ML17208A774: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/11/1980
| issue date = 06/11/1980
| title = Responds to NRC 800512 Ltr Re Violations Noted in IE Insp Rept 50-335/80-10.Corrective Actions:Examiner Passed Eye Exam & Schedule for Recertification of Vision Tests Established
| title = Responds to NRC 800512 Ltr Re Violations Noted in IE Insp Rept 50-335/80-10.Corrective Actions:Examiner Passed Eye Exam & Schedule for Recertification of Vision Tests Established
| author name = UHRIG R E
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = Oreilly J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000335
| docket = 05000335
Line 15: Line 15:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000335/1980010]]


=Text=
=Text=
{{#Wiki_filter:IP.O.BOX529100,MIAMI,FL33152FLORIDAPOWER6LIGHTCOMPANYJune11,1980L-80-177Mr.JamesP.O'Reilly,
{{#Wiki_filter:I P.O. BOX 529100, MIAMI,FL 33152 FLORIDA POWER 6 LIGHT COMPANY June 11, 1980 L-80-177 Mr. James P. O'Reilly, Director,   Region  II Office of Inspection    and Enforcement U. S. Nuclear Regulatory Commission 10l Marietta Street, Suite 3100 Atlanta, Georgia 30303
Director,
 
RegionIIOfficeofInspection
==Dear Mr. O'Reilly:==
andEnforcement
 
U.S.NuclearRegulatory
Re:   RII:   BRC 50-335/80-10 Florida  Power  8 Light Company  has reviewed the subject inspection report      and a response    is attached.
Commission
There  is  no  proprietary information in the report.
10lMariettaStreet,Suite3100Atlanta,Georgia30303DearMr.O'Reilly:
Very  truly yours, Q~~
Re:RII:BRC50-335/80-10
Robert E. Uhrig Vice President Advanced Systems    8 Technology REU/MAS/pa Attachment cc:   Harold F. Reis, Esquire OFFICIAL COPE-i:
'FloridaPower8LightCompanyhasreviewedthesubjectinspection
                                                                                              ~  '
reportandaresponseisattached.
                                                                                                    ~
Thereisnoproprietary
80OPO7 0/m                                                                PEOPLE... SERVING PEOPLE
information
 
inthereport.Verytrulyyours,Q~~RobertE.UhrigVicePresident
RESPONSE  TO USNRC  I & E INSPECTION REPORT  80-10
AdvancedSystems8Technology
~Findi n:
REU/MAS/pa
As  required by Criterion    V of Appendix B to 10 CFR 50 and as implemented by Section 5.0    of the FPL Topical guality Assurance Report, "Activities affecting quality shall be prescribed by documented instructions, procedures, drawings... and shall be accomplished in accordance with these instructions, procedures and drawings". Paragraph 5.4.3.1 of FP8L procedure gI 9 PR/PSL-2, the implementing guality Instruction for the control of NDE, and paragraph 8 of ASNT SNT-TC-lA require a yearly eye examination for  NDE  personnel.
Attachment
Contrary to the above, on April    ll, 1980 NDE rt,cords revealed that for the site Level III examiner, an eye examination had not been administered within the required yearly time frame.
cc:HaroldF.Reis,Esquire'~~OFFICIALCOPE-i:80OPO70/mPEOPLE...
~Res ense:
SERVINGPEOPLE
: 1. The Level  III examiner  has satisfactorily  passed his eye examination.
RESPONSETOUSNRCI&EINSPECTION
: 2. All affected personnel have been reminded of the need for yearly vision tests and given a recertification schedule for the current year.
REPORT80-10~Findin:AsrequiredbyCriterion
3 ~ Full compliance is considered achieved    as  of this date.}}
VofAppendixBto10CFR50andasimplemented
bySection5.0oftheFPLTopicalgualityAssurance
Report,"Activities
affecting
qualityshallbeprescribed
bydocumented
instructions,
procedures,
drawings...
andshallbeaccomplished
inaccordance
withtheseinstructions,
procedures
anddrawings".
Paragraph
5.4.3.1ofFP8Lprocedure
gI9PR/PSL-2,
theimplementing
gualityInstruction
forthecontrolofNDE,andparagraph
8ofASNTSNT-TC-lA
requireayearlyeyeexamination
forNDEpersonnel.
Contrarytotheabove,onAprilll,1980NDErt,cordsrevealedthatforthesiteLevelIIIexaminer,
aneyeexamination
hadnotbeenadministered
withintherequiredyearlytimeframe.~Resense:1.TheLevelIIIexaminerhassatisfactorily
passedhiseyeexamination.
2.Allaffectedpersonnel
havebeenremindedoftheneedforyearlyvisiontestsandgivenarecertification
scheduleforthecurrentyear.3~Fullcompliance
isconsidered
achievedasofthisdate.
}}

Latest revision as of 15:06, 4 February 2020

Responds to NRC 800512 Ltr Re Violations Noted in IE Insp Rept 50-335/80-10.Corrective Actions:Examiner Passed Eye Exam & Schedule for Recertification of Vision Tests Established
ML17208A774
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/11/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17208A773 List:
References
L-80-177, NUDOCS 8007070100
Download: ML17208A774 (3)


Text

I P.O. BOX 529100, MIAMI,FL 33152 FLORIDA POWER 6 LIGHT COMPANY June 11, 1980 L-80-177 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 10l Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: RII: BRC 50-335/80-10 Florida Power 8 Light Company has reviewed the subject inspection report and a response is attached.

There is no proprietary information in the report.

Very truly yours, Q~~

Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/pa Attachment cc: Harold F. Reis, Esquire OFFICIAL COPE-i:

~ '

~

80OPO7 0/m PEOPLE... SERVING PEOPLE

RESPONSE TO USNRC I & E INSPECTION REPORT 80-10

~Findi n:

As required by Criterion V of Appendix B to 10 CFR 50 and as implemented by Section 5.0 of the FPL Topical guality Assurance Report, "Activities affecting quality shall be prescribed by documented instructions, procedures, drawings... and shall be accomplished in accordance with these instructions, procedures and drawings". Paragraph 5.4.3.1 of FP8L procedure gI 9 PR/PSL-2, the implementing guality Instruction for the control of NDE, and paragraph 8 of ASNT SNT-TC-lA require a yearly eye examination for NDE personnel.

Contrary to the above, on April ll, 1980 NDE rt,cords revealed that for the site Level III examiner, an eye examination had not been administered within the required yearly time frame.

~Res ense:

1. The Level III examiner has satisfactorily passed his eye examination.
2. All affected personnel have been reminded of the need for yearly vision tests and given a recertification schedule for the current year.

3 ~ Full compliance is considered achieved as of this date.