|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A2412021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-09, Logic Diagram Emergency Equipment Cooling Water System Valve - Division I ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A3022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2410, Fire Protection Evaluation Reactor and Auxiliary Buildings Roof Plan El. 697' - 6 and 735' - 6 ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B ML21055A2962021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011, Rev. AP, Diagram Condensate Polishing Demineralizer System ML21055A2952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2046, Reactor Water Clean-Up Reactor Building ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A2922021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2028, Rev. K, Process Flow Diagram Radwate System ML21055A2902021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-4, Rev. B, Logic Diagram Nuclear Boiler System ML21055A2862021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing 6C721-2308, Rev. H, Reactor and Auxiliary Building Foundation Sections & Details Unit 2 ML21055A2842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2034, Diagram Core Spray System C.S.S. Reactor Building ML21055A2832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M271-2550, Flow Diagram of Equipment Drains in Radwaste Building ML21055A2822021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2023, Diagram Feedwater System ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2612021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2400-25, Post Accident Sampling System - P & Id Sh. 1 ML21055A3952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5878, Reactor Core Isolation Cooling Following Main Condenser Isolation Using Suppression Pool as a Backup Water Source ML21055A2422021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-03, Rev. F, Logic Diagram Nuclear Boiler System ML21055A2432021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-6, Rev. a, Logic Diagram Neutron Monitoring System (Part 6) ML21055A2452021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2086, Diagram Fire Protection System Reactor Building & Auxiliary Building ML21055A2462021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2100-01, Rev. C, Logic Diagram Reactor Recirculation System Part 1 ML21055A2482021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2404, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Tray Area Plan - El. 603' - 6 ML21055A2492021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2511, Side Stream Lrwp System P&ID ML21055A2502021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-03, Logic Diagram Reactor Core Isolation Cooling System ML21055A2522021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-03, Rev. J, Logic Diagram Emergency Equipment Cooling Water System Pumps a & B ML21055A2532021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-05, Logic Diagram Neutron Monitoring System (Part 5) ML21055A2552021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011-1, Diagram Condensate Polishing Demineralizer System (Sheet 2 of 2) ML21055A2562021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 7M721-2218, Floor & Equipment Drains Sub-Basement Plan Reactor Building ML21055A2582021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2430-01, Logic Diagram Turbine Building Closed Cooling Water Pump North Center & South ML21055A2592021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2408, Fire Protection Evaluation Reactor and Auxiliary Buildings Fourth Floor Plan El. 659' - 6 ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 7 6 5 4 3 2 1 I.. DESIGN ?P,ESS 150 PSI'?
. Dt~l~N iEMP. 12..0°F
~ -- -@;s:.:_~-~--
o/z u' :r:/e PEMl'I WTR MAtl>U?
H FY FY FY
, M-2678 (E-4) ~ H
~f\L ~ - ~ ~ f U.. SEC calTLJis<lL TWMS RfTUPN VALVES IDGC VALVE LOGIC I .,,, I 1-2780-05 4* I LC. I r --(
/ ~
r--_1 F010 F009 I {j, g~~~
OE516tr,j
- iEMP. 12.S*F MOI :
'7 (405e,)
I'""
0 ro' I i.:;:i IF0438 F083 11 -cJ, . If.: F613 8" (4102)
~I F612 F043D I ~-~
TWMSI~ (Ro\ I F045 F043C IIALVE LOt,IC - - ~ NOT!=- "13 F008
..,g 1-2780-04 1I 01 F043E
( ~':'._) S£{: I FOOi I
- ,I' 4" G5100F093 z
jjj ~
I I ,....
\....
r--<@> *TROLJBLE" 'Q/o I Q o.a GS!OO ti) 00
.s I I I
N I')
,c I G
i
-'t 0
z E4100
~ 00 I I* G
~~
G51DC040fu- - - - _.__ - - 0
@ :~
Q. --
~ 1*
C, Q!
N I I
,9,c I.z
.. ,, o I V ::::, . I
,--fLis, t- I Oo 3
.t ;1; 8;el 0 ID G51DC0407 TWMS ISOLATION HPCI KEEP FILL I ,-------, I'\"
~ VALVE LOGIC 1-2780-04 I G51DCD40~- - - - _._ - -
3/4" FOl4A
' M-2035(C6) l-J I ** 0
~
0 N
I t,,l CONDENSE?
