MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684 - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
H iG I F E
I
D I I--<
C I I__,
1:
I I
I B
A 8
7 6
- 0.
- 0.
- '.I V
~
N I "'
r
---;--o1 Fl72 3"
SEE DWG. M-4291----J
- z-M-4952 (~_:;)
=>
615D C,.,.-,,t,,
I 3*
5 F'oR S7M, ~ COJvlJJ,N$1'17/:-
p1p,,_,,G
<*,r,E M. 4-Z,:, 2, MOT 4,-1,~,SOl..£.
- r-: IT07' <.,,a :!:i> 4'Y.
NOIO !M&.V.e,--
Alllled ~VC, HOT <S,<:,
M,Jt<t:L.E."'- \\
F207 CHILLER UNIT I V41008001A
~ "
CON0£N::.L!R.
11r---[><]
I F294 P5L Pl r; --
a*~ PR£SStJRe
~~
FZ~A01 F293 F205 F203 F292 4
I
"' "' I I
I l'5L Sl:ENOTI:(p c-.t:.60't 1
~ ~
i,/.$ra E
'II,,:::,_-,
I F206
'j' OCT!.,.,
~
~,:
)-1'4-..1----------
- J ~
F208 G:
tr1 2 ILZ" f!B?
.10D ~ 'f'3[4"f_lB9 F295 J('
REPLACEABLE j:'.
SUCTION FILTER l
~6 FIB7,. V4ltUl'l.1H' Fl90 RSF 9621-T',
Ir;,;
Fl76 D101 9 I" Fl79
~
Fl77 r i..,.
V41 F022 1
~,..,,,
2 1/2
F224 I
F204 1-SEE M-4264.
m "
I E/V 40
~
t,.,;Ql/10.!:,,lJi....EAIOIOI t:j
_,_.,L
,:f,5)/,RA,,/.:J,tON 1/,d L V,£.
1.-1',
FIBO V4l00F017--...__
2" 1;2 Ii
'--
- TO LABORATORY FACE & BY-PASS 3"
MOOULATING 2"
DAMPERS
,...,..-i-r*""T--t---,----1-------1------,--,-~---,
V"110of"ofG + ~
SHUT-OFF,,.
-~
DAMPER-10850 c.c-..-v; MANUAL,--"t"* -- o DAMPERS** i I
I I
J%
0 1[;:l 0
~~
lb l
I I
I l '. '
AV.TIL/A.,I'{,. y l
lii 1
\\ /,
,;.;,t---,--1 VACUUM F191
/ILAT1N,$
I
- 1.
VACUUM BREAKER co,~
r-t---ll-
! Fl Bl BREAKER rt'-----+-,
I I
- T~I
.CAN)'
~
_/
11/ _,,
"'::;;:Y<,
/
1.Y'l.. -..
jj 1.:~
I
'\\
l Pll.£J-1EA1' C.:.W..
V4/ 00[3.::>04
---1 V4l00DD19 I
- ""/L TE..R5 I V4100~001B I)
,fl/A?- Co,vCJ'/ T/aN,-v<;,
lj,y/7' c:1:---
M-2271_~
I 8270 CFM) Y'. C}
(VARIED AMOUNTS IN tJ ~
CO/Vt:>. /i!£1UllN HOT le COLD DECKS
"' e-DEPENDING ON r=,
HEATING &: COOLING E5 :c:
DEMANDS) u I
~
-l,.
~ II So 00
~ If)
'< (\\J
~
~
- u.
V 0
If)
~
fUME HOOD EXHAUST fAN 3
2 I - -- - -- -......
-- -- - *- -- i-- -- --
- I
-....... - - -- - -- ~ l -... -- - - - - -- - - - - - - - - -- *- - -- -- t-I --- -*- - -.-* -- - - - - - -- - - I I
I I
-7 I
I I
I I
I I
I I
I I
I I -j
~
I I
V4100 ;,vt9 A
..zi:'.=;
-,;.-ooor020,,.,.I
,-..:::i~
v4l=ro2,..
...,,v,.
8r
,,.,,c,,vv#;.AiJn,,v-~
,,._,,O,al,/l,A/1//IIC;
~
_,..,,o,a,u~ >) r;n,'G
~-,11>4.A?
I,(
=A-p,e,.;;:. I OAM P.E '<.
