|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684 - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 H
G F
E i
I D
C B
A 8
DIVISION II BATTERY 2PB 7
ID #R3200S004 ___ _
~:T-~~- ~~~1* I I
B T;El~~ *::;02*
(-JI
(+)
H
('\\~
I
___L_ I
~-I I
(/)
I Vl
__J
__J
__J
__J w
w u
u
__J_
(/)I
- __J,
...J!
w u
-=-- I
(/)
__J
__J w
u I
(J's (J',I I
OJ ru
~I
(]',
rul I
-=--
_I I.__-=-=---
- I I
~ #4!~~ -:~
__ __(-)
1 1
""r* +; *-7--
(r-,¥~~
I 8
l*!lc"'*!IO I=
.L
~
,,I}
l O.,J_
- o
~ '
,o I
A B
lo g~
' 8 A
,fi I
IO
....J 12 I
Cl I~ i04!:l'o'l.-tr.>
I
/:,j I f ii:
l '
J~ J *i'110
, # L---+-~
4 _j~
J
.~ 1*¥c VO 1-1/C #1/0 ~
204551-2P
'(+j 1(-)
~~_.:/
204&S~-;p I
\\'.' l-l/C#l/0 204554-2P
~-,
~ 1-'lc. # 1/6 204-55(;*2P ID. #R3200S027 6
5
~
~
480VAC f80V AC 480VAr Mcc /i.72f:,fA2PO:,,!ie,
- -,C('72F*2ll,lt>53P
.JI.CC
~
CSD-f'512-22)
~
CSD-2512-15A)
(SDr2512-22l
..--- 3/C#4,2.0Ho40*.!.r t-"3/C #4, 201825-2P i:.:;. ~ (C. ~1-, ~1\\l\\<23 -zf',
R3200S021A I
BATTERY R3200S021B I
BATTERY I
CHARGER 2B-1 CHARGER 2B-2 I
R3200S021C BATTERY t:HARGER 2Bl-2
, r_1:tR7
, W-R:
I f -
Q O
I I r-y]
i L1 L2 L3 i~SEt7 L1 L2 L3 i
1-JOTl:.S
,(.i~~r(-)'
\\:!..J 2 9-9 L ---,
~ ____ __J
~-
1'------r-'
I~
I
~
~
~
- s:
<[
lD I"'
~1~
- i._
~
'\\I
~
\\ i?:P
[)'.
[)'.
<[
<[
_J
_J
<[
<[
w l'J lu
<C N r, I
_JIO s;,~
> ii:
'3 -J w '° u
" r*
_j "
D > "'.,
- ,, ii:
D dd ru o,~
P'!
\\.) I~
us en N =
ru
'2P (JP
\\
cP 0
,~1~~:
I O
O O
I SEE =-i L1 L2 L3 I NOTES
- 1+1[@7-l:
2 &. 9 L ---
__J d ~
(SPARE CHARGER -
CONNECT
)
i, AT DIST. CAB. AS NECESSARY 2-1/C #1/0 204559A,B-2P q
O 3P
- ,~~---;i 11AIN DC, DIST. CAB, 2PB-2 4
SEE NOTE #11
_J_60v,IX,MCC-,
2P8 I, R 320l'1.>D/6 (S0-26~0- /4-)
1a 10 2
J
/,;$
~
400A I(+)
I
+
L--------------~-
N N
"""-MAIN LUGS <-l l
1 6 r Y
I
?fB11sTf:-
IJ l
b
!;J
- =J
~
!:/ : I :... R:,aQQS037 U~ Ll-<,0.~,44-J
~
~
~N
~
~
6' v"
c....!..
- ,(I
,J"'I JI i'-' f'
~
~~
2
- i:2
\\'J "*
~I!*
I SEE NOTE
- j
[ I 3H' OA-2 l I
J 30A-2P 30A-2P, 4 5
200A-2P
':iEE-NOTE f.7_..,
l iYPICAL)
- J l60A-2P!JOA-2P110
// 100A-3P IO A-.:J.Pl 12 13 200A-3P 14 200A-3P I
200A MAIN LUGS 1 30A-2P 30A-2P 2 3 30A-2P 30A-2P 4 5 30A-2P 30A-2P 6 7 30A-2P 30A-2P 8 9 30A-2P 30A-2P 10 11 30A-2P 30A-2P 12 13 30A-SP 30A-SP 14 15 30A-SP 30A-SP 16 2PB2-5 DC DIST. CAB.
RELAY RM.
R3200S064A-CLASS lE DIV.II 1978
~
I 100,1a.
