{{#Wiki_filter:ACCELERATED DI TRIBUTION DEMONS TION SYSTEM REGULATORY XNFORMATION DXSTRIBUTION SYSTEM (RXDS)ACCESSION NBR: 9104020144 DOC.DATE: 91/03/27 NOTARIZED:
{{#Wiki_filter:ACCELERATED DI TRIBUTION DEMONS                                     TION SYSTEM REGULATORY XNFORMATION DXSTRIBUTION SYSTEM (RXDS)
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and.Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFXLIATXON PLUNKETT,T.F.
ACCESSION NBR: 9104020144             DOC. DATE: 91/03/27   NOTARIZED: NO           DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and .Light                 C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                 C 05000251 AUTH. NAME           AUTHOR AFFXLIATXON PLUNKETT,T.F.         Florida     Power   & Light Co.
Florida Power&Light Co.RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIP.NAME           RECXPIENT AFFILIATION Document     Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards Feb 1991 six month integrated schedule regulatory rept, for Turkey Point Plant.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
Forwards Feb 1991 six month integrated schedule regulatory rept, for Turkey Point Plant.                                                     D DISTRIBUTION CODE: A001D           COPIES RECEIVED:LTR       ENCL     SIZE:
General Distribution NOTES: DOCKET 05000250 05000251 D$i RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R XNTERNAL: NRR/DET/ECMB 9H NRR/DOEA/OTSB11 NRR/DST/SELB SD NRR/DST/SRXB SE OC G FX E 01 EXTERNAL: NRC PDR COPXES LTTR ENCL 1 1 2 2 1 1 1-1 1 1 1 1 1 0 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DET/ESGB NRR/DST SE2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS3 RES/DS IR/E I B NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 0 1 1 D D.D NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: OR Submittal: General Distribution                                                   $i NOTES:
PLEASE HELP US TO REDUCE WARM CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM-DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPXES REQUIRED: LTTR 18 ENCL 16 A-D=D I I 1 I r qO lf'II I 1 P.O.Box 029100, Miami, FL, 33102-9100 MAR Rv 1991 L-91-087 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RECIPIENT              COPXES            RECIPIENT         COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL PD2-2 LA                     1      1    PD2-2 PD              1    1            D AULUCK,R                     2      2 D
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Inte rated Schedule 6-Month Re ulato Re ort Attached is the February 1991 Six Month Integrated Schedule (I/S).Regulatory Report for the Turkey Point Plant.The schedules discussed in this report reflect information updated since the August 1990 Regulatory Report which was provided to the NRC on September 27, 1990 (L-90-345).
XNTERNAL: NRR/DET/ECMB 9H               1      1    NRR/DET/ESGB          1    1 NRR/DOEA/OTSB11             1    -
Changes of interest to the NRC discussed in this report have been reviewed with the NRC Project Manager for the Turkey Point Plant in accordance with the Integrated Schedule Plan.Should there be any questions regarding this report, please contact us~Very truly yours, T.F.Plunkett Vice President Turkey Point Plant Nuclear TFP/RJT/r j t Attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant<..)378 9i04020i44 910327 PDR ADOCK 05000250 R PDR an FPL Group company l'pO//g(
1    NRR/DST        SE2    1    1 NRR/DST/SELB SD             1      1    NRR/DST/SICB 7E        1    1 NRR/DST/SRXB SE             1     1     NUDOCS-ABSTRACT        1     1 OC                          1     0    OGC/HDS3              1   0 G FX E        01        1     1     RES/DS IR/E IB        1   1 EXTERNAL: NRC PDR                                    NSIC
'LI't(!,.f)'!V'(~<~II ATTACHMENT I The following is a summary of the I/S modifications for the Six Month Integrated Schedule Regulatory Report.The February 1991 Integrated Schedule is based on the following outages: OUTAGE DESCRIPTION START FINISH Unit 3 Unit 3 Unit 3 Unit 4 Unit 4 Unit 4 Diesel Tie-in Cycle 13 Refueling Cycle 14 Refueling Cycle 13 Refueling Cycle 14 Refueling Cycle 15 Refueling 12/11/90 08/22/92 04/01/94 11/25/90 04/0 1/93 10/01/94 10/04/91 12/04/92 06/03/94 11/05/91 06/03/93 12/03/94 Changes to the Integrated Schedule since the last issue to the NRC, August 1990 (L-90-345 dated September 27, 1990)are as follows: MODIFICATIONS ADDED 793 794 1362 1363 1364 1365 1366 1368 1369 1370 1371 1372 DESCRIPTION 3 REPL 480V MCC 3E DUE TO CORROSION 4 REPL 480V MCC 4E DUE TO CORROSION 3 RESTRAINT MOD-PORV DISCHRG LINE 4 RESTRAINT MOD-PORV DISCHRG LINE C MISSILE PROT EVAL-PLT EXT DOORS 3 IMPROVE HOTWELL DRAINAGE 4 IMPROVE HOTWELL DRAINAGE 3 REPL MOV-535/536 ACTUATORS 4 REPL MOV-535/536 ACTUATORS 3 CONTAINMENT PRMS R-11 6 R-12 REPL 4 CONTAINMENT PRMS R-11 6 R-12 REPL C CONTROL ROOM HVAC CONTROL MOD LIC CAT FPL FPL NRR NRR FPL FPL FPL FPL FPL FPL FPL FPL MODIFICATIONS CANCELLED 952 1001 1293 1294 1359 DESCRIPTION C EDG LUBE OIL MODIFICATIONS C EXISTING"B" EDG IDLE START/STOP 3 CTL LD METERS-ADD UNITS/CHA SCALE 4 CTL LD METERS-ADD UNITS/CHA SCALE C FLOOD PROTECTN 4.16 SWCHGR ROOMS LIC CAT FPL FPL NRR NRR FPL
                                                                                              .D A
~~<g,~
                                                                                              -D =
MODIFICATIONS COMPLETED~IS 50 67 293 396 417 418 422 549 744 787 792 1244 1262 1280 1310 1355 1360 DESCRIPTION 3 MSR MODERNIZATION REPLACEMENT 4 REPLACE LOW PRESSURE ROTORS 3 SGWL CNTMT ISOLAT'N VLV REPLACEMENT S BOUNDARIES FOR VISUAL LEAK INSP 3 REPL CCW HX THERMOMETERS W/RTD'S 4 REPL TUBE SIDE CCW HX TIS W/RTD'S 3 MAIN STM SAFETY LIFTING LEVERS 3 ADD'L CNTMT ELECT PENETRATIONS 4 SFP BRIDGE CRANE REPLACEMENT C INSTALL BARRIERS IN HVAC DUCTS S CNTRL ROOM LIGHTING EVALUATION 4 4160V SWGR CNTRL MOD-ADD A DIODE 4 REPL EXTR STM CS PPG W/CR MOLY 4 CCW HEAT EXCHANGER REPLACEMENT S ICW PMP FDN SFTY HAZARD EVALUAT'N C EOP REVIEW REV 1 S STORM STUDY/PLANT DRAINAGE EVAL LIC CAT FPL FPL FPL FPL FPL FPL FPL FPL FPL I&E NRR FPL FPL FPL FPL FPL FPL
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WARM CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM-DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPXES REQUIRED: LTTR               18   ENCL     16


fttlfCT ALNICAIS~LOI CSO SAFA I taft l~TLHACI SCINT lactfAC SLANT INTtCMIIO SCHIOIAC SL441OA SOslt AICI LICHT CO.HOOC ITS I INTLAVAL I VIAAISI TACCf I SCHtOLAC TA\C I INISH IAAC DATA DATC 24 LSNATIL 24NOVtt~LH I TNAAI I 14'I FAOIICTS2~442 scaltaat OAA cHAAT SIAAT FINISH CATA DA'lf 2 SANS 4 SOL CSS IISlatl TAACC I SCH COUL f LINC ttfAC OH NAC CLVOIIIHINT C*TICOAITS Lltf ttttt OH CFO Sltl SVSIIH SCOT Stttal SCOOLS 4 CCS ff 1989 1990 1991 1992 1993 CFO POST TMI CONF I RMATORY MOOIF I CAT"N C AREA RADIATION MONIT"G SYST REPL CFO MOD 0341 18AUG89 P 23AUG91 I I 5APRST P04 T11.20 U4 SEL SYS MODSI REPAIRS C EDG AIR START MOTORS UPGRADE CFO MOD 0578 18JUL88 5ICW9 1 27APRS I POST PEP 4 RHR-INSTL UPGRADED 8" GL08E VLV CFO MOO 0585 SFE888 SNOVST 5MAR91 SCTTES 0 CSDDTLLL tfLC CDLOCTI42LT DAIE Lftttoif IOHZVIACE ISLC CLSDCTLEILT Da TE LISLKNT CLTTACE SILC CDLAC TIMIST DATE'ATA OATF I 1 q C 4' t&OFKCT AINT CATS PI&I&KO~ACI I KHffT I TUKKKT t&INT f&FCIKAK ttANT INIICAATKO SCINKANK f1&&I&A AOvf&Al&l I IIHT CO NIKN 1 fl T INTf&VAI~VIA&I&I TAKCK't SCNtt&NS f A&C~I N I&H'IAAO OAIA OAII 1&IFNATSS I\N&V I&&I&i ITNA&~I I&~I t&OIICTF\&&&1&CHICA&f OA&CHAAI STAKT FINISH CATA OATF 1&AN&&SINCSS ISTIC&I TAOCKTSCNKOUI K tACK O&KAK VAIUKT 1&FO~INf O&FAF.ON N&C CIA&II'INfNT CAftCO&ltS SOOT KKKAKS OCCOKS\CUK tf 1989 1990 1991 1992 1993 REG 3 ATWS MODIF I CAT IONS REG MOD 0088 2DECBS 4&&Ill ll I BMAY91 4 ATWS MODIFICATIONS REG MOD 0587 3JUNB7 22MAY91 TOTf.fvt 0 NKCKFKL ISC COKOKTTCNT CATE CKKUIESKT f&lN~ACC t&TC CCINKT&4:NT ISA TC t18ltXI CVTACC TTTC CCSSKTLEITT DttTE DATA DATE I IJ" tlOSICT AINICAIS tlOI Nll tACk I SNtfT I Tlskktt tOINT IACIIAS tIANT INIICRAIIO SCNtOIAI SIOSIOA tOSIS ANI IICNT CO.NCOI Ttl I I Nl t I VAI TANCtl SCNICkf f IANC I INIW IANC DIVA DATI ll IINATSS SINOVI I taOIICISS SIOI SCNIOIAI NAR CORRI SI All I IN ISO NAIA OAII ISANSI IOICSS~1st~I~SACS OIIAS VAIOI 2 Nll 4 INI OSSAA CN NAC CCSNIIININT CAIICOS~IS COST ORIAAS OCOOIS 1 CIN IS 1989 1990 1991 1992 1993 3 REACTOR HEAD LIFT AIG LOAD CELL NRR MOD 1089 4 REACTOR HEAD LIFT RIG LOAD CELL NRR MOD 1070 C CLOSED CIRCUIT TV SECURITY SYSTEM NRR MOD 1301 C PERIMETER FENC"G SI INTRUS"N DET"N NAR MOD 1183 PAATIAL SATS ON PCM 88-384 DATED 2/25/91.S CNTRL ROOM HFE ANNUNCIATOR STUDY NRR MOO 1011 C SECURITY ACCESS CNTL/CARD READEA NRR MOO 1184 4 RENIIIBER/RELABEL RCS VENT VALVES NAA MOD 1298 4 NUREG 0737, PORV SUPPORT MOOS NRR MOD 1383 C SECURITY PERIMETER LIGHTING NAR MOD 1182 3 RENLNBER/RELABEL RCS VENT VALVES NAR MOO 1295 PARTIAL SATS ON DEEP 87-213 DATED 5/03/90.C SECURITY PLANT ENTRANCE FACII.ITY NAR MOO 1188 PARTIAl.SATS ON PCM 88 503 DATED 2/05/91 ANO 2/25/91.310CT88 170CTSB 25APRBB 28SEPBB 4JUN90 7AUG90 SRCVSI 27JUL90 4OCT91 SFEB91 SICVSI!BFEB91 I'>>clc>>!PSICICSI SAPR91!5NOV91~ISAIRSI P SICSCSI I ISASSS I P SICSCSI 24JUN91 5JAN90 5JAN90 13SEP90 25APABB ICCTSI 9 5JAN90~25APR90 4 GL 88-17 LOSS OF DECAY HEAT AEMVL NAR MOO 1328 COMPLETE EATS ON PCM 89.040 DATED 1-22.91.28SEP89 5RCVSI 25JUN91 IQTCS I OttONAL SSTC CSOCTTQOIT OATE CURROIT I4t4~SOE ISSC CCSOCTIKKT OA SC Cued aaaX S/TC Coalort42tt Oalc DATA DATE SNOJKCT AINKCA'lf NIOT NNN NACf~KNI f 1 TIJKKKT SOINT IACIKAK STANK INIIONAIIO SCNIINAK flONIOA NONS4 NISI I ICNT CO.99449 I S~I INTf SUAI I TAKOKT SCNSOIAK SANO I IIS IKN TANC NAIA DA'll 14 9214AT99 I INONI 9 tl>>IINANSI lf 1 4l SNOJIC\SS 4\49 SCIIIOIA f OAN CNANT ST ANT I INISN OAIA OATf T JANKK SCS f44 I\SSOSI TAKCK T SCNK OUI K~ACK ONSAK TAIUf.1 Nl~I I>>K OsfAK ON IINC CO>>II>>NNI CATSCOKIfS SONS OsfAKS SCODKS 4 CUN~I 1989 1990 1991 1992 1993 3 NUREG 0737, PORV SUPPORT MOOS NRR MOD 1382 S PROBABILTY RISK ASSESSMNT PROGRAM NRR MOD 1325 3 GL 88-17 LOSS OF DECAY HEAT REMVL NRR MOO 1327 COMPLETE SATS ON PCM 89-275 DATED 5I22I90.C VITAL AREA BARRIERS NRR MOO 0700 S THERMAL STRESS PPG CONNCTO TO RCS NRR MOO 1312 S SFTY PARAMTR DISPLAY SYS HFE REVW NRR MOD 1289 PARTIAI.SATE ON PCM 90-189 DATED 9I07I90.C SECURITY COMPUTER SYSTEM NRR MOD 1185 13SEP90 17JANBS 28SEP89 BFEBBB 8MAR89 17NOV88 29JUN91 T 9949991 27AUG91 SNOV91 30SEP91 SINUS I 14OCT91 COMPLETE SATS ON PCM 90-028 DATED 9I 12I90.REMOVAL OF THE EXISTING SECURITY SYS GRD TWR IS NOT NRC COMMIT.RELATED AND WILL BE SCHEDULED AT A LATER DATE.28SEP88 31DEC91 It 31OEC91 3 NORMAL CTLIT CLRS CNTRL SWITCHES NRR MOD 0550 PROCUREMENT ON HOLD 17JAN89 28AUG92 4DEC92 3 NIS ELIM.UNUSED SWITCH POSITIONS NRR MOD 1297 C CTL RM OP DESK PHONE REACH RESOLN NRR MOD 1290 3 PHASE A ISO SIGNAL TO RCS SMPL LN NRR MOD 1351.....................
I     I 1
2eJUN90 24SEP92 V 49<<92 I 1449991~299292 4OEC92 lSJJN92~IIN1992 II SJUINI 4 TURB RUNBACK SELECTOR SWITCH REPL NRR MOD 1245 10MAR87 1APR93 SAT TESI 0 ORDSSAS.IKTC COHATNTTIT DATE CURRESST SON~AGE SRC COSAATIEIST PA TE CURTeTT OUTAGE SSTC COSSATTESST DATE DATA OATE i
I rqO lf
SROIKCT AINKCATS tlof Naa~AFN~Rais f TURKKV tOINf IKCS CAR tlANT IN1KCRATIO SCNIOINK FIORIOA aessa AICI~Ilail CO.NOOK 2 I S T~NII RVAI~Vlaa(as TARCKT SCNKOIN K fARO S INISN laall OAF*OAII 20 l1lalf'IS'I aaav a~RIFI lfNARSI I~Cl taoslcfIT asof Ccalcaal RAR ceaaT START KFANRC F INISN toff as NAIA OAN lllfafl TAROK T SCNKOUC K tAIN oafaa vAIIN a Naa I INK OFIAa ON NRC CCaalllelNT CATICORIKS SORT~RKAKS OCCOlS CUR KS 1989 1990 1991 1992 1993 4 NORMAL CTMT CLRS CNTRL SWITCHES NRR MOD 0589 PROCUREMENT ON HOLD 17JAN89 8APR93 3JUN93 4 NIS-EL IM.UNUSED SWITCH PORITIONS NRR MOO 1298 4 PHASE A ISO SIGNAL TO RCS SMPL LN NRR MOD 1352 28JUN90 dJAN92 Srural 5MAY93 3JUN93 IMAYSS SOT CS I IIII ORONRL ffc COSOCTS4ICT OATC KKTRCTIT ICSIJRITROC fffC COaOKTRCNT OA TC CORIEIIT CVTCOC IIC COSSCTSCSIT OrSTC DATA DATE  
      'I I
I 1
 
P.O. Box 029100, Miami, FL, 33102-9100 MAR    Rv    1991 L-91-087 U. S. Nuclear Regulatory Commission Attn:  Document Control Desk Washington, D. C.              20555 Gentlemen:
Re:  Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inte rated Schedule 6-Month Re ulato      Re  ort Attached is the February 1991 Six Month Integrated Schedule (I/S).
Regulatory Report for the Turkey Point Plant.                The schedules discussed in this report reflect information updated since the August 1990 Regulatory Report which was provided to the NRC on September 27, 1990 (L-90-345).      Changes of interest to the NRC discussed in this report have been reviewed with the NRC Project Manager for the Turkey Point Plant in accordance                      with the Integrated Schedule Plan.
Should there be any questions regarding    this report, please contact us ~
Very  truly  yours, T. F. Plunkett Vice President Turkey Point Plant Nuclear TFP/RJT/r j  t Attachment cc:  Stewart D. Ebneter, Regional Administrator, Region II, l'pO/
USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i04020i44 910327 PDR  ADOCK    05000250 R                      PDR an FPL Group company
  ..)378                                                                                        /g(
 
                  'LI t(!,.f )'! V'(~<~
II
 
ATTACHMENT  I The following is a summary of the I/S modifications      for the Six Month Integrated Schedule Regulatory Report.
The February  1991  Integrated Schedule is based    on  the following outages:
OUTAGE DESCRIPTION          START            FINISH Unit 3  Diesel Tie-in            12/11/90        10/04/91 Unit 3  Cycle 13 Refueling      08/22/92        12/04/92 Unit 3  Cycle 14 Refueling      04/01/94        06/03/94 Unit 4  Cycle 13 Refueling      11/25/90        11/05/91 Unit 4  Cycle 14 Refueling      04/0 1/93      06/03/93 Unit 4  Cycle 15 Refueling      10/01/94        12/03/94 Changes to the Integrated Schedule since the last issue to the NRC, August 1990 (L-90-345 dated September 27, 1990) are as follows:
MODIFICATIONS ADDED LIC DESCRIPTION                        CAT 793            3 REPL 480V  MCC 3E DUE TO CORROSION            FPL 794            4 REPL 480V  MCC 4E DUE TO CORROSION            FPL 1362            3 RESTRAINT  MOD  PORV DISCHRG LINE            NRR 1363            4 RESTRAINT  MOD  PORV DISCHRG LINE            NRR 1364            C MISSILE PROT EVAL  PLT EXT DOORS            FPL 1365            3 IMPROVE HOTWELL DRAINAGE                      FPL 1366            4 IMPROVE HOTWELL DRAINAGE                      FPL 1368            3 REPL MOV-535/536 ACTUATORS                    FPL 1369            4 REPL MOV-535/536 ACTUATORS                    FPL 1370            3 CONTAINMENT PRMS R-11 6 R-12 REPL            FPL 1371            4 CONTAINMENT PRMS R-11 6 R-12 REPL            FPL 1372            C CONTROL ROOM HVAC CONTROL MOD                FPL MODIFICATIONS CANCELLED LIC DESCRIPTION                        CAT 952            C EDG LUBE OIL MODIFICATIONS                    FPL 1001            C EXISTING "B" EDG IDLE START/STOP              FPL 1293            3 CTL LD METERS-ADD UNITS/CHA SCALE            NRR 1294            4 CTL LD METERS-ADD UNITS/CHA SCALE            NRR 1359            C FLOOD PROTECTN  4.16  SWCHGR ROOMS            FPL
 
