Fermi I Decommissioning License Termination Plan I
DTE E-gy History
- In January of 1955, the AEC invited proposals for construction of nuclear power plants
- In 1956 Construction of the Enrico Fermi Atomic Power Plant, Unit 1 was started
- In August 1963 criticality was achieved
- Operation at power levels in excess of I Mwt was initiated in December 1965 and continued until October 1966 2
DTE V.,-
History
" October 1966 flow of sodium was blocked to several fuel assemblies which partially melted
" Recovery operations from October 1966 to July 1970
" November 1970 full power operations
" On November 27,1972, the PRDC Executive Committee decided to decommission the Fermi 1 plant 1
Decrpto Fermi I was a fast breeder reactor power plant cooled by sodium and operated at essentially atmospheric pressure The reactor plant was designed for a maximum capability of 430 Mwt; however, the maximum reactor power with the first core loading (Core A) was 200 Mwt.
m m
I I
DTF E--,,
Major Activities
- Asbestos Abatement
- Removal of all Components and Piping from RRA
" Monitoring of Plant and Surrounding Area for Radioactive Materials 2
DTE Activities
-JV
" Sodium Residue Processing
" Preparation for Reactor Vessel Removal
" Ground Water Monitoring Report docketed in 2007 7
SApply '"ons W~
from prevous deroronnssonngs
- Draw upon experience of Fermi I personnal
- Maintain an open dialogue with the NRC
- Involve regulators early on in the process
- A strong foundaon provides for a sbrng, defensible program f--
3
OTE E-9V Historical Site Assessment
- Performed a meeting with former EF1 employees
- Performed a review of operating logs
- Performed a review of old formal maintenance logs 10 Resources
- License Termination Manager
- Previous FSS Manager at Yankee Rowe responsible for the successful license termination
- EF1 RP Supervisor/Health Physicist
- Golder Associates
- Groundwater monitoring program
- Bartlett Nuclear Corporate Office OTE E-gy Progression
" HSA
" Characterization Plan
" Develop site specific DCGLs
" Develop LTP
" Develop FSS Program
" Perform FSS
" Submit Final Reports 12 4
Deo misonn onSm iea Op.-
in Reco
- Benefits
- Availability of equipment and expertise
- Challenges
- Systems which support both plants
- What is Fermi 1 site vs. Fermi 2 site?
- NRC agreed in September 2000letter that Fermi 1 is within Fermi 2 boundary 13 Deo msioigo.am iea Oprain Reato
- End state of Fermi 1
- Residual material on site of operating plant
- Evaluate addressing in Fermi 2 UFSAR
- Any precedents from material licenses?
- Radiation shine from operating plant
- Study performed by Chesapeake Nucdear Services in 2005
- NRC agreed that contribution from Fermi 2 not part of Fermi 1 residual activity.
Dcmi ssonn on Same Sit as
" Site programs geared towards operating plant
" Site focus 15 5