|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684 - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
H G
i F
y (N)
X E
D C
IB A
8 NA 7
f{
~
N
.b "'.)I
('I-r-
0 8 i
\\) o.3
- [
z
,~ '--'
t\\l,..
t s
- I<::!
.:. IS I.
I~
I Lil fJ 141 lj I
I X
IY Ii!
r----------------N-)(..,..._,
NY~-,..i:_-1,1-~----
6 Nl:I 480 V AC. 40 A, 3PDT 11.UTO T,O, TEAUSFER SW <'jNC
-~. -- -
r-ill
<( i IT]
- J
~<.lg
~->-
~,Jj /11 u 1¥ ~
- i::
~
i Cl.
'"I,
' 1£ if!IB.
-'- I 3 I lo JZ I~
I dl 1",u I
I
~K
~E~rEYtEX I
<'(LA L6 1:>C.0 -CAT. 'i!>40340":!15 rlLC
~L__
E1.
______ 1""'
I
)I y
C.
I
\\
1-12.
! \\ µz.
lJJJ.Jj i S K. Vf'..
11-12.
<} 1-\\ 4-TR.AN~..-1 WJ._)
1'5 K.Vf>,.
_f"() ~eo ** 1zq240 v
-~---
TRAN~':rn ~IZD
/240V TRANS.."'3 UJjJJ 1'5 KVA m ~\\20
/24DV 8
Ill
)(?.AO X3 iL4
-=:-
(-- -*; ---13p R
I-D ISTR.I CAB:tl p SEE NOTE 13 I
1.
I 2
3 4
5
~
~
6 6
6
()
/2P /2P /zr /zP /2P /2P y
~
\\J1 x,
X2 X3 X4
~ x.# X!!, d 114-
"=~---'
0-TBl-2 lgQy_
TB!-1 I
TBl-2 120'-/
TBl-1 JTB3 VOLTAGE-;:;EGUI.ATO-;- -7 R3101S010B
~
VOLTM:.E. RE<=oUL.A TOR-1J L_ "fB2-4 - 0- --rn2::J""~
T~4---;,--: --y TB2-3
-v-v-/---
3P
~
~f~ ~
A i!. -,
-"-"- DISTR.- CAB"2...,._ ~~
"-"-'DISTR. CAB!'3...,...,._,
N(Y) 2 1
- ,.cl t-1 /~I *" *"1 **so;
....._)., *,) I
- 13 14. 15 ZP ;zp 2P /J!..,./J:,
Fl l'-y----)
R Flt
<.J 'i=" LI al
<J
-; 2 -;o,
.gwr::oro
,.. J f'/l
~ L ~.u. g ii QI.JiQ:z:
(!iO
"'(ii "'1- ~g
,II ii -9 ~ f u...
I -
t 0
1
~
~ ~~
<'f')
(
\\
~
- 0 U)
_1 r- 0 eJ 1/l ~ a, ;,,
,:) ~ l(1,I'.)
,.() -
I() l(l Q j,n lP
- 0.
0..
N j N :-1 NI...i
- IlJIWJ:t:w w
0::
o_
V)
~
1201/ AC.- MPU*t 1<3101!:>00I DIVlc.)IOIJ I
ATT~I-IE.0 TO Mc'C. 72.6*2A 2...iD l'L.1<. AUXILIARY BLDG.
CDL. F-10 EL. 612'-6' OUTPUT VOLTAGE SETTING:
I. REGULAmR SHALL 6E SET FOR l30V AC FOR CAB. '11" Z 2-REGULATOR SflALL BE SET FOR l'ZSVAC FOR CAB- :ii: 3.
7 lo 1
2P (J -!
-' -v iQ 0 't.t 0
"'.J n
~
--9
~
~
~
--0 c<l
~ 3 (L
j I w x *~1 lz *t 14 *'-ts JG,
/zr /2P /zP o /d -'v-,f*'v-- d r-
'\\..
~ '"-...____ _ ___
_.)
~
- ~
-1
':::l 8
'ill
~3
~ :ti 0.:
,3 -'
~
"' ' - j
~
.J
- 0. - j -:r w
~
6 0::
o_
V)
~
R3101S010A y --
(N)
X 5
4 4
~
~ ;3 ILo'°
~--'
~ti}
- i::l g I~....
ru I.