      ~
        ~
< g, ~
 
MODIFICATIONS COMPLETED LIC
~IS                      DESCRIPTION                CAT 50          3 MSR MODERNIZATION REPLACEMENT      FPL 67          4 REPLACE LOW PRESSURE ROTORS        FPL 293          3 SGWL CNTMT ISOLAT'N VLV REPLACEMENT FPL 396          S BOUNDARIES FOR VISUAL LEAK INSP    FPL 417          3 REPL CCW HX THERMOMETERS W/RTD'S    FPL 418          4 REPL TUBE SIDE CCW HX TIS W/RTD'S  FPL 422          3 MAIN STM SAFETY LIFTING LEVERS      FPL 549          3 ADD'L CNTMT ELECT PENETRATIONS      FPL 744          4 SFP BRIDGE CRANE REPLACEMENT        FPL 787          C INSTALL BARRIERS IN HVAC DUCTS      I&E 792          S CNTRL ROOM LIGHTING EVALUATION      NRR 1244          4 4160V SWGR CNTRL MOD-ADD A DIODE    FPL 1262          4 REPL EXTR STM CS PPG W/ CR MOLY    FPL 1280          4 CCW HEAT EXCHANGER REPLACEMENT      FPL 1310          S ICW PMP FDN SFTY HAZARD EVALUAT'N  FPL 1355          C EOP REVIEW REV 1                    FPL 1360          S STORM STUDY/PLANT DRAINAGE EVAL    FPL
 
fttlfCT    ALNICAIS                  TLHACI SCINT  lactfAC  SLANT                                                TACCf I SCHtOLAC  24                                                ~ LH  I TNAAII      14 ' I
~ LOI      CSO                            INTtCMIIO SCHIOIAC                HOOC    ITS I                       TA\C I INISH    LSNATIL                                            FAOIICTS2      ~ 442 SAFA  I     taft  l      ~         SL441OA SOslt AICI LICHT CO.              INTLAVAL      I   VIAAISI          IAAC DATA DATC  24NOVtt                                            scaltaat  OAA cHAAT SIAAT            2 SANS 4          TAACC I        SCH COUL      f          SCOT  Stttal  SCOOLS 4       CCS  ff FINISH          SOL CSS    LINC ttfAC  OH NAC CLVOIIIHINT C*TICOAITS CATA  DA'lf    IISlatl    Lltf ttttt OH CFO  Sltl SVSIIH 1989 1990 1991   1992   1993 CFO                        POST TMI CONF I RMATORY                                                                                                                          P 23AUG91 MOOIF I CAT"N                                                                                                                              I      I C AREA    RADIATION MONIT"G SYST REPL              CFO MOD 0341                      18AUG89              5APRST P04 T11. 20                                                                                                                                  5ICW9 1 U4 SEL SYS MODSI REPAIRS                C EDG    AIR START MOTORS UPGRADE                  CFO MOD       0578          18JUL88                  27APRS  I POST PEP                                                                                                                                      SNOVST 4 RHR-INSTL UPGRADED      8" GL08E VLV            CFO MOO        0585            SFE888                  5MAR91 SCTTES    0        CSDDTLLL tfLC CDLOCTI42LT DAIE Lftttoif IOHZVIACE ISLC LISLKNT CLTTACE SILC              DATE'ATA CLSDCTLEILT CDLACTIMIST Da TE OATF
 
I 1
C 4'
 
t&OFKCT  AINT CATS              TUKKKT t&INT f&FCIKAK ttANT                                        TAKCK't SCNtt&NS      1&                                        &I&i  ITNA&~ I    I& ~ I PI&I      &KO                        INIICAATKOSCINKANK          NIKN 1  flT                      fA&C ~ I N I &H    IFNATSS                                      t&OIICTF\      &&&1
~ ACI  I    KHffT    I          f1&&I&A AOvf& Al&l I IIHT CO      INTf&VAI      ~ VIA&I&I         'IAAO OAIA OAII    I \N&VI&                                      &CHICA& f OA& CHAAI STAKT          1&AN&&          TAOCKTSCNKOUI K                    SOOT  KKKAKS OCCOKS  \        CUK  tf FINISH        SINCSS  tACK O&KAK VAIUKT 1    &FO CATA OATF    ISTIC&I   ~ INf O&FAF. ON N&C CIA&II'INfNTCAftCO&ltS 1989  1990    1991      1992 1993 REG                                                                                                                                                    4&&Ill 3 ATWS MODIF I CAT IONS                      REG MOD      0088                          2DECBS ll        I BMAY91 4 ATWS MODIFICATIONS                          REG MOD      0587                                          3JUNB7 22MAY91 TOTf.fvt 0  NKCKFKL  ISC COKOKTTCNT CATE CKKUIESKT f&lN~ACC t&TC  CCINKT&4:NT ISA TC DATA t18ltXI CVTACC  TTTC CCSSKTLEITT DttTE DATE
 
I IJ"
 
tlOSICT tlOI AINICAIS Nll Tlskktt tOINT IACIIAS tIANT INIICRAIIO SCNtOIAI                  NCOI    Ttl I TANCtl SCNICkf I
IANC INIW f    ll IINATSS                                                  taOIICISS    SIOI tACk    I  SNtfT        I         SIOSIOA tOSIS ANI IICNT CO.                       I I Nl t VAI                          IANC DIVA DATI    SINOVI I                                                 SCNIOIAI  NAR CORRI SI All          ISANSI                                                          COST    ORIAAS  OCOOIS 1        CIN IS I IN ISO        IOICSS    SACS  OIIAS VAIOI 2      Nll NAIA OAII    ~ 1st ~ I ~  4 INI OSSAA CN NAC CCSNIIININT CAIICOS ~ IS 1989       1990       1991         1992   1993 ICCTSI 3 RENLNBER/RELABEL RCS VENT VALVES                      NAR MOO 1295 PARTIAL SATS ON DEEP 87-213 DATED 5/03/90.
C SECURITY PLANT ENTRANCE FACII.ITY NAR MOO 1188 5JAN90      ~    25APR90 9
SRCVSI PARTIAl. SATS ON PCM 88 503 DATED 2/05/91 ANO    2/25/91.                                                                            310CT88                            27JUL90 4OCT91 3 REACTOR HEAD          LIFT AIG        LOAD CELL      NRR MOD     1089                                          4JUN90              SFEB91 SICVSI 4 REACTOR HEAD LIFT RIG LOAD CELL                        NRR MOD      1070                                            7AUG90            BFEB91            !
I'>>clc>>
C CLOSED        CIRCUIT TV SECURITY SYSTEM                NRR MOD 1301                          170CTSB
                                                                                                                                                        ~
C PERIMETER FENC"G SI INTRUS"N DET"N NAR MOD 1183 PSICICSI PAATIAL SATS ON PCM 88-384 DATED                    2/25/91.                                 25APRBB                                    SAPR91          !
5NOV91 S CNTRL ROOM HFE ANNUNCIATOR STUDY                      NRR MOO 1011                                          5JAN90                      ISAIRSI P SICSCSI I
C SECURITY ACCESS CNTL/CARD READEA                      NRR MOO      1184                    28SEPBB                                    ISASSS  I 4 RENIIIBER/RELABEL RCS VENT VALVES NAA MOD 1298                                                              5JAN90 4 NUREG 0737, PORV SUPPORT                  MOOS        NRR MOD       1383                                            13SEP90 P  SICSCSI C SECURITY PERIMETER              LIGHTING              NAR MOD 1182                                            25APABB      24JUN91 5RCVSI 4 GL 88-17 LOSS OF DECAY HEAT AEMVL NAR                        MOO    1328 COMPLETE EATS ON PCM                89.040 DATED      1-22.91.                                      28SEP89                              25JUN91 IQTCS I                OttONAL  SSTC CSOCTTQOIT OATE CURROIT    I4t4~SOE    ISSC CCSOCTIKKT OA SC DATA Cued aaaX          S/TC Coalort42tt Oalc DATE
 
SNOJKCT  AINKCA'lf              TIJKKKT SOINT IACIKAK STANK                                                    TAKOKT SCNSOIAK      14                                                                tl>>    IINANSI      lf 1 4l NIOT      NNN                          INIIONAIIO SCNIINAK                  99449  I ~I S                               I SANO IIS IKN        9214AT99                                                          SNOJIC\SS      4\49 NACf    ~  KNI 1f                flONIOA NONS4 NISI I ICNT CO.              INTfSUAI      I                   TANC NAIA DA'll      IINONI9                                                                    f SCIIIOIA OAN CNANT ST ANT        T JANKK          TAKCK T       SCNK OUI        K           SONS  OsfAKS  SCODKS 4        CUN ~ I I INISN        SCS f44 ~ ACK ONSAK  TAIUf. 1  Nl ~
OAIA OATf    I\SSOSI  I I>>K  OsfAK ON IINC  CO>>II>>NNI CATSCOKIfS 1989       1990         1991         1992       1993 3 NUREG        0737,    PORV SUPPORT MOOS                NRR MOD       1382                                                13SEP90                  29JUN91 T 9949991 S PROBABILTY            RISK ASSESSMNT          PROGRAM NRR MOD 1325                                                    17JANBS 3 GL      88-  17 LOSS OF DECAY HEAT REMVL NRR MOO 1327 COMPLETE SATS ON PCM                  89-275  DATED    5I22I90.                                          28SEP89 C  VITAL AREA BARRIERS                                  NRR MOO      0700                                            BFEBBB        27AUG91 SNOV91 S THERMAL STRESS PPG CONNCTO TO RCS NRR MOO 1312                                                                          8MAR89        30SEP91 SINUS I S SFTY PARAMTR DISPLAY SYS HFE REVW NRR MOD 1289 PARTIAI. SATE ON PCM 90-189 DATED                  9I07I90.                                                    17NOV88            14OCT91 C SECURITY COMPUTER SYSTEM                                NRR MOD      1185 It 31OEC91 COMPLETE SATS ON PCM 90-028 DATED 9I 12I90.
REMOVAL OF THE EXISTING SECURITY SYS GRD TWR IS NOT NRC COMMIT. RELATED AND WILL                                                                          28SEP88              31DEC91 BE SCHEDULED AT A LATER DATE.
4DEC92 3 NORMAL CTLIT CLRS CNTRL SWITCHES                        NRR MOD      0550 PROCUREMENT ON HOLD                                                                                              17JAN89                      28AUG92 3 NIS ELIM. UNUSED SWITCH POSITIONS NRR MOD 1297 C CTL RM OP DESK PHONE REACH RESOLN NRR MOD 1290 3 PHASE A ISO SIGNAL TO RCS SMPL LN NRR MOD 1351
                                                                                                                        ..................... 2eJUN90 1449991 lSJJN92 II
                                                                                                                                                                            ~~            24SEP92 V 49<<92 I
299292 4OEC92 IIN1992 SJUINI 4 TURB RUNBACK SELECTOR SWITCH REPL NRR MOD 1245                                                                      10MAR87                                1APR93 SAT TESI  0          ORDSSAS. IKTC COHATNTTIT  DATE CURRESST  SON~AGE      SRC COSAATIEIST  PA TE DATA CURTeTT OUTAGE    SSTC COSSATTESST DATE OATE
 
i SROIKCT  AINKCATS              TURKKV tOINf IKCS CAR tlANT                                              TARCKT SCNKOIN K    20                                              RIFI  lfNARSI      I~ Cl tlof      Naa                        IN1KCRATIO SCNIOINK            NOOK    2 IS T                      fARO  S INISN    l1lalf'IS                                          taoslcfIT    asof
~ AFN  ~  Rais  f              FIORIOA aessa AICI ~ Ilail CO.        ~ NIIRVAI      ~  Vlaa(as          laall OAF* OAII  'I aaav a ~                                        Ccalcaal  RAR ceaaT START          KFANRC          TAROK      T  SCNKOUC          K      SORT  ~ RKAKS  OCCOlS            CUR KS F INISN        toff as tAIN oafaa vAIIN a      Naa NAIA OAN      lllfafl  I INK OFIAa ON NRC CCaalllelNT CATICORIKS 1989  1990      1991 1992    1993 3JUN93 4 NORMAL CTMT CLRS CNTRL SWITCHES                  NRR MOD      0589 PROCUREMENT ON HOLD                                                                                        17JAN89                8APR93 Srural 4  NIS-EL IM.      UNUSED SWITCH PORITIONS NRR MOO 1298                                                                    28JUN90      5MAY93 3JUN93 4 PHASE A ISO SIGNAL TO RCS SMPL LN NRR MOD 1352                                                                                dJAN92            IMAYSS SOT CS I  IIII  ORONRL    ffc COSOCTS4ICT  OATC KKTRCTIT ICSIJRITROC  fffC  COaOKTRCNT OA TC DATA CORIEIIT CVTCOC  IIC COSSCTSCSIT  OrSTC DATE
 
faOIICT  AINICASS                Tlsattv fosar IAOICM fIAHT                                                          TMCCI SCNIOIAC      ta NI 01    ~ al                          INIICaAIIO SCHIOA I                    Sssal    I II I                      9*NO IINISH      IIHAVSS                                                          aaoslcrt I    alai s  salt r              flaaIOA aavta Asts ~ ICHI CO.                  INSINVAI                            IMO NAIA OAIf    1911OVSt                                                          SCHIONI I OAN CHAN I AIM  I          tIAHSS                                                          soaT ~ ltAIs accots 1            COa  lf
~ INISN NAIA OAII SOICSS I~ Itatl fact aataa VMUI I INI aataa OH NAC l  Ila CCNO99114IN1  CAItaaastS 1989        1990        1991        1992      1993 I &E                                                                                                                                                                  1NOV90 C INSTALL BARRIERS                  IN HVAC DUCTS            l&E    MOD 0787                                                              P II COMPLETE SATS ON PCM                    87-388  DATED    2I25I91.                                30NOV87                                9AUG90 495191 l&E MOD 0425 3 RPI      INVEATER AEPLACEMENT
                                                                                                                                                        !            II            I PARTIAL SATS ON PCM 88.582 DATED                      SI01I90.                                  29NOV88                                    29DEC90 5NOV91 QI C FLUX MAPPING              h  SEAL TABLE EVAL              18IE MOD    1154 140EC90      ~      SAPR91 SNOV91 C FLOOD PROT EDG FUEL                      OIL XFER  PMPS    I&E MOO 1320
                                                                                                                                                        !            II            I PARTIAL SATS ON PCM 89-124 DATED                      2-12-90.                                      31llAY89                                  9APR91          !
5NOI191
                                                                                                                                                        !            II            I 4 SMALL BDAE PIP INGINCR DISPOSITION I&E MOD 1314                                                                        7MAY90                      13JUN91 IIOVII
                                                                                                                                                        !            II 4 RPI      INVERTER REPLACEMENT                              l&E    MOD 0785                                          SDEC88        19JUN91 40CT91 S PWR LOSS TO            VITAL BUS AT SALEM          2      I&E    MOO  1058                                                      12APA91 II
                                                                                                                                                                          ~    V 17SEP91 5NOV91 S IEN      87-2 SEISMIC DUAL-DIAPHR VLVS I&E                        MOD  1087                                                    . IIIHVSI a
I
                                                                                                                                                                            ~        41OVI I
                                                                                                                                                                                              $  4DEC92 C IMPROVE PA SYSTEM                  AUDIBILITY              I&E MOD 0711                                            15MAY87                13FEB92                !
3 SMALL BORE PIP INGINCR DISPOSITION I&E MOD 1313                                                                                        7MAY90        24SEP92 3 INST CTMT PHYS BARRIPAEV PERS ACC l&E MOD 0880                                                                        7APR88                          300CT92 3JUN93 4 INST CTMT PHYS BARRIPREV PEAS ACC l&E                              MOO 0851                                                SJUL89                          14APR93 ICTTCS s              CIOONAL sttC CCINIOTACTIT OATC CTIRSCNT  ICII~TACE ITC    CCIOOTKHT CA TC DATA CCRTetT CTTTACE  STOIC CCASATIESTT DATE OATE
 
i 4.
f 1,
 
FCOILCT  ALNICA11                TUCCLV FOINT IAICtfAA FSANT                                      TAACL2 SCNiDIEE    20                                                    CIAI IINAA13      IO LI FIOT      OAA                          INTLCAATIO 5CNCDINE            NOOC  tfff                  TAAO FINISN      I INAV\5                                                FAOIIC'Ill  CLOT
~ ACI  ~  SNI I 'I    ~          FIOAIOA FOAIA AAO I ICNf CO ~        INIfAVAI    I  VCAAI1 I    ~ MC NAIA OAII  INIDVtf                                                5CNIC3Af OM CIIAAT SIMT          2IANC ~          TAOCLTSCNCOUI                  E      SOOT  CAIAAS OCODLS 1    CUC  il
~ INISN      SDLCTS    tACE SALAS VALUE." 5    OCA NAIA OAII    313  jgl I  I INI OffAC  DN NAC CCIellIINNI CAIIOOAI~ 5 1989        1990      1991      1992    1993 OAA S SOER 86-3 CK VLV APPLICATION RVW                ORA MOO 1268                    10AUG88                                  22FEB91 C GAS ANALYZER SYSTEM MQO                        ORA MOO 0036                                                I        II          I PARTIAL SATS ON PCM 84-165 DATED 03I22I90                                        2DEC85 3 I.OAD CENTERS X FORMER REPLACEMENT ORA MOD 0661                                                            l        1l          I
                                                                                                                                          ~
PARTIAL SATS ON PCM 89-532 DATED 2I 13I91                                            14AUGSS                            11MAR91 C WASTE NEUTA              WTP SYSTEM MOD        ORA MOD    0042 SL I        II          1 COMPLETE EATS ON PCM Sd 084 DATED 8I27I90                                      9JAN8d PARTIAL SATS ON PCM 85-195 DATED 4-30-87.
4 LOAD CENTERS X-FORMER REPLACEMENT OAA MOD 1081                                                              I        II          I PARTIAL SATS ON PCM 89-533 DATED 2I 13I91                                                    18FEB90                    IIMAII31 I        II          I C ADO"N OF "SWING" STATION BATTERY                ORA MOD 1272                    22SEPSS I        II 3 REDUCTION IN 4KV BKR VOLTAGE DAOP ORA MOD 1252                                                    1 JUN87      28JUN91 I        II 4 REDUCTION IN 4KV BKR VOLTAGE            DROP ORA MOD      1253                                  1 JUN87        5AUG91 I        II C WTP      IN-LINE CHEMISTRY MONITORS            ORA MOD    0767                                        7AUG90 I        I C REPI. F IRE WTR SYS MN PP Wl 10" LN            OAA MOD 1281                                                      14AUG91            30MAA92 I        I 3 SECONDARY CHEM            INLINE MONITIOAS    ORA MOO    0102                                        17SEP90 II          I        I 4 SECONDARY CHEM INLINE MONITORS                  ORA MOO    0103                                                      17SEPSO          9JUN93 DATA DATE
 
