|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684 - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
{{#Wiki_filter:H G
F E
D I
I C
B A
7 6
~---------------'---------------_L ______________ I 8
5 SEE REF, 16 OTHER PIPING PT
((JjJ X-2BDn 900# SS CONNECTED TD LOOI
_________________ __:~~~~--=:::::::,,_0"~1*~IT--/s,~C:L~A~S~S~A'___~
VESSEL A
I CTYP, 8 LINES)
' (\\J
(\\J
j~~B~I ~l~t~'::
1
~1x-~2~s~D~b~-------'
~
I 4
28' 3
2
- NOTES, t, CLOSED CODLING wATER SYSTEM TD AND FROM THE RECIRCULATION PUMP SHALL BE CAl"ABLE OF CONTINUOUS DPERATl N DURING PERI DS F*DRYwELL ISOLATION.
- 2. RECIRCULATl N LOOP ENCLOSED IN BOX SHALL HAVE PART NUMBERS CORRESPONDING TD ITS RESPECTIVE LINE DR L P NUMBER UNLESS DTHER'v/ISE NOTED. EXAMPLE1 XXXB IS ON LINE "B"
- 3. INSTRUMENT LINE VALVING MUST COMPLY w!TH INSTRUMENT PIPING STANDARDS REF. 13,
- 4. DECONTAMINATION C NNECTl N TD BE READILY ACCESSIBLE FOR CONVENIENT & RAPID CONNECTION OF TEMPORARY PIPING.
- 5. ~-~ DESIGNATES ISOMETRIC DRAw!NG ND, (PREFIX NO. 6M721-) OR LOCKED PEN/LOCKED CLOSED AS INDICATED BY LO DR LC, (NOTES CONTINUED ON 1-2106-0D REFERENCES, 1
FDC
__ 1 ________ 1
- ======-------~~PT' 1 ____ {f~~tl L~jl!JtF=i~ol ~ ~~~-~4~
- A~J ___ f1lirl COO> '
I
~ -i'
, -----, _ --__, u~o~*~;.~*B~;~l~~J~ci1~=4, -- -- --6il-- 1--::* *=c:-::*-::*1i)~~N~2~1Di~c--==-=-===-=-===-==--=--=--=--~~~~:=-=--=--=--}{/~~--J 1
M-2081 2
M-2082 DIAGRAM-CONTROL ROD DRIVE HYDRAULIC SYSTEM DIAGRAM-STANDBY LIQUID CONTROL SYSTEM DIAGRAM-RESIDUAL HEAT REMOVAL SYSTEM, DIV. 1 DIAGRAM-RESIDUAL HEAT REMOVAL_ SYSTEM, DIV. 2 DIAGRAM-CORE SPRAY SYSTEM 13 M-2049 14 M-5357, DIAGRAM-FUEL POOL COOLING SYSTEM FILTER DEMINERALIZER DIAGRAM-REACTOR BUILDING CLOSED COOLING &
IL I
~DX H ~
D ~-
I
~
,c,c m
~ 0-1/:";'o/
NllO IL I X-4Ab
~-
VESSEL 12*
n Lgo1 CT
'.~
--;; B
-:~~;~~~~:_~~3+----I== I ---t-----==---~
(TYP 5 L018 lh i-----i:ur---- --- -
~
x--t-------1 N2E LINES) I PT L- ~\\,!}-
-- ~""
~:1 \\'.]7:,_ co
- '"M
""' 1,/jj\\j
{5!}----
-~---------
1/+,
3 M-2084 4
M-2083 5
M-2034 6
M-2035 7
M-2043 8
M-2044 9
M-2045 DIAGRAM-HIGH PRESSURE COOLANT INJECTION SYSTEM DIAGRAM-HIGH PRESSURE COOLANT INJECTI N SYSTEM BAROMETRIC CONDENSER DIAGRAM-REACTOR CORE IS LATI N COOLING SYSTEM DIAGRAM-REACTOR CORE ISOLATION COOLING SYSTEM M-5444 15 M-2678 16 M-2089 17 M-2088 18 M-2006 19 M-2085 20 M-2023 21 EMERGENCY CODLING SYSTEM DIAGRAM-DEMINERALIZED SERVICE wATER RISERS DIAGRAM-NUCLEAR BOILER SYSTEM DIAGRAM-REACTOR wATER CLEANUP PHASE SEPARATORS DIAGRAM-CONDENSATE STORAGE SYSTEM DIAGRAM-STATION AIR SYSTEM DIAGRAM-FEEDwATER SYSTEM FDR FUNCTI N SEE REF, 3 Nl!O N511 F
X-28Dc HA
,B C
~-
I I
zsv i
I 111 oo'"s~
=
============~~~N~50!9~Bl~~I ~J=-=-==::=-=-"'l----
RO C.!A..,,,,.,...