" gi wl~
"'lo I
(\\j
~lo
,2 I~
11 10 I
I
~
3
~
Ill
~A~
r- "1 >-
<J
1~ ~
I Q.
~
'1' ru I§ "1-w o
" I"'
Zi lj 1,
jlJ I
I I
l
-N~l'. :.,.1 z '\\.r,.i-i NA, Nfl 4BO \\J /\\C 40 />.., "3PDT "'-UTO T.O.T12Nu"':>FE.i?. 51,J6,NC
,---J.--.,
z IY I J<,.
1--E e '!"E'f <I-,- EX
- -..:.:::.l---------------*
QLA ct/3 A"::£0 - C"-T. '!)4034o~5 rlLC.
~o I~
I
~1~-
)<'
y z
-+----------------------"f----,
\\
~----------------------~
\\
( 1-\\~
?*H 4 T~Nf,,1" 1 WJj 1'5 K.V/\\
__ JY) (n__
4BO -120/zqoV 6)(1 xaR_9x3
\\(+
=
~
l
_____ ___ __j 3P J
J
~
1--
DISTR. *cAB~ I 1~, 72 ~3
/2p /2P /zp /zp /2P w
0::
o_
V)
-CAU rt ON*
,-=
1--
iil i'
~~
0 1' ~
2 J
-J)w 0/
!,/ ~
~
(lj * '
~~
- a.
_j
- ti w 2P
~ \\42
. \\'J H4 1-lz.
LU..W
\\';:. K.VP-.
1-\\ 4-1'5 K',//>,.
4BO -
12.ov {'l40V Tl<.ANS.*2.
400 *!20/2.U::,V TR.ANS:"'& ur
!TL---,
201G28/\\*2P 20IG2GA*2.P X3 l(4
'/..2
'x3
\\(4-
~~~~~~~-:::: --201G288*2P ~;::~f===~~==
TB1*~1 2016258*2P SEE n"O
__ --0,,,,-
~ --
---t>'-',
~r;~ 12
-!cjTF3 TBl-2 VOLTAGE REGULAT~R TB!=~i] R3IOISOl 1&
~ jlB3 TBl-2 VOLTAGE REGULATOR I RSIOl!:>O!IA e
TB2-4
~---
TB2-3 L-TB23 01rzq,2P
~-~
~ ~ 5
~
l o
201G29A-2P-'I'
<f"" O 5P 20IG27A-2.P*--
j--t- -1 3/>*-....._~2.Ul6Z7!3-ZP
~
H e-'
~
~
DISTR. CAB:it2
~ DISTR.TCA8"'3 1--
X t-J(Y,'
i!:
1
- 2.
13 4
iS l
02P /2P j2P /zp jZP
=
-I H
1--l u
c) -
u
~~ ~ oJ_
l}t
-t2ui8-
[11 lJ "' J IJ1
~r~"-~
owo I\\J,{} N :r_
0:
~
0
~rd)~~ t ~
I
<v:
l)~
=-
0 Q
I 0
N _,
I() *
\\0
,3 N,n i O,'
II',9 "1 -') co 10
<l. ll'i ll.
u) (l)
---*o.."'
N.Jr-J.J-
- rw:rwN-1 IW
"--y---)
w 0::
o_
(J) 1'20\\1 AC.-MPU"'f.'
R~IOI !:.0012.
DIVl'::>IOlu 2
ATT~E.O TO M<<. 72.li'*tA 31<.0 *L.li!. AUXILIARY. BLDG..
COL, F-10 EL. 643'-6" r.1(2) =~ :7*:~ 7 =~
!Cc
!DX I
234 5
jzP
\\ll IX
~
\\fl
.....,
<=
e-
~
u r
(\\I 0 I 0
~ Gl
~~~
2d
\\!l <ll.
~
~
'9
,,,, ('")
o-a- '9
- 0. I,
- r,d w
0::
o_
V)
SYM~L 2P
,jf - SEE NOTE
,usi. WITH GOA SLUG IN NEUT14/l.L OUTPUT VOLTAGE SETTING REGULATOR'S SHALL BE SET FOR 12.SV AC (TZ) *
(TI)
I'..