tSOITCT  AIINCASS              TICSSS tOINT IACISAS tlANT                                        TASCS 2 SCNITSN f    10 PIOT      Stl                        INTICAATIO SCINOulf                    NODS  TSI I                I IAOC I NISH          I  I I NIT 2                                                POOIICIS2    SIOI
~ ACS  I  SHIST      I        IICAIOA POOI ~ APII I IIOIT CO.              INTIAVAI    I OIAAISI IAOC DATA OATf      2NIOOOS                                                SCHIIOA I SAA CNAOI
% IAAI        SIANSO IINISH        2DICSS  tACS OlfAC VATIC  1  Itl DATA DAII    1092OSI  IINf OA2992 ON NOC CCIOIIIINNT CAIICDAIIS 1989          1990        1991      1992 1993 FPL                    3 MOV FAIL DUE TO IMPROPER SW SETNG FPL MOD 0525 COMPLETE SATS ON PCM                87-005  DATED    4I 15I87.                  10APRSS      ) 10JAN89 PAATIAL SATS ON PCM 87-008 DATED                  4I23I90.
4 STM GENERATOR J NOZZLE AEPLACEMNT FPL                        MOD 1274 NEED SATS FOR CLOSURE                                                            28JUNSS                2MAY89 4 CONDENSER INLET WATERBOX AEPAIR                      FPL MOO 1288                                            I PARTIAL SATS ON DEEP 88-344 DATED 05-04-89.
                                                                                                            = 14SEPSS              22MAYSS 4 MOV FAIL DUE TO IMPROPER SW SET"G FPL MOD 1110 I
                                                                                                                            ~
THE COMMITMENT RELATED PORTION OF THIS                                                                II 11JUN89 MODIF ICATION WAS COMPLETED IN MARCH 1989.                                        15 JAN87                I JUN89 THE REMAINDER OF THE WORK IS NOT ISIS RELATED.
PARTIAL SATS ON PCM 87-008 ST 87-009 04-MAR-89 3 RHR PLNPS SEAL UPGRADE                                FPL MOD 1172 PARTIAL SATS ON PCM 58 077 DATED 03I28190                                        31AUG87                          22IIAII90 3 SGWL CNTMT ISOLAT"N VLV REPLACEMT FPL MOO 0293                                                                I            II COMPLETE SATS ON PCM 88 077 DATED 1-23-91.                                        21MARBS                            2299290
                                                                                                                                      ~
S RESOLVE CNTMT PURG FSAR DISCREP                      FPL MOD 0828 ENGINEERING STUDY COMPLETE 01-OCT-90 PER LETTER      &#xb9;  JPN PTN-90-2815.            EST IMATEIAPPAOVAL                              17NDV89                      IOOTIO FOR ADDITIONAL WOAK IS IN PROGRESS.
C HP WORK AREA AND N.O. WORK AREA                      FPL MOO 0378 PARTIAL SATS ON PCM 89 512 DATED 2120/91.                                                  1991999                          1920990 3 SFP COOLING SYS SEISMIC MOD                            FPL MOD 011S THE CONllTMENT FOR THIS MOD HAS BEEN MET.
BAI.ANCE OF WOAK BEYOND THE 18 DEC 87 NAC COMMITMENT DATE IS FOR ISSUANCE OF FINAL STRESS CALCULATIONS. WHICH WAS NOT REGD TO                                        14AUGSS                                    14DEC90 MEET THIS COISJITMENT.
SATS REOUIRED FOR CLOSURE.
C EDG PROJECT          LICENSING SUBMITTALS              FPL MOD 1144 ENGINEERING I.ETTER REOUIRED FOR CI.OSURE.                                      20JUL87 3 EDG STATION BATTERY CHARGERS                          FPL MOD 114S                                                        II          I IMPLEMENTATION UNDER MOD                &#xb9;\\45.                                  22MAASS 3 MSIV    AIR  OPERATOR BACKUP N2 SYST                FPL MDD 0257                                                        II          I SATS REOUIRED FOR CLOSURE.                                                        2OEC85                                    11JAN91 S MOV THERMAL OVERLOAD HTR SELECTN FPL MOD 1249 REF. LTA JPE-PTSP-88 1051 CONFIRMS MEETING NAC COMMIT ON JUN 20, 1988. COMPLETION OF PREP                                                            25 JUL 89 ST APPVL OF STD E.3.20              MEETS NRC COMMITMENT.
EP TO BE ISS SPECIFYING TOL"S FOR MOV"S.                                        190CT87                                    24 JAN9 I IS NOT NRC COMMITMENT RELATED.
4 SFP BRIDGE CRANE AEPLACEMENT                          FPL MOD 0744 COMPLETE SATB ON PCM              88-171 DATED 1-29 91.                          4FEBSS                                    29JAN91 DATA DATE
 
IV tEOIECT rlol AINfCA11 Stl TUEEET POINT IECEEAC tfANT INTECAATEO SCNEEAAE                  NOOE      Tff~
TAACET SENEOIOE lAAO 2 III ISO 20 IINAT1$
                                                                                                                                                                              ~ IPI  12NA012 tEOIEC'lf2    0102 IP 'l PACE    ~  SNE  ff            TIOAIOA POvfA ANO  ~ ICNT CO.              I Nl l 0 VAE                  TAAO NAIA OAII        21NOV1$                                        SCNI CIA l OAA CNAll STAll          22AIITE        TAOCE      T  SCNE OUT        E            SUET      OAEAES OCCOES 1 CUE  ll
~ INISN        SOIC1'1 PACE OEEAE VAIUEI ~    Stl CATA CATE    l1ll012  IINE OATAE CN NAC CIVPIITNfNT CATECINIfS 1989      1990    1991      1992 1993
                                                                                                                                                                                                        ~ ~
FPL                  C MN CTI. RM DOOR SI SECURITY SYS MOD FPL MOD                        1271 SATS REQUIRED FOA CLOSURE.                                                            13JULSS                                  SFEB91 3 EDG SWING SWGR 3AD                                    FPL MOD 1178                                                          II          I IMPLEMENTATION UNDER MOO 421145.                                                    20AUG87 4 EDG SWING SWGR 4 AD                                    FPL MQO 1180                                                          II          I IMPLEMENTATION UNDER MOD 421145.                                                    22FEBSS 4 BACKUP INSTR. AIR COMPRESSOR                          FPL MOO 0291                                                          II          I SATS REQUIRED FOR CLOSUAE.                                                                4APRBS 3 BORIC ACID EVAP PMP UPGRADE                          FPL MOO 0237                                                          II          I NEED SATS FOR CLOSURE                                                                12NOV85 C ADDNL EMERG LIGHTING FOR APP.                R      FPL MOO 0592                                                          II          I PARTIAL SATS ON PCM 86-213 IREV SI 10-31-89                                          1  2JUNSS C ELECT DWG SEPARAT"N 62 RENIPJBERING FPL MOD 1095                                                                            II          I PARTIAL SATS ON PCM 87-279 GATED 04-13-89.                                                SJUN87 4 MSIV SAFETY REI. AIR ACCIkl SYS                      FPL MOD 1258                                            11JUN89      II          I PARTIAL SATS ISSUED                5I24l89.                                          10MAYSS                                  20FEB91 S ICW CK VLV OPER Wl IA FAII.URE                        FPL MOD 1283                                                          II          I ENGINEERING LETTER AEQUIREO FOR CLOSURE.                                            260CT87 4 TPCW HX ISOLTN - CV2201 FAIL CLSE FPL MOO 1285                                                                              II          I PARTIAL SATS ON PCM 88-346 DATED                  04-29-89.                          15NOVSS                                20FEB91 3 SFP BRIDGE CRANE AEPLACEMENT                          FPL MOO 0745                                                          II          I PARTIAl. SATS ON PCM              88.170 DATED 12 17 90.                            20JAN88 4 SPENT FUEL POOL RERACKING                            FPL MOO 1190 COMPLETE SATS ON PCM 87 405 DATED 2-1-91.                                            31JUL87 PARTIAL SATS ON PCM 88-319 DATED 12 8-90.
3 REMOVAL OF TPCW AMERTAP SYSTEM                        FPL MOD 1317 TPCW AMERTAP SYSTEM WOAK WAS SPLIT FROM MOO 531. TPCW AMERTAP WAS NOT NRC COMMITMENT RELATED.                                                                              18NQVSS PARTIAl. SATS ON PCM 86-195 CATEO 4 28-88.
C W.T  ~ PE  FLOW METERS UPGRADE                      FPL MQO 0151                      11FEBSS II          I C EDG HC      TUABOIIDLE GEAR STUB SHAFT FPL                    MQD  0509                16MARSS II          I C NEW EDG BLOGS I.TG F IAE CQh%I HVAC                  FPL MQO 1175                        1SEP87 II          I 4 ATMOSPHERIC DWlP VLV AEPLACEMENT                      FPL MOD 1260                        3MAY88 3 AEACTOR CAVITY HANDRAIL                              FPL MOO 0233                                                          II          I PARTIAL SATS ON PCM BS.1SS CATED 03129l90                                                2 MAR 87                              20MAR91 DATA DATE


