Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A2412021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-09, Logic Diagram Emergency Equipment Cooling Water System Valve - Division I ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A3022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2410, Fire Protection Evaluation Reactor and Auxiliary Buildings Roof Plan El. 697' - 6 and 735' - 6 ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B ML21055A2962021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011, Rev. AP, Diagram Condensate Polishing Demineralizer System ML21055A2952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2046, Reactor Water Clean-Up Reactor Building ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A2922021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2028, Rev. K, Process Flow Diagram Radwate System ML21055A2902021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-4, Rev. B, Logic Diagram Nuclear Boiler System ML21055A2862021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing 6C721-2308, Rev. H, Reactor and Auxiliary Building Foundation Sections & Details Unit 2 ML21055A2842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2034, Diagram Core Spray System C.S.S. Reactor Building ML21055A2832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M271-2550, Flow Diagram of Equipment Drains in Radwaste Building ML21055A2822021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2023, Diagram Feedwater System ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2612021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2400-25, Post Accident Sampling System - P & Id Sh. 1 ML21055A3952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5878, Reactor Core Isolation Cooling Following Main Condenser Isolation Using Suppression Pool as a Backup Water Source ML21055A2422021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-03, Rev. F, Logic Diagram Nuclear Boiler System ML21055A2432021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-6, Rev. a, Logic Diagram Neutron Monitoring System (Part 6) ML21055A2452021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2086, Diagram Fire Protection System Reactor Building & Auxiliary Building ML21055A2462021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2100-01, Rev. C, Logic Diagram Reactor Recirculation System Part 1 ML21055A2482021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2404, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Tray Area Plan - El. 603' - 6 ML21055A2492021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2511, Side Stream Lrwp System P&ID ML21055A2502021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-03, Logic Diagram Reactor Core Isolation Cooling System ML21055A2522021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-03, Rev. J, Logic Diagram Emergency Equipment Cooling Water System Pumps a & B ML21055A2532021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-05, Logic Diagram Neutron Monitoring System (Part 5) ML21055A2552021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011-1, Diagram Condensate Polishing Demineralizer System (Sheet 2 of 2) ML21055A2562021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 7M721-2218, Floor & Equipment Drains Sub-Basement Plan Reactor Building ML21055A2582021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2430-01, Logic Diagram Turbine Building Closed Cooling Water Pump North Center & South ML21055A2592021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2408, Fire Protection Evaluation Reactor and Auxiliary Buildings Fourth Floor Plan El. 659' - 6 ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 7 6 5 4 3 2 1
- '°
_J u ~
l'.) I z l'.)
~
H _J
(\J Lf)
H 8 ~
rn D I (V) ,- ,c PT \ TEST F304 L105 I CONN rn *CHILLED rn 3*sz (V) VATER PUMP (V) V41F403*
F305 4*
F300 3/4 3/4"'
F301 V4100C011 2'
F297 1/4 1 3"SZ -
0 u
_J 3*sz - ~-) 15031 I C F298 IL's,jf---0--, 3;4* F299 3;4* 3;4*
l'.) ~
z Lf) 5 3 _Ju.I
~
1 o oI F302 F315 F288
~
START -UP I p u
(D)
STRAINER I Uci3 F307 OJ Lf)
"'st I TEST ,~ I TEST a ,:
c,,
r:, I CONN __./ CONN 3*sz u. ,c I
F290 VENTI L F223* 112*
I (V) 4' 3* I 3*sz 15031 I 4* 3'SZ 15031 I iG STRAINER _>-112*
DI VATER
<;:F313 F312 i 1*sz F311 3/4' F310 TV L650 TV 1*
F309 (V)
F308 6150 <:l"M fR.OM.
1-\fALTI-I- Pl-\Y~\G~
1'\00UI.A"I' 11-1(# OAMl"'e~
V4100Fd04
'5Hll"i Off DAMf'E~
- -,£4,IOOFOO?>
G MAKEUP PT"\TEST LAI> FUME. 1-1ooi,,;, ........,..~ ---,
~
M 2678 (B-4l>~-;;;;;1~*s:;:z;--....,,._. (D) L104 )CONN
r-X )( QTW 138441 F314
> M-2711 ) I _l)I EXPANSI N TANK SHUT FF DAMPERS HfAt- iH PHY',1 <=-'> AP,!SA V4100A001 I V4IOOF005 ':>I\IJT-OFF VAMPER *X.HAU~T f-"N
\!-,\Lei YA,l"c~
- \'.,C:. (Tr\ I VA-1001" 00\ ....,_.., Y41 OOf007 V41COC.00'9
~ ------.------------------~ (\
I~
TSL\ H Ill
- L I
I
\ ~
J
=j1 I I C 1-\ w ,:,UPPL"( I r I i l}i----~
~
\.IJ I z
- i
- J
-<(
I: EVAJORAiOR..