O' ,
~--/e'.' ~I L I M-2004 C-3 I}: ::::, ~COlliOl:NSAi~ . - ----...._
c,Q,
~
~ F604
. . .!"""-*... _;._,i I / 0 F015A I TO HTR. FEED { , - - - -.... * * - " ' - ' P0\.11St\lN6 ',.*1. I ...
1 - , . . ~ , . . t..,.
-i, 1 G51DC0407 j\
Ho
)-,.\C ERIS I
PMP DISCH. ,....- .. ,_ 0&,'lll*J. '...,J' *
-J ' . .,
L. TEST POINT #!1 6 0
"'_, CONN. M-2004 (C-3) I UhllTS -;;, ( I
~OSS) *--"'-'--4,---- +----T---_; I I HTR. FE'ED Pt.IP MIN I : * * ~Ji I
) ,;,/-- ~.:J.084 (F-5 _ I FLOW TO CONDENSER 1-- .. ---l .... -.~
~~
f--.-__ Gd' FROM TE-T23N006 7 RHR 'iE:Sr \..\NE I M-2004 (D-2) CON.OE.NSER 9..,
1 ; ~/< 1 Glq 'ilo0,., %;'.
/
I 1,
1 1
/
I PENET, X-228A
-, -,,,. ,; - _Ji-::'_ --- ,, ' - - - - -
---~ t./
I I
I EMERGENCY RELIEF CONTROL STA TO C.S.T.
\',,
1-<'
£2. ~
PLIMP NOTES:
t -
~-~ /~ I TE T23
'\
TE T23 N006 I
I P/0 F046 r---
1
~L.OC.I(
1-2780-06 VALVr. 6, TWMS CLASS "B" ISOLATION VALVES TO CLOSE ON "HIGH HIGH LEVEL" ALARM IN ORYWELL OR TORUS ROOM FLOOR DRAIN SUMPS, HIGH ORY-WELL PRESSURE OR LOW RPV LEVEL 2 ALARM.
q.v N003 I ' 247"'30' \ I VALVE _,I 6A. TWMS PUMP OPERATION TO STOP ON "HIGH HIGH LEVEL" ALARM IN ORYWELL
~
- o* B~PASS C'~- 112'30' I \
I r;,' OR TORUS ROOM FLOOR DRAIN SUMPS, TORUS WATER LEVEL LOW-LOW IHO
\
LOblC N'
§, (I/# I ALARM, EITHER PUMP SUCTION ISOLATION VALVE IS s95% OPEN OR VALVES
, 1 .*
I m I 1-2780-06 TO SAMPLE PNL. P33P406 -~- ~ _TO CONPE.NSER..
G5100F033 & G5100F609 BOTH ACCIDENTALLY CLOSE (s5%),
I 1-2400-03 (D-3) '-,
--11~ ~ M-2004-1 (B-8 7. FOR LEGEND OF SYMBOLS & ABBREVATIONS SEE M-2000 & 2001.
\ I RD RO ..cDWG. NO.
\I (91 I 1 --
,"""4)
F043A D005 8. l~6~M7--2~1--_-~~"'--1DENTIFIES PIPING ISO FOR FABRICATION & ERECTION.
~ L____ l-----~------ 9. UNLESS OTHERWISE INDICATED ALL ALARM NO'S SHOWN ON THIS DWG. ARE SUFFIXED l I I
'\
I
\
'I I
' I /
~/..
ll'd
'I)
MO' F029 RD D007 m
~I F032 10.
11.
G51 (EXAMPLE 008G51)
FOR CONTROL LOGIC DEVELOPMENT SEE DWG. NOS. 1-2780-01 THRU 07.
, ~E, I
.,-"ii."1 $ IS<JL ' F028 F031 12. FOR ADDITIONAL INSTRUMENTS CONNECTED TO TORUS LEVEL TAPS/ LT-E41L450 AND
./;AJ;IE 17 I
' ' (4058) .io57l_. t;,* (4057)
LT-E41L452. SEE SYSTEM DIAGRAM M-2035 AND 1-2679-01.