faOIICT AINICASS NI 01~al s salt r Tlsattv fosar IAOICM fIAHT INIICaAIIO SCHIOA I flaaIOA aavta Asts~ICHI CO.Sssal I I I I INSINVAI TMCCI SCNIOIAC 9*NO IINISH IMO NAIA OAIf ta IIHAVSS 1911OVSt aaoslcrt I alai SCHIONI I OAN CHAN I AIM I~INISN NAIA OAII tIAHSS SOICSS I~Itatl fact aataa VMUI l Ila I INI aataa OH NAC CCNO99114IN1 CAItaaastS soaT~ltAIs accots 1 COa lf 1989 1990 1991 1992 1993 I&E 3 RPI INVEATER AEPLACEMENT l&E MOD 0425 PARTIAL SATS ON PCM 88.582 DATED SI01I90.C FLUX MAPPING h SEAL TABLE EVAL 18IE MOD 1154 C FLOOD PROT EDG FUEL OIL XFER PMPS I&E MOO 1320 PARTIAL SATS ON PCM 89-124 DATED 2-12-90.4 SMALL BDAE PIP INGINCR DISPOSITION I&E MOD 1314 4 RPI INVERTER REPLACEMENT l&E MOD 0785 C INSTALL BARRIERS IN HVAC DUCTS l&E MOD 0787 COMPLETE SATS ON PCM 87-388 DATED 2I25I91.30NOV87 29NOV88 31llAY89 P 1NOV90 II 9AUG90!495191 II I 29DEC90!5NOV91 QI 140EC90~SAPR91!!SNOV91 II I 9APR91!!5NOI191 II I 7MAY90 13JUN91!IIOVII II SDEC88 19JUN91 40CT91 S PWR LOSS TO VITAL BUS AT SALEM 2 I&E MOO 1058 S IEN 87-2 SEISMIC DUAL-DIAPHR VLVS I&E MOD 1087 C IMPROVE PA SYSTEM AUDIBILITY I&E MOD 0711 3 SMALL BORE PIP INGINCR DISPOSITION I&E MOD 1313 15MAY87 12APA91~17SEP91 II V 5NOV91 a.IIIHVS I~41OVI I I$4DEC92!13FEB92 7MAY90 24SEP92 3 INST CTMT PHYS BARRIPAEV PERS ACC l&E MOD 0880 7APR88 300CT92 3JUN93 4 INST CTMT PHYS BARRIPREV PEAS ACC l&E MOO 0851 SJUL89 14APR93 ICTTCS s CIOONAL sttC CCINIOTACTIT OATC CTIRSCNT ICII~TACE ITC CCIOOTKHT CA TC CCRTetT CTTTACE STOIC CCASATIESTT DATE DATA OATE i 4.f 1, FCOILCT ALNICA11 FIOT OAA~ACI~SNI I'I~TUCCLV FOINT IAICtfAA FSANT INTLCAATIO 5CNCDINE FIOAIOA FOAIA AAO I ICNf CO~NOOC tff f INIfAVAI I VCAAI 1 I TAACL 2 SCNiDIEE TAAO FINISN~MC NAIA OAII 20 I INAV\5 INIDVtf CIAI IINAA13 IO LI FAOIIC'Ill CLOT 5CNIC3Af OM CIIAAT SIMT~INISN NAIA OAII 2IANC~SDLCTS 313 jgl I TAOCLTSCNCOUI E tACE SALAS VALUE." 5 OCA I INI OffAC DN NAC CCIellIINNI CAIIOOAI~5 SOOT CAIAAS OCODLS 1 CUC il 1989 1990 1991 1992 1993 OAA S SOER 86-3 CK VLV APPLICATION RVW ORA MOO 1268 C GAS ANALYZER SYSTEM MQO ORA MOO 0036 PARTIAL SATS ON PCM 84-165 DATED 03I22I90 3 I.OAD CENTERS X FORMER REPLACEMENT ORA MOD 0661 PARTIAL SATS ON PCM 89-532 DATED 2I 13I91 C WASTE NEUTA SL WTP SYSTEM MOD ORA MOD 0042 COMPLETE EATS ON PCM Sd 084 DATED 8I27I90 PARTIAL SATS ON PCM 85-195 DATED 4-30-87.4 LOAD CENTERS X-FORMER REPLACEMENT OAA MOD 1081 10AUG88 2DEC85 14AUGSS 9JAN8d 22FEB91 I II I l 1l I 11MAR91 I II 1 I II I PARTIAL SATS ON PCM 89-533 DATED 2I 13I91 C ADO"N OF"SWING" STATION BATTERY ORA MOD 1272 3 REDUCTION IN 4KV BKR VOLTAGE DAOP ORA MOD 1252 4 REDUCTION IN 4KV BKR VOLTAGE DROP ORA MOD 1253 C WTP IN-LINE CHEMISTRY MONITORS ORA MOD 0767 C REPI.F IRE WTR SYS MN PP Wl 10" LN OAA MOD 1281 3 SECONDARY CHEM INLINE MONITIOAS ORA MOO 0102 4 SECONDARY CHEM INLINE MONITORS ORA MOO 0103 22SEPSS 18FEB90 1 JUN87 1 JUN87~IIMAII31 I II I I II 28JUN91 I II 5AUG91 I II 7AUG90 17SEP90 14AUG91 17SEPSO 9JUN93 I I 30MAA92 I I II I I DATA DATE tSOITCT AIINCASS PIOT Stl~ACS I SHIST I%IAA I SIANSO IINISH 2DICSS DATA DAII 1092OSI TICSSS tOINT IACISAS tlANT INTICAATIO SCINOulf IICAIOA POOI~APII I IIOIT CO.tACS OlfAC VATIC 1 Itl IINf OA2992 ON NOC CCIOIIIINNT CAIICDAIIS NODS TSI I INTIAVAI I OIAAISI TASCS 2 SCNITSN f IAOC I I NISH IAOC DATA OATf 10 I I NIT I 2 2NIOOOS 1989 1990 1991 1992 1993 POOIICIS2 SIOI SCHIIOA I SAA CNAOI FPL 3 MOV FAIL DUE TO IMPROPER SW SETNG FPL MOD 0525 COMPLETE SATS ON PCM 87-005 DATED 4I 15I87.PAATIAL SATS ON PCM 87-008 DATED 4I23I90.4 STM GENERATOR J NOZZLE AEPLACEMNT FPL MOD 1274 10APRSS)10JAN89 NEED SATS FOR CLOSURE 4 CONDENSER INLET WATERBOX AEPAIR FPL MOO 1288 PARTIAL SATS ON DEEP 88-344 DATED 05-04-89.4 MOV FAIL DUE TO IMPROPER SW SET"G FPL MOD 1110 THE COMMITMENT RELATED PORTION OF THIS MODIF ICATION WAS COMPLETED IN MARCH 1989.THE REMAINDER OF THE WORK IS NOT ISIS RELATED.PARTIAL SATS ON PCM 87-008 ST 87-009 04-MAR-89 3 RHR PLNPS SEAL UPGRADE FPL MOD 1172 PARTIAL SATS ON PCM 58 077 DATED 03I28190 3 SGWL CNTMT ISOLAT"N VLV REPLACEMT FPL MOO 0293 COMPLETE SATS ON PCM 88 077 DATED 1-23-91.S RESOLVE CNTMT PURG FSAR DISCREP FPL MOD 0828 28JUNSS=14SEPSS 15 JAN87 31AUG87 21MARBS 2MAY89 I 22MAYSS I II 11JUN89 I JUN89 22IIAII90 I II~2299290 ENGINEERING STUDY COMPLETE 01-OCT-90 PER LETTER&#xb9;JPN PTN-90-2815.
EST IMATEIAPPAOVAL FOR ADDITIONAL WOAK IS IN PROGRESS.C HP WORK AREA AND N.O.WORK AREA FPL MOO 0378 17NDV89 IOOTIO PARTIAL SATS ON PCM 89 512 DATED 2120/91.3 SFP COOLING SYS SEISMIC MOD FPL MOD 011S THE CONllTMENT FOR THIS MOD HAS BEEN MET.BAI.ANCE OF WOAK BEYOND THE 18 DEC 87 NAC COMMITMENT DATE IS FOR ISSUANCE OF FINAL STRESS CALCULATIONS.
WHICH WAS NOT REGD TO MEET THIS COISJITMENT.
SATS REOUIRED FOR CLOSURE.14AUGSS 1991999~1920990 14DEC90 C EDG PROJECT LICENSING SUBMITTALS FPL MOD 1144 ENGINEERING I.ETTER REOUIRED FOR CI.OSURE.3 EDG STATION BATTERY CHARGERS FPL MOD 114S IMPLEMENTATION UNDER MOD&#xb9;\\45.3 MSIV AIR OPERATOR BACKUP N2 SYST FPL MDD 0257 SATS REOUIRED FOR CLOSURE.S MOV THERMAL OVERLOAD HTR SELECTN FPL MOD 1249 REF.LTA JPE-PTSP-88 1051 CONFIRMS MEETING NAC COMMIT ON JUN 20, 1988.COMPLETION OF PREP ST APPVL OF STD E.3.20 MEETS NRC COMMITMENT.
EP TO BE ISS SPECIFYING TOL"S FOR MOV"S.IS NOT NRC COMMITMENT RELATED.4 SFP BRIDGE CRANE AEPLACEMENT FPL MOD 0744 COMPLETE SATB ON PCM 88-171 DATED 1-29 91.20JUL87 22MAASS 2OEC85 190CT87 4FEBSS 25 JUL 89 II I II I 11JAN91 24 JAN9 I 29JAN91 DATA DATE IV tEOIECT AINfCA11 rlol Stl PACE~SNE f f TUEEET POINT IECEEAC tfANT INTECAATEO SCNEEAAE TIOAIOA POvfA ANO~ICNT CO.NOOE Tff~I Nl l 0 VAE TAACET SENEOIOE lAAO 2 I II ISO TAAO NAIA OAII 20 IINAT1$21NOV1$~IPI 12NA012 IP'l tEOIEC'lf2 0102 SCNI CIA l OAA CNAll STAll 22AIITE~INISN SOIC1'1 CATA CATE l1ll012 TAOCE T SCNE OUT E PACE OEEAE VAIUEI~Stl IINE OATAE CN NAC CIVPIITNfNT CATECINIfS SUET OAEAES OCCOES 1 CUE ll 1989 1990 1991 1992 1993~~FPL SATS REQUIRED FOR CLOSUAE.3 BORIC ACID EVAP PMP UPGRADE FPL MOO 0237 NEED SATS FOR CLOSURE C ADDNL EMERG LIGHTING FOR APP.R FPL MOO 0592 PARTIAL SATS ON PCM 86-213 IREV SI 10-31-89 C ELECT DWG SEPARAT"N 62 RENIPJBERING FPL MOD 1095 PARTIAL SATS ON PCM 87-279 GATED 04-13-89.4 MSIV SAFETY REI.AIR ACCIkl SYS FPL MOD 1258 PARTIAL SATS ISSUED 5I24l89.S ICW CK VLV OPER Wl IA FAII.URE FPL MOD 1283 ENGINEERING LETTER AEQUIREO FOR CLOSURE.4 TPCW HX ISOLTN-CV2201 FAIL CLSE FPL MOO 1285 PARTIAL SATS ON PCM 88-346 DATED 04-29-89.3 SFP BRIDGE CRANE AEPLACEMENT FPL MOO 0745 PARTIAl.SATS ON PCM 88.170 DATED 12 17 90.4 SPENT FUEL POOL RERACKING FPL MOO 1190 COMPLETE SATS ON PCM 87 405 DATED 2-1-91.PARTIAL SATS ON PCM 88-319 DATED 12 8-90.3 REMOVAL OF TPCW AMERTAP SYSTEM FPL MOD 1317 TPCW AMERTAP SYSTEM WOAK WAS SPLIT FROM MOO 531.TPCW AMERTAP WAS NOT NRC COMMITMENT RELATED.PARTIAl.SATS ON PCM 86-195 CATEO 4 28-88.C MN CTI.RM DOOR SI SECURITY SYS MOD FPL MOD 1271 SATS REQUIRED FOA CLOSURE.3 EDG SWING SWGR 3AD FPL MOD 1178 IMPLEMENTATION UNDER MOO 421145.4 EDG SWING SWGR 4 AD FPL MQO 1180 IMPLEMENTATION UNDER MOD 421145.4 BACKUP INSTR.AIR COMPRESSOR FPL MOO 0291 13JULSS 20AUG87 22FEBSS 4APRBS 12NOV85 1 2JUNSS SJUN87 10MAYSS 260CT87 15NOVSS 20JAN88 31JUL87 18NQVSS 11JUN89 SFEB91 II I II I II I II I II I II I II I 20FEB91 II I II I 20FEB91 II I C W.T~PE FLOW METERS UPGRADE FPL MQO 0151 C EDG HC TUABOIIDLE GEAR STUB SHAFT FPL MQD 0509 C NEW EDG BLOGS I.TG F IAE CQh%I HVAC FPL MQO 1175 4 ATMOSPHERIC DWlP VLV AEPLACEMENT FPL MOD 1260 3 AEACTOR CAVITY HANDRAIL FPL MOO 0233 PARTIAL SATS ON PCM BS.1SS CATED 03129l90 11FEBSS 16MARSS 1SEP87 3MAY88 2 MAR 87 II I II I II I II I 20MAR91 DATA DATE
+<
+<
tSOICCT AINCCAIT tlol I tl tACf I SNf CT 1 TINSCT POINT IAICICAC PCANT INTCCSAICO SCNIOIAC CIOOIOA POsff AICI IICNf CO NOOC I II'I I VI I CTAI I TCAAISI TAOCC 1 SCNCOVIC IANO I IVI\V'TACO OAIA SAIC SO FIOAT'IT T\NOTCC~AOIICT f T CIOI SCNCOVlf OAA CNAlf SIAN I f IN ISO NAIA Ollf TIANCC TOC CT'I~TCCOT~tACC OICAS VAlVE 1 ftl I INC OICAC ON NNC CONIITNINT CAICCONIIS 1989 1990 1991 1992 1993 FPL S ECCS HEAT SINK UPDATE C NEW EDG FIRE PROTECTION 4 ADO SI RELOCATE AFW N2 SUPPLY FPL MOO 0382 FPL MOD 117$FPL MOD 0218 SMAY87 llMAYBB II I COMPLETE SATB ON PCM 85-170 DATED Od-27-87.COMPLETE SATS ON PCM 8S 045 DATED 04-04-88~PARTIAL SATS ON PCM 88 184 DATED 04-21-89.4 PROCURE SI INSTALL TWO NEW EOG"S FPL MOO 1138 PARTIAL SATS ON PCM 87-283 DATED 2I27I91.3 POAV STROKE TIME ENHANCEMENT FPL MOD 1315 PARTIAL SATS ON PCM 89 585 DATED 04I 18/90 4 REPLACE SI CHK VLVS 4.874A SI 8 FPL MOD 135S 3 CHARG PMP AEI.IEF VLVIDRN LN SUPPT FPL MOD 1323 4 REACTOA CAVITY HANDRAIL FPL MOD 0080 3 ATMOSPHERIC DISAP VLV REPLACEMENT FPL MOD 1259 PARTIAL SATS ON PCM 88 517 DATED 05-11 90 ANO 07 18-90 4 NORM CNTMT CLRS CAPACITY INCREASE FPL MOD 0903 PARTIAL SATS ON PCM 87 028 DATED 04 22 89.4 PORV STROKE TIME ENHANCEMENT FPL MOO 131S 4 UPGRD RCP OIL LIFT SYSILOWR COOLR FPL MOD 1021 S PROV ACCEPT CRIT FOA OIL XFR PMPS FPL MOD 092S C EDG DIESEL IO.O.S.T.BLDG CONST FPL MOO 1174 PARTIAL SATS ON PCM 87 259 DATED ll04ISO AND 2 I 27 I 9 1.C INVERTER RM HVAC UPGRADEIPERM FIX FPL MOO 1218 C DES Sf PUACH STA BATTERY CHARGERS FPL MOO 1275 0 SECONDARY SIDE HIGH ENERGY P IP ING FPL MOD 0892 0 BORIC ACID CONCENTRATION REDUCTN FPL MOD 1311 4 ADD"L CNTMT ELECT PENETRATIONS FPL MOD 0788 20ECSS 26FEB87 240CTBS 27DEC89 170CT89 2MAR 87 3MAYSS 7APRSS SDECSB 30CTSB BMAY87 4APABB 13JULBS 13JUNSS 1ZJUN89 30MAR 89 II I I II I II I II I II 2APA91 I SAPR91 I 10APR91 I 13APRS I I 13APR9 1 I 19APR91 I 25APR91 I II 4JUN91 I 13JUN91 I II I II 20FEB91~Q 14MAY91 i j Il I II I II I II CATA DATE
tSOICCT   AINCCAIT                 TINSCT POINT IAICICAC PCANT                                     TAOCC 1 SCNCOVIC      SO tlol      I tl                          INTCCSAICO SCNIOIAC               NOOC     I II'I           IANO  I IVI\V        FIOAT'IT                                            ~ AOIICTf T  CIOI tACf    I   SNf CT    1           CIOOIOA POsff AICI IICNf CO              I VII CTAI    I TCAAISI 'TACO OAIA SAIC     T\NOTCC                                             SCNCOVlf OAA CNAlf SIAN I           TIANCC f IN ISO         TOC CT'I tACC OICAS VAlVE 1       ftl NAIA Ollf      ~ TCCOT ~  I INC OICAC ON NNC CONIITNINT CAICCONIIS 1989       1990     1991         1992 1993 FPL S ECCS HEAT SINK UPDATE                               FPL MOO 0382                    SMAY87 II          I C NEW EDG FIRE PROTECTION                               FPL MOD 117$                llMAYBB 4 ADO SI RELOCATE AFW N2 SUPPLY                         FPL MOD 0218 COMPLETE SATB ON PCM 85- 170 DATED Od-27-87.
~~I b h S TASI IINISN NAIA Oalt 2IAIISl SOTCSS Ill lal I FaslfCT AlslCA1$Fl ol f Fl~Asl~SJII t I~TOatIV POINT IACITM FIANT INTTCSATTO SCNttast flOSIOA FOVI~JNO I ICNT CO.'IAAOT f SCNS OUI T FACT~atAS VAINTT~Fal I INF salas ON Nac COIOIITJNNI CATIOOAITS IAACtf SCNf last TASC FINISN TASC OAI*OAII NCOT 2/FT I Nl t aVAl I VtA$9$9 loaf sltAls scoots~CIJS lf 1$ITNAVTS 2$992$9 a 1989 1990 1991 1992 1993$$OITC122 Slsl SCNIOIAT SAA CNAAT FPL 3 P2R RLF LN SNUBBER REPLACEMENT FPL MOO 1267 PARTIAL SATS ON PCM 89 046 DATED 04I 18I90 C WTR EQUIPT 6I HOTWELL SAMPLE SYST.FPL MOD 0180 3 NORM CNTMT CLRS CAPACITY INCREASE FPL MOO 0902 PARTIAL BATS ON PCM 87 025 DATED 07-16-90 4 EDGILD CTR 4H, MCC4D 5 XFR OF LDS FPL MOD 1139 IMPLEMENTATION UNDER MOD&#xb9;1145.3 EDG LOAD CTR 3HIMCC 3D FPL MOD 1142 IMPLEMENTATION UNDER MOD&#xb9;1145.PARTIAL SATB ON PCM 89 069 GATED 1I24I90 ANO 2I 14I90.50CTSS 21JUN90 I 10OCT88 100CTSS 13JUN91 II II 15JUN91 II 17JUN91 17JUN91 14JU N91 3 4KV BUS AIC MODIF ICATION FPL MOO 1329 4 4KV BUS AIC MODIFICATION FPL MOO 1330 4 REPLACE FARRIS RELIEF VALVESICCW FPL MOD 0415 PARTIAL SATS ON PCM 86.238 CATED 04-07-89.C EDG BLDG I3AI4A,3BI48]
COMPLETE SATS ON PCM 8S 045 DATED 04-04-88 ~                                     20ECSS PARTIAL SATS ON PCM 88 184 DATED 04-21-89.
TIE-INS FPL MOO 1140 IMPLEMENTATION UNDER MOD&#xb9;1145.PARTIAL SATS ON PCM 87 254 DATED 2I2'7I91.3 CHEM INJECTION OF ICW TO CCW HX FPL MOO 1321 29DEC89..............
4 PROCURE SI INSTALL TWO NEW EOG"S                     FPL MOO 1138 PARTIAL SATS ON PCM 87-283 DATED 2I27I91.                                     26FEB87 3 POAV STROKE TIME ENHANCEMENT                         FPL MOD 1315                                                       II          I PARTIAL SATS ON PCM 89 585 DATED 04I 18/90                                     240CTBS                                      2APA91 I
29DEC89 2SEP88 29SEPSS 20JUN91 I ll 28JUN91 18JUN91 I ISJUN91 4 CHARG PMP RELIEF VLVIDRN LN SUPPT FPL MOD 1324 C NEW EDG PROJ SITE PREPARATION FPL MOD 1137 PARTIAL SATS DATED II04I90 ON PCM 87-212 4 REPL MOV.535I536 ACTUATORS FPL MOO 1389 C REVIEW WEJ-IT EXPANSION ANCHORS FPL MOO 0586 PARTIAL SATB FOR PCM 89 070 DATED 11-09-89, 12 05-89, ANO 12 13-89 4 MAIN FEED CV 2011 CLOSING TIME FPL MOO 1102 3 INSPECT IREPAIR INTAKE STRUCTURE FPL MOD 134S....31MAY89 SMAR88 I ll 4JUL91 3JUL91 300CT89 I 15JAN87 14SEP90 I 4MAY87 ISJUL91 5JUL91 l 9JUL91 II 10JUL91 II 19JUI91 3 HIGH INITIAL RESPONSE EXCITER S NAC AUDIT PEP PROJ4/CONF IG MGT FPL MOO 0978 FPL MOD 1308 22DECSS ISJUL91 I II COMPLETE SATS ON PCM 90-157 DATED 1-29 91.COMPLETE SATS ON PCM 90-158 DATED 1-29-91.17MAR89 18JUL9'I CATA DATE SIAAI IINISN CATA OATS 2 IANaa TOICTS Ialfoal~COI I C I AINT CATS~a of~ACI~SNI f t TIICCTY tOINT IAICITAO tfANT INIIIAAIIO SCNIOVIS flCOIOA tfafk Aafa I ICNY CO.Akol'I sckl Col 9 tACC Olfak VAIOC$ftl I INC Offak ON alaC CINNIIININT CAIIOCOIIS TACOTT SCNTOIOT IANO~IVI SN IAAO Oalk OAII llCOC tttl I Nlt k fal~TIAAISI SOkl Oklalf OCCOIS CVN lf 20 IINAT$$INTOVI~1989 1990 1991 1992 1993 CIPI ITNAkal Ia.AS~aollctfl aaof SCNIOUlt OAk CNAAI F PI.4 MG-d RELAY REPLACEMENT FPL MOD 1354 13FEB90 4 CHEM INJECTION OF ICW TO CCW HX 3 I CW UPGRADE FPL MOD 1322 FPL MOO 1192 C UNDERSZD NZZL-SHLL JOINTS-TNK HX FPL MOD 1343 C ERDADS INPUT ISOLATION ADDITIONS FPL MOD 1214 COMPLETE SATS ON PCM 87-310 DATED 10-31-89.1 JUN90 I SJUN89 II I~29JUL91 II I 2AUG9 1 IL j 2AUGS 1 II I SCOPE OF WORK IS FOR DUAL UNIT OUTAGE ONLY.FUTUAE WORK TO BE SCHEDULED.
4 REPLACE SI CHK VLVS 4.874A               SI 8       FPL MOD 135S                               27DEC89                      SAPR91 I
S LIMITING CONDITION CVT OPERATION FPL MOD 0344 S BKR LIST VEAIF"N WALKDOWN OF NCRS FPL MOO 1265 IFEB90 29DEC88 I II 15AUG91 THE COMMITMENT RELATED PORTION OF THIS MOD HAS BEEN COMPLETED PER LTR JPN-PTP-90-0190, DATED 1/19/90.THE REMAINDER OF THE WORK IS NOT CFO RELATED.COMPLETE SATS ON PCM 89 323 DATED 6/14/90.COMPLETE SATS ON PCM 89-253 DATED 9/11/90.COMPLETE SATS ON PCM 90-184 DATED 2/21/91 6FEB89 22 JAN9 I 28AUG9 I C REG GUIDE 1'7 AUDIT PAEP FPI.MOD 1326 0 EXISTING"A" EDG IDLE START/STOP FPL MOO 0132 PARTIAL SATS ON PCM 87-284 DATED 2/27/91.17AUGSS 29SEP88 SSEP91 30AUG91 3 MG d RELAY AEPLACEMENT FPL MOD 1353 3 POLAR CRANE MOTORS/ENGR PACKAGE FPL MOO 0478 4 POLAR CRANE MOTORS/ENGR PACKAGE FPL MOD 0477 C EPS ELECTRICAL ENHANCEMENT FPI.MOD 1145 PARTIAL SATS ON PCM 87 264 DATED 2/27/91.0 PLANT LIGHTING UPGRADE PH I 6I I I FPL MOO 0889 PARTIAL SATS ON PCM 88-296 DATED 02 06-90.3 BYPASS RTO EL IMINAT"N MOOIF ICAT"N FPL MOO 0816 NAC REVIEW AND APPROVAL OF LICENSING REPOAT SCHEDULED TO COMPLETE 15 JUN 91.4 BYPASS RTD EL IMINAT"N MODIF ICAT"N FPL MOO 0617 1 2JAN90 11JUL90 I 11JUL90 I 24FEB88 12SEP91 230CT87 16 JANSO 24SEP91 I II 7SEP91 l 10SEP91 I IOSEP91 NRC REVIEW ANO APPROVAL OF LICENSING REPORT SCHEDULED TO COMPLETE 15 JUN 91.16 JANSO I II 12NOV91 3 SFP DEMIN RESIN FLUSH UPGRADE FPL MOD 0956 60CT87 130EC91 DATA DATE  
3 CHARG PMP AEI.IEF VLVIDRN LN SUPPT FPL MOD 1323                                               170CT89                        10APR91 I        II          I 4 REACTOA CAVITY HANDRAIL                             FPL MOD 0080                   2MAR 87                                  13APRS I 3 ATMOSPHERIC DISAP VLV REPLACEMENT                   FPL MOD 1259 I        II          I PARTIAL SATS ON PCM 88 517 DATED 05-11 90                                       3MAYSS                                    13APR9  1 ANO 07 18-90 4 NORM CNTMT CLRS CAPACITY INCREASE FPL MOD 0903                                                               I        II          I PARTIAL SATS ON PCM 87 028 DATED 04 22 89.                                       7APRSS                                    19APR91 I        II          I 4 PORV STROKE TIME ENHANCEMENT                         FPL MOO 131S                   SDECSB                                    25APR91 I        II 4 UPGRD RCP OIL LIFT SYSILOWR COOLR FPL MOD 1021                                                         30CTSB I        II S PROV ACCEPT CRIT FOA OIL XFR PMPS FPL MOD 092S C EDG DIESEL IO.O.S. T. BLDG CONST                     FPL MOO 1174 20FEB91  ~
Q  14MAY91 i
PARTIAL SATS ON PCM 87 259 DATED                 ll04ISO                                           BMAY87 AND 2 I 27 I 9 1 .
j        Il C INVERTER RM HVAC UPGRADEIPERM                 FIX FPL       MOO 1218                                 4APABB I        II C DES Sf PUACH STA BATTERY CHARGERS                     FPL MOO 1275                                   13JULBS I        II 0   SECONDARY SIDE HIGH ENERGY P IP ING FPL MOD 0892                                                   13JUNSS I        II 0 BORIC ACID CONCENTRATION               REDUCTN       FPL MOD 1311                       1ZJUN89                                4JUN91 I        II          I 4 ADD"L CNTMT ELECT PENETRATIONS                       FPL MOD 0788                   30MAR 89                                  13JUN91 CATA DATE
 
