUTcR REcERENCE NO,S SHOclcl ON EACH FEEDER.
I 4160V, ESS, BUS "'l3EC AT DIESEL C\ENER,\TO!s BU!~DIIIG Rl400S002C I l' 3 ,1\l. ,. BRF.i\KERS ARE 3 50MVA. I N'iERRUPT I ~G Cl,PAC I ry UNLESS OTHEm,1 I SE I NU! CA TED.
"'\160V.E$S, BUS tcl4ED AT DIESlL GE!slRATOR BUH.l)INGRi4<lOSOOZl)I i **
1,1,u LUGS cOR POWER FEEDS TO 8E Z HOLE DOUSLE INDENT PRESSURE TYPE,
_ ,..__ *- FD*, (D
'EC EC3 EC4 ~
cu
~C5 ED2 lot _. _ _ 1/4! :&
.. 1* ED4 i :IJ E05 5, Ill IN81CATED lOCATION OF' ucViCEo .AT 4160V S'~GR, 3*C,T,rf.--@; rt-- II X,~
tf- *;* r~3-C,T I
w 2-C,T,200/5A r!
- i,.' 3-C.T 7 °' 2 tt 3-C.T 00
~ 2-C.T.200/5A* ,.___ ~
- ~Ill 6. it,. 11,:0ICATlS LOC/\Tl(Jl*,I OF DEVICES AT c.D.C3/4 PANEi.
(X,Z)150/5A 1200/SA 1200/SA ,
( y J 7,:;/5A J:' (AX\ - , TOEC2~ TOEC!',
~
w w
1-C,T,150/5A y ( X,ZJl';;D/5,A t -i**
t Yi " GYJ 7f>/'J,A A< ii
- 7, 6 INDIC/\TES LOCATION Or DEVICES AT C.O.P.
D ft;i 1" g ~ lA I TO 9 D SOS l200Ar ~t TO BUS X ~ vvn 1)*~44
...1,,N. ,,..,.
i 1200AfDUMHY
el 1200 A l -- l ClFF, (87Bl 1200A -
~
1 ro aus DlftF
~1~\.6 (i7Bl <
A 1i I
l200AQ--*(!l41 l'N..Y4 *
(
lcOOA BKR':'
DUM ~
~ 1200A --@,
- 8. TRANSFORMER TAP SETTINGS AND PERCENT IMPEDANCE (o/.:2)
CAN BE FOUND N NE LINE DIAGRAM SD-2500-01.
j z~y,JJ2-P,T. i 3-C.T.
y 69, 3
~ 3-C,T .
1
'./ J1 I 1 3-CT. t..: @,
I I
~'
l 3
~ 1-C,T, er- _J SD-2500**01 REfl:ROJCE DF,,A',..J I NGS ONE LIIJE DIAC, -4160V, 480V. AUX, POi.JE~ & STOGY UiESEL GcN.
;32-d~Js:.tf: , 3/4y ,~~00-12011
- 1200/5A't-;,,,-------___J
=
=
l200/SA( _---~_ __
3-C,kf.E_
l~'f '
'-t' \ T4200-12ov 2-P.T
__ _ _ _ ____J 1-.1
. gm 1,oof.,,,.lt-,i.- .. SYSTEM.
- r* ~"')
'll 1200/ ---~
~ ~~
'-- L. SD-2500-03 ON[ LIN[ DIAG. -4160V, BIJSES 64D & 64C REACTOR 8UILDING, 3 u l 't l 1 ~~
'--fl ~ I tJ -j1 3 1
' SD-2500-04 ONE L1!\!E DIAG. *-4160V. 3USES 65!:::,65F & 65G REACTOR GUILlJ!f1JG..
r .o'u~-@~
~
0I iOSYNCH \')
-- w" TD SYNCH.Ii ; ~-- VA~ ,j;,/*
1-CT ~ C > ,
50-SA '
I*
,64/' 1 BUS
~
X
,tu::~T ~!*~ A°' 1
\'o~.T,~ ,( "~-----,,_".Jl ~.r,1:;. rl--*B" t:t:---11 t BUS I! I O
~
X 1
i ":'o/1 .......