I
,B LO I
D002 RD
_,.;;..;:.,;:~
D002 (NIB)
RHR
'20" I....
I I
(_REF. 4 <F-3),
I I..
I (NIA P50 I
I fOR FUNCTION B31DC041~*-. 7( i~E/V SEE R,;F "3
/
I~.
020 0'0:-* __ _.__
I
\\
I c,,
I t!.oC. Gt<s.,..AL)-- -
1,:i_ ____ lSOLA'I ON I
\\
,iGNAL
/
!AS
~
PB T4"1 D
1
- ,C I i------<-;
- ;,,::::::-:-,--
,;--;;=------ ;::;:_ -
OL-, $!&>JAi.- I
}AW25 ),-..---,_-"':f_.,,- :,0 Iii r'
/
N,
.. Cl-~~~------
VENT 1/z',,------
TEST[+'4--1'9111-,
I N4o"o N\\00
/J!i!J12*
~1 I,-
(@BS/
I N2JJ I 7 (L~62l <TYP 5
-~
LINES)
(\\
~
~)
~
(\\J QI
~
PT L002 A
28" I"
rI-2837-191 DC 10 M-2046 11 M-2047 12 M-2048
- NOTES, BAROMETRIC CONDENSER DIAGRAM-REACTOR wATER CLEANUP DIAGRAM-REACTOR wATER CLEANUP FILTER DEMINERAL!ZER DIAGRAM-FUcL PuDL CODLING SYSTEM INSTRUMENTATION AND CONTROL A. UNLESS THERl.'ISE SHOwN, ALL INSTRUMENT PIS N s ARE PREFIXED B31 ALL VALVE AND EQUIPMENT PIS N s ARE PREFIXED B3100 22 M-2012 23 M-2090 24 M-3445 25 M-5007 DIAGRAM-RESIDUAL HEAT REMOVAL SERVICE wATER SYSTEM DIAGRAM-NUCLEAR BOILER SYSTEM DIAGRAM-NITROGEN SYSTEM DIAGRAM-PRIMARY CONTAINMENT PNEUMATIC SUPPLY SYSTEM
- '.)REF. 4, (F-3?'
24' B.
PEN & CLOSE BACKLIGHTED PUSHBUTTONS w!TH RED & GREEN INDICATING LIGHTS AT DEll!CATED SHUTD wN PANEL H21P627, C. NOTE DELETED D, INST LINE CHECK VALVES TYP. F009A HAVE LOCAL AND CONTROL ROOM INDICATION OF POSITION.
REFERENCES, RHR
)REF. 3, (G-Jj)
,u* I
- 1. 97R567 (Rl-25)
GE PIPING AND INSTRUMENT SYMBOLS LEGEND OF PIPING AND INST SYMBOLS
- 2. M-2001 RD DC LfilLL_
Ffl FTL D005
~--
F~05 fLUf V
,,_~ci wr
_,II L003 r, IT7 L005 t,
I" e XE 7
e A
L -'----*J N014
,E
."./
I" I
I N013A I
FTH,{'
I A P006 L_11t51 ____._ ____ )I-2146-02 (E-7))
LOg6
~-,OB,9 ILI
~~,~
62 FLw UNIT 'A'
~
~
A,B I -
H I
RO
______ T"1 __ -----{;;:-,X;E~
_J i
DOJ16 I
r
, i
,:24 --*--
f022 F021 X-29A, I
A REF 10 (E -7) 900# C,S, I 150# c.s.