IOO'li,-"ZfD 'l.
S 100.11rr-ZP
-1.P
~
I 200A MAIN LUGS 1 30A-2P 30A-2P 2 3 30A-2P 30A-2P 4 5 30A-2P 30A-2P 6 7 30A-2P 30A-2P 8 9 30A-2P 30A-2P 10 11 30A-2P 30A-2P 12 13 30A-SP JOA-SP 14 15 30A-SP 30A-SP 16 I 2PB2-6 DC DIST. CAB.
RELAY RM.
R3200S064B-CLASS lE DIV.II 1978 coc,.,
M,li/W.,.:u4 :!J J_
H G
F u
i.,
o
"' u
-o 0
- 11--..._
I 6 - 200A--2P=.:..:1
~
7 200A-3~
15 200A-3P
~ "'°"'--.P =-*P 4 +
7 60A-2P 60A-2P 6 SEE NOTE 1112 I
N:>a,,9*.?/11' /IJ0,9*Z.P 2
- S.$0,;*t?P 3o,f/-l!'P tJ.
S ~-id> #li*Z.P U 7.C..9*,?P 610/l-e'P t1 9 3o/l-.?# 3M*i?~,c, II Jki-'9*c"P 3o,.v-a,,D
/Z l'3 ~-& 3M-~ /il-
/5.3M-SI° ~-SP /~
17 ~-SP 3a-9*.5r' 18 19j""'9-5P 3o'9*SP <"D GROUND DETECTION LIGHTS $TATUS P,B, Ll(ifT POTENTIAL P.B,
- 1
- 2 fA/JlT PS, I, 2 J
,(
POS
!ION£* A/B,fO '4-0 40 40 40 4{)
AIB I' \\
\\T/
A
, 0 0
/20 40 4() 40 B
6 \\4£1 J40
'. 40 !,~0J120l12(} I -s
.4 I 60 1,0~[ 0 I 40 i 40 I 1'I. I B N
L...
8 40 40
,j(,
0 60,o I B
(-} -
,I llfJ lO !l.P '<0 40 -fO B --j
/3 40 40 40 /l.0
/)
0 B
- ~ RMALLY ALL LIGHTS_ARE EQUALLY_DIM SEE NOTE 10 P.B. #1, 2 A= NORMAL B = DEPRESSED Ip _j~,;
6 1
w i* I~
I s
3
~
I 1--r" 0 ~, ----a; I tJ!
+
-*11 GRD. D[T'N C
ll6HTS.
!a !!200.5()~9...
R3200S064A -
RELAY ROOM D.C. DISTR. CABINET 2PB2-5 V
(\\J "'
8 ~
0 (L
(\\J
~'°" -
<[
U D
N -.,
I ~-,-
N
\\ '
(L N
~
0
- , <[
Cl U
Cl lo ru N cH*: 1 ir 1 1 1 ~. :i, :i. ~- 1** ~.
r<AIN,u&~
'/
"/
I/
"/
o/
j I,/
o/ 1/ l, AT TOP 2 p.
2P ?
2P f 2P 2P 2P ~ 2P {
2P 1 2P I 2P 1 2P I 2P F
I Pei "'I-
\\.)=
I
~I~
-' =
w
(\\J Cl'.
> °'I u
,,, (\\J 0
OJ 0
.,. OJ (L.,
M
- JJ
(\\J
.i'
<)
>-" ~
~ 0
- .!.I If) 0
I I
0
,: N '
> Au
~N
... ~
~ N "
~
- M
>, N
"' =
0 Cl Cl'. ~
r£ N tJJ J, c£ D
,,., (\\J z~
-*u N
'° Cl
- 0..,
-=
I OJ
!Ill t;;I
~
A
~
),.
~10
<~
~ Cl o
..J -
.,,./j If)
Lu.!...
a,:
-..r a::o A
o v
uru ecru Ct":
- i::..!..
Cl...
er:.__,
,c w u nJ u
- 7 !*,7
(/J ID C,1......
0,.,o_lf) z ~
~ u*
OJ
"<t" (IJ s:g If)
(Y)
.,.c,
(\\J
'° ru
~
'?:.
- 1 5c 7
0 0 " ~
M MN O'.
W 0 r
ru
°'
I w
~
z \\.)
N '
N M
M
=.,
- =
I OJ
-"' =-
u...-
en
<I: en
~...
Wo
"" ru '
u -
0.. u 3
ru
= ru ru ru
~...