0 g,,v
,'f)Yx. l;ii!I INDICATES SLUG I. WIIEI--\\
Mi:.~Ell.\\lol(a 01Z
,:;,gouNO 1\\S'!:oTINC~
I>.
OISTl41BU*
T\\Ot-.1 CJ'.l!.II.IE.T ANO J"..S<;.OC\\,o..T\\S.D 1"RJ>.NSl'Oll.Mi;l2-,
COMMON Gi2.0UNC:>
ioU&
1,11
()
N 1..1 l"i "-ROW IJ D OF TRJ>,l,.\\'!:,FC 11.M e. la P.,c I I.I c~
i E':!>, e. 0 ON\\.."(.
2, W\\.\\ E t..l Pl~i>,.51 t-l <a, Se.CON l:)l'l,.11. Y
\\/ OLT 1>o,.:;,, E '!>, SE-.
SECOl,ll:::,1>.1>. '( \\10\\.. T.O.&Q ?~-INC:.
01.0...G, I'< ia..M,
=
I y 5ECON DA.I<.):' VOLT AG!:
PHA.'SING DIAGRAM MPU *t ! MPU"Z AC1oco*s INCORPORATED, THIS DRAWING WAS REFORMATTED BY MICROSTATION AT REVISION ~T". AU..
PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFILM IN DOCUMENT CONTROL.
TC A PORTION OF THIS DRAWJNG JS AFFECTED BY THE FOLLOWING:
CHANGE DOCUMENT 2
1 r------* --*- -* *-1 I 3l'DT AUTO I
1 T.O
$WITCH I
- Al,\\t) LOC,IC.
,!/,:,SEll/t~l'!' I I
I L----- ***-.. -----1.l
,-----,,--7,--7 I FlJStD I I FU$1:1) I I FI.J~D I I tll$"TR, I I 'i;,\\,a,"TR, I I 1) \\ *iiT rat ' I I cAa,*1 I l cAe *'l I I c,. 6 "'.3 I L-~-J '-- __ j L __ _J
,--- r---,,---1 I *ri.:A N$F :
ITR.ANo,F. I JTI?AN5F, j I,.I I I 1/4 I I "':;
I I..
I I
L ___ _J
.. ____ j L,. ___ __.
FOR MPU *1 ONL~ --r-\\:;:-t--.___ __ _
!votTAl>E -* l I - o:A~; i PREPARED BY l
REGULATOR i
I
-,;a;:G,ULATORI I
I I
I J
I I
GEN~IUL ARAAN~~M~NT (IJ,T,S.,)
PHA~E RE.LATION5HIP (AS l"OL.I..OW5>)
PR.lt-'IA~Y X
<]
Her..,\\
~
y 480\\/. Tlii:AN&,*t,~,$
X x, 'I' l-l(nii)
SE.CONDA RY 1t!l,t-,
><1,-,
2.'(1'20-2'.40\\/
TR.ANS.* I
- L
~
...L
)(2 I X+
,c.,,3 l
xi,X3 =
12.0V.
)<
X2 14 120 \\I T/<.O.NS,l;...3 NOTE.S Tli1,f.-N<o.*1!.
IJ st.f- $PLC.1FlC"-TiON !1,07'-14et FOR A001TIONAL I Nl'Ol'lM,I.T101,1, 2.)UNl"T<<. WIL.I. &Ii. MOUNTi.U IN TY?lc..A\\..
1:.0fl'k ZO" ""10TOCl C.ONTlll.01.. C.~N~A.
COMPA.Cli ME.t.lTiio -~ l=RAM&.S l"Oi:t EAC.1-1 UN IT,
~TRAJ,UloFOli!.l'IEii. Sl:.C:.T IONS $\\.IA.I,.\\.. *&
-.QV\\lfilll.l.'C, l='Oll_ VI.NTll..&TtON.
'l)T114NSFOR/l'IER IMPfD!lNCf 1.85?. AT /S/< 1111
- 5) Al\\.. TRI\\NSFORME.R CONNECTIONS P?.- Ht, TERMINAL">
FOR 5 "/o B005T,
!;.)THe. MOOVLAR POWe.l't. U"41"fS $\\,\\OW1'1 01'1 Tl-ll'S c,,t,/6 AR6. C.1,.AS,i, IE,t,.'i, l:&~1.1-16.0 l!>Y I £.'E.E. STt:>. 308-il
- 7) IMPOf,i,TANT: TWO l'Z.OV FliCEC>Eit.S CAN NOT {!,ii, l3/4l<Al..1.ELEO, l;&E Cil.UTION /l.NO ¥1iCTOII. ~1,I.G~M.