3/ *
-'----"I-"---
]-2837-29 CLASS 'A~
~CLASS 'C' J
TD DRYwELL EQUIP.
I 2400 04 <G 2)
DRAIN SUMP SAMPLE LINE GRP GRPFC I
PUMP COOIB CU-"5"1'-(Q~J)-* FC F!Ol F059 2'
l 5 IIM-G 33 - 3 96 -ll M-2223 <B-6)
TO P33P405A
'B' 'A' Cl.ASS D (Q~ID)
F029 F030 TE'S Al,Bl,Cl 61
( L-6
(
FlD2
,,-, a Vl@~r.TION SWITCH
~
I j~~¥
! I I I A~
t"
',j I LO I * ' '
FxE' - - - 7 I I j
J I N014
/
(
~
TE\\J MSE
~
N3sor----.
PESET TO Pllllll' &001-B
-<_fy~*
A N 04 0
TO BUR ING TEMP T/E JCT BOX
---*-* -- -*-- ------ ------ ------ - ------- -7
"-ll.- M"'
I c -
- 7 I
Al. A2
"'°" """ i<iollo t
l'PER BEARING MONITOR NOTE 1 & 8
- ao - --- -----------------------*----------
I L
1-_:-*
I>-.
I
-,--- --- -------------------------------7' I NC.ii',
LSE I
OIL LEVEL
!fl;!;
- -- --- ------------------------------ 1 I I I
p,.
H N200 L RTD s Dl,EI,Fl
- 7 1 1 1
LT
,A_,__,
I
(\\J~I I
~
(-:-------
I I
---* ----~-----------------------7 I
I L__
\\-:--=-
-L007 i
- -TO-MO_T_OR---W-IN""'n...
lN_G _______ :~
-- --- ------< D-5
{
- : : : : F5~A (J,C2
~
3/4"
! --~ I I
2" JREF~ElC4w(G 2))
TEMP; MONITOR
~ @--
0 TE N003A I
I I I I I DRAIN
- * ---{:x, 1 1 W-~-i I
I I
I L___
3/4" I
I I 2106 01 I
--- --- -----( E-4 I
I I I
<'---l--*
, I j 2:
E-4
_)--------1 w
TE NOOIA I
I I I
I 1
~='==-,,N==-'
w I
I I I 3/4 I
TE-T5 3'32A
(
Z I
I 1 I I
I MqTOk c-
-- -"x
1 SHI-A-9
-+--,- -- *
(
SHl-E-4
(
I L__
i----1 1
/
REF O
I
I I I
'-..°./
3/4
.--i.-'
TEw
, 1 REF. 10 I
I I I C,-+---------.f,--- - --- _._ -
S: E-7 )
I I
NOD!
Z I
I I
TE TE
____ _j TIC JCT, BOX Z:'
EECw
,-!----i(REF. 14 (G-3) (
L_
r Hd A l_~p]
PT II I : L - - - - - - N388A N389A I
LOwER BEARING 1
X-30A,b) I L012 I
,--, LT LSE OIL LEVEL I ; I A
,, 7 I
I fl,fl:
LOOS N202 GRP. C I GRP, D
~"'::1---1 II IL "TE:w II
~
A H
A L~~
4
~; ~I I
1N383,-~
L-------'
FSE
-<8> -1 F;,~
T F524A 3/4' \\...£1
- __. h
. oorn, r.co,, _,, l~J.§.),'.jj::~:U,-_iQ!J~j N002
~I ~I ')("
LfilL\\__
w FOff FIJIICTIO~ IPDBQ IA SEf REF. 3 4'
l]i]B ~
iA697
~
I
-33A,e,,
[!SOC.SIG,, )-A' t D~IN
~ I r¥-
A 61,'M-B31-4002-fl Irr
nqf2 B31DC042'if's-, I
I I
I 3 019J).02A 'lz'rJJ_~~-~:11:::Ill!:
150# T c.s. Ell L-=I I '
1lr:;i_
I I
CLASS 'C' 1
PXE l--J::~~9:J---'7
,~
l I
Q Nlll I r{_ ! t. t.