-=
I' ru g
u a
"' ~
~
<f)
,,1.,
(r D
C ru
<)
ol
";l I u
~ N
.... :fl
"'I" Cl
- N I~~
"' " u
" w o....>>,.._
V.l <C 0
- ,: _J w w O'. °' "'.,
W O'.
0 v, I N
- , Cl'.
L..
ru
~
> u
(\\J u
N
~ -
M r--.J_,
oo ruru
..-,-.;t
\\D
'Sf-
\\l)
(Y) 0...
"<t" Cl..
C\\J 0
- r:ru,:r:
'---v./
u O'. -
u C,
w z
D C,
z
<[
<[
i
~
O"
<C
~
u OJ...
N
<[
_J w
[)'.
u
~ ru
~ '
o ro D
(L M - "'
Lil N
Cl R3200S065 AUXILIARY BLDG, 3rci, FLOOR
- 0.
(\\J u.,
~ '
<[
~~
0
"'N
""~
oO o I= Ill
(\\J ~;
i R3200S054 Ll:>1:-AL V) R3200S053 LOCAL VOLTMETER.
A V()L T~ETER_
BI\\TTE!t1 i.'.B-1 R3200S066 RHR COMPLEX BATTERY 2B-2 s
200A-2P 400A MAIN LUGS_
16 200A-2P iDUBLE 400A MAIN I I IGS R32.005027 MAIN DC.Dl:,T, C.A'B, 'LP!'>-2..
CL I>. S<; IE ll\\V. TI
'l>,_U~\\\\.1"'11..'( ?JL Ob',, 11..1:l l=L.
9 30A-S 30A-SP IO I z-~*oA rl,,,Y,d -!'<'.1&.S j
R3200S065 ZP82-IS
':iW~R ROOM O,C, 01':iTR. CA6 DI\\". 2 (Au)(: I.. IAR'I' 01..DGi ~ Ro FLOOR)
S\\./GR. ROOM DC DISTR. CABINET 2PB2-15
$\\./GR. ~ CONTROL EDG. 13 ~ 14 D,C, DIST. CAB, 2PB2-14 (w~~,, -- --:)
?~O,~ *~~ lJ->
MAIN LUGS I
1 4
S
- l.
3~
z 7...
El
- r SEE zp°j iPt 2P/ zpi zp °/ ep{ 2Pf lP NOTE #12 2~/ zpO/
5
.?POI "l i!P6/ i!POJ 6
- i Q
CJ\\
w 0
¢ 0
U, U 0
0
~ "'~~
~~
o co..,.
oaf.....,
'<l"'(l')-,1n-"
I C,:
,M 0.:::
uv ll._
Y ::::: '- ru I W
,::,l lf)
I ::::!
lf')
l'\\t
~ I.I) lf)
<.D r-,. t-I r-,.. 0J
.... ~i=:i..
l/11 l(\\VJW
<::t"i:::l
(/)
~.........,~0(/)
~()
co"
._;ru.__,
L..
8
~
Oru i
.--<' ~
'4_
I 1q1B
>t ru i, ~
~
u ' 7 -. ;::
U o ru' V,b r=:
- o. ~ru ru -~
I ru-SEE NOTE :lt12 11;/
~ I
,c f
e)j
~
= '
~
=
ru
= '
- 0. -
aJ u
~ ru
'° J.i
~@
~ "'. "'
l)I~
ru U
i=i o-,
00
(\\J
(\\J (Y) 0 O
0 0
0 u
V)
VJ V)-._
0 0,J o'
0 O---::..r-.
0
(\\Jr,. "<t"
'<l"NOJ-st"lr--,..-a o2,1..... --Cl:'..
(\\J Cl!'.
I uU-i:::iU~U L.J N r--, W CU r--. W M rt,_ (\\J "<t" I
C\\J C\\J
-r-.1 -
r-,.
Ir-...
- q-Z#OOz#
'.JI I
"<t" I
U) "' "' "'"' " "'
" ' VJ ::J V.l ::J r:r:I '".._,.
r:r:11 (\\J '._/ r:r:I
,q3zoosow+I!- REUl'f R_OOl"'I_ D,C.. Dl.5Tfl. CA61tJET_2PB2-G z"'
(L "'
_J~~
er, o-, 0\\
I M#
f---'.C\\J 0
V) r---.Z r-,..
U O
U o cu o-..._
OU I
(\\J r,. "it
('\\J,....., (/)
z I
0\\.-1 I.-<O....J I
C\\J Cl,'.
(Y) O<[....,.
I I OLJ '--'
~ ru
'ruMo u.,....,i=:iu-o,:::...Ju C\\J r-- w (\\J r-,.
