Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A2412021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-09, Logic Diagram Emergency Equipment Cooling Water System Valve - Division I ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A3022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2410, Fire Protection Evaluation Reactor and Auxiliary Buildings Roof Plan El. 697' - 6 and 735' - 6 ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B ML21055A2962021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011, Rev. AP, Diagram Condensate Polishing Demineralizer System ML21055A2952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2046, Reactor Water Clean-Up Reactor Building ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A2922021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2028, Rev. K, Process Flow Diagram Radwate System ML21055A2902021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-4, Rev. B, Logic Diagram Nuclear Boiler System ML21055A2862021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing 6C721-2308, Rev. H, Reactor and Auxiliary Building Foundation Sections & Details Unit 2 ML21055A2842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2034, Diagram Core Spray System C.S.S. Reactor Building ML21055A2832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M271-2550, Flow Diagram of Equipment Drains in Radwaste Building ML21055A2822021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2023, Diagram Feedwater System ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2612021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2400-25, Post Accident Sampling System - P & Id Sh. 1 ML21055A3952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5878, Reactor Core Isolation Cooling Following Main Condenser Isolation Using Suppression Pool as a Backup Water Source ML21055A2422021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-03, Rev. F, Logic Diagram Nuclear Boiler System ML21055A2432021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-6, Rev. a, Logic Diagram Neutron Monitoring System (Part 6) ML21055A2452021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2086, Diagram Fire Protection System Reactor Building & Auxiliary Building ML21055A2462021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2100-01, Rev. C, Logic Diagram Reactor Recirculation System Part 1 ML21055A2482021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2404, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Tray Area Plan - El. 603' - 6 ML21055A2492021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2511, Side Stream Lrwp System P&ID ML21055A2502021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-03, Logic Diagram Reactor Core Isolation Cooling System ML21055A2522021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-03, Rev. J, Logic Diagram Emergency Equipment Cooling Water System Pumps a & B ML21055A2532021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-05, Logic Diagram Neutron Monitoring System (Part 5) ML21055A2552021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011-1, Diagram Condensate Polishing Demineralizer System (Sheet 2 of 2) ML21055A2562021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 7M721-2218, Floor & Equipment Drains Sub-Basement Plan Reactor Building ML21055A2582021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2430-01, Logic Diagram Turbine Building Closed Cooling Water Pump North Center & South ML21055A2592021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2408, Fire Protection Evaluation Reactor and Auxiliary Buildings Fourth Floor Plan El. 659' - 6 ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System 2023-10-12
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML22216A0062022-08-31031 August 2022 ECCS Strainer LAR Pre-Submittal Presentation Material ML21183A1072021-07-0202 July 2021 2020 Fermi Power Plant End-of-Cycle Meeting Presentation ML20241A1672020-08-28028 August 2020 2019 Fermi Unit 2 EOC Virtual Meeting Presentation ML19045A2692019-02-19019 February 2019 Public Meeting Presentation Slides on February 19, 2019 ML18337A0252018-12-0404 December 2018 License Amendment Request Pre-Submittal Meeting 24 Month Fuel Cycle Project December 4, 2018 ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18177A2082018-06-27027 June 2018 DTE Energy Meeting Slides for June 27, 2018 Public Meeting ML17038A3432017-02-0909 February 2017 DTE Presentation for February 09, 2017 Meeting ML14204A0582014-07-23023 July 2014 License Renewal Process and Environmental Scoping Meeting Slides ML1011902092010-05-0505 May 2010 Slide Presentation for Public Meeting ML0934802192009-12-14014 December 2009 Pre-Decisional Enforcement Conference Agenda ML0914606682009-05-27027 May 2009 EOC Slides for 5/27/09 Meeting ML0832202602008-11-0404 November 2008 DTE Fermi 1 License Termination Plan Handout ML0828202672008-10-0909 October 2008 Meeting Slides, Fermi Human Performance. ML0809907172008-04-0909 April 2008 EOC Public Meeting Slides ML0807011522008-03-0505 March 2008 Decommissioning License Termination Plan ML0726701772007-09-20020 September 2007 1 - 09/20/2007 Meeting with NRC Representatives at NRC Headquarters, Regarding Decommissioning Project ML0726701812007-09-20020 September 2007 09/20/2007 Meeting Presentation Regarding Decommissioning Project Status, Attachments 1 and 2 ML0601702692005-12-13013 December 2005 BWROG Non-proprietary Slides. GE Presentation Regarding Decay Ratio Adder Removal for BWROG Stability Solution Options I-D and II ML0515802902005-05-25025 May 2005 NRC Slides of Meeting with Detroit Edison Company to Discuss the Fermi End-of-Cycle Plant Performance Assessment ML0326705112003-10-0303 October 2003 Summary of Meeting with Detroit Edison Company to Discuss Extended Power Uprate License Amendment for Fermi 2 ML0324606982003-08-28028 August 2003 Meeting Handout to Discuss Detroit Edison'S Planned License Amendment Request for an Extended Power Uprate for Fermi 2 ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2022-08-31
[Table view] Category:Photograph
MONTHYEARML22081A0732022-03-0202 March 2022 EGLE Wetland Permit No. WRP032246 v.1 ML0726701812007-09-20020 September 2007 09/20/2007 Meeting Presentation Regarding Decommissioning Project Status, Attachments 1 and 2 2022-03-02
[Table view] |