|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A2412021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-09, Logic Diagram Emergency Equipment Cooling Water System Valve - Division I ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A3022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2410, Fire Protection Evaluation Reactor and Auxiliary Buildings Roof Plan El. 697' - 6 and 735' - 6 ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B ML21055A2962021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011, Rev. AP, Diagram Condensate Polishing Demineralizer System ML21055A2952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2046, Reactor Water Clean-Up Reactor Building ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A2922021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2028, Rev. K, Process Flow Diagram Radwate System ML21055A2902021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-4, Rev. B, Logic Diagram Nuclear Boiler System ML21055A2862021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing 6C721-2308, Rev. H, Reactor and Auxiliary Building Foundation Sections & Details Unit 2 ML21055A2842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2034, Diagram Core Spray System C.S.S. Reactor Building ML21055A2832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M271-2550, Flow Diagram of Equipment Drains in Radwaste Building ML21055A2822021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2023, Diagram Feedwater System ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2612021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2400-25, Post Accident Sampling System - P & Id Sh. 1 ML21055A3952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5878, Reactor Core Isolation Cooling Following Main Condenser Isolation Using Suppression Pool as a Backup Water Source ML21055A2422021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-03, Rev. F, Logic Diagram Nuclear Boiler System ML21055A2432021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-6, Rev. a, Logic Diagram Neutron Monitoring System (Part 6) ML21055A2452021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2086, Diagram Fire Protection System Reactor Building & Auxiliary Building ML21055A2462021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2100-01, Rev. C, Logic Diagram Reactor Recirculation System Part 1 ML21055A2482021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2404, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Tray Area Plan - El. 603' - 6 ML21055A2492021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2511, Side Stream Lrwp System P&ID ML21055A2502021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-03, Logic Diagram Reactor Core Isolation Cooling System ML21055A2522021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-03, Rev. J, Logic Diagram Emergency Equipment Cooling Water System Pumps a & B ML21055A2532021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-05, Logic Diagram Neutron Monitoring System (Part 5) ML21055A2552021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011-1, Diagram Condensate Polishing Demineralizer System (Sheet 2 of 2) ML21055A2562021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 7M721-2218, Floor & Equipment Drains Sub-Basement Plan Reactor Building ML21055A2582021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2430-01, Logic Diagram Turbine Building Closed Cooling Water Pump North Center & South ML21055A2592021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2408, Fire Protection Evaluation Reactor and Auxiliary Buildings Fourth Floor Plan El. 659' - 6 ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
{{#Wiki_filter:8 7 6 5 4 3 2 1 H H I
~
'°I -AIR INTAKE FILTER
- c
~ R3000 D008 ~
'li -~
<O
~ I 3/ 4" FILL
~
I
~
;1 3/ 4" AIR INTAKE. FlLTE.R
'°I N
FILL £ R5000 0007
* ~
- , ATlv105PI-IERE; w D\E.SE.L EXHAUST
- ___! ~--@ <O r 7
\
MUFFLE.R R3001D016 w :c-T Ve<;,i;;;'\t, N
I
/>..TMOSPHE.RE 1 DIE.SE.L £.J,HAUST
il~ : : .-- ~
/L'
~1* --
\ MUFFLER G 1- - ---, L-~--1
/ :t' ' II)
.1..,. G II '"' ,---LR3;01~015
~ ~ ~I
>~
~iT
. --- £J.
ILT-~~-J P1100F217D D
/ )I-{
I t')
I P1100F217C ,l"'T..l,, ~
'-.ill:i I f' z
I .
~ ~ ::l, J, SILENCER I
L1-~~_J ~' I 2, 1 ~
M-N-2153 3/4 OVERFLOW I
"' GROUP D ni -, ~I -E.XPAN'SION JOINT
~ r -y
; A I R \NTAKE.
R300000l2 z
I !