      ~ ~
I b
h
 
FaslfCT  AlslCA1$                    TOatIV POINT IACITM FIANT                                                IAACtf SCNf last      1$
Fl ol    f Fl                            INTTCSATTO SCNttast                  NCOT    2/FT                  TASC FINISN        ITNAVTS                                                    $ $OITC122  Slsl
~ Asl  ~  SJII tI      ~          flOSIOA FOVI ~ JNO I ICNT CO.              I Nl t aVAl  I VtA$ 9$ 9      TASC OAI* OAII      2 $ 992$ 9 a                                              SCNIOIAT SAA CNAAT S TASI          2IAIISl            'IAAOT f        SCNS OUI        T            loaf sltAls scoots  ~    CIJS  lf IINISN          SOTCSS    FACT ~ atAS VAINTT ~     Fal NAIA Oalt     Ill lal I   I INF salas  ON  Nac COIOIITJNNI CATIOOAITS 1989      1990        1991        1992 1993 FPL                      3 P2R RLF LN SNUBBER REPLACEMENT                          FPL MOO 1267 PARTIAL SATS ON PCM 89 046 DATED 04I 18I90                                                                      50CTSS      13JUN91 II C WTR EQUIPT 6I HOTWELL SAMPLE SYST. FPL MOD                        0180                                              21JUN90                    14JU N91 3 NORM CNTMT CLRS CAPACITY INCREASE FPL MOO                          0902                                                    I         II PARTIAL BATS ON PCM 87 025 DATED 07-16-90                                                                                    15JUN91 4 EDGILD CTR 4H, MCC4D 5 XFR OF LDS FPL MOD 1139                                                                                        II IMPLEMENTATION UNDER MOD                &#xb9;1145.                                                                10OCT88      17JUN91 3 EDG LOAD CTR 3HIMCC 3D                                  FPL MOD 1142 IMPLEMENTATION UNDER MOD                &#xb9;1145.
PARTIAL SATB ON PCM 89 069 GATED                    1I24I90                                                    100CTSS      17JUN91 ANO    2I 14I90.
3 4KV BUS        AIC MODIF ICATION                      FPL MOO 1329                                      29DEC89                            18JUN91 I
4 4KV BUS AIC MODIFICATION                                FPL MOO 1330                  ..............      29DEC89                            ISJUN91 4 REPLACE FARRIS RELIEF VALVESICCW FPL MOD 0415 PARTIAL SATS ON PCM 86.238 CATED 04-07-89.                                                                       2SEP88      20JUN91 I3AI4A,3BI48] TIE- INS                FPL MOO 1140 C EDG BLDG IMPLEMENTATION UNDER MOD &#xb9;1145.                                                                              29SEPSS I          ll 28JUN91 PARTIAL SATS ON PCM 87 254 DATED 2I2'7I91.
3 CHEM INJECTION OF ICW TO CCW HX                         FPL MOO 1321 PARTIAL SATB FOR PCM 89 070 DATED 11-09-89,                                              .... 31MAY89                                        3JUL91 12    05-89,    ANO 12      13-89 I         ll 4 MAIN FEED CV 2011 CLOSING TIME                          FPL MOO 1102                                              SMAR88        4JUL91 3 INSPECT IREPAIR INTAKE STRUCTURE                        FPL MOD 134S                                  300CT89                                    5JUL91 l
4 CHARG PMP RELIEF VLVIDRN LN SUPPT FPL MOD 1324                                                                                                   9JUL91 C NEW EDG PROJ SITE PREPARATION                           FPL MOD 1137                                                       I          II PARTIAL SATS DATED                 II04I90 ON PCM     87-212                                                   15JAN87        10JUL91 II 4 REPL MOV.535I536 ACTUATORS                             FPL MOO 1389                                                   14SEP90                  19JUI91 I
C REVIEW WEJ-           IT EXPANSION       ANCHORS       FPL MOO 0586                                             4MAY87        ISJUL91 3 HIGH INITIAL RESPONSE EXCITER                            FPL MOO 0978                                            22DECSS        ISJUL91 S NAC AUDIT PEP PROJ4/CONF IG MGT                          FPL MOD 1308 COMPLETE SATS ON PCM                90-157 DATED 1-29 91.
I          II 17MAR89                                          18JUL9'I COMPLETE SATS ON PCM                90-158 DATED 1-29-91.
CATA DATE
 
~ COI CI I  AINTCATS              TIICCTY  tOINT IAICITAO tfANT                                                TACOTT SCNTOIOT      20                                                      CIPI  ITNAkal      Ia . AS
~ a of                                  INIIIAAIIOSCNIOVIS                    llCOC      tttl                  IANO ~ IVISN      IINAT$$                                                  ~ aollctfl    aaof
~ ACI        SNI ft              flCOIOA    tfafk Aafa I ICNY CO.              I Nlt k fal          TIAAISI    IAAO Oalk OAII    INTOVI~                                                  SCNIOUlt OAk CNAAI SIAAI
          ~
2 IANaa           Akol      'I   sckl Col      9            SOkl      Oklalf
                                                                                                ~
OCCOIS    CVN lf IINISN          TOICTS  tACC Olfak VAIOC     $   ftl CATA OATS      Ialfoal  I INC Offak ON alaC   CINNIIININT CAIIOCOIIS 1989      1990
                                                                                                                                                        ~
1991          1992 1993 F  PI.
4 MG-d RELAY REPLACEMENT                                    FPL MOD 1354                                          13FEB90 II          I C UNDERSZD NZZL-SHLL JOINTS-TNK HX                         FPL MOD 1343                                              1 JUN90                    29JUL91 C ERDADS INPUT ISOLATION ADDITIONS                         FPL MOD 1214                                                                 II          I COMPLETE SATS ON PCM                   87-310 DATED     10-31-89.                                                                             2AUG9 1 I           IL          j 4 CHEM INJECTION OF ICW TO                    CCW HX      FPL MOD 1322                              SJUN89                                      2AUGS 1 3 I CW UPGRADE                                              FPL MOO 1192 II           I SCOPE OF WORK IS FOR DUAL UNIT OUTAGE ONLY.                                                                   IFEB90 FUTUAE WORK TO BE SCHEDULED.
I          II S LIMITING CONDITION CVT OPERATION FPL MOD 0344                                                                   29DEC88        15AUG91 S BKR LIST VEAIF"N WALKDOWN OF NCRS FPL MOO 1265 THE COMMITMENT RELATED PORTION OF THIS MOD HAS BEEN COMPLETED PER LTR JPN-PTP-90-0190,                                                                                           22 JAN9 I DATED 1/ 19/90.               THE REMAINDER OF THE WORK IS NOT CFO RELATED.                                                                                             6FEB89      28AUG9 I COMPLETE SATS ON PCM 89 323 DATED 6/14/90.
COMPLETE SATS ON PCM 89-253 DATED 9/11/90.
COMPLETE SATS ON PCM 90-184 DATED 2/21/91 C REG GUIDE             1 '7   AUDIT PAEP                 FPI. MOD 1326                               17AUGSS                                  30AUG91 0 EXISTING "A"               EDG   IDLE START/STOP       FPL MOO 0132 PARTIAL SATS ON PCM 87-284 DATED                     2/27/91.                                               29SEP88           SSEP91 3 MG d RELAY AEPLACEMENT                                   FPL MOD 1353                                       1 2JAN90                              7SEP91 l
3 POLAR CRANE MOTORS/ENGR PACKAGE                           FPL MOO 0478                                             11JUL90                      10SEP91 I                      I 4 POLAR CRANE MOTORS/ENGR PACKAGE                           FPL MOD 0477                                             11JUL90                      IOSEP91 C EPS ELECTRICAL ENHANCEMENT                               FPI. MOD 1145                                                   I PARTIAL SATS ON PCM 87 264 DATED 2/27/91.                                                                     24FEB88          12SEP91 0 PLANT LIGHTING UPGRADE PH I 6I I I FPL MOO 0889 PARTIAL SATS ON PCM 88-296 DATED 02 06-90.                                                                     230CT87          24SEP91 3 BYPASS RTO EL IMINAT"N MOOIF ICAT"N FPL MOO 0816 NAC REVIEW AND APPROVAL OF LICENSING REPOAT I          II 16 JANSO SCHEDULED TO COMPLETE 15 JUN 91.
4 BYPASS RTD EL IMINAT"N MODIF ICAT"N FPL MOO 0617 NRC REVIEW ANO APPROVAL OF LICENSING REPORT                                                               16 JANSO                                12NOV91 SCHEDULED TO COMPLETE 15 JUN 91.
I         II 3 SFP DEMIN RESIN FLUSH UPGRADE                             FPL MOD 0956                                           60CT87             130EC91 DATA DATE
 
\
\
taOITCT AINICASS tata 9ta~ACf I CNfff Tufafr FOINT IRJCITAA FIANT INIIOSATIO SCNIOJA I FIOSIOA FOSIS AIO I ICNf CO.992OS~I~I I Naf SVAI~VTAS1$9 TAScaf scNTCIJaa IAAO I INISN TARO DATA OATf TS 1119RVSS TSNOVSS~\N IINRS\I I~aa taollcl la sas\SCNIOIAT OAR CNAaf OIAAT flANSS f INISN SOICSS NAIA OAII ISIIO\I 1 A O O 1'I C C N f O U I 1 tAOC OSTJA VAIINI\Itl IINf Oafaf ON NSC CISN121191NT CATICORIIS sosf oafAAS ocoofs s calo at 1989 1990 1991 1992 1S93 FPL C CONTROL ROOM HABITABILITY HVAC FPL MOD 0014 THE COMMITMENT RELATED PORTION OF THIS MODIFICATION HAS BEEN COMPLETED.
taOITCT   AINICASS             Tufafr FOINT IRJCITAA FIANT                                                 TAScaf scNTCIJaa  TS                                                            ~ \N  IINRS\I      I~ aa tata      9ta                      INIIOSATIO SCNIOJA I                 992OS    ~ I~ I                  IAAO I INISN    1119RVSS                                                        taollcl la    sas\
ENHANCEMENTS TO THE CONTROL ROOM HVAC SYST.BEYOND 17 JUN 88 ARE NQT CFO RELATED.2JAN85 27DEC91 C EVALUATION OF AIR OPERATED VALVES FPL MOD 1344 C F IRE PIAIP DIESEI.ENGINE UPGRADE FPL MQD 0191 3 C BUS XFMA DELUGE SYS ALARM FPL MQD 0854 3 CHAAG PIAlP SUCTN QUICK DISCONNECT FPL MOD 0431 3 MSR INSTRNAENTAT I ON FPL MOD 1010 S 480V LOAD CTR UNO VOLTAGE SETTING FPL MQO 0484 C CHEMICAL STORAGE BLDG CENTRAL AIC FPL MOD 1202 C PASS DSLVD HYD MONIL IQ SMPL UPGAO FPL MOO 1337 C RELOCATE WTP PRETAEATMENT SYSTEM FPL MOO 1349 PARTIAL BATS ON PCM 88 107 DATED 8 10-88.4 SFP OEMIN RESIN FLUSH UPGRADE FPL MQO 1155 S MISSILE PROTECT EVAL-PLNT EX DOOR FPL MOD 1354 C PASS CHLORIDE ANALYZER REPLACMNT FPL MOD 1319 PARTIAL BATS ON PCM 89-141 DATED SI 13I90 ANO 10I05ISO.28JUL91 II 3JAN92 I SJAN92 I 10JAN92 11JUNSO I 4JUN90 I 22DECdd 31MAY89 25JUNS7 22FEBSS 3APR90 I 31MAY90 I 19OCT87 II I II I 18MAA92 II I 14FEB92 I 14FEB92, II I 18 JAN92 II I 14AUG91~23JAN92 II I 30JAN92 I II I 31 JAN92 II I..........
~ ACf  I  CNfff            FIOSIOA FOSIS AIO I ICNf CO.               I Naf SVAI     ~   VTAS1$ 9     TARO DATA OATf   TSNOVSS                                                         SCNIOIAT OAR CNAaf OIAAT         flANSS       1 A O O 1 'I   C C N f O U I 1             sosf oafAAS    ocoofs s    calo  at f INISN        SOICSS tAOC OSTJA VAIINI \     Itl NAIA OAII    ISIIO\I IINf Oafaf ON NSC CISN121191NT CATICORIIS 1989         1990         1991     1992         1S93 FPL                   C CONTROL ROOM HABITABILITYHVAC                        FPL MOD 0014 THE COMMITMENT RELATED PORTION OF THIS MODIFICATION HAS BEEN COMPLETED.
29AUGS1~7FEB92 II I 14FEB92 I II I C PLT PERIMETER FLOOOWALL AEPAIR FPL MQO 1357 18JUN90 3 PERSONNEL da EQMT HATCH SHIELD FPL MQD 1182 3 IMPROVE HQT WELL DAAI MAGE FPL MOO 1385 C WASTE GAS SYS UPGRADE PAOGAAM FPL MOD 0788 C IA COMPS-MODIFY LCC CONTROI.LOGIC FPL MOD 0281 C CCW AAEA PIPE TRENCH FLOODWALLS FPL MQD 1358 3AUG90 24MAR85 II 27JUN91 II 14AUGS 1 II SAUGS 1 II 23JUN92 II I I I I~2999992 I I RJUR92 I I 2 9 J UR9 2 DATA DATE  
ENHANCEMENTS TO THE CONTROL ROOM HVAC SYST.                                                               2JAN85              27DEC91 BEYOND 17 JUN 88 ARE NQT CFO RELATED.
~~h''g tfDJ(CT ALNCCASS tLDT Itl tACf I SNECI 1 TUSACV tOINT SAC(CAN t(ANT INILCAAIEO SCINDINL~IONIOA PONIN AID I ICNT CO NQOC'ISIS INICNVAI I VEANISI'TANCC T SCNC(NN f EAAO S I NISH'IANO DATA OAIC 14 I IIIATS'29NOVES NUN ISNAEEI lt~4 PAOJLCIS 1~941 SCNI DIA I OAE CNAAE SIAN 1 2JAPICC f IN(SN SDf C4$DATA OAlf I\SCOSE TA~OE1SCNCDULC SPCC OLCJJ(VALUC 4 StL LINf~EfAA DN NEC CCIEIIINCNT CAICCCOllS SUET OECANSOCODLS
C EVALUATION OF           AIR OPERATED VALVES FPL             MOD   1344                                                   28JUL91              3JAN92 II                      I C F IRE PIAIP DIESEI. ENGINE UPGRADE                 FPL MQD 0191                                             11JUNSO                            SJAN92 I                                    I 3 C BUS XFMA DELUGE SYS ALARM                           FPL MQD 0854                                             4JUN90                          10JAN92 I          II          I 3 CHAAG PIAlP SUCTN QUICK DISCONNECT                   FPL MOD 0431                                         22DECdd                18 JAN92 S MISSILE PROTECT EVAL-PLNT EX DOOR FPL MOD 1354 C PASS CHLORIDE ANALYZER REPLACMNT FPL MOD 1319 II 14AUG91 II
\CUN CS 1989 1990 1991 1992 1993 FPL S STUOYIMOV FAIL"R DUE TO HANlERING FPL MOD 0697 3 REPL RXIREF CAVITY LTG F IXTURES FPL MOD 0358 3 REPL 480V MCC 3E DUE TO CORROSION FPL MOO 0793 3 REPLACE G.E.CR120BD AUX RELAYS FPL MOO 1207 27DEC85 1 OAUG87 24JAN92 Il 31MAY91 II 29JUN92 I 1SEP92 I IEEP92 I 1SEP92 3 DRYER SYSTEM FOR SJAE SPING-4 MON FPL MOD 1332 II II 1SEP92 3 REPL MOV-535I53S ACTUATORS FPL MOO 1388 3 REPLACE FARRIS RELIEF VALVESICCW FPL MOD 0414 14SEP90 II I 12SEP92 PARTIAL SATS ON PCM 86 237 DATED 4I 17I90.C 3E 6(4E LOAD CENTER PERM TIE FPL MOD 1080 3 TEMP AC IN CONTAIMAENT FOR OUTAGE FPL MOO 1331 22DECSS 22JUN90 il 12FEB90 24SEP92 24SEP92 II I 24SEP92 3 PRESSURIZER SPRAY VLV BDY REMOVAL FPL MOO 1348 3 UPGRD RCP OIL LIFT SYSILWR COOLER FPL MOO 0888 15SEP89 24SEP92 l ll I COMPLETE EATS ON PCM 89-574 DATED 4I 16I90 ANO SI22I90.C ADO RELAYS TO UNORVLTAGE CIRCUITS FPL MOO 1341 3 PERM SHIELDING IN CASK WASHDOWN FPL MOO 0134 4 PERM SHIELDING IN CASK WASHDOWN FPL MOD 0135 3 CNTMT PRMS R 11 8(R-12 REPL FPL MOO 1370 C CONTROL ROOM HVAC CONTROL MOD FPL MOO 1372 3 CTMT VESSEL CATHODIC PROTECTION FPL MOD 128S 10AUG88 20CT92 II I 2994191 II I 1244992 II I 1244992 II I 16AUG91 II I 14AUE91 II I 4PEI92 II I 120CT92 I 280CT92 I 280CT92 I 300CT92 I 300CT92 I 18NOV92 4 C BUS XFMR DELUGE SYS ALARM FPL MOO 0853 4 J UN90 11 JAN93 II I 4 CHARG PIktP SUCTN QUICK DISCONNECT FPL MOO 1255 22DEC88 15 JAN93 II I 4 IMPROVE HOT WEI.L DRAINAGE FPL MOD 1366 14AUG91 22JAN93 DATA DATE 4 T r Nt I 9 PROJECT ALNLOASR nol I Pl~AOI I BNIfT~TIIaaav POINT EBICLTM nfflr INILORAELO SCNLEBAL flOBIOA FOFIR AFEI IIOII CO~NBOL Erl'I INIEBYFE I YEABIRF raaolr scNLIaaa TARO~INIBII'IABO OA'IA OAII 14 I I FBI Y'I 4 3\NOY3 4~229 I INM'I~~4~4~ROILClrr BART BENI IBA~OAR 2 NAB E START I INISN OAIA OAIR RIANRR rofcaa 1492441 TAacrrscarooa PACR OEEAA VALOR I'4 Pal I INE~EIAR ON NEC COIOIIEINNT CAlfCORIES scoT RRLAas occoas 4 Coa rf 1989 1990 1991 1992 1993 FPL 4 PERSONNEL 8L EQMT HATCH SHIELD FPL MOD 1183 27JUN91 1FEB93 3 C" BUS SWGR ENCL AIC MOOS FPL MOD 0070 4 REPL 480V MCC 4E DUE TO CORROSION FPL MOD 0794 4 DRYER SYSTEM FOR SJAE SPING-4 MON FPL MOO 1333 C ADO FUSE SPEC TO BKR LIST 82 DWGS FPL MOD 1254 C CATWALK IN WATER TREATMENT PLANT FPL MOD 1171 14OCT85 23JUL91 II 31MAY91 II 28FEB90 I I 2SEP92~11FEB93 I I 1 8MAR93 I I 12APR93 I I 12APR93 4 REPL RXIREF CAVITY LTG FIXTURES FPL MOD 0357 4 PRESSURI2ER SPRAY VLV BDY REMOVAL FPL MOD 1347 4 CNTMT PRMS R-11 82 R-12 REPL FPL MOD 1371 3 TRANSFER CANAL LEAKAGE PERM FIX FPL MOD 0895 4 TRANSFER CANAL LEAKAGE PERM FIX FPL MOD 0898 4 CTMT VESSEL CATHODIC PROTECTION FPL MOD 1305 4MARS7 II I I 28AUG91 17MAY93 II I j 29FE392~2292993 II I I 19JUL91 II I I SJUL93 II I I IIFEB32~IFAF293 II I I 23APR93 I II I I 15SEP89 5MAY93 4"C" BUS SWGR ENCL AIC MOOS FPL MOD 0071 3DEC85 7OCT93 4 ICW UPGRADE FPL MOD 1193 1JUL91 12DEC94 DATA DAVE l h~y ,]}}
                                                                                                                                                                    ~  I I
23JAN92 PARTIAL BATS ON PCM 89-141 DATED                                                                              31MAY89          30JAN92 SI 13I90 ANO 10I05ISO.
I          II          I 3 MSR INSTRNAENTATI ON                                 FPL MOD 1010                                         25JUNS7                31 JAN92 S 480V LOAD CTR           UNO VOLTAGE SETTING FPL MQO C CHEMICAL STORAGE BLDG CENTRAL                 AIC FPL       MOD 0484 1202                                   22FEBSS II
                                                                                                                                          .......... 29AUGS1 II 14FEB92
                                                                                                                                                                    ~ I I
7FEB92 I          II          I C PASS DSLVD HYD MONIL IQ SMPL UPGAO FPL MOO 1337                                                             3APR90                              14FEB92 C RELOCATE WTP PRETAEATMENT SYSTEM FPL MOO 1349                                                                         I          II          I            I PARTIAL BATS ON PCM 88 107 DATED 8 10-88.                                                                   31MAY90                            14FEB92, I          II          I 4 SFP OEMIN RESIN FLUSH UPGRADE                         FPL MQO 1155                                         19OCT87                 18MAA92 II         I C PLT PERIMETER FLOOOWALL AEPAIR                       FPL MQO 1357                                           18JUN90 C CCW AAEA 3 PERSONNEL PIPE TRENCH FLOODWALLS da EQMT HATCH 3 IMPROVE HQT WELL DAAIMAGE SHIELD FPL MQD 1358 FPL MQD 1182 FPL MOO 1385 3AUG90 27JUN91 II II II 14AUGS II 1
                                                                                                                                                                  ~    I I
I I
2999992 I
I I
RJUR92 I
C WASTE GAS SYS UPGRADE PAOGAAM                         FPL MOD 0788                                                           SAUGS  1              2 9 J UR9 2 II C   IA COMPS-MODIFY LCC               CONTROI. LOGIC FPL MOD 0281                                           24MAR85                     23JUN92 DATA DATE
 