~O~STA~-,, -@a1 SD-2510-05 ONE LINE DIAG, -4oOV, BUSES 72EA,72EC,& 72FD, rr-,r"'4t '.2
~,-71 1' _ i!...--J:"y _ ;-,I E-2988 CABLE BUS RLlC. AUX, BLDG. 41601i .& 480V S>JGR ROOMS 2ND & 5RD
!' °" -,
r 0
~ 0:::::U-j
~1t L> " FLOORS.
~ ,J,y~2*00-l r-c;4i.lO*l 2,} 0
. l '" -
N ( AX I Ai'!.
ru i! _,.,J:' Y :,,,_J '(_ ~ 1 ~/l f2 ':!: j Ax,;~), T 0
3071-34 0
N
- .f 0.1 - "7! f!. w ,_ - 0
- >-1**
L' i'o- ~A "' 41f.OV. MicT~.L lcNCLOSl:D SL*Jl1CHGEf1R SPECIFIC!\TION, o,
~i N
§~~
N ....1 *
O fJ
""'--Hwx&\,--1--1~
-~- ~AR Wo
,n
_J
> *
- l bf O I I -l\'!',.1--,- - l w1 ."'
N 8fal-E4-16c CP\BLE RUS ArI J,a ~ "°
. r/t. ,. l ~i -~~~1 g@J~
UI l YAR 0
'" w w I H I
~I ~,."' ; 3-471 g6 I ' 'T *'-*
,- IrJJPERIAL
' '"Q'D
~, K, * ...:i:* IOP '10, ,
0 V, 0 **uuco LK ..
,,~
;Jr\
"' :! ::J ~ '
C
'-' i fl
* ~
;r::: ,. I "'"
\..Vi ~011
,27 ..
?; ~
u 8
lf)\
x t*~"->>----@i---('."\d 1 vr*v,.
bl w' ,'..{
3
_*~
jc'l ---o.. ff>~l TC' \
~ ~
".;91 L!I
~
'.I' v*
JI
~ I
,,sl i '-".';,
I l
.,.-:"":\ A I!
1
.,,- t,,m c'--,.
Y I
ur;~!
3 ~ j
.J
-'11, x
\:.;,::!
iI
~
-o:::Jl----7=1'u-Jw, ___........,_DVJ 1 iii"'"° fw),?
,.,,,"'<,....t.,,("
11 t:,.
ii::;;
,o
-..r .
*1* 'C:-86056 ', T, F. f'URCHASE ORDl?k NO.
I-N-2578-06, 08, 10 & 12 RELAYING 4 Ml'fER!NG EDS #;l,ij I?. #13 flf'/4 C l ~~
" ,-\y*J..*2-P.T.~-7 -,,,
* \2_7_'9 , ,_..i.,.__L2-P,T. . -.
*ll r~~ ~~ ~l
\,_"_; i I ._,__ /,~ I
~ ~
fl-
~
~1 ~ g ~
I z'l!7Y r7 x\ 'T~O!B 1* V1\.:)t~l I
.v e-';--.
1
-~
~
'.. I , ' a-j:' ~I*
x r 21HM20~~
\..~'1\f)l sl, i.._-, ~l
.u co-......
- -N-2578-15, 16, 17 & 18 RELAYING cl' METERING BUS DIFFERtNTl/'.l
-~ ,. . _., l~, "' r,:" \ BUS *I I EA,~ 12EB,i>i3E'C 4" 14ED rE1r01 TO S.Y~(H,;
BUS "'-r::==::-~l----! ~*d sYth'.]t il V?,E~TER. -, *VS1V'o ~v t ro BUS i
i~11 1:~,,._.. Y)
( EXCITER ! ,Ji
'IQLTAGE I 3-CT _..,.,.--4i r;,
1
,votTAGE jREGuLATR 3-C,T,l---rr-r--r-,
I,~ ~ 1, 1 I I I G1 4 ~* ~
0,ElVIE Rf,~,@),(~* . Ji t i 1
A
©-{lf SHUNTS i (1:J.M)1 l'.io, 1
,SHUNTS (:,,@, 59 \~!~1~,TD t I ,6SD721-2500-08 x
VOL TD G v.!