~ I ~- '~;' 1* 0) I 1 >.. I -..., ,-:::...J VAIR SEISMIC CLASS R30010004 ::::;
'!} I I * -
t:..ROUP "**I C:. TO ROOF DRAIN GROWP ti
'is l I M-N-2153 3/4 OVERFLOW SEISMIC CLASS 1l ! tl 1---E.XPANSION JOINT I R300!D062,
!\)
~
- INTAKE. 51L.E.NCE:R R3000DOII
*-*-N :
"< I I
§; Ve>" J,W, Vl=iNT M-N-2130 sr1s.11~ 1~11 (, TO R009 DRAIN
~ I I
z
. ~ 1 START -SIG.~AL FROM GROUPD I OC)
--*-" ~f- . ~ ~le-"Ali<t t:a?LANT V&NT :::, ,;e," J, W, VGNT
<.O Vl
-1§~ r*
M-N-2130
/
0 Fl-
,,....._p*-
R:30 I
- M-N-2130 a, "
N
- z
- s I
a.
u1 c!. r - I
-r--,::r.t
u, 1...,
l~I I- -
LOW REACTOR WArER LEVEL
- - - - - - :=;,_ 1;1 3/e, AIR COOLA~!-.:~!:IT ___
5~15. ll, QA ll d ,1 , tl/l
~ -;;;-
fsrART -s1~AL FROM LOW REAC, TOR
~ ~ :Io
~"'II WATER LEVEL LO
~
LT J
;{ ~ i
,L002 K;:10 90 I: c,~
a 0
Q.
0 fX 0
';' N
- z
~
1
~ START SIG.NAL FROM 1 , 'I PRESSURE..
.:C irl l-ll&H CONTAIN MEN,
' / -' *- - :.r:-c_CT ~"i.., ,, ' 1 I .
1 u -;::, a~~--------
J
~~
f;' I:
- g ~I START SIGNAL F'ROWI
~*::::&:
1-:,..-..,...., - . I _i:::. °",,...,
nv ,-- L,O . t ' i ' ,-,I .
~! ;
-:;;:- ~ \ \'.Cl 3000:A.008 .,_ / PT """:,:,
- I '3 !.:S tT \ 1 '1,002 HIGH CONTAINMENT LO ,- \ '
1-1i,i
. - - - / I
\ R";}O I iS (X
_ _ 1.1:1: START SIGNAL 1.:::.-- - r ."- " 'f .
n ..
I (!) A10 BY M-N-2153-- R:30 1-- - R-:io i-- "" __,, 1 II.\ 1 :-'*i* -~ 1i. I PRESSURE C /
J)\C.KET WATER,\
~,- - 003 I Ill I
'I I FROM LOSS OF ~ .,,_ '""' 0 "
, :,,..,.,_,.,,.,..LJ L'"""l
,""-'__.., *, if' oft. 1, r-::;:;:::,..,_
* &, ,:;; \\.. . 11, ri fl Q. '*
\' :)
0 0:: ::,
I "' --------
F ~ EXPANSION TANK 2 EOUALIZING sf
*T da
___ '.,...=;J;,~ BUS VOLTAGE J_ , . ,. - *, . . R..?;OOOA..007_~
. ,--, 1-..,,.,-,:;.J ~ I3/4. Ii~
1 *.1
~ * (!J F
LINE M-N-2130 ,.. A16 BY M-N-2153-- ~~I: I FROM
-'7{ START LOSS SIGNAL OF
.:C FLEXIBLE HOSE / ~z ~'-'Ill ttf \=. TO 0 ~LO ;n\C.K£T WATER E.XPANSION TANK
*111:"2 E"UALIZING
' -'~..:::;:::::.e.,..,,...,,,_-.J Ill
-s * ~
~ 0 BUS VOLTf\G.E.
- !. o ASSEr,..a1Es CTYP. )_,,.... ::.) o xb r DIESEL GENERA TOR ~
EMERGENCY '!I "'"::;.
-'- SOLENOID START :g \':!...I LINE M-N-2130 11,,,...,...,.,_ '
11:;*....., ' -- i
,ai40 o. SET AT RV '> ATMO}PHERE 10..;::: i:)i:il~ 'f o
~
FLEXIBLE HOSE / 1-zw ~,
\v/ 275 PSIG 1/2" I , Q~l
~~ Ill Ii.
l:~ * \ _ R3001S004
"" "'39 §) ASSEMBLIES (TYP.)_/ a. ~Q ~ 20;3' \ _ DIESEL GENER/\TOR EMERGENCY '-.."\,
_._\
'---l'O START SOLENOID VALVES r
Y I(\ .,. EXPANSION JOINTal<
c# A11 O R3000 F030D
) 1 ~irz <I ~ ,u (REF. EDISON FILE R3001DoeB1 O
l3 SET AT 275 PSlG 1/2" ATMOSPHE'RE z::iu"'
j fl-,2 §iJs 6
,-1 tel .