E LOO-I e, 1-2780-04 TE)'
T23
)'002
\ '
1 T23 N007 '
/'1 -
TWMS ISOLATl<lt<
VALVE Ul&IC F609 I 13.
14.
ORIFICE R0-0003 IS RESIZED AND REPLACED TO MEET TWMS CLEANUP MODE DESIGN CONDITION.
THE INTERNAL STRAINER SCREENS TO THE TWMS PUMP SUCTION STRAINERS (G51000001 E
' :;.,J 1-2780-04 ~tJ,F055
- , o I 67"'30' ' ,, "' 292,}30' AND G51000002) HAVE BEEN REMOVED. THE STRAINERS HAVE NO STRAINING TYPE or
, FUNCTION.
/ 0 ABANDONED Gsrnc~,o, 0407 ** - -
c J.
'r J"._ ~:0- 1 IN PLACE 15. DESIGNATES VALVE POSITION LOCKED OPEN OR LOCKED CLOSED BY LO OR LC 0 , / ' INDICATION WITHIN BOX.
r{o t,._.
I I
Ille, az -"
'-( '
G51DC 0407 M
,,y,c
-7
$,~ r-- PENET. ---------1~TE~- T23 roRV' 8CR.Ai~J FE.II Ef ,
"'s:;-'°c , ' "'s:,,<?c"
- 07. <fl 0'57.
- 16. UNLESS OTHERWISE SHOWN:
ALL INSTRUMENT PIS NUMBERS ARE PREFIXED G51.
ALL VALVE AND EQUIPMENT PIS NUMBERS ARE PREFIXED G5100.
gl "1
I I ~
I D.
- X-227A 22'30'
\.;'.008 337°30'
"'X-213B --.. '6 ~
_o:.,._ -.(' ._
1'.'f1c, ....
o>
"7J
"-1 O I
'::Q-o>
3/4" F053 3/4" F040A
"'1io-~'f \ I/,: 6' DESCRIPTION OF MODES II i~ ' v' I ce,1E, 2" DRw \
y _fCT\__..fcr:J 1. DRAINING 0
l1l F606
~*, F014B
/
,<5/
HPCI ROOM FLOOR \ ~ DUAL -~~ SUCTION FROM THE TORUS, DISCHARGE INTO THE CONDENSER
! ~
{405-7) 4-f." I TD~SUMP G1101D076 ~* -,
1 2. FILLING FOl51/B TEST 3/4i F023A , I 1 I
SUCTION FROM THE CONDENSER, USING CONDENSER PUMP, FILLING THE TORUS CORE SPRAY TEST LINE
£2034(H -- COhlN. F018A! lo' I -*'
"' F024A F025A
\
\ ~
~
~
- 3. CLEAN UP SUCTION FROM THE TORUS THROUGH THE MAIN CONDENSER, WITH CONDENSER
~ ~
FOl9A! F603 5T~INER.- \ PUMPS RUNNING, AND DISCHARGING INTO THE TORUS.
G51DOD001 .9
' \ 4. BYPASS D
<SEE NOTE #14) F038A
,. TORUS WATER ".
MANAGEMENT PUMP' NOR1H ~ SOUTl1 I
I
£/;: ~ A. SUCTION FROM THE TORUS, THROUGH BYPASS, CONDENSER PUMPS RUNNING, DISCHARGING INTO THE TORUS.
D F039A "' G5100C001 '
r-- - - LOGIC /
1 T WMS PUMP 8, SUCTION FROM THE TORUS, THROUGH BYPASS, CONDENSER PUMPS NOT RUNNING, 11 INMS PUMP "NORTH" CROSS<,~E~ 1-2780-0L_
I ~
~ ,i; DISCHARGING INTO THE TORUS.
r - II VAlVE UJG1c I VAi.
1Y1."
~ 1-2780-03 I I I
~ 3/4:"
--0. -
I F608 I
/
I' F04~ 3 .. ,~-- ..
7.n.--1..