(DE f I
L TE
. I n.
,'[Nl L ___________ l H
I E-0------1.-:
I SE£ REF 1.,
I ILOi..
C P~22 L_m51 ---------)1-2146-02 (E-6))
61 FLOw UNIT 'C' zsv 1- -
N515 I
A,B I fJ.:x~ ---.J I
I I I !
c f):(1 I
P022 FE\\
I fm\\
I FXE B~---7 P006 L
r, L003 B
~
'-i
~
=
FTL LOOS
.B zsv X-30A,c N518 A,B IL I
.. - I
-y I
ILOI
I N520 A,B
i-61
*---Jl-2146-02 (E 2)
FXE"l-
.J FL w UNIT 'B' )
B~:( --
P006 H21 B [I))
cM.. e
.. t t : -----------
N3:o I ' I/ y
'_J j
I TO DRYwELL
@p
/.;},_
FSE I
'-.~
T/'- KT. aox~*
JJ&
I EQUIP. DRN SUMP A 6\\IM-B31-5251-1 CONTROLLED D015
~,,---
007 I
-D<H>1
TEw o,9/
I A.B
'-."./ /-,
M-2223 s 6\\IM-B31-5269-1 BLEED FF
""""A I B31 1Goo1A NO, 2 N3 c/ *r* ~ _ !"7io1 1----
I> <I 17::':~
X-32B~
51:l/) "'s.s J""cLi\\"::iS A zsv 1
1
~x~
I I D Sc ---7 P022 L 1m C51
--,----,----JI-2146-02 <E-D)
I I
I I
I I
I I
I I
I I
I
~
PUMP 'A' (C-8)
) SEAL A I
~
p;;-71 A
1
1 T"YP.'J N514
A,B I,_i,,
1-6l.
I I
FL w UNIT 'D' I
I I
___ 21A 1
[QI
~
PUMP 'B' (C-7)
--~IL-~---"'-1
.' rm I CAVI y 1*
I
~-
1
~~- ~I 1* D 3/4 : ~
~ )
~-@-isE 1 112, I *
~
N402 N403 D016~
I
.xi-N004
~I L_. -
I
)
I I'
A A
A 1'
PT 3/4', B3101G007A
~
~
~
A s1 '. ' -* ---~1--~--+
'-...i ~
3/4" L~S i
)~~AC
~
}
I' 3/4'~
17: "'11 1 ~
1 I - ri'-iii
~--*~- ---
1 '; ___ ~ "'*
cc B3101G~~31A~I )cAv n ~ (_, _, _ Q-1,Ill_'._,_. -{x [~
[SEE NTE BH ;
Al
/
X-32B,d A
17::__
zsv N516
_A,B_
FXE
___ _J N024 FIE FIE D
P022
@9 @9
--- A ~21 At~ ('r516) ~*
jDIDWl'I-O..Jl-...JC:,.J"J'-l~ePlL
~~
N391\\
111 )
I y iNTATM, 1112*
1 g-,li,1:=:::
I
~
FRFUNCTI~SEEREF,3 I PQQ6 I I
\\__V
- !i' ~
A 1~161,/~ B3! 4002 I I B31DC0411 g~
I 1--------VEtlT *698-l F017A i!l:
+
gcj F002A
~~).,
/
B3101
~B6'JM-B3-404~-
28'
!~~~~L
- /l m<
+
+
4,
,y;:;.,_.
~'.",-r--,4::'.
o 5 12::s---
{)
u mu COO!A I
PXE N006 I.
010
~~c:;-:::::JrrJtF16A g u B31Dco412
,c
~ ~
2 PEN S'
~
I B310:i' 3~ 4*
900KS<
00011cs I
IFlJC\\I MYE MYE'
/MYE'
MYE
-1
)SOL:Sl&,)-...t A
ZSV
-~~
l CLASS A TRE TE\\,/
B3101G006A?
.JVJ c_j{j L011 X-30B,lo N52:3 A
J-A l_C:_1 B
H21 B
N028-------,-----,
I
'; ~%~
'o 1..-
MD 9006S~I
~ 0
~~*,
'MV/
-*-7 3/4' 5
a3(o PT F031A GROUP C GROUP"C"
~ \\F~1YI zsv N612 "N613,.