(U I ruru I (\\J
('")
I tn1t'--lD1
....,a) r-,. Z #
COz
- r--
V 1
"<t"1 set"
\\l) i=:i V) "° i=:i L:J \\l)
If) 11/.1 ::J If) (/)
A If)
(\\J,..,, r:r:I
(\\J...,
w C\\J 7
fil
~
,e ce I " I
':l"."I"
=
~
(
J
~"' 1*~
_J W Cl
.>1-c::p
~...J<C "Sf' o ):W t--
U"' > '-"
(\\J
- l...J I
2EIYn,:<t t;!
O:'. f-- >
0... V) 1--
u z
z ru COHr:r:1 I lf)
(\\J,_.
r--.
"<I- 0,::: :;; 1--
co u_Ww._<!: o 0 I-D
__J (Y)
ID <[ l() D (lJ t---:31-~ ru
<C u
_J 00 O'.
Lil I
_J "'
<C.,
0 N
D
"' u r
ru D
M S-N M
OJ CL -
'i:
~ "'
<[
u
~
<C D
_J w
0 I
N Cl'.
N
>'Ll N
A I
~ N OJ 0
o_
Cl
(\\J
'i:
J
~
~
sl~
"'\\ "'
~ 7 -
,n u
1 N
~'
a "
~ M Q.
0 N
cc w
<[
- 0.
~
.:c
'3 w
z,..........,,......
-vQ,'.M P=<
m
<t ru
<[
I I
0 mS::m V
Cl::
'¢
<[
0 Cl::
0
.....J
(\\J
+
(\\J W
I Ct'.
t:;
ES e
r u u (L
(\\J w
I I
r--
~
0
=., -
(\\J u
'° (")
§:
- 0.
N ~
I ru
'°
- 0. -
5c
\\.)
(\\J I
N
(")
N
~
u
- o. l 8
N
°'
I r
,o.,.
D o_
N N ~
> id I
- i:;:
N Cl
- o. ru --
I 5
u
... z
,~
U o.,
w.,
u -
z
~
w
(\\J C,
w -
" u N
OJ 0
OJ OJ
- 0. "' -.,
IN
~
_J w,~
°' 21; c,-
I -.,
<C
_J ru D
z u
0
(\\J U
I - "
Lr)
"' (\\J (L
(")
- 1 N
I 0 '
r!I~
- Ji u N
0
=
OJ N
pq
(")
(\\J
~
<[
\\.)
~
z.,
D Cl
<[ "'
z ii:
°' -
w r
u
~ ru Cl
"' co OJ 0
(L
'i: ru
_J ~
z "'
(L "'
' cL r-00 z,-._
o ru ou' w
z 0
_J o <r......
Ou~
~ u
_J (\\J co ro.,.
Cl '°
"',n w (\\J 4
- 1
~
IO 0/
0 1
2P
/2P I
~
J 3
2P l "
-r
... t-)J v*
Z.P l:ZP "
0 2.00A M..,N 1P u/.*
/
1>,-'
LU'-='
I.P
-n,p I
~8
~ l
~
o2 i:/2
~
t-"' M...
LOW o
_J"' '"
u"" -
c,- "
Cl'."' '"
Er, 4: '
25i:o ~
~g u
-u (\\J WsO
,n.,.
_j:::: ::::
ZW N (L
z '"
>-<C
<C "-
_J w
o2 i:/2
~
r"' M
Cl,<
_J <e N uek'. ~
"' "' (\\J De, z '
w"" "
- 00 (/)
- ~
,,, 0 oO U 0 U
(\\J
" '° '
-on o c,--
c,:W N Wz (\\j r<<
Eju.
z -
'° 8
I).
4 I
r--
-41
~
N P=< r=:
. ('LI
<[(\\J
~......
U I
<r l'-
z
\\.) (\\J z'
<t -
_j
<C,.!..
.---<W
_J,..,-
~~kl~~ U CL(")
I (lJ C}.---;()\\(L,q-1
('<)
r--
0
...... 0\\
Ct'.
,;;;/""~#CO
~, ~
~ 0 wru w\\G Rl;FE.Rl:NCE:
ORAWIN~':>
SD-2531-13 CHAl<GE:R i.1TERN.. I. W'Rl~G OIAGR.. *A E-2833-10 i>ATTE:i<.Y IN*;TACL ~T*CN O<<.. WING,.
