ML072670181

From kanterella
Jump to navigation Jump to search
Meeting Presentation Regarding Decommissioning Project Status, Attachments 1 and 2
ML072670181
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/20/2007
From:
Detroit Edison
To:
NRC/FSME
References
Download: ML072670181 (4)


Text

Fermi 1 Decommissioning Project Status September 20, 2007 Reactor Vessel Overview

A Fermi I Decommissioning Project Status September 20, 2007 Page 1 Rotating Plug Work

Fermi 1 Decommissioning Project Status September 20, 2007 Page 2 Reactor Beuiding Piping

....... 7.

~ K IH qll F

............H

.8.

M.........

LI l4*

_ _ _ý (Th \\v 1

-n-Prinvit oftin

.6l...

c4g EFl5-010 Pageo Vk. Nbel~lJsnd 100. 116.

118. 28.

130-162.

150-162.

170-178 P-L 06115/2005 Revision 7

Legend Fence Protected Areo Boundary Sump

.TL,5 Proposed Shollow/Deep Monitor Well Termination Boundary Notes

1. Drowing is adopted from the following Detroit Edison Company drawings:

6E721-56 (Perimeter rood ond general building layout) 6E721-43-1 (Scaled dimensions of sodium/gos buildings, reactor ond FARB) 6P721-1074-1 (Sodium tunnel) 6C721-1640-1 (FARB interior) 6E721-57-4 (East sodium gallery) 6E721-57-5 (West sodium gallery) 6P721-1117-1 (Health physics building and drains) 6P721-1118-1 (Radioactive waste discharge line) 6P721-1836-20 (Fission products detector building)

2. Monitor Well locations subject to change based on surface conduit positions and hydraulic gradient.

I-AS SHOVIN It-1"n 5/23/031 I Dlý DY

  • -Mg, M1.h19-I-

Dy/,L#R SITE PLAN DETROIT EDISON FERMI 1 DETROIT, MI 50 0

50 APPROXIMATE SCALE IN FEET n

N.

58793.0002-002 IK PACT -

023--8793 1-.

0 1 DITE\\FERM 1IWI r1' 2

frW.LCT 02~3-47Q3 I~

0 I'~~

DTE\\FERM i~MI 5I