{161-;,
"N61~
"PXE r - ;- -i "c'
N405 0
- i A-A M-4000 650//
,,!:640/
N035 I
_Jz
~~
A F036A F037A ILI A,B po~'o po>'o P081 P081 MA I e
£
,'-.'.::./
00 Q'\\
0
- 3 I
<I:
A A
Wu-:
'6 O v? ~
=t: A CO CO °' u
- ..J 8 W--4001 Hll J
3: i:::i
<[ i:i::i j
16 1
1 E/S EIS 6
<t O
O I i:l ~ 3/4' I
P612 B3100 B3100 A
I I
I I
I I
I I
P006 1,.;a,;..,;;,__,
R633 K600 B31DC04B3,
,c PB ii: d
.___;'I"-
18310~
Isl 5 1
F115A F114A
§'le; gju.u_
9QQKS0 900/!CS lg!
PDXE ~ 'PDXE PDXE'J '6'DxE'J I
K609 CR
!AS F015A l...'...J iF0?3A CLASS"B" CLASS"C"
- ) 75 5 I
CLASS"'"f' CLASS"C" ~
N112 N113 /-I N114 N115 11 A
H11
(.,') fl l
I
/f 8 B ::E:CJ... a.._
I I
1 I
/
I\\.,
/
P612 I
P612 A
U ~
!;-.l I F027A 1
./
1 CLASS"A" CLASS"B" J
~
/
A A _H2i A
H21 A I
I A
I iA695
~ 5 I PTL) ~ l;1 L!:.;~;.. *=- ;;---- -T-- --1 ----- ---<t!Jf-,-. ___,_ --- - - *- - --- -- -- - -- -* --- - - - - - - -- - --
<<y.
ILOII~"
?'lfol:,
P~o'i.lc P o6 POD"
'/
I 1......
I u
CRW 31" LO!O g :5 F028A
~
I L
~ S:
/4 A
~ '"
,1 i;j j
I A
~
X-JOB,':J F510) zsv FDR FUNCTI N SEE REF, 3 N028 - -
_J
~---
---*z c-7 1
V) ~
w
~ :5 I
i
~....
L..:..I
~ w I
N,;~1
~,----"---
l~H_~( c I
A.*-
TO N006B TD RECIRC Fl
~ i;1
° SEE I I
_I Tl L._
c' t;J CR\\/
/
4'
.. \\
P006 6
LP *s*
004
!'l :5 NOTE 4 I
I
Dill I
1;
- ----+- C-7
}
A I
u
- cr I
I I
~
I F CJ is -'
DOIO MYE 1/MYE MYE V'MY~
J Rwcu 0
u_ ""
[3 c1i A
FDCv
~
N612 N613 N614 TD N005B REF. 10 CD 7) v.i w I
I TXE' TXE"'\\
- =i
,-.;~
~
F510 zsv 7 B 1'-
BI'-
/ A
,~
- f, 1'
<> ~.
I NGO!
N601 51 "'
X-33A,9
" 522 pnfh PB'l PHoit10 I POBO I 1
-,, B O g g -.J I
I L:J ~ r:-i
\\
IL I
\\
r
,u B3104 LfilL'\\
DOOIA\\J IM-30961 8,,
I I
1' p/:)TT i
PDX J
PDXE J DX
_j DXE J
'Y' r
CRw-<
- rl I
I Le:; A795 L '
A796 L403 PLH RD
~TL e- "'1 ~;
L 1' N112/ ~
,s!'111':-
"NllS,.
