ENCLOSURE SEQUOYAH I;UCLEAR PLANT UNIT 2 INCORRECT INSULATION UKIGHT USED IN PIPING ANALYSIS 10CPR50.5S(e)
ENCLOSURE SEQUOYAH I;UCLEAR PLANT UNIT 2 INCORRECT INSULATION UKIGHT USED IN PIPING ANALYSIS 10CPR50.5S(e)
_
NCR_SQN CEB 8008 ,        ,
NCR_SQN CEB 8008 ,        ,
FIRST INTERIM REPORT Description of Deficiency Insulation uaights that were originally provided ucre used in the pipin;; analysis. When the "as-constructed" insulation drawings are received, th=y are reviewed to determine if any significant changes were made that affect the scisraic analysis. Upon review of the piping analysis for unit 1, a discrepancy between actuci insulation weight and the d..ta used for the piping analysis was discovered. A similar situation may also exist for unit 2.
FIRST INTERIM REPORT Description of Deficiency Insulation uaights that were originally provided ucre used in the pipin;; analysis. When the "as-constructed" insulation drawings are received, th=y are reviewed to determine if any significant changes were made that affect the scisraic analysis. Upon review of the piping analysis for unit 1, a discrepancy between actuci insulation weight and the d..ta used for the piping analysis was discovered. A similar situation may also exist for unit 2.
                                                                          .
Corrective Action When the "cs-constructed" insulation drawings for unit 2 are received, tha infomation will be compared with the data used in the unit 2 pipin;; analysis. When this review is complete, TVA can determine if a sic.ilar concern exists for unit 2 and uhat corrective action, if any, is required.                      -
Corrective Action When the "cs-constructed" insulation drawings for unit 2 are received, tha infomation will be compared with the data used in the unit 2 pipin;; analysis. When this review is complete, TVA can determine if a sic.ilar concern exists for unit 2 and uhat corrective action, if any, is required.                      -
                                                                .
I l
I l
l
l
!
!
                                                    -
* C  $'
* C  $'
l D
l D
                                                             *~D)
                                                             *~D)
W W Ju  KD)M.
W W Ju  KD)M.
Udu        A[lnLa
Udu        A[lnLa t                                                                                  -c i
;
                                                              '
t                                                                                  -c i
I l
I l
f      $00530041% g
f      $00530041% g L}}
,
L}}

Latest revision as of 20:09, 18 February 2020

First Interim Deficiency Rept Re Incorrect Insulation Weight Used in Piping Analysis.Drawing Data Will Be Reviewed
ML19323G117
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/23/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML19323G114 List:
References
MCR-SQN-CEB-800, NUDOCS 8005300417
Download: ML19323G117 (1)


Text

,

a

^

( )* <

ENCLOSURE SEQUOYAH I;UCLEAR PLANT UNIT 2 INCORRECT INSULATION UKIGHT USED IN PIPING ANALYSIS 10CPR50.5S(e)

NCR_SQN CEB 8008 , ,

FIRST INTERIM REPORT Description of Deficiency Insulation uaights that were originally provided ucre used in the pipin;; analysis. When the "as-constructed" insulation drawings are received, th=y are reviewed to determine if any significant changes were made that affect the scisraic analysis. Upon review of the piping analysis for unit 1, a discrepancy between actuci insulation weight and the d..ta used for the piping analysis was discovered. A similar situation may also exist for unit 2.

Corrective Action When the "cs-constructed" insulation drawings for unit 2 are received, tha infomation will be compared with the data used in the unit 2 pipin;; analysis. When this review is complete, TVA can determine if a sic.ilar concern exists for unit 2 and uhat corrective action, if any, is required. -