I
~
~
t' VALVES 1 2 3 A
,;t
\(I Ill 0 F054 2
,. 'f G5100F033 G5100F609 0
X X
X 0
X X"
O'*
X" O'*
DRw G5100F610 X X X X X ABANDONED .!- F0378 01::Sl<=>N PRESS.
HPCI ROOM FLOOR G5100F611 0 0 0 X X
~J TD SUMP Gl101D076 IN PLACE 150 Psrg,.... iI f I 4' JO C1100F027 (SEE M-2081) X X 0 0 X PTL L002B
- .9 ~R G5100F612, F613,FOOI 0 0 0 0 0
.4i F0248 G5100FOIO X X X X X F025B 0 0 0 0 11(
\
- F021B} F023B CJ G51 OOF023B, F023A, F025B, F025A GSIOOF608 G5IOOF602, F600, F603, F601 0
0 X X X
X 0 0 X X 0
F038B ' STRAINER TORUS WATER GSI OOF605, F604 F606. F607 X 0 0 0 0
~
G51000002 I.\. (SEE NOTE /114)
MANAGEMENT PUMP G5100C002 CONDENSER PUMP DISCHARGE HP NP NP X C
C HI~ HI ,
F039B "SOUTH"
"-G5IOOF609 TO OPEN PRIOR TO THE CLOSURE OF G5100F033
\ \ I I
E4100 v(Co] 1\q *-DEPENDING ON WHICH CONDENSER PUMPS ARE RUNNING: THOSE VALVES TO BE IN THE OPEN POSITION, THE REST IN NP.
\ Fl48 0 X -VALVE CLOSED
'-. 0 -VALVE OPEN NP-VALVE IN NORMAL POSITION TWM$ 1i?ETU1'N I
, Hl*HI \ "t/
VALVE G5100F611 CONTIDL LOGIC ~--~ y L....< I 2679 OlCC 2)(
DRw '
T RUS R M FLOOR (DECO DWG. 1-2780-07) (SUMP G1101D065) r.J' 6M721-4100 LATEST REVISION AQ
@ @ r~
..,..J. FY l/E
-* LXE (N402
- o~MAL EL. 557<>"
LEVEt. t====-========:=:=9 TO!i!US A E.L. OF TOli'US
- t .5.57*. .9*
I
'r -~-
NOl2TH f -3CUTt4 j1..owwt B TWM.S ?UM?$ !. Q, I-2679-0l(C-2) B CONT~OL LOGIC . I *~
(DECO DWG. 1 - 2 7 ~ //
I NUCLEAR SAFETY RELATED I
i\ \ E4100Q(0]
f147 6 THIS IS A MICROSTATION PRODUCED DRAWING.
~1 LO-LO LO TOl<US .SECTIOl',I AT AZ 2_,z4-* It" CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS DRAWING WAS REFORMATTED BY MICROSTATION AT REVISION "AJ". ALL INC.CODE Detroit Edison Fermi 2 PREVIOUS APPROVAL SIGNATURES ARE TITLE ON FILE ON MICROFILM IN DOCUMENT CONTROL. T DIAGRAM AQIDCD'S INCORPORATED, .A. PORTION OF THIB DRAWING PREPARED EY DATE TORUS WATER TM 19-0019, REV. ¢ IS .AFFECTED BY THE FOU.OWlNG:
MANAGEMENT SYSTEM TC CHANGE DOCUMENT CHECKED BY DATE 1-..,,==::--::===------------------- A A OTHER REVISIONS, !----+-------, DIAG TORUS WTR MANAGEMENT SYs APERTURE CARD TITLE APPROVED BY:_ DATE I PLANT IDENTIFICATION SYSTEM NUMBER I ARMS RECIPIEN'l' #
G5100 PREPARED BY CHECKED BY DATE DOCUMENT TYPE CODEDDDMEC NUC OPS FILE N0.1 MOHAMED NUMAN
~;;I"" OTHER APPROVALS DATE 1801 6 M7 21- 41 OO EDP POSTING ENTRlES REQUIRE THE APPROVED ifavid Kakoc;,:\d ADDITION OF THE ARMS ST.A.TUB CODE: DRAfflNG NUMBER forT. Murphy Ill ~ ~/JJ/1' EITHER "AFC" OR "ASB" R '7 R Fi Lt "' ') 1