E-2833-03 CHARGER INSTALLATION DRA\\./ING AS[DCD'S INCORPORATED, OTHER REVISIONS:
REMOVED 35,309.011 ADMINISTRATIVE CHANGES PER PEPS-0019 PREPARED BY A. DITTMAN APPROVED BY DATE 4/14/20 Mlc::hae1 McLaughlin 1
9f,ECKED BY
/f I. J;,-"'j 1/b /,'A
', 7 3
I l I I I l, ___
N
- I
- TYPICAL. C/:l.lolNE:T ~U?
- 'OLARITY-F_goNi view ND_TES1
- 1.
REFER TD DETROIT EDISON SPECIFICATION 3071-128 STD, EJ FDR FUSE SIZE, TYPE AND RELATED DATA.
- 2. BATTERY CHARGER HIGH VOLTAGE ALARM AND TRIP SET AT 134.0 +/-.5V AND 138.5+/-.5V RESPECTIVELY, LOI./ VOLTAGE ALARM SET AT 124.2
+/-,5V.
- 3. PROVIDE ISOLATING BARRIERS AROUND CENTER FUSE CLIP OF 3P S\\./ITCHES.
4, DENOTES NON-NUCLEAR SAFETY RELATED 5, ALL CABLES SHALL BE 2/C 1112 UNLESS OTHER\\./ISE NOTED, 6, 'SP' DENOTES 'SPACE' 7, FRONTAL ELEVATIONS OF DISTRIBUTl N CABINETS SHO\\./ S\\./ITCH AND FUSE CLIP SIZE, NOT FUSE SIZES.
REFER TD NOTE #1 FDR FUSE SIZES, -
- 8. FDR DETAILS OF HI & LO VOLTAGE AND LOSS OF PD\\./ER ALARMS AT MAIN CONTROL ROOM ANNUNCIATOR CABINET, SEE D\\./G.
SD-2531-13 TABLES 3 & 4.
- 9.
BATTERY CHARGER FLOAT AND EQUALIZE VOLTAGES SHALL BE SET AT 129.0 +/-,5V AND 135,5 +/-,5V RESPECTIVELY, 10, GROUND DETECTI N LIGHTS ARE 101./, 120V RATED PRESENCE OF FAULT NOT INDICATED UNTIL PB#2 IS DEPRESSED,
- 11.
MAIN DC DIST. CAB 2PB-2 P S 7 HAS A SPACE \\./HERE A FUSE CLIP 1./0ULD NORMALLY BE LOCATED FDR THE POSITIVE LEG ONLY, 12, BREAKER C2PB2-15 CKT-8 & CKT-5) TD BE MAINTAINED IN 'OFF' POSITION \\./HEN REACTOR IS AT PD\\./ER (MODES 1, 2, OR 3),
- NOTE, CIRCUIT 5 ENERGIZED DURING DIVISl N II OUTAGE (LC l FDR TESTING ONLY, EXCEPT FDR USE IN RESPONSE TD BEYOND DESIGN BASIS EXTERNAL EVENTS, DATE
~-15-20 DATE
(}{Ir~
THIS DRAWING WAS REFORMATTED BY MICROSTATION AT REVl'SION "AE". ALL PREVIOUS APPROVAL SIC.NATURES ARE ON FILE ON MICROFILM IN DOCUMENT CONTROL.
,c A PORTIDN OF THIS DR.A.WlNG ll3 AFFECTED BY THE !"OLLOWING:
CHANGE DOCUYENT EDP POSTING ENTRIES REQUIRE THE ADDffiON OF THE ARMS STA'l'US CODE:
O EITHER ".AFC" OR HASB" INC.CODE T
PREPARED BY DATE CHECKEJ? BY DATE APPROVED BY DATE OTHER APPROVALS DAT~
?
R3200SOc.,<o
- 2. PB 2. - 14 E.D~, I '3 t 14 D.C, Dl'STR. CAB, DIV, 2 TITLE
( RHR COM Pl.EX:)
[ 6SD721-2530-ll
- Ji'vr~mN AS LATEST I.-*-~~~-
NUCLEAR SAFETY REl,ATED THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
Detroit Edison Fermi 2 ONE LINE DIAGRAM 260/130V. ESS. DUAL BATTERY 2PB DISTRIBUTION-DIV1SION II APERTURE CARD TITLE ONE LINE 130 260V DC BATT DIST PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT 7l R3200 DOCUVENT TYPE CODEDDDELE NUC OPS FILE NO.I DATE ISSUED TO IS 1B01 Q/12/2'0 DRAWING NUMBER 6SD721-2530-11
- REV, AS 1
E D
C B
A