\.Al . . . ,
1*
RHR SERVICE .....,,, DIE Sf L TD VOL TD GOV, \2.'.=i, ll ..,-,.., EMERG. DIESEL X 300 KP YATER PUMP 'B' E1151C001B GEH FLO, 3,C,T, 1'I 1
E.D. GENERATOR #13 z.A..y 2850KW,2400/4!60V 3¢,6 Hi! 900RPM R3001S003@
T
',I
~Er~c1'T CONT, a~Y
*~**
'- A rv-y:~'
Al TRANSFORMER Ii c.1:1<H1 11000/5~
750K VA,4160-480j277Y Rl400S038A
}-I**
i1 "72,C . JOO\ RI-IR SERVICE:
I-:;;; J WATER PUMP"!)
~ E1151COOID
,Ax'
/ .~
t 1.....-':)11 ~-.
I j
A
- i l -,;
)
GEN,FLD.
3-C,T, I '\ E. D. GENERATOR #14 -~EGUL, CONT, I z.A..vi 2ss KY, 24D0/416 V. & cxcn.
. / 3*, 60Hi', 900 RPM I*
R3001S004 J I .
;'\
'-ti'*
,?L.....,,\
y r-v fY'
' \v.;i.y~
..,1.':" '
TRAHSFORMER #7}EI) 750 K VA, 4160--48()/277\/.
Rl40oso:~9A
, ,~~~+*,'(._ -JI*
1--J1H LATEST RE,vl~TON T
600/5AYI-,.__ . ,GoO/sA,..._.,_..________ -*
I t. e* i t LQ"
' l
[ ~-, ,;::;,11 ,,f .
ie~-__.,_µ600/SA \SHORTED & GNnJ 1(2¢)~~(2 SPA; CT'S , TD 480V.
BUS 72EC IC. NSIT II
. l
~--i -©~ I - -
( 2 SP.~RE CT'S '
SHORTED & GND) - T~ 4 SOY.
8 IIS 72ED ev !
B
~--1if(Jl200/,A
~3-C,T (SD-*2510-05) (SD-2510-05)
B NUCLEAR SAFETY RELATED NE UT RAL EiROUl<D TRANSFORMER lOKVA, J,,S 4160-240V.
en)~ +/-
NEUTRAL GROUND TRANSFORMER lOKVA, 1¢ 4160-240V. _(
[ ~(64)t
{-
Y THIS IS A MICROSTATION PRODUCED DRAWING.
- CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS DRAWING WAS REFORMATTED BY MICROSTATION AT REVISION "O". ALL
!NC.CODE Detroit Edison Fermi 2 T 1ncn*s INCORPORATED:
PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFILM IN DOCUMENT CONTROL.
PREPARED BY u
DATE TITLE ONE LINE DIAGRAM 4160V DIESEL GEN. BUSES A PORTION OF THIS DRAWING IS AFFECTED BY THE FOLLOWING:
#llEA, 12EB, 13EC & 14ED
,c CHANGE DOCUMENT CHECKED BY DATE DIESEL GENERATOR BUILDING I iA OTHER REVISIONS: APERTURE CARD T'ITLE l A CORRECTED PIS NUMBER AT ZONE B-7 AND ONE - LINE 4160V DIESEL GEN-
- BUSES I CORRECTED BUS '65E' TO '65F' AT ZONE C-4 PER PEPS-0019 Af'PRO~p B'i -~ DATE PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT #
R1400 PREPARED BY MOHAMED NUMAN DATE 10-08-18 DATE
't:,l'-/lt1 OTHER APPROVALS DATE DOCUMENT TYPE CODEDDDELE NUC OPS FILE NO.;
1801 A DATE EDP POSTING ENTRIES REQUIRE THE APPROVED BY Davjd Kakoczki forT.Murphylll '()"_ ....__
1, _
~~11, ADDITION OF THE ARMS STATUS CODE:
EITHER H AFC" OR "ASB" DRAWIBG NUMEER6SD721-2500~ 08 F1 A ~}}