( C.001..-'E:.R.)
~)4" PVC. 1"-l'.>UL1'"TE.D I
I I
j RADVASTE BUILDING EXHAUST FAN V4100C003 1001/. EACH I
~i L1;
~
I ill :1 I C.\\'N RE-iUR'-' I
'~ !'R.1:fllTelt':> - 35,630 CFlvl
- , ~ '>l'TI-\S, I F F222*
TSH
1 I
I I
I 1/41000017
\\EPA flCTE"'-'5__:, I .. I 29,480 CF,<f
/,.VCLI./DIN(!ft $000 CPM INJ:",L r,eA r/oN ~
/ -+-- F
~---<1:::---1/ 11\ER.M.i\L I I V4100!7018 e )( I"A IJ. <;,I0"-1 VA c.V,a I RADIATION ).jQIJIT~
I I D11N503A THRU G / D11P281 '--
I I I
IHI I
I I\
I I '.\; I\ H I I (\
E/V
$151-\T G>L1';.s,____.,..- ~ 1;: I i, I I I
I "u.u tw
< ;, lf:f -i):I ll::~I\UT Ol"f 17AMPe"-
-1 I
((s>j ~fil~ ;j SHUT FF DAMPER V4100F006 H
~p A
11-lLE.T V~Ni;';,
V4IOOF002 P,IIDWA'7ffi E>LIILPINb is,<HALl'?T V 4100C004 FAN v41 oo !'oos I 00% !!!-AC.I-\
- fl\..,eR/DR"l"e"'- I '--....,../ 4.
\(\ -5 I D~
-z ~
I 3 Ml >>l'-H-"~~T FAN N>OM I 1000 c.rM E I I.. I 1-~ - I 11000 CFM(M-2240 (F-6>< E L!Cli.JIO .,-,--.,p VA,LVe; F221* I I
I BL.~4!> 1-o, I ,; 0 Z'?* 11 21-z' s, I I
<M-2008 (D-6) +/- ------ I r1R£ C¥W'E'ER
\!4100F303
.----..,------:--:--:-,-::------------7-,,--RECIRC. VENT FAN (ABANDONED IN PLACE>
CORRIDOR a.G>1:1!.(,,"
..--.... *v41ooco20
~v4100F244 C.OND!!:r,\ $ e ",. I (f\ ..._ _ _ _ _ ____
104 CFM ISOS4* 1 I ,, I 104 0 CFM.
21/z.~._1 .......... ,t_
)M-2008 (D-6) ),___ _ _ I I r CeM st
~ ~ r - -
'-1---
..__ 0/'2f:iXJ Cl'M
.__t- - - - - - ----
I 1 -V4100F245 to CFM {::o CFM to CFM
,------- ------+ ~
V4100F246__.
BACKDRAFT I
I-....,..',/
BACKDRAFT 0 CFM+
~
- MlJF F' 1..-E.1'-- ,....._,
I r- ---------+ I 1 0 I
+ +
-i CTN\
iy, ,.,
O CFM.,
D OiSCl,ARc,E IC.IL lsuCT\0~ , -- -*
D 1"1'-E=&URE.
I PReS!'>llRi' \ 1"l\e SS.URE I
, l'i <;,-0 CFM 0 ~~
Pl\" I ABANDONED I I I I I I DE CONT AMINA TI N LAUNDRY FACILITY I I ..,. '.'.)
Ae,Af,.JOQNE.D [-
I co CEN!Rll'\.IG£ ~ ABANDONED ZONE II F220* "
O' . I 1./) EL,c.,1;,:.0*
WI-J£1I RESPIRATOR Zi'/;___,j ~I.
~-
I
(~
~
F317* c~v-T D1,-,'iAR.G.E
!:>,OF' VALVE:
(\J Le. ,e,,.,_""
~L I -..,.
u.
I DEC NT AMINATI N RM. EL. 613'-6' 726 A _,
~v-T I ~
EL._,j_.__L "'r---OJ I"'u.
I OJ Lf) le ,
~v-T u l PS~'*
- ! I
"'..,. 120 u
--..___J -. a9o4 [-
I I CFM.t st --?--
OIL LEVeL r(i'- *
$UC:1'l0M STOP V.i\LVe.