    ~ ~
h''g
 
tfDJ(CT   ALNCCASS               TUSACV tOINT SAC(CAN t(ANT                                         'TANCC T SCNC(NN f   14                                                                  NUN    ISNAEEI      lt ~4 tLDT      Itl                          INILCAAIEO SCINDINL                NQOC  'ISIS                EAAO   S I NISH   I IIIATS'                                                             PAOJLCIS 1     ~ 941 tACf    I  SNECI      1          ~ IONIOA PONIN AID I ICNT CO              INICNVAI    I  VEANISI    'IANO DATA OAIC    29NOVES                                                                SCNI DIA I OAE CNAAE SIAN 1         2JAPICC         TA    ~ OE1SCNCDULC                        SUET OECANSOCODLS  \    CUN CS f IN(SN       SDf C4$ SPCC OLCJJ( VALUC   4   StL DATA OAlf    I\SCOSE    LINf ~ EfAA DN NEC CCIEIIINCNT CAICCCOllS 1989       1990         1991         1992         1993 FPL S STUOYIMOV           FAIL"R   DUE TO HANlERING FPL MOD         0697                                                           24JAN92              29JUN92 I
3 REPL RXIREF CAVITY LTG F IXTURES                     FPL MOD 0358                                     27DEC85                            1SEP92 Il          I 3 REPL 480V MCC 3E DUE TO CORROSION FPL MOO 0793                                                                       31MAY91                            IEEP92 II          I 3 REPLACE         G.E. CR120BD AUX RELAYS             FPL MOO 1207                                       1 OAUG87                         1SEP92 II 3 DRYER SYSTEM FOR SJAE                 SPING-4 MON FPL MOD     1332                                                                     1SEP92 II 3 REPL MOV-535I53S ACTUATORS                         FPL MOO 1388                                             14SEP90                                  12SEP92 3 REPLACE FARRIS RELIEF VALVESICCW                   FPL MOD 0414                                                               II           I PARTIAL SATS ON PCM 86 237 DATED                 4I 17I90.                                         22DECSS                          24SEP92 II          I C 3E 6( 4E LOAD CENTER PERM               TIE       FPL MOD 1080                                         22JUN90                                      24SEP92 3 TEMP AC IN CONTAIMAENT FOR OUTAGE FPL MOO 1331 il 12FEB90           24SEP92 3 PRESSURIZER SPRAY VLV BDY REMOVAL FPL MOO 1348                                                                 15SEP89                24SEP92 3 UPGRD RCP OIL LIFT SYSILWR COOLER FPL MOO 0888 COMPLETE EATS ON PCM               89-574 DATED                                                     10AUG88 l            ll          I 20CT92 4I 16I90 ANO SI22I90.
II          I C ADO RELAYS TO UNORVLTAGE                 CIRCUITS FPL     MOO 1341                                                 2994191                            120CT92 II          I            I 3 PERM SHIELDING IN CASK WASHDOWN                     FPL MOO 0134                                                             1244992                    280CT92 II          I            I 4 PERM SHIELDING IN CASK WASHDOWN                     FPL MOD 0135                                                             1244992                    280CT92 II          I            I 3 CNTMT PRMS R 11 8(             R-12 REPL           FPL MOO 1370                                                       16AUG91                          300CT92 II          I            I C CONTROL ROOM HVAC CONTROL MOD                       FPL MOO 1372                                                       14AUE91                          300CT92 II          I            I 3 CTMT VESSEL CATHODIC PROTECTION                     FPL MOD 128S                                                               4PEI92                     18NOV92 II           I 4 C BUS XFMR DELUGE SYS ALARM                         FPL MOO 0853                                                         4 J UN90         11 JAN93 II           I 4 CHARG PIktP SUCTN QUICK DISCONNECT FPL                     MOO 1255                                   22DEC88                             15 JAN93 II           I 4 IMPROVE HOT WEI.L DRAINAGE                         FPL MOD 1366                                                       14AUG91                             22JAN93 DATA DATE
 
4 T r
Nt I
 
9 PROJECT   ALNLOASR                 TIIaaav POINT EBICLTM  nfflr                                              raaolr scNLIaaa    14                                                              ~ 229  I INM'I ~      ~4 ~4 nol       IPl                            INILORAELO SCNLEBAL                  NBOL    Erl'I                  TARO ~ INIBII    I IFBIY 'I 4                                                      ~ ROILClrr      BART
  ~ AOI   I BNIfT     ~           flOBIOA FOFIR   AFEI IIOII CO                 INIEBYFE     I   YEABIRF     'IABO OA'IA OAII 3\NOY3 4                                                           BENI IBA ~ OAR 2 NABE TAacrrscarooa
                                                                  ~
START         RIANRR                                                          scoT RRLAas    occoas 4    Coa  rf I INISN       rofcaa   PACR OEEAA VALOR I '4     Pal OAIA OAIR    1492441  I INE ~ EIAR ON NEC COIOIIEINNT   CAlfCORIES 1989     1990         1991       1992       1993 FPL 4 PERSONNEL           8L EQMT HATCH       SHIELD         FPL MOD 1183                                                       27JUN91                           1FEB93 C ADO FUSE SPEC TO BKR C CATWALK LIST IN WATER TREATMENT PLANT 82 DWGS    FPL MOD 1254 FPL MOD 1171                                                        23JUL91 I
2SEP92 I
                                                                                                                                                                                      ~ I I
11FEB93 1
3   C" BUS         SWGR ENCL       AIC   MOOS             FPL MOD 0070                                         14OCT85                            8MAR93 II
                                                                                                                                                                              ~
I          I 4 REPL 480V           MCC 4E DUE TO CORROSION FPL MOD                   0794                                                 31MAY91                              12APR93 II          I          I 4 DRYER SYSTEM FOR SJAE SPING-4 MON FPL                           MOO   1333                                                 28FEB90              12APR93 II          I          I 4 CTMT VESSEL CATHODIC PROTECTION                          FPL MOD 1305                                                                IIFEB32                    IFAF293 II           I           I 4 REPL RXIREF CAVITY LTG FIXTURES                         FPL MOD 0357                                           4MARS7                            23APR93
                                                                                                                                                                              ~
I          II          I          I 4 PRESSURI2ER             SPRAY VLV BDY REMOVAL FPL MOD 1347                                                             15SEP89                      5MAY93 II          I          I 4 CNTMT PRMS R-11               82 R-12 REPL             FPL MOD 1371                                                         28AUG91                            17MAY93 II          I          j 3 TRANSFER CANAL LEAKAGE PERM                     FIX     FPL MOD 0895                                                               29FE392                      2292993 II          I          I 4 TRANSFER CANAL LEAKAGE PERM FIX                         FPL MOD 0898                                                         19JUL91                               SJUL93 "C"
II         I           I 4           BUS SWGR ENCL           AIC   MOOS             FPL MOD 0071                                           3DEC85                                 7OCT93 4 ICW UPGRADE                                             FPL MOD 1193                                                                         1JUL91       12DEC94 DATA DAVE
 
lh
~ y
      , ]}}

Latest revision as of 22:30, 3 February 2020

Forwards Feb 1991 Six Month Integrated Schedule Regulatory Rept for Turkey Point Plant
ML17345A777
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/27/1991
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-087, L-91-87, NUDOCS 9104020144
Download: ML17345A777 (35)


Text

ACCELERATED DI TRIBUTION DEMONS TION SYSTEM REGULATORY XNFORMATION DXSTRIBUTION SYSTEM (RXDS)

ACCESSION NBR: 9104020144 DOC. DATE: 91/03/27 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and .Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFXLIATXON PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Feb 1991 six month integrated schedule regulatory rept, for Turkey Point Plant. D DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution $i NOTES:

RECIPIENT COPXES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 D AULUCK,R 2 2 D

XNTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DET/ESGB 1 1 NRR/DOEA/OTSB11 1 -

1 NRR/DST SE2 1 1 NRR/DST/SELB SD 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB SE 1 1 NUDOCS-ABSTRACT 1 1 OC 1 0 OGC/HDS3 1 0 G FX E 01 1 1 RES/DS IR/E IB 1 1 EXTERNAL: NRC PDR NSIC

.D A

-D =

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WARM CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM-DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPXES REQUIRED: LTTR 18 ENCL 16

I I 1

I rqO lf

'I I

I 1

P.O. Box 029100, Miami, FL, 33102-9100 MAR Rv 1991 L-91-087 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Inte rated Schedule 6-Month Re ulato Re ort Attached is the February 1991 Six Month Integrated Schedule (I/S).

Regulatory Report for the Turkey Point Plant. The schedules discussed in this report reflect information updated since the August 1990 Regulatory Report which was provided to the NRC on September 27, 1990 (L-90-345). Changes of interest to the NRC discussed in this report have been reviewed with the NRC Project Manager for the Turkey Point Plant in accordance with the Integrated Schedule Plan.

Should there be any questions regarding this report, please contact us ~

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant Nuclear TFP/RJT/r j t Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, l'pO/

USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i04020i44 910327 PDR ADOCK 05000250 R PDR an FPL Group company

..)378 /g(

'LI t(!,.f )'! V'(~<~

II

ATTACHMENT I The following is a summary of the I/S modifications for the Six Month Integrated Schedule Regulatory Report.

The February 1991 Integrated Schedule is based on the following outages:

OUTAGE DESCRIPTION START FINISH Unit 3 Diesel Tie-in 12/11/90 10/04/91 Unit 3 Cycle 13 Refueling 08/22/92 12/04/92 Unit 3 Cycle 14 Refueling 04/01/94 06/03/94 Unit 4 Cycle 13 Refueling 11/25/90 11/05/91 Unit 4 Cycle 14 Refueling 04/0 1/93 06/03/93 Unit 4 Cycle 15 Refueling 10/01/94 12/03/94 Changes to the Integrated Schedule since the last issue to the NRC, August 1990 (L-90-345 dated September 27, 1990) are as follows:

MODIFICATIONS ADDED LIC DESCRIPTION CAT 793 3 REPL 480V MCC 3E DUE TO CORROSION FPL 794 4 REPL 480V MCC 4E DUE TO CORROSION FPL 1362 3 RESTRAINT MOD PORV DISCHRG LINE NRR 1363 4 RESTRAINT MOD PORV DISCHRG LINE NRR 1364 C MISSILE PROT EVAL PLT EXT DOORS FPL 1365 3 IMPROVE HOTWELL DRAINAGE FPL 1366 4 IMPROVE HOTWELL DRAINAGE FPL 1368 3 REPL MOV-535/536 ACTUATORS FPL 1369 4 REPL MOV-535/536 ACTUATORS FPL 1370 3 CONTAINMENT PRMS R-11 6 R-12 REPL FPL 1371 4 CONTAINMENT PRMS R-11 6 R-12 REPL FPL 1372 C CONTROL ROOM HVAC CONTROL MOD FPL MODIFICATIONS CANCELLED LIC DESCRIPTION CAT 952 C EDG LUBE OIL MODIFICATIONS FPL 1001 C EXISTING "B" EDG IDLE START/STOP FPL 1293 3 CTL LD METERS-ADD UNITS/CHA SCALE NRR 1294 4 CTL LD METERS-ADD UNITS/CHA SCALE NRR 1359 C FLOOD PROTECTN 4.16 SWCHGR ROOMS FPL

~

~

< g, ~

MODIFICATIONS COMPLETED LIC

~IS DESCRIPTION CAT 50 3 MSR MODERNIZATION REPLACEMENT FPL 67 4 REPLACE LOW PRESSURE ROTORS FPL 293 3 SGWL CNTMT ISOLAT'N VLV REPLACEMENT FPL 396 S BOUNDARIES FOR VISUAL LEAK INSP FPL 417 3 REPL CCW HX THERMOMETERS W/RTD'S FPL 418 4 REPL TUBE SIDE CCW HX TIS W/RTD'S FPL 422 3 MAIN STM SAFETY LIFTING LEVERS FPL 549 3 ADD'L CNTMT ELECT PENETRATIONS FPL 744 4 SFP BRIDGE CRANE REPLACEMENT FPL 787 C INSTALL BARRIERS IN HVAC DUCTS I&E 792 S CNTRL ROOM LIGHTING EVALUATION NRR 1244 4 4160V SWGR CNTRL MOD-ADD A DIODE FPL 1262 4 REPL EXTR STM CS PPG W/ CR MOLY FPL 1280 4 CCW HEAT EXCHANGER REPLACEMENT FPL 1310 S ICW PMP FDN SFTY HAZARD EVALUAT'N FPL 1355 C EOP REVIEW REV 1 FPL 1360 S STORM STUDY/PLANT DRAINAGE EVAL FPL

fttlfCT ALNICAIS TLHACI SCINT lactfAC SLANT TACCf I SCHtOLAC 24 ~ LH I TNAAII 14 ' I

~ LOI CSO INTtCMIIO SCHIOIAC HOOC ITS I TA\C I INISH LSNATIL FAOIICTS2 ~ 442 SAFA I taft l ~ SL441OA SOslt AICI LICHT CO. INTLAVAL I VIAAISI IAAC DATA DATC 24NOVtt scaltaat OAA cHAAT SIAAT 2 SANS 4 TAACC I SCH COUL f SCOT Stttal SCOOLS 4 CCS ff FINISH SOL CSS LINC ttfAC OH NAC CLVOIIIHINT C*TICOAITS CATA DA'lf IISlatl Lltf ttttt OH CFO Sltl SVSIIH 1989 1990 1991 1992 1993 CFO POST TMI CONF I RMATORY P 23AUG91 MOOIF I CAT"N I I C AREA RADIATION MONIT"G SYST REPL CFO MOD 0341 18AUG89 5APRST P04 T11. 20 5ICW9 1 U4 SEL SYS MODSI REPAIRS C EDG AIR START MOTORS UPGRADE CFO MOD 0578 18JUL88 27APRS I POST PEP SNOVST 4 RHR-INSTL UPGRADED 8" GL08E VLV CFO MOO 0585 SFE888 5MAR91 SCTTES 0 CSDDTLLL tfLC CDLOCTI42LT DAIE Lftttoif IOHZVIACE ISLC LISLKNT CLTTACE SILC DATE'ATA CLSDCTLEILT CDLACTIMIST Da TE OATF

I 1

q C 4'

t&OFKCT AINT CATS TUKKKT t&INT f&FCIKAK ttANT TAKCK't SCNtt&NS 1& &I&i ITNA&~ I I& ~ I PI&I &KO INIICAATKOSCINKANK NIKN 1 flT fA&C ~ I N I &H IFNATSS t&OIICTF\ &&&1

~ ACI I KHffT I f1&&I&A AOvf& Al&l I IIHT CO INTf&VAI ~ VIA&I&I 'IAAO OAIA OAII I \N&VI& &CHICA& f OA& CHAAI STAKT 1&AN&& TAOCKTSCNKOUI K SOOT KKKAKS OCCOKS \ CUK tf FINISH SINCSS tACK O&KAK VAIUKT 1 &FO CATA OATF ISTIC&I ~ INf O&FAF. ON N&C CIA&II'INfNTCAftCO&ltS 1989 1990 1991 1992 1993 REG 4&&Ill 3 ATWS MODIF I CAT IONS REG MOD 0088 2DECBS ll I BMAY91 4 ATWS MODIFICATIONS REG MOD 0587 3JUNB7 22MAY91 TOTf.fvt 0 NKCKFKL ISC COKOKTTCNT CATE CKKUIESKT f&lN~ACC t&TC CCINKT&4:NT ISA TC DATA t18ltXI CVTACC TTTC CCSSKTLEITT DttTE DATE

I IJ"

tlOSICT tlOI AINICAIS Nll Tlskktt tOINT IACIIAS tIANT INIICRAIIO SCNtOIAI NCOI Ttl I TANCtl SCNICkf I

IANC INIW f ll IINATSS taOIICISS SIOI tACk I SNtfT I SIOSIOA tOSIS ANI IICNT CO. I I Nl t VAI IANC DIVA DATI SINOVI I SCNIOIAI NAR CORRI SI All ISANSI COST ORIAAS OCOOIS 1 CIN IS I IN ISO IOICSS SACS OIIAS VAIOI 2 Nll NAIA OAII ~ 1st ~ I ~ 4 INI OSSAA CN NAC CCSNIIININT CAIICOS ~ IS 1989 1990 1991 1992 1993 ICCTSI 3 RENLNBER/RELABEL RCS VENT VALVES NAR MOO 1295 PARTIAL SATS ON DEEP 87-213 DATED 5/03/90.

C SECURITY PLANT ENTRANCE FACII.ITY NAR MOO 1188 5JAN90 ~ 25APR90 9

SRCVSI PARTIAl. SATS ON PCM 88 503 DATED 2/05/91 ANO 2/25/91. 310CT88 27JUL90 4OCT91 3 REACTOR HEAD LIFT AIG LOAD CELL NRR MOD 1089 4JUN90 SFEB91 SICVSI 4 REACTOR HEAD LIFT RIG LOAD CELL NRR MOD 1070 7AUG90 BFEB91  !

I'>>clc>>

C CLOSED CIRCUIT TV SECURITY SYSTEM NRR MOD 1301 170CTSB

~

C PERIMETER FENC"G SI INTRUS"N DET"N NAR MOD 1183 PSICICSI PAATIAL SATS ON PCM 88-384 DATED 2/25/91. 25APRBB SAPR91  !