P612 B
6M721-2833 PI ROOS PT L402 FOOS F052A O :3 I
~
B.
d d
( LOlO LOll )
RO u..l § ~ § <[
I.... --. -
B J:l?t B
_rii;,_1_ B Ji);_l_ B I
B I
A
~ w I
I RECIRC LOOP INLET TEMP
/
~ 7 B
DIJrO B
DOll i'5 7 7 7 7
/
ITn1 p'/i'i,'2 P022 P022 P022 I
I I
-, I XX B
Q_ XX XX s
@I@'
I I
I I
/ '-
I I
I VAL VE <t r:t:i
- 'Ji,
- :q
<I:,::q crs O
<t p:i <t i:x,i
<t i:x,i <t r:i:i <[ r::i::i <[
<er:ri
<t rxi
<ei::i::i <['
<C!Y'I
-::r r:i:i
<[,c:o
<t r:<:i
<I:""' <[""'
<[""'
-<r,:,;i
<I: µ:i X-33A,ci FD5C1Vl NPOX2E8 f-- -- -
__J A1797 A1798 REC!RC LOOP 'B' SA"E AS LOOP 'A*
~ ~ C\\.J ~ ~ ~ cu C"l
...-...- "° "° MM r-.. r-.. r--
'°'° 0
0 mro co r-..r-..
n.i C\\.I
,;,; M ITT ITT "° -..o t\\J ru v v lll in 28¥ I
ZSV
/
C 1*1 NO o
ir, u, 1n u, o o g g 8 8 8 8 8 8 8 8 ru
°' °' coco ru MM O =
ru ru MM i.n l()
i.n 111 B
D RECIRC. LOOP INLET TEMP, UNLESS THER\\./ISE SPECIFIED SEE NOTE 2 u..
1..,_
c..:......._
c..:......._
LL LL LL u.. u.. LL u.. u.. u.. u.. u.. u.. E EE EE EE E EE EE EE EE EE r r r ~ EE i': i': C: i'.:
N524
_rid I w RwCU (REF. 10 (D-7!,
PRIMARY CONTAINMENT 3/4'1 900! ss l!J 1CLASS 'A'
\\._REACTOR RECIRCULATI N PUMP 'B' SUCTION VALVE B3105F023B DRAIN VALVES B3100F027B & F028B HAVE BEEN REMOVED & DRAIN LINE CAPPED SEE EDP-31082.
B3100 VALVES B3105 VALVES B3100 VALVES B31 VALVES B3100 VALVES I
A,B P022 1
2~
EEC\\J 1M 40261
) REF, 14 (D-D) 1/2~---"2'.'._'
EEC\\,'
IM-40261 (REF. 14 CD-2)<
TD PUMP B3101C001B ND, 1 SEAL CAVITY (REF. M-5702-1, ZONE (C-8))
AKIDCD'S INCORPORATED:
EDP-8D010.009, REV. ¢ THIS DRAWING WAS RID'ORMATTED BY MICROSTATION AT REVISION 'AH'. ALL PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFILM IN DOCUMENT CONTROL.
TC A PORTION OF THIS DRAWJNG IS AFFECTED BY TBE FOI.l.OWING; CHANGE DOCUMENT PREPARED BY INC.com,:
TITLE T
DATE LATEST REVIS!ON AK
!NUCLEAR SAFETY RELATED!
THIS IS A MICROSTATION PRODUCED DRAW1NG.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
Detroit Edison Fermi 2.
DIAGRAM REACTOR RECIRCULATION SYSTEM NUCLEAR BOILER SYSTEM H
(}
F' E
D C
B CHECKED BY OTHER REVISIONS, DA"rE APER'l'TJRE CARD TIT~
A DIAG REACT_ RECIRC NUC BLR SYS APPROVED BY PLANT IDENTIFICATION SYSTEM NUMBER D3100 ARMS RECIPIENT #
PREPARED BY
!DATE I CHECKED~
DATE DOCUMENT TYPE CODE
- w. ADLER 10/10/181-P.I- ~=
J*l**t<t I
OTHER APPROVALS DATE DDDMEC NUC OPS FILE N0,1 1801 DATE ISSUED TO IS 10-ID- \\~
APPROVED BY DATE EDP POSTING ENTRmS REQUIRE THE DRAWING NUMBER
_,-,A_~
ADDITION OF THE """" STATUS CQDE, 6 M 7 21 2 8 3 3 v' ' --r ~
\\vh*ftt, EITHER ".Al"C" OR "ASH"
~
...,........ "flt::__
REV. AK 8
7 6
5 4
3
?
1}}