I
~ CFM
"'+ +
$10MT eAUGoe ( 1: COl,\f'RE,o'°"f<-
7* 1 I --t _ _ _ _ _J, low C01-'!f'II.E5SORi II
&IA/e.1e, F218
lI I
1 eCMC H21P592
~r
- 1980 C.FM 4800 CFM I I
' I 2904 CFfl 2904 CFM C
,._ ____ _ ~ *-- ______ _j '--< M-4952 (E -5><
C
~ ft
~~ I ~ij ~Is 11
- .TO!" e.ME RG.. Re,;, El" Ot=f" PUMP PO'l'O*.l"
~
st I
-..,. ~
OJ I -~ I -
~
I
- ,.,_u,o C>f'E.R'"'TION' u.
(\J u.
~
(\J I w
~
0 u.
~
ru u.
~
(\J Lf) Lf) If) lf1 I "'..,.
OJ
(\J I
"'st I
"'st I
,c I ::c ::c
"' c..*
e:L.. o,"2 e.- 0 " If e.L. <-,l":> -
6M721-4953 LATEST REVISION Q
THE FLOW NUMBERS INDICATED ARE HISTORICAL DESIGN VALUES; FOR ACTUAL FLOWS SEE DC V4100-01 VOL. I & DC V4100-02 Vol.I
~o TI)i..i B NOTe~: WAT!,i.* COOL.li.C>
B I, WORK T.11~ D!ZAINHJ'-i WlTH DE'StlG!t-1 IN'::>Ti<!.UCTIOI-I I\JO, 40 CI.\H.W.2 i.ll-hT V4100B006 7.. Foll: L.~!al-JD AND ~'(ME!,01,.<:, ";,F.:,a. D2AWIN(;i.., M-2001 AND M-4951. !NON-NUCLEAR SAFETY RELATED!
~' FOia ilJ':,TICUl-'\l=>.ITAilON AIJD C.OIJT..WL.~ '$1=.E;. DZ..O.Wt>J"i 1-2755-01, 03, 07, 09 1. 11.
- 4. TO A'St~l"ST DIIZIEC.-r10Is1 OF Ali<l=L.OW': DU1<'1i-l"i Dooli. OPISN1"'1C::,'5, THIS IS A MICROSTATION PRODUCED DRAWING.
':>1-Z.c. E.)'..HAU,S,T DWC.TWOiZ,.K l='Oii: A MINIMUH !=\.OW 01= ~,oo c.l=M, CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING
-S, 'ljc< PEI.JOTE.:;. E.QL.IIPIVIE.I-IT <$UPPLIE.D 6Y CHIL.l.£R.. UNIT e.UPPc.lE../<.. DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
- 6. UNLESS THER\./ISE SHD\./N: ALL INSTRUMENT PIS NUMBERS ARE PREFIXED V41.
THIS DRAWING WAS REFORMA'I'I'ED BY ALL VALVE AND EQUIPMENT PIS NUMBERS ARE PREFIXED V4100. MICROSTATION AT REVISION "Q". ALL INC.CODE Detroit Edison Fermi 2 PREVIOUS APPROVAL SIGNATUR!S ARE TITLE ON FILE ON MICROFILM IN DOCUMENT CONTROL. T RADWASTE BUILDING HEATING Q loco's INCORPORATED: A PORTION OF THIS DRAWING PREPARED BY DATE VENTILATING AND AIR EDP 37719,B013, REV. ~ IS AFFECTED BY THE FOU.Ol'ilNG:
CONDITIONING FLOW DIAGRAM iA TC CHANGE DOCUYENT I CHECKED BY I DATE I IA IOTHER REVISIONS: \ I 1---1--------- RAD BLDG HVAC FLOW DIAG APERTURE CARD TITLE uNIT ...2 APPROVED BY DATE I PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT #
V4100 PREPARED BY A. DITTMAN DATE 3/2/18 ICKED _J)Y
'<! ,tf<S/=5" DATE
'PROV, ,ATE DOCUMENT TYPE CODEDDDMEC NUC OPS FILE NO.
1801 DATE ISSUED TO IS 3 G-1 I(
,sforTom EDP POSTING ENTRililS REQUIRE THli!
~
,y III per ,
TMPE-13*0028 / ;'M)(l /.('!;
ADDrrION OF THE AR!45 STATUS CODE; EITHER "AFC" OR "ASB" DRAWING NOMBER 6M721-4953 REV.