5NOV91 S CNTRL ROOM HFE ANNUNCIATOR STUDY NRR MOO 1011 5JAN90 ISAIRSI P SICSCSI I

C SECURITY ACCESS CNTL/CARD READEA NRR MOO 1184 28SEPBB ISASSS I 4 RENIIIBER/RELABEL RCS VENT VALVES NAA MOD 1298 5JAN90 4 NUREG 0737, PORV SUPPORT MOOS NRR MOD 1383 13SEP90 P SICSCSI C SECURITY PERIMETER LIGHTING NAR MOD 1182 25APABB 24JUN91 5RCVSI 4 GL 88-17 LOSS OF DECAY HEAT AEMVL NAR MOO 1328 COMPLETE EATS ON PCM 89.040 DATED 1-22.91. 28SEP89 25JUN91 IQTCS I OttONAL SSTC CSOCTTQOIT OATE CURROIT I4t4~SOE ISSC CCSOCTIKKT OA SC DATA Cued aaaX S/TC Coalort42tt Oalc DATE

SNOJKCT AINKCA'lf TIJKKKT SOINT IACIKAK STANK TAKOKT SCNSOIAK 14 tl>> IINANSI lf 1 4l NIOT NNN INIIONAIIO SCNIINAK 99449 I ~I S I SANO IIS IKN 9214AT99 SNOJIC\SS 4\49 NACf ~ KNI 1f flONIOA NONS4 NISI I ICNT CO. INTfSUAI I TANC NAIA DA'll IINONI9 f SCIIIOIA OAN CNANT ST ANT T JANKK TAKCK T SCNK OUI K SONS OsfAKS SCODKS 4 CUN ~ I I INISN SCS f44 ~ ACK ONSAK TAIUf. 1 Nl ~

OAIA OATf I\SSOSI I I>>K OsfAK ON IINC CO>>II>>NNI CATSCOKIfS 1989 1990 1991 1992 1993 3 NUREG 0737, PORV SUPPORT MOOS NRR MOD 1382 13SEP90 29JUN91 T 9949991 S PROBABILTY RISK ASSESSMNT PROGRAM NRR MOD 1325 17JANBS 3 GL 88- 17 LOSS OF DECAY HEAT REMVL NRR MOO 1327 COMPLETE SATS ON PCM 89-275 DATED 5I22I90. 28SEP89 C VITAL AREA BARRIERS NRR MOO 0700 BFEBBB 27AUG91 SNOV91 S THERMAL STRESS PPG CONNCTO TO RCS NRR MOO 1312 8MAR89 30SEP91 SINUS I S SFTY PARAMTR DISPLAY SYS HFE REVW NRR MOD 1289 PARTIAI. SATE ON PCM 90-189 DATED 9I07I90. 17NOV88 14OCT91 C SECURITY COMPUTER SYSTEM NRR MOD 1185 It 31OEC91 COMPLETE SATS ON PCM 90-028 DATED 9I 12I90.

REMOVAL OF THE EXISTING SECURITY SYS GRD TWR IS NOT NRC COMMIT. RELATED AND WILL 28SEP88 31DEC91 BE SCHEDULED AT A LATER DATE.

4DEC92 3 NORMAL CTLIT CLRS CNTRL SWITCHES NRR MOD 0550 PROCUREMENT ON HOLD 17JAN89 28AUG92 3 NIS ELIM. UNUSED SWITCH POSITIONS NRR MOD 1297 C CTL RM OP DESK PHONE REACH RESOLN NRR MOD 1290 3 PHASE A ISO SIGNAL TO RCS SMPL LN NRR MOD 1351

..................... 2eJUN90 1449991 lSJJN92 II

~~ 24SEP92 V 49<<92 I

299292 4OEC92 IIN1992 SJUINI 4 TURB RUNBACK SELECTOR SWITCH REPL NRR MOD 1245 10MAR87 1APR93 SAT TESI 0 ORDSSAS. IKTC COHATNTTIT DATE CURRESST SON~AGE SRC COSAATIEIST PA TE DATA CURTeTT OUTAGE SSTC COSSATTESST DATE OATE

i SROIKCT AINKCATS TURKKV tOINf IKCS CAR tlANT TARCKT SCNKOIN K 20 RIFI lfNARSI I~ Cl tlof Naa IN1KCRATIO SCNIOINK NOOK 2 IS T fARO S INISN l1lalf'IS taoslcfIT asof

~ AFN ~ Rais f FIORIOA aessa AICI ~ Ilail CO. ~ NIIRVAI ~ Vlaa(as laall OAF* OAII 'I aaav a ~ Ccalcaal RAR ceaaT START KFANRC TAROK T SCNKOUC K SORT ~ RKAKS OCCOlS CUR KS F INISN toff as tAIN oafaa vAIIN a Naa NAIA OAN lllfafl I INK OFIAa ON NRC CCaalllelNT CATICORIKS 1989 1990 1991 1992 1993 3JUN93 4 NORMAL CTMT CLRS CNTRL SWITCHES NRR MOD 0589 PROCUREMENT ON HOLD 17JAN89 8APR93 Srural 4 NIS-EL IM. UNUSED SWITCH PORITIONS NRR MOO 1298 28JUN90 5MAY93 3JUN93 4 PHASE A ISO SIGNAL TO RCS SMPL LN NRR MOD 1352 dJAN92 IMAYSS SOT CS I IIII ORONRL ffc COSOCTS4ICT OATC KKTRCTIT ICSIJRITROC fffC COaOKTRCNT OA TC DATA CORIEIIT CVTCOC IIC COSSCTSCSIT OrSTC DATE

faOIICT AINICASS Tlsattv fosar IAOICM fIAHT TMCCI SCNIOIAC ta NI 01 ~ al INIICaAIIO SCHIOA I Sssal I II I 9*NO IINISH IIHAVSS aaoslcrt I alai s salt r flaaIOA aavta Asts ~ ICHI CO. INSINVAI IMO NAIA OAIf 1911OVSt SCHIONI I OAN CHAN I AIM I tIAHSS soaT ~ ltAIs accots 1 COa lf

~ INISN NAIA OAII SOICSS I~ Itatl fact aataa VMUI I INI aataa OH NAC l Ila CCNO99114IN1 CAItaaastS 1989 1990 1991 1992 1993 I &E 1NOV90 C INSTALL BARRIERS IN HVAC DUCTS l&E MOD 0787 P II COMPLETE SATS ON PCM 87-388 DATED 2I25I91. 30NOV87 9AUG90 495191 l&E MOD 0425 3 RPI INVEATER AEPLACEMENT

! II I PARTIAL SATS ON PCM 88.582 DATED SI01I90. 29NOV88 29DEC90 5NOV91 QI C FLUX MAPPING h SEAL TABLE EVAL 18IE MOD 1154 140EC90 ~ SAPR91 SNOV91 C FLOOD PROT EDG FUEL OIL XFER PMPS I&E MOO 1320

! II I PARTIAL SATS ON PCM 89-124 DATED 2-12-90. 31llAY89 9APR91  !

5NOI191

! II I 4 SMALL BDAE PIP INGINCR DISPOSITION I&E MOD 1314 7MAY90 13JUN91 IIOVII

! II 4 RPI INVERTER REPLACEMENT l&E MOD 0785 SDEC88 19JUN91 40CT91 S PWR LOSS TO VITAL BUS AT SALEM 2 I&E MOO 1058 12APA91 II

~ V 17SEP91 5NOV91 S IEN 87-2 SEISMIC DUAL-DIAPHR VLVS I&E MOD 1087 . IIIHVSI a

I

~ 41OVI I

$ 4DEC92 C IMPROVE PA SYSTEM AUDIBILITY I&E MOD 0711 15MAY87 13FEB92  !

3 SMALL BORE PIP INGINCR DISPOSITION I&E MOD 1313 7MAY90 24SEP92 3 INST CTMT PHYS BARRIPAEV PERS ACC l&E MOD 0880 7APR88 300CT92 3JUN93 4 INST CTMT PHYS BARRIPREV PEAS ACC l&E MOO 0851 SJUL89 14APR93 ICTTCS s CIOONAL sttC CCINIOTACTIT OATC CTIRSCNT ICII~TACE ITC CCIOOTKHT CA TC DATA CCRTetT CTTTACE STOIC CCASATIESTT DATE OATE

i 4.

f 1,

FCOILCT ALNICA11 TUCCLV FOINT IAICtfAA FSANT TAACL2 SCNiDIEE 20 CIAI IINAA13 IO LI FIOT OAA INTLCAATIO 5CNCDINE NOOC tfff TAAO FINISN I INAV\5 FAOIIC'Ill CLOT

~ ACI ~ SNI I 'I ~ FIOAIOA FOAIA AAO I ICNf CO ~ INIfAVAI I VCAAI1 I ~ MC NAIA OAII INIDVtf 5CNIC3Af OM CIIAAT SIMT 2IANC ~ TAOCLTSCNCOUI E SOOT CAIAAS OCODLS 1 CUC il

~ INISN SDLCTS tACE SALAS VALUE." 5 OCA NAIA OAII 313 jgl I I INI OffAC DN NAC CCIellIINNI CAIIOOAI~ 5 1989 1990 1991 1992 1993 OAA S SOER 86-3 CK VLV APPLICATION RVW ORA MOO 1268 10AUG88 22FEB91 C GAS ANALYZER SYSTEM MQO ORA MOO 0036 I II I PARTIAL SATS ON PCM 84-165 DATED 03I22I90 2DEC85 3 I.OAD CENTERS X FORMER REPLACEMENT ORA MOD 0661 l 1l I

~

PARTIAL SATS ON PCM 89-532 DATED 2I 13I91 14AUGSS 11MAR91 C WASTE NEUTA WTP SYSTEM MOD ORA MOD 0042 SL I II 1 COMPLETE EATS ON PCM Sd 084 DATED 8I27I90 9JAN8d PARTIAL SATS ON PCM 85-195 DATED 4-30-87.

4 LOAD CENTERS X-FORMER REPLACEMENT OAA MOD 1081 I II I PARTIAL SATS ON PCM 89-533 DATED 2I 13I91 18FEB90 IIMAII31 I II I C ADO"N OF "SWING" STATION BATTERY ORA MOD 1272 22SEPSS I II 3 REDUCTION IN 4KV BKR VOLTAGE DAOP ORA MOD 1252 1 JUN87 28JUN91 I II 4 REDUCTION IN 4KV BKR VOLTAGE DROP ORA MOD 1253 1 JUN87 5AUG91 I II C WTP IN-LINE CHEMISTRY MONITORS ORA MOD 0767 7AUG90 I I C REPI. F IRE WTR SYS MN PP Wl 10" LN OAA MOD 1281 14AUG91 30MAA92 I I 3 SECONDARY CHEM INLINE MONITIOAS ORA MOO 0102 17SEP90 II I I 4 SECONDARY CHEM INLINE MONITORS ORA MOO 0103 17SEPSO 9JUN93 DATA DATE

tSOITCT AIINCASS TICSSS tOINT IACISAS tlANT TASCS 2 SCNITSN f 10 PIOT Stl INTICAATIO SCINOulf NODS TSI I I IAOC I NISH I I I NIT 2 POOIICIS2 SIOI

~ ACS I SHIST I IICAIOA POOI ~ APII I IIOIT CO. INTIAVAI I OIAAISI IAOC DATA OATf 2NIOOOS SCHIIOA I SAA CNAOI

% IAAI SIANSO IINISH 2DICSS tACS OlfAC VATIC 1 Itl DATA DAII 1092OSI IINf OA2992 ON NOC CCIOIIIINNT CAIICDAIIS 1989 1990 1991 1992 1993 FPL 3 MOV FAIL DUE TO IMPROPER SW SETNG FPL MOD 0525 COMPLETE SATS ON PCM 87-005 DATED 4I 15I87. 10APRSS ) 10JAN89 PAATIAL SATS ON PCM 87-008 DATED 4I23I90.

4 STM GENERATOR J NOZZLE AEPLACEMNT FPL MOD 1274 NEED SATS FOR CLOSURE 28JUNSS 2MAY89 4 CONDENSER INLET WATERBOX AEPAIR FPL MOO 1288 I PARTIAL SATS ON DEEP 88-344 DATED 05-04-89.

= 14SEPSS 22MAYSS 4 MOV FAIL DUE TO IMPROPER SW SET"G FPL MOD 1110 I

~

THE COMMITMENT RELATED PORTION OF THIS II 11JUN89 MODIF ICATION WAS COMPLETED IN MARCH 1989. 15 JAN87 I JUN89 THE REMAINDER OF THE WORK IS NOT ISIS RELATED.

PARTIAL SATS ON PCM 87-008 ST 87-009 04-MAR-89 3 RHR PLNPS SEAL UPGRADE FPL MOD 1172 PARTIAL SATS ON PCM 58 077 DATED 03I28190 31AUG87 22IIAII90 3 SGWL CNTMT ISOLAT"N VLV REPLACEMT FPL MOO 0293 I II COMPLETE SATS ON PCM 88 077 DATED 1-23-91. 21MARBS 2299290

~

S RESOLVE CNTMT PURG FSAR DISCREP FPL MOD 0828 ENGINEERING STUDY COMPLETE 01-OCT-90 PER LETTER ¹ JPN PTN-90-2815. EST IMATEIAPPAOVAL 17NDV89 IOOTIO FOR ADDITIONAL WOAK IS IN PROGRESS.

C HP WORK AREA AND N.O. WORK AREA FPL MOO 0378 PARTIAL SATS ON PCM 89 512 DATED 2120/91. 1991999 1920990 3 SFP COOLING SYS SEISMIC MOD FPL MOD 011S THE CONllTMENT FOR THIS MOD HAS BEEN MET.

BAI.ANCE OF WOAK BEYOND THE 18 DEC 87 NAC COMMITMENT DATE IS FOR ISSUANCE OF FINAL STRESS CALCULATIONS. WHICH WAS NOT REGD TO 14AUGSS 14DEC90 MEET THIS COISJITMENT.

SATS REOUIRED FOR CLOSURE.

C EDG PROJECT LICENSING SUBMITTALS FPL MOD 1144 ENGINEERING I.ETTER REOUIRED FOR CI.OSURE. 20JUL87 3 EDG STATION BATTERY CHARGERS FPL MOD 114S II I IMPLEMENTATION UNDER MOD ¹\\45. 22MAASS 3 MSIV AIR OPERATOR BACKUP N2 SYST FPL MDD 0257 II I SATS REOUIRED FOR CLOSURE. 2OEC85 11JAN91 S MOV THERMAL OVERLOAD HTR SELECTN FPL MOD 1249 REF. LTA JPE-PTSP-88 1051 CONFIRMS MEETING NAC COMMIT ON JUN 20, 1988. COMPLETION OF PREP 25 JUL 89 ST APPVL OF STD E.3.20 MEETS NRC COMMITMENT.

EP TO BE ISS SPECIFYING TOL"S FOR MOV"S. 190CT87 24 JAN9 I IS NOT NRC COMMITMENT RELATED.

4 SFP BRIDGE CRANE AEPLACEMENT FPL MOD 0744 COMPLETE SATB ON PCM 88-171 DATED 1-29 91. 4FEBSS 29JAN91 DATA DATE

IV tEOIECT rlol AINfCA11 Stl TUEEET POINT IECEEAC tfANT INTECAATEO SCNEEAAE NOOE Tff~

TAACET SENEOIOE lAAO 2 III ISO 20 IINAT1$

~ IPI 12NA012 tEOIEC'lf2 0102 IP 'l PACE ~ SNE ff TIOAIOA POvfA ANO ~ ICNT CO. I Nl l 0 VAE TAAO NAIA OAII 21NOV1$ SCNI CIA l OAA CNAll STAll 22AIITE TAOCE T SCNE OUT E SUET OAEAES OCCOES 1 CUE ll

~ INISN SOIC1'1 PACE OEEAE VAIUEI ~ Stl CATA CATE l1ll012 IINE OATAE CN NAC CIVPIITNfNT CATECINIfS 1989 1990 1991 1992 1993

~ ~

FPL C MN CTI. RM DOOR SI SECURITY SYS MOD FPL MOD 1271 SATS REQUIRED FOA CLOSURE. 13JULSS SFEB91 3 EDG SWING SWGR 3AD FPL MOD 1178 II I IMPLEMENTATION UNDER MOO 421145. 20AUG87 4 EDG SWING SWGR 4 AD FPL MQO 1180 II I IMPLEMENTATION UNDER MOD 421145. 22FEBSS 4 BACKUP INSTR. AIR COMPRESSOR FPL MOO 0291 II I SATS REQUIRED FOR CLOSUAE. 4APRBS 3 BORIC ACID EVAP PMP UPGRADE FPL MOO 0237 II I NEED SATS FOR CLOSURE 12NOV85 C ADDNL EMERG LIGHTING FOR APP. R FPL MOO 0592 II I PARTIAL SATS ON PCM 86-213 IREV SI 10-31-89 1 2JUNSS C ELECT DWG SEPARAT"N 62 RENIPJBERING FPL MOD 1095 II I PARTIAL SATS ON PCM 87-279 GATED 04-13-89. SJUN87 4 MSIV SAFETY REI. AIR ACCIkl SYS FPL MOD 1258 11JUN89 II I PARTIAL SATS ISSUED 5I24l89. 10MAYSS 20FEB91 S ICW CK VLV OPER Wl IA FAII.URE FPL MOD 1283 II I ENGINEERING LETTER AEQUIREO FOR CLOSURE. 260CT87 4 TPCW HX ISOLTN - CV2201 FAIL CLSE FPL MOO 1285 II I PARTIAL SATS ON PCM 88-346 DATED 04-29-89. 15NOVSS 20FEB91 3 SFP BRIDGE CRANE AEPLACEMENT FPL MOO 0745 II I PARTIAl. SATS ON PCM 88.170 DATED 12 17 90. 20JAN88 4 SPENT FUEL POOL RERACKING FPL MOO 1190 COMPLETE SATS ON PCM 87 405 DATED 2-1-91. 31JUL87 PARTIAL SATS ON PCM 88-319 DATED 12 8-90.

3 REMOVAL OF TPCW AMERTAP SYSTEM FPL MOD 1317 TPCW AMERTAP SYSTEM WOAK WAS SPLIT FROM MOO 531. TPCW AMERTAP WAS NOT NRC COMMITMENT RELATED. 18NQVSS PARTIAl. SATS ON PCM 86-195 CATEO 4 28-88.

C W.T ~ PE FLOW METERS UPGRADE FPL MQO 0151 11FEBSS II I C EDG HC TUABOIIDLE GEAR STUB SHAFT FPL MQD 0509 16MARSS II I C NEW EDG BLOGS I.TG F IAE CQh%I HVAC FPL MQO 1175 1SEP87 II I 4 ATMOSPHERIC DWlP VLV AEPLACEMENT FPL MOD 1260 3MAY88 3 AEACTOR CAVITY HANDRAIL FPL MOO 0233 II I PARTIAL SATS ON PCM BS.1SS CATED 03129l90 2 MAR 87 20MAR91 DATA DATE

+<

tSOICCT AINCCAIT TINSCT POINT IAICICAC PCANT TAOCC 1 SCNCOVIC SO tlol I tl INTCCSAICO SCNIOIAC NOOC I II'I IANO I IVI\V FIOAT'IT ~ AOIICTf T CIOI tACf I SNf CT 1 CIOOIOA POsff AICI IICNf CO I VII CTAI I TCAAISI 'TACO OAIA SAIC T\NOTCC SCNCOVlf OAA CNAlf SIAN I TIANCC f IN ISO TOC CT'I tACC OICAS VAlVE 1 ftl NAIA Ollf ~ TCCOT ~ I INC OICAC ON NNC CONIITNINT CAICCONIIS 1989 1990 1991 1992 1993 FPL S ECCS HEAT SINK UPDATE FPL MOO 0382 SMAY87 II I C NEW EDG FIRE PROTECTION FPL MOD 117$ llMAYBB 4 ADO SI RELOCATE AFW N2 SUPPLY FPL MOD 0218 COMPLETE SATB ON PCM 85- 170 DATED Od-27-87.

COMPLETE SATS ON PCM 8S 045 DATED 04-04-88 ~ 20ECSS PARTIAL SATS ON PCM 88 184 DATED 04-21-89.