6)MPU*MODUL.A~ POW!i.12. IJNIT
<"\\) PUSES TYPE AN\\l 5\\ZEAR* 5/IOWN ON S/'E(:.~01/>> 128 sn,.,J'-2-1.
- 10) TO ROl.lTE CABLES 204037-IC AND 204055*2C IN SUCH A MANNER s:J THAT THESE CABlE5 ARE PLACED ON TOP OF THE REST Of THE CABLES IN THE FOLLOWING TRAYS: CABLE 2040.37*1C IN TRAYS IC*Q94,IC*056 IC-123.CABLE204055**2C IN TRAYS 2C*022,2C*034,2C*058 II 2C*096 II)
Ve.NOOR t-\\AMEPlAT\\:. 5HOW5 bOA-3P,0NLY 2--POLE USED,
- 12) TB!-2 AND TB2-4 ARE INTERNALLY CONNECTED BY THE VENDOR,
- 13) FUSE CLIP AT MPUL SPARE DIST. CAB. 1, LINE 73 v/AS REMOVED FROM THE FUSE BLOCK, LINE T3 v/lRE v/AS TAPED. ALL THREE FUSES AT MPUl, SPARE DIST. CABINET 1 HAVE BEEN REMOVED FROM FUSE BLOCKS.
REFEf3_(::NCE DRAWINGS SD-2512-lSA t-1.c:.i;., ~Tb.I...
! l =~~ l l ltlAl,{AT\\OMs l>IIU,W\\...
i i
~IRIN~ *p1AG,~N\\ MPU +2 WIRING DIAGRAM-MPU'l SD-2531-23 SD-2531-24 1-2600-01 1-2600-03 120V 01ST. PANELS -ONE Ul>JE tl/1\\G;.
E-2833-06 CONDUllSclNSERTS FOR MCC',; 1,2&3'; FLRS RX. BLC E-2997-06 CAB. MTG, DET, MPU'S 1, 3 & 5 sD-222-17, -11A I/D 40{)\\/ A.c. Mc.c. 72c*3A sD-2s22-1sA, -rnB r./D 4fJO/ A.c, MCC. 72.1:.-s/J..
sn-2s22-20 T./D 40011 A.G. Mee. 12-f!>.ZA SD-2522-24 1/D 480V A.C. MCC 72F -2A I 6SD721-2530-01
!NC.CODE u
TITLE DATE LATEST REVISION AC NUCLEAR SAFETY RELATED THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
Detroit Edison Fermi 2 ONE LINE DIAGRAM 120VAC INST. & CONT.
POWER FEEDERS DIVISION 1 & 2 IH G
F E
D C
B CHECKED BY OA7E REACTOR BUILDING OTHER REVISIONS:
r.c;;==--::-:::::-==----------------1 A APE TUR CARD TITLE R
I 4
REMOVED 35328003 AT D',/G. REV. 'AC'.
0 L D 120V DISTR DIV 1.& 2 RX B
~ARMS"-c-"RE"c-c=1P=!EN=T=#
PREPARED BY ID.A.ti I cH;J!fCKEff_ ByJ,
1.tTJ j~
, If* VI..,_
MIKE McLAUGHLIN I 03/23/17 I \\
n A APPROVED BY c =;i JI *, *
\\J v-1 01~~.
,_/) 'O"d\\f.......-
Zol"/
~
EDP POSTING ENTRIES REQtnRI!'! THE ADDITION OF THE ARMS STATUS CODE:
EJTHER "AFC" OR "ABB" I
APPROVED BY OTHER APPROVALS n
DATE PLANT IDENTIFICATION SYSTEM NUMBER R3101 DOCUMENT TYPE CODEDDDELE NUC OPS FILE NO.I DATE ISSUED TO IS DATE lB01 I
3-2 '-\\ +
DRAWING NUMBER 6SD721-2530-01 REV.
AC 1
1