V (SEE TABLE 'A' FDR I I
MIXING BOX CORRESPONDING TCP MIXING BOX
=
260 CFM I TYP. 8 PCI.S.)
1300 CFM p; I
--~_,
I v4too FO 2 2 M;;;;,Ou,t. -I 7/ JY(i, OA,¥7Pe/4:"
'--.. "?/KING...Sc>>C 7'50 C~M 1~-c, CJ'M
-\\,t y q.1 o,o,=o 2.::,
MODULATING DAMPER I
...... M /,.r /",,. G
,5,::,,,. 2170
<<:."/f!l'M APC ?;,,?,t:~S"SV,'il.*- -., I
.liitJJt./t::.JNt; YA.t.V.G
]
~165Q C'">I V4100P0Zy, ~
V4IOOF02.';;
MD r:::>.tJL,t;,J 7'/1 A/ (i
/vJCU~u;: ~ r'/Ni/S
.L:>~Pe A!
T "4/K/N6 _,($OJ(
400 C,.:;_,...,
.(>O,...._,. ;;;, £.A<
'-/".o?_..,..,.,,....,..::;
..:9<!>-<
340 CP--,
I t J t
...:6t:::l; ':-,4;;:;,,~c::,~ 6 i
,'?.,,..,.,,,,,,,,,,, -4 j
I I
.__,__-1 I
I
"'4/JOA/a..a~
\\_MIXING BOX I
r- -
_ _;.i 2600 CFM I
I-~--~~-~
~
~ ---'---1 J_
t------'l;;....._,.1..--1---. - 'l 7 I
I 450 "F""
j
~ __ I _____ ----.
+--
-*-!----+-----~-,
= '
=l*
OJ
- ----.--;:a I
I~{~
~
-.L
~~f PORTABLE PORTABLE AIR AIR CONDITIONER CONDITIONER (882 CFM)
(882 CFM)
PANEL PANEL 0
~i~
~
j~~
~i~ ~t[ Riq
~~~ I
~
,r I
PORTABLE V
AIR CONDITIONER (882 CFM) i--
V 4100B128 SW OFF1c.e Alli; A E. OFF-le.
At<EA o~t If)
...L, le u
I I
I 1'.
- e
~ X~
I: U i
LL
...... bo
()
&. a O
ul a
(\\J 8
1(1 DO-K}
=*
~
..L-
=.j,}
~*\\*
I I -
ti g'!'
?;
~
I
_ _i-.
r.-
~ r*!:;:;;i r:::*=
,,,,,,.ooo-::;yi-I
~ * *n* £
, ;o*
1e:
~.
cof l(
V H'dl/1>,'N"',V.1#
V 100
~41 'f:;::::_J 1_1_ '#I 1--
00 L
, v*,oo I
2"' P'te!E-FJL.7,1,!k
-"" L_.,__ o'
£MIMPEt<.
pr:;
,;;;:.,c:::._
t::,~
()
(1<'PlCAL)
\\
lT'<Pl<:Al.)
Ll_,::;..,.x~~;;.,....J
\\:-,J,-,Pt=.;
1 5/'l!Cf"IU>GAAPH '" -
ef 6-~
~-d
~-d
~
\\y4100Yoo
~ ~
r-tOO?. '(Q04,.""r VOO'S
-iOO/i,,
,(oo7
~'.,'001
,:, ~;..
~---
4 100 V4,lo0
\\/4100 000
\\14100
¥4100 SE!i ;,{(>1'1! 5 L.----
t t 1000 CFN O C..FM 390 CFH 390 C!'M 390 C!"M 400 I :::<=1'-1
- ,: f c, _L
~ ~t
~It
~,_~f
~Jr OJ~~
- t.
~
41 GUP605 GlfP604 GENERAL AREA
-y" 11> G;SO CF,-1 THRU b<>oR OPENINGi 6£NF-k,,,_,~ ~~ G~N4',-...:'4i. ~£.4-1 rv,.,.,,,,:,,;,oo-o sr...-<..c-sv.o.-:.<<;,,;.sc*,,.,._
\\_..,.'(,.,C..._L) 860 CFM CHEM CLEAN GENERAL AREA GENERAL AREA
-"cc>c,A,1
.-,F ~/1.,..i;_
---~-----~-*- __,_
GENERAL AREA COUNTING ROOM L w' LEVEL GENERAL AREA LABORATORY L.ABRATORY CHEM, PLASMA ROOM CHEM. MONITOR & PARTS STORAGE
_;;c~O""NTROL ROOM DAMPER OPERATORS &
NOTES.*
- 1)
DELETED 1
L I
/4?£,4,:: r.:,.e l 8~,1,i.t:;).IAJ~.