4 PROCURE SI INSTALL TWO NEW EOG"S FPL MOO 1138 PARTIAL SATS ON PCM 87-283 DATED 2I27I91. 26FEB87 3 POAV STROKE TIME ENHANCEMENT FPL MOD 1315 II I PARTIAL SATS ON PCM 89 585 DATED 04I 18/90 240CTBS 2APA91 I

4 REPLACE SI CHK VLVS 4.874A SI 8 FPL MOD 135S 27DEC89 SAPR91 I

3 CHARG PMP AEI.IEF VLVIDRN LN SUPPT FPL MOD 1323 170CT89 10APR91 I II I 4 REACTOA CAVITY HANDRAIL FPL MOD 0080 2MAR 87 13APRS I 3 ATMOSPHERIC DISAP VLV REPLACEMENT FPL MOD 1259 I II I PARTIAL SATS ON PCM 88 517 DATED 05-11 90 3MAYSS 13APR9 1 ANO 07 18-90 4 NORM CNTMT CLRS CAPACITY INCREASE FPL MOD 0903 I II I PARTIAL SATS ON PCM 87 028 DATED 04 22 89. 7APRSS 19APR91 I II I 4 PORV STROKE TIME ENHANCEMENT FPL MOO 131S SDECSB 25APR91 I II 4 UPGRD RCP OIL LIFT SYSILOWR COOLR FPL MOD 1021 30CTSB I II S PROV ACCEPT CRIT FOA OIL XFR PMPS FPL MOD 092S C EDG DIESEL IO.O.S. T. BLDG CONST FPL MOO 1174 20FEB91 ~

Q 14MAY91 i

PARTIAL SATS ON PCM 87 259 DATED ll04ISO BMAY87 AND 2 I 27 I 9 1 .

j Il C INVERTER RM HVAC UPGRADEIPERM FIX FPL MOO 1218 4APABB I II C DES Sf PUACH STA BATTERY CHARGERS FPL MOO 1275 13JULBS I II 0 SECONDARY SIDE HIGH ENERGY P IP ING FPL MOD 0892 13JUNSS I II 0 BORIC ACID CONCENTRATION REDUCTN FPL MOD 1311 1ZJUN89 4JUN91 I II I 4 ADD"L CNTMT ELECT PENETRATIONS FPL MOD 0788 30MAR 89 13JUN91 CATA DATE

~ ~

I b

h

FaslfCT AlslCA1$ TOatIV POINT IACITM FIANT IAACtf SCNf last 1$

Fl ol f Fl INTTCSATTO SCNttast NCOT 2/FT TASC FINISN ITNAVTS $ $OITC122 Slsl

~ Asl ~ SJII tI ~ flOSIOA FOVI ~ JNO I ICNT CO. I Nl t aVAl I VtA$ 9$ 9 TASC OAI* OAII 2 $ 992$ 9 a SCNIOIAT SAA CNAAT S TASI 2IAIISl 'IAAOT f SCNS OUI T loaf sltAls scoots ~ CIJS lf IINISN SOTCSS FACT ~ atAS VAINTT ~ Fal NAIA Oalt Ill lal I I INF salas ON Nac COIOIITJNNI CATIOOAITS 1989 1990 1991 1992 1993 FPL 3 P2R RLF LN SNUBBER REPLACEMENT FPL MOO 1267 PARTIAL SATS ON PCM 89 046 DATED 04I 18I90 50CTSS 13JUN91 II C WTR EQUIPT 6I HOTWELL SAMPLE SYST. FPL MOD 0180 21JUN90 14JU N91 3 NORM CNTMT CLRS CAPACITY INCREASE FPL MOO 0902 I II PARTIAL BATS ON PCM 87 025 DATED 07-16-90 15JUN91 4 EDGILD CTR 4H, MCC4D 5 XFR OF LDS FPL MOD 1139 II IMPLEMENTATION UNDER MOD ¹1145. 10OCT88 17JUN91 3 EDG LOAD CTR 3HIMCC 3D FPL MOD 1142 IMPLEMENTATION UNDER MOD ¹1145.

PARTIAL SATB ON PCM 89 069 GATED 1I24I90 100CTSS 17JUN91 ANO 2I 14I90.

3 4KV BUS AIC MODIF ICATION FPL MOO 1329 29DEC89 18JUN91 I

4 4KV BUS AIC MODIFICATION FPL MOO 1330 .............. 29DEC89 ISJUN91 4 REPLACE FARRIS RELIEF VALVESICCW FPL MOD 0415 PARTIAL SATS ON PCM 86.238 CATED 04-07-89. 2SEP88 20JUN91 I3AI4A,3BI48] TIE- INS FPL MOO 1140 C EDG BLDG IMPLEMENTATION UNDER MOD ¹1145. 29SEPSS I ll 28JUN91 PARTIAL SATS ON PCM 87 254 DATED 2I2'7I91.

3 CHEM INJECTION OF ICW TO CCW HX FPL MOO 1321 PARTIAL SATB FOR PCM 89 070 DATED 11-09-89, .... 31MAY89 3JUL91 12 05-89, ANO 12 13-89 I ll 4 MAIN FEED CV 2011 CLOSING TIME FPL MOO 1102 SMAR88 4JUL91 3 INSPECT IREPAIR INTAKE STRUCTURE FPL MOD 134S 300CT89 5JUL91 l

4 CHARG PMP RELIEF VLVIDRN LN SUPPT FPL MOD 1324 9JUL91 C NEW EDG PROJ SITE PREPARATION FPL MOD 1137 I II PARTIAL SATS DATED II04I90 ON PCM 87-212 15JAN87 10JUL91 II 4 REPL MOV.535I536 ACTUATORS FPL MOO 1389 14SEP90 19JUI91 I

C REVIEW WEJ- IT EXPANSION ANCHORS FPL MOO 0586 4MAY87 ISJUL91 3 HIGH INITIAL RESPONSE EXCITER FPL MOO 0978 22DECSS ISJUL91 S NAC AUDIT PEP PROJ4/CONF IG MGT FPL MOD 1308 COMPLETE SATS ON PCM 90-157 DATED 1-29 91.

I II 17MAR89 18JUL9'I COMPLETE SATS ON PCM 90-158 DATED 1-29-91.

CATA DATE

~ COI CI I AINTCATS TIICCTY tOINT IAICITAO tfANT TACOTT SCNTOIOT 20 CIPI ITNAkal Ia . AS

~ a of INIIIAAIIOSCNIOVIS llCOC tttl IANO ~ IVISN IINAT$$ ~ aollctfl aaof

~ ACI SNI ft flCOIOA tfafk Aafa I ICNY CO. I Nlt k fal TIAAISI IAAO Oalk OAII INTOVI~ SCNIOUlt OAk CNAAI SIAAI

~

2 IANaa Akol 'I sckl Col 9 SOkl Oklalf

~

OCCOIS CVN lf IINISN TOICTS tACC Olfak VAIOC $ ftl CATA OATS Ialfoal I INC Offak ON alaC CINNIIININT CAIIOCOIIS 1989 1990

~

1991 1992 1993 F PI.

4 MG-d RELAY REPLACEMENT FPL MOD 1354 13FEB90 II I C UNDERSZD NZZL-SHLL JOINTS-TNK HX FPL MOD 1343 1 JUN90 29JUL91 C ERDADS INPUT ISOLATION ADDITIONS FPL MOD 1214 II I COMPLETE SATS ON PCM 87-310 DATED 10-31-89. 2AUG9 1 I IL j 4 CHEM INJECTION OF ICW TO CCW HX FPL MOD 1322 SJUN89 2AUGS 1 3 I CW UPGRADE FPL MOO 1192 II I SCOPE OF WORK IS FOR DUAL UNIT OUTAGE ONLY. IFEB90 FUTUAE WORK TO BE SCHEDULED.

I II S LIMITING CONDITION CVT OPERATION FPL MOD 0344 29DEC88 15AUG91 S BKR LIST VEAIF"N WALKDOWN OF NCRS FPL MOO 1265 THE COMMITMENT RELATED PORTION OF THIS MOD HAS BEEN COMPLETED PER LTR JPN-PTP-90-0190, 22 JAN9 I DATED 1/ 19/90. THE REMAINDER OF THE WORK IS NOT CFO RELATED. 6FEB89 28AUG9 I COMPLETE SATS ON PCM 89 323 DATED 6/14/90.

COMPLETE SATS ON PCM 89-253 DATED 9/11/90.

COMPLETE SATS ON PCM 90-184 DATED 2/21/91 C REG GUIDE 1 '7 AUDIT PAEP FPI. MOD 1326 17AUGSS 30AUG91 0 EXISTING "A" EDG IDLE START/STOP FPL MOO 0132 PARTIAL SATS ON PCM 87-284 DATED 2/27/91. 29SEP88 SSEP91 3 MG d RELAY AEPLACEMENT FPL MOD 1353 1 2JAN90 7SEP91 l

3 POLAR CRANE MOTORS/ENGR PACKAGE FPL MOO 0478 11JUL90 10SEP91 I I 4 POLAR CRANE MOTORS/ENGR PACKAGE FPL MOD 0477 11JUL90 IOSEP91 C EPS ELECTRICAL ENHANCEMENT FPI. MOD 1145 I PARTIAL SATS ON PCM 87 264 DATED 2/27/91. 24FEB88 12SEP91 0 PLANT LIGHTING UPGRADE PH I 6I I I FPL MOO 0889 PARTIAL SATS ON PCM 88-296 DATED 02 06-90. 230CT87 24SEP91 3 BYPASS RTO EL IMINAT"N MOOIF ICAT"N FPL MOO 0816 NAC REVIEW AND APPROVAL OF LICENSING REPOAT I II 16 JANSO SCHEDULED TO COMPLETE 15 JUN 91.

4 BYPASS RTD EL IMINAT"N MODIF ICAT"N FPL MOO 0617 NRC REVIEW ANO APPROVAL OF LICENSING REPORT 16 JANSO 12NOV91 SCHEDULED TO COMPLETE 15 JUN 91.

I II 3 SFP DEMIN RESIN FLUSH UPGRADE FPL MOD 0956 60CT87 130EC91 DATA DATE

\

taOITCT AINICASS Tufafr FOINT IRJCITAA FIANT TAScaf scNTCIJaa TS ~ \N IINRS\I I~ aa tata 9ta INIIOSATIO SCNIOJA I 992OS ~ I~ I IAAO I INISN 1119RVSS taollcl la sas\

~ ACf I CNfff FIOSIOA FOSIS AIO I ICNf CO. I Naf SVAI ~ VTAS1$ 9 TARO DATA OATf TSNOVSS SCNIOIAT OAR CNAaf OIAAT flANSS 1 A O O 1 'I C C N f O U I 1 sosf oafAAS ocoofs s calo at f INISN SOICSS tAOC OSTJA VAIINI \ Itl NAIA OAII ISIIO\I IINf Oafaf ON NSC CISN121191NT CATICORIIS 1989 1990 1991 1992 1S93 FPL C CONTROL ROOM HABITABILITYHVAC FPL MOD 0014 THE COMMITMENT RELATED PORTION OF THIS MODIFICATION HAS BEEN COMPLETED.

ENHANCEMENTS TO THE CONTROL ROOM HVAC SYST. 2JAN85 27DEC91 BEYOND 17 JUN 88 ARE NQT CFO RELATED.

C EVALUATION OF AIR OPERATED VALVES FPL MOD 1344 28JUL91 3JAN92 II I C F IRE PIAIP DIESEI. ENGINE UPGRADE FPL MQD 0191 11JUNSO SJAN92 I I 3 C BUS XFMA DELUGE SYS ALARM FPL MQD 0854 4JUN90 10JAN92 I II I 3 CHAAG PIAlP SUCTN QUICK DISCONNECT FPL MOD 0431 22DECdd 18 JAN92 S MISSILE PROTECT EVAL-PLNT EX DOOR FPL MOD 1354 C PASS CHLORIDE ANALYZER REPLACMNT FPL MOD 1319 II 14AUG91 II

~ I I

23JAN92 PARTIAL BATS ON PCM 89-141 DATED 31MAY89 30JAN92 SI 13I90 ANO 10I05ISO.

I II I 3 MSR INSTRNAENTATI ON FPL MOD 1010 25JUNS7 31 JAN92 S 480V LOAD CTR UNO VOLTAGE SETTING FPL MQO C CHEMICAL STORAGE BLDG CENTRAL AIC FPL MOD 0484 1202 22FEBSS II

.......... 29AUGS1 II 14FEB92

~ I I

7FEB92 I II I C PASS DSLVD HYD MONIL IQ SMPL UPGAO FPL MOO 1337 3APR90 14FEB92 C RELOCATE WTP PRETAEATMENT SYSTEM FPL MOO 1349 I II I I PARTIAL BATS ON PCM 88 107 DATED 8 10-88. 31MAY90 14FEB92, I II I 4 SFP OEMIN RESIN FLUSH UPGRADE FPL MQO 1155 19OCT87 18MAA92 II I C PLT PERIMETER FLOOOWALL AEPAIR FPL MQO 1357 18JUN90 C CCW AAEA 3 PERSONNEL PIPE TRENCH FLOODWALLS da EQMT HATCH 3 IMPROVE HQT WELL DAAIMAGE SHIELD FPL MQD 1358 FPL MQD 1182 FPL MOO 1385 3AUG90 27JUN91 II II II 14AUGS II 1

~ I I

I I

2999992 I

I I

RJUR92 I

C WASTE GAS SYS UPGRADE PAOGAAM FPL MOD 0788 SAUGS 1 2 9 J UR9 2 II C IA COMPS-MODIFY LCC CONTROI. LOGIC FPL MOD 0281 24MAR85 23JUN92 DATA DATE

~ ~

hg

tfDJ(CT ALNCCASS TUSACV tOINT SAC(CAN t(ANT 'TANCC T SCNC(NN f 14 NUN ISNAEEI lt ~4 tLDT Itl INILCAAIEO SCINDINL NQOC 'ISIS EAAO S I NISH I IIIATS' PAOJLCIS 1 ~ 941 tACf I SNECI 1 ~ IONIOA PONIN AID I ICNT CO INICNVAI I VEANISI 'IANO DATA OAIC 29NOVES SCNI DIA I OAE CNAAE SIAN 1 2JAPICC TA ~ OE1SCNCDULC SUET OECANSOCODLS \ CUN CS f IN(SN SDf C4$ SPCC OLCJJ( VALUC 4 StL DATA OAlf I\SCOSE LINf ~ EfAA DN NEC CCIEIIINCNT CAICCCOllS 1989 1990 1991 1992 1993 FPL S STUOYIMOV FAIL"R DUE TO HANlERING FPL MOD 0697 24JAN92 29JUN92 I

3 REPL RXIREF CAVITY LTG F IXTURES FPL MOD 0358 27DEC85 1SEP92 Il I 3 REPL 480V MCC 3E DUE TO CORROSION FPL MOO 0793 31MAY91 IEEP92 II I 3 REPLACE G.E. CR120BD AUX RELAYS FPL MOO 1207 1 OAUG87 1SEP92 II 3 DRYER SYSTEM FOR SJAE SPING-4 MON FPL MOD 1332 1SEP92 II 3 REPL MOV-535I53S ACTUATORS FPL MOO 1388 14SEP90 12SEP92 3 REPLACE FARRIS RELIEF VALVESICCW FPL MOD 0414 II I PARTIAL SATS ON PCM 86 237 DATED 4I 17I90. 22DECSS 24SEP92 II I C 3E 6( 4E LOAD CENTER PERM TIE FPL MOD 1080 22JUN90 24SEP92 3 TEMP AC IN CONTAIMAENT FOR OUTAGE FPL MOO 1331 il 12FEB90 24SEP92 3 PRESSURIZER SPRAY VLV BDY REMOVAL FPL MOO 1348 15SEP89 24SEP92 3 UPGRD RCP OIL LIFT SYSILWR COOLER FPL MOO 0888 COMPLETE EATS ON PCM 89-574 DATED 10AUG88 l ll I 20CT92 4I 16I90 ANO SI22I90.

II I C ADO RELAYS TO UNORVLTAGE CIRCUITS FPL MOO 1341 2994191 120CT92 II I I 3 PERM SHIELDING IN CASK WASHDOWN FPL MOO 0134 1244992 280CT92 II I I 4 PERM SHIELDING IN CASK WASHDOWN FPL MOD 0135 1244992 280CT92 II I I 3 CNTMT PRMS R 11 8( R-12 REPL FPL MOO 1370 16AUG91 300CT92 II I I C CONTROL ROOM HVAC CONTROL MOD FPL MOO 1372 14AUE91 300CT92 II I I 3 CTMT VESSEL CATHODIC PROTECTION FPL MOD 128S 4PEI92 18NOV92 II I 4 C BUS XFMR DELUGE SYS ALARM FPL MOO 0853 4 J UN90 11 JAN93 II I 4 CHARG PIktP SUCTN QUICK DISCONNECT FPL MOO 1255 22DEC88 15 JAN93 II I 4 IMPROVE HOT WEI.L DRAINAGE FPL MOD 1366 14AUG91 22JAN93 DATA DATE

4 T r

Nt I

9 PROJECT ALNLOASR TIIaaav POINT EBICLTM nfflr raaolr scNLIaaa 14 ~ 229 I INM'I ~ ~4 ~4 nol IPl INILORAELO SCNLEBAL NBOL Erl'I TARO ~ INIBII I IFBIY 'I 4 ~ ROILClrr BART

~ AOI I BNIfT ~ flOBIOA FOFIR AFEI IIOII CO INIEBYFE I YEABIRF 'IABO OA'IA OAII 3\NOY3 4 BENI IBA ~ OAR 2 NABE TAacrrscarooa

~

START RIANRR scoT RRLAas occoas 4 Coa rf I INISN rofcaa PACR OEEAA VALOR I '4 Pal OAIA OAIR 1492441 I INE ~ EIAR ON NEC COIOIIEINNT CAlfCORIES 1989 1990 1991 1992 1993 FPL 4 PERSONNEL 8L EQMT HATCH SHIELD FPL MOD 1183 27JUN91 1FEB93 C ADO FUSE SPEC TO BKR C CATWALK LIST IN WATER TREATMENT PLANT 82 DWGS FPL MOD 1254 FPL MOD 1171 23JUL91 I

2SEP92 I

~ I I

11FEB93 1

3 C" BUS SWGR ENCL AIC MOOS FPL MOD 0070 14OCT85 8MAR93 II

~

I I 4 REPL 480V MCC 4E DUE TO CORROSION FPL MOD 0794 31MAY91 12APR93 II I I 4 DRYER SYSTEM FOR SJAE SPING-4 MON FPL MOO 1333 28FEB90 12APR93 II I I 4 CTMT VESSEL CATHODIC PROTECTION FPL MOD 1305 IIFEB32 IFAF293 II I I 4 REPL RXIREF CAVITY LTG FIXTURES FPL MOD 0357 4MARS7 23APR93

~

I II I I 4 PRESSURI2ER SPRAY VLV BDY REMOVAL FPL MOD 1347 15SEP89 5MAY93 II I I 4 CNTMT PRMS R-11 82 R-12 REPL FPL MOD 1371 28AUG91 17MAY93 II I j 3 TRANSFER CANAL LEAKAGE PERM FIX FPL MOD 0895 29FE392 2292993 II I I 4 TRANSFER CANAL LEAKAGE PERM FIX FPL MOD 0898 19JUL91 SJUL93 "C"

II I I 4 BUS SWGR ENCL AIC MOOS FPL MOD 0071 3DEC85 7OCT93 4 ICW UPGRADE FPL MOD 1193 1JUL91 12DEC94 DATA DAVE

lh

~ y

, ]