EOG." 13
\_ EXPANSION :JOINT BYM-N-2153 1:-1\l :;: NO. T1-3302l R300!S003*
!II I" is' 2 !~ R:3001D007"' QI t~
** ll!EXPANSION JONT '! A8 R3000 l?,:~a: (REF. EDISON FILE l'O CO\,;\PRE.SSOR::,::=:-===:::;-- Lil ::J j R3001D060 I, ~2 NO. T1-3302) l S1ART LOGIC r:------~- - ~ LJ
-, :, l:l tl 6WM-R30-N2191-1 & ----,
~I BY M-N-2153 II TO COMPRESSOR START LOGIC FOJOB H 1=1 lL 1.11 I ;//i EXPANSION JOINT
<i;
~
.,.13/4 r-----,
1 lli~ R3001D059 I PSE.
R30
~'5 2143 R30 GROUF?D
*s=.1'\ I c '------+-4---=====::-'::--....,.-:
6WM-R.30-N5414-1
--+--+--- - - Q .L;J . j ;---,.......r"- *,°i-- - - - +--=: f~
GROURC 1
~'S'S2 I
I C,/1,. I
' ~ROUP Q' I
j~E V5 ~L~-~~~~ r-----,
6WM-R30-N2175-1 & ,
6WM-R30-N5413-1 ~----Fi I I 1- -:,.~.;---- n.. GROUP D "' R'.'iO 2.144 R30 ,1 GROUP D "3-- - - L;J _t:;J t
.-:. -~;: : - ¥LO -
I I 1 .. I I .....
~
~* -%' 4 8 GRO\JPC a
t I 5Eo1S I QA I "R
1 "'51
, ~"__, _[_"
I - i,,.w
----- -55~~
1
'5!!15 :t QA I 1\*
GROUPC I
lff I ,,,-"
.,.-,_,\___ - +-----~
a: L I i '\
0 a, I ~
- =::;
t<l 1,._ ..,.., l!1- --.- 4' ~
,,,. ....1 - - - I ..... .....
~
Q,
~ il3/4~I
~
~
1/1 ---
E I I N
I =
0--
O i -
°' :z -
N I
;r-,")
I L(')
~ -, I ~ I~ ~
\ I
\
I 1/
' N :z
~
I, <LO N ~ I ~
~ ~ N
/-,\---T-- (/
0-- :=::;
- (!I, E
I I t;al 13 I
- - I C)
I
"\
~
I \ / z :z u,
,..., I.\
l+/-rI I'-<") .., ...-:
--..c.j. _ _ _ _L__ '- / z ,:::lE iI :zI :Z O OZ 0 LO
\
'-"l ;
"" /
~~
I I.(') I
~
I "' "' I ~
v5 ..-w I :, I \
~ 0 O ~f'I")
_ I "'F
~
'- / _j ----- ' I ;
r------ - - - - - - - -'---, ....=: N N ~ N ~
V'l I @ LO u, I N ..__.. -..- l.l"")
,, _ _ _ _ R'.::>000D004"'
___________ J , , ~I s!S'acD. rne,,G ';;, ~"";J. .'if~ I z
I z
I I .c '*. ' , I i :z I
'-;' J \20ts5
-~ .....
'° I~
- Z:o 0
Ln N I
- -- -:::.r:*-- '
__,/...J..
-- " ' I i / IN O::z:
STARTING AIR COMPRESSOR 3/4 'f' A 18 "" "' "' 54 ,- '-.
_-_::::_ - - _.__ --- - ~ - --. :::s N i ..? - .
N z
I ~ I z
~ I z :::s Rac>OOD003- I I I
'°"'\.
, . L 74 V5 ~12." :Tus !$ 2 7576 LO BY M-N-2153 STARTING AIR COMPRESSOR
-- - _j :,;
"' A 1 6 ".51"' ::. *5c.
