ML21055A305

From kanterella
Jump to navigation Jump to search
3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation
ML21055A305
Person / Time
Site: Fermi, 07200071  DTE Energy icon.png
Issue date: 02/02/2021
From:
DTE Electric Company
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21055A091 List: ... further results
References
NRC-21-0002
Download: ML21055A305 (1)


Text

4 3 2 1 7 E1100F211

,------1-..1-----;:,'<1----------------------, NOTES:

SYSTEM TEST OPERATED BY REMOTE MANUAL CONTROL D 1. VALVES FO2-4 AND FO28 ARE REMOTE MANUALLY OPENED.

2. TEST ONE RHR PUMP AT A TIME. D DIV. I DIV. II ALL VALVE NUMBERS AND PIPING ORIFICES PRIMARY SHOWN ON THIS DIAGRAM SHOULD BE PRERXED BY E1150 CONTAINMENT UNLESS NOTED OTHERWISE.

ALL INSTRUMENTATION SHOWN OH THIS DIAGRAM SHOULD BE PREFIXED BY E11 UNLESS NOTED OTHERWISE.

THIS DRAWING SHOULD NOT BE CONSTRUED AS THE CONTROLLED p &: ID or THE LOW PRESSURE COOLANT INJECTION SYSTEM.

r I

1 I

I I I

C CNTRL HINIMUH F'LII BYPASS C NTRL MINIHUM F'LD\/ BYPASS C

I I I

I

~ ________ j I

~--------- ---------------- - _j ~

~

~

El!OO E1100 El100 moo FOJ4A f034C F0340 f0348 E1100 El!OO row. E1100 E1100 El!OO El!OO f03IA El!OO F018C f031C f031D f0318 f046A 4M721-5866

£1100 LATEST REVISION RHR 1----'=-i~

FOOi C RHR HEAT (,)

PUMP 'A' ' - - - - - - - - - - ! E X C H . E1101B001A RHR RHR RHR E1102C002A E1100 r,y~ PUMP 'D' E1102C0020 PUMP *9*

El102C0028 E1100f014A El 100f002A fO.JOA ULTIMATE HEAT SINK RHRS\J CLING T IJERS B

!NUCLEAR SAFETY RELATED!

THIS IS AN AUTOCAD PRODUCED DRAWING.

CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.

INC.CODE Detroit Edison Fermi 2 DCD'S INCORPORATED: PREPARED BY u LOW PRESSURE INJECTION COOLANT SYSTEM A PORTION OF THIS DRAWING IS AFFECTED BY THE FOLLOWING:

EDP 27275 REV. ¢ TEST MODE DURING PLANT OPERATION EDP 27329 REV. ¢ TC CHANGE DOCUMENT CHECKED BY DATE A 1 -------------.t----+___.;.-----,-----~=

OTHER REVISIONS:

--il------------------!A APERTURE CARD TITLE UFSAR FIG. 6.3-15 t----l------------1--_!!,AP!:JP5:.!R~O!.!VE~D:..,cBe_Y.!.,_---+-.J.!.6~---I PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT#

E1100 PREPARED BY DATE CHECKED BY DATE NUC OPS FILE NO, DATE ISSUED TO IS

> - - - - - - - - - + - - - - < DOCUMENT TYPE CODEDDDMEC JIGNESH SHAH 6/10/96 OTHER APPROVALS DATE 1801 (;-~-~~

4 M7 21-APPROVED BY EDP POSTING ENTRIES REQUIRE THE REV.

ADDffl0N OF THE ARMS STATUS CODE: DRAWING NUMBER H,\C Gj', .S,cA-~ El'ftlER "AFC'" OR ., ASB"'

5866 C L 4 2 1 _J