CO-N7/<0L ROQM --f-......_
f /.'~Ai.TN 1-'NVs,cs
,..q.e,,
~:Ao< d,,v,£ Jl.l.i',)Vi,I:
Or"~.JC£ /JM~ 5~.f:F
,,4-9~,4 K£y P,L..QI'{
N
~.5c..QL£.
X'°-40¥,#5..... ~
Al~/~oµ,r r.;; -
0 REFERENCE DRA\\,/!NGS, M-1131.
M-1232 M-1233 M-2234 M-2238 M-2239 BASEMENT FL R (EL 557"-6')
FIRST FLOOR CEL. 583'*6')
FIRST FLOOR MEZZANINE <EL. 601'-6')
SECOND FLOOR & SECOND FL. MEZZANINE (EL 613'-6' & EL. 628'-6')
SUPPLY FANS & AIR CDNDITI NING UNIT EXHAUST FANS 6M721-2711 LATEST REVISION V
CORRESPONDING TCP'S DAMPER II/
OPERATOR THERMOSTAT
- 2)
- 3)
/CC>JI.-:, ~-&GE.-vO ANP 61/.,...,,80,:.._$
SE~
.O..Q...q.w.,..vG> ~. -M-..?OOI FOR.
.OE"T4J...5 'S£E C>R,.1i~/NCi,
/Vt:$'
.,A,?~C.2?~. B9..:,c THE FLOW NUMBERS INDICATED ARE HISTORICAL DESIGN VALUES; FOR ACTUAL FLOWS SEE DC V4100-01 VOL. I
& DC V4100-02 Vol.I V 410DF019 TCP-K003A V4100FD20 TCP-K003B V4l00F021 TCP-K003C V4100F022 TCP-K003D V4100F023 TCP-K003E V4100F024 TCP-K003F V4100F025 TCP-K003G V4100F026 TCP-K003H TABLE 'A'
- 5) 1',li*OC4. TIO/'/ OF 5/>l:t; r'P.AMI: r'P,IG'!J, r'l..45MA ANl,,i. Y Zl:P,,
f'JfOM 1./NO/:~ rNe EXHAU'Sr' HOO() V4IOO'(Oo4, ro r;,e, CAl.l~P.Ar10N 1'.00M !!EQUJ;/1,EO NEW !!XHAUST over AN~ 1.0(;1(/NG Cl.0510 l!J(){AI.IST H()OC V4/0oyoo4.
1,)
- 7)
II< DENOTES EQUIPMENT SUPPLIED BY CHIUER UNIT SUPPL1£1<.
UNLESS OTHERWISE SHOWN:
ALL INSTRUMENT PIS NUMBERS ARE PREFIXED V41 ALL VALVE AND EQUIPMENT PIS NUMBERS ARE PREFIXED V4100 V 1ncn's INCORPORATED:
TSR-38039, REV. A THIS DRAWING WAS REFORMATI'ED BY MICROSTATION AT REVISION "p". ALL PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFILM IN DOCUMENT CONTROL A PORTION OF THIS DRAWING IS AFFECTED "fJY THE FOLLOWING:
PREPARED BY INC.CODE TITLE T
DATE INON-NUCLEAR. SAFETY RELATED!
THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
Detroit Edison Fermi 2 FLOW DIAGRAM AIR CONDITIONING & VENTILATION RADWASTE CONTROL ROOM I-I G
F E
D C
B APERTURE CARD ~TLE HEALTH PIIYSICS LAB A
TM 17-0005.BOOl, REV. ~ REMOVED AT DIJG, REV *v*;
DIAG A*1c & VENT HLTH PHYS LAB TC CHANGE DOCUMENT CHECKED BY DATE OTHER REVISIONS:
8 7
6 5
4 PREPARED BY MIKE McLAUGHLIN APPROVED BY t'.3,Brecf_e DATE I CHECKED B~
10102110 G,8,--ede, f*er PiA<le,. 'V,,-v1" ve 5'
~
I APPROVED BY D. TE PLANT JDENTIFICATION SYSTEM NUMBER I ARMS RECIPIENT #
V4100 DATE 1oftsf f8 DATE 1*/rs/('o EDP POSTING ENTRIES REQUIRE TH'.E ADDITION OP' THE ARMS STATUS CODE:
ErI'HER "Al'C" OR "ASB" OTHER APPROVALS
?
DOCUMENT TYPE CODEDDDMEC NUC OPS FILE NO.
1801 DRAmNG NUMBER 6 M7 21-2711 1
DATE ISSUED TO IS I0\\0,*\\5 REV.
V 1