BYM-N-215ry1\':;,f ...,.A16 11/2x ~:-i RED --~-"Y FLEXIBLE HOSE. I 2.077
""' 008' I ~LG 2.* LO 1.)_LOBYM-N-2153 R300ID084 R3001BOOB A 1P COOLER
~
SET@~E,O P5;c::,
'l!I
~.ET,""-' ,t b O ;:,, SIG.
,-,,,~1/4 REO
~
(R3000'\ I/
LR__30
... 1 ,.)\'..:1
'.:'___j,..
D t'l D "'.,s 3/8'0. D. TUBING - - - - - - 12"
- ~:
~1/~
" WATER Ni
~ t')
, ,, ,:,ET@'2..,01"$1Go 3/4 SET@ 2. 6 0 PSI<=>
- ii 2 N~
' SEPARATOR ,. . . l'iEO
*1_ tmo 3,& J!l IN J " lll.t..11::::-r ~n*
I I z1 R~
- ::; GROUP-D GR UP-D lz RI/
\15 FLEXIBLE HOSE
*i::3000 3/4if:-
I V5 ,
";al' IL~
-~"8"- 7J.t 3/4.J-
-. 1 ..,, ,, ::::; I f03Golo
. _2129 3/8' O. D. TUBING GR UP-D GROUP-DY - ~
I "PA. G
..A..J __
~D,(TYIJ D R3001DOSO AIR DRYER 3/4 II Fo3SD I
I
~- -*LL.____
\.;-...1/2' x 1/4" RED.
- ~,;I; R::1000 FD35'8 II
*-., \2128 VS VS 212 7,
~
~-o.
""tC ,li.f. ...; ,_
""Y
, '~ ,,
I 213~
v.., D
- 3/a"o.o. 3/4'O.D, l:.l
/ 3/4x1/2 RED. ~ R300CI,t>,014 7TUBING ,---1...., rR3000AOlb £ 0130, TUBING ,:,,v,.JJ (R) .J
~!::::===~-- ',,Y2 AIR AIR r' ' --
~
1 I vs I 1~'41- * 'I 2.075
- RE.CE.l\lE.R
. \ t ""'
I RECEIVER I I I y
-......_- 314" VS
, C:
1R:?,OCX)A015 I Jl.lR
~--1~ R ~ IS l R300iD088 '--..J"\ u
_,.,,r;_ I R.ECEI\IE.R : i' j ,: RECEIW..R AIR I
* \
~~
~ ~ V TRAP [ 6\IM-R30-N5!31-1 0... 20t.3
- , , R 30 ::o ,.-...:.. II 0::::,
Q..
II
.1-2 X 34 11 RED. ~--'T' ~FLEXIBl E HOSE u
I I
I ,....__,
I PT u
d_ 1:i. '
QI, R3000 °'l'.J .012 0 1 R 30 I I
;::) ~
R3000 F031D "4" I RJnnn'\ ~vu \ .*
CJ V5
/
0::: - R3001B007 l
* ....,_, §s \.
.,,
- o
~I * ~
. - -......- )
~0
-"' L7 ;:::c, F200D Cl.. uG I L.............. * . /
ro.
\ r_ s. R3001D083 AIR COOLER D .___ - '::c-C::- CJ _,.
J_
- s. WATER R3ooo Es .--- GPOuP*C p',i,_L ill R3000
'--:;i;-::::::-'~J2CJ~bi~zj[§[,8~-- s I d_ ;'.;'/'!\~\f-0(,,,7
~
t \_ P~nnn 3/4 SEPARATOR F031B R3000 (S,:i:L F041B 0
I I I ~li,.,.,JL F041D 3/4 " ~ o... A ::i ,_., z
"' ~
- a ::J 8~ F04CB <C.SJ T Sj
~
0 3/4" N I UJL.U m C5 wZ I
z, )i" a.' E5 t,lZ GROUP . ~
z I
R3000 F201D j'Y2 1 8 z; l. FLEXIBLE HOSE R3000 0
c.s. ) 3/4" F0323 z
?I 1/2" C y~A20 DRAIN 3/4' R3000 0, S.S. o:;8
(!J R300!D079 AIR DRYER l 3/4" I I c.s.
S.S.
&0 c.s.
S.S.
5 1/2;, il.
aB c:. -
(!J IC GENERAL NOTES'. F202D t') ,;:;-
If) I t') -
Lf) "' I II
~ ~
~
~
- 1) UNLESS OTHERWISE SHOWN ALL PIPING IS GROUP"cSE\SI\AIC CLASS.I~
=====-b
~~
N~
t'l-;:::,
2)
QA LEVEL r:
*= FURNISHED BY OTHERS.
No ZN I :g z~
I ~ R3000 11 11..._ .
/--l-3;4x1/2 RED t'l-;:::,
Lf) '
Lf)
~~
I I+/- F200B
---~*----:;;....""cf f
- .I I I I 6wM-R30-N5132-1 I No No
- 3) FOR INSTALLATION OF DIESEL GENERATORS SEE COLT INDUSTRIES DRAWINGS ::::; 'f I,~
- ~ #21 z
- ~
I "'
~ z:N 11868657 ~ 11868659 . #22 R3000 R3001D087 I I'
- : ; ! IN2J I lz
! I
- 4) ALL PIPING SHOWN GROUP .D. SHALL BE SElSMIC CLAss*1" UNLESS '""-TRAP ::::; ~*24 y'#A 19 F201B OfHERWISE NOTED. 1 6 \./M R30 N5407 l I y'#A 19 6M721N-204 7 3/4' '
- 5) "4= COMBINED J. W. Pl PING, J. W. COOLER SHELL, AND AIR COOLER t-- X 'y#A22 y'#A22 LATEST REVISION I
TUBE SIDE DRAINS (ON NORTH SIDE OF SKID).
R3000
~
"' AL
- 5=COMBINED AIR COOLER HX SHELL J. W, PIPING AND AIR COOLANT 0 F202B DRAINS ( ON SOUTH SIDE OF SKID). "'
~
L!.J 3/ 4# I
- 6) DRAIN NUMBERS APPEAR ON M-N-2050 J FUNNEL NUMBERS APPEPR ON z DRAIN I
- i M-N-2050 AND M-N-2152 OR M-N-2153 B 7) AIR START PIPING FROM THE AIR RECEIVER IS ASME Ill, GROUP C UNLESS NOTED OTHERWISE. YA21 NUCLEAR SAFETY RELATED B
REFERENCE:
A) DESIGN SPEC, 3071-517 THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS DRAWING WAS REFORMATTED BY MlCROSTATION AT REVISION
- AE". ALL INC.CODE Detroit Edison Fermi 2 PREVIOUS APPROVAL SIGNATURES ARE TITLE ON FILE ON MICROl'ILM IN DOCUMENT CONTROL T P&ID ALIDCD'S INCORPORATED: A PORTION OF THIS DRAWING PREPARED BY DATE DIESEL GENERATOR SYSTEM IS AJl'FECTED BY THE FOlLO'\\'ING:
DIVISION II I TC CHANGE DOCUMENT CHECKED BY DATE R. H. R. COMp LEX A OTHER REVISIONS, REVISED SEISMIC & QA CLASSIFICATION AT APERTURE CARD TITLE A
STARTING AIR COMPRESSOR R3000D004 TD P&ID DSL GEN DIV II RHR CMPX REFLECT TSR 37105, APPROVED BY DATE PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT #
(REF. LCR 14-015-UFS)
PREPARED BY DATE I CHECKED ijY R3001 DOCUMENT TYPE CODE NUC OPS I<'!LE NO.I DATE ISSUED TO IS 2-22-l'SJ I - YilrFV ,.,,.,.,,_,'°CJ OTHER APPROVALS DATE DDDMEC '"°' 1 z---zz-1q 6 M7 21 N- 2 O4 7 EDP POSTING ENTRIES REQUJRE THE REV.
'oses for Toi,
_.,. J Ml1rphy III per TMPE-13-0028, re-0no ADDITION OF THE ARMS STATUS CODE:
EITHER "AFC" OR nASBn DRAW!NG NUMBER AL 8 -~ I 7 6 5 4 3 ? 1}}