ML18022A423: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/16/1986
| issue date = 09/16/1986
| title = Package of Comments Urging Denial of Util Request for Exemption from Requirement to Conduct Full Participation Emergency Response Exercise,Per 10CFR50,App E
| title = Package of Comments Urging Denial of Util Request for Exemption from Requirement to Conduct Full Participation Emergency Response Exercise,Per 10CFR50,App E
| author name = BAWDEN R S, BRACHE M, COUNTS C, DAVIS V S, DOWDY D M, EVANS C, FOSTER D L, FRANKLIN S, GREENE T, MAY C H, NEVILLE C E, RANSDELL R J, REGO C, REGO P, TIEDEMAN M, WILSON R
| author name = Bawden R, Brache M, Counts C, Davis V, Dowdy D, Evans C, Foster D, Franklin S, Greene T, May C, Neville C, Ransdell R, Rego C, Rego P, Tiedeman M, Wilson R
| author affiliation = AFFILIATION NOT ASSIGNED
| author affiliation = AFFILIATION NOT ASSIGNED
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 27
| page count = 27
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:RE('ULA Y INFORMATION DISTR IBUTI~YBTEl'I (R IDS)ACCESSION NOR: 8609220043 DOC.DATE: 86/09/i6 NOTARIZED:
{{#Wiki_filter:RE('ULA     Y INFORMATION DISTR   IBUTI   ~YBTEl'I (R IDS)
NO DOCKET 0 FACIL: 50-400 Shearon Hav v is Nuclear Power Plant>Unit i.Cav olina 05000400 AUTH.MANE AUT)lOR AFFILIATION REQ0>.P.Affiliation Not Assigned REQOi C.Affiliation Not Assigned EVANS>C.Affiliation Not Assigned RECIP.NANE RECIPIENT AFFILIATION DENTONi H.R.Off ice of Nuc 1eav'eactor Regulationi Direc tov (p ost 85i i25  
ACCESSION NOR: 8609220043         DOC. DATE: 86/09/i6   NOTARIZED: NO               DOCKET 0 FACIL: 50-400 Shearon   Hav v is Nuclear   Power Plant> Unit   i. Cav olina     05000400 AUTH. MANE           AUT)lOR AFFILIATION REQ0>. P.           Affiliation Not Assigned REQOi C.             Affiliation Not Assigned EVANS> C.           Affiliation Not Assigned RECIP. NANE         RECIPIENT AFFILIATION DENTONi H. R.       Office of Nuc 1eav'eactor Regulationi Direc tov (p ost 85i i25


==SUBJECT:==
==SUBJECT:==
Package of'omments urging denial of util v equest f ov exemption fv om v equiv ement to conduct full participation emergency v esponse exev c isei per iOCFR50i App E: DISTRIBUTION CODE: YE03D COP IEB RECEIVED: LTR ENCL BI ZE: TITLE: Request fov NRR Action (e.g.2.206 Petitions) i Related Cov v espondenc NOTES: Application fov permit renewal filed.05000400 RECIPIENT ID CODE/MANE PMR-A PD2 LA BUCNLEY, 8 Oi INTERNAL: EDO/ACB ELD/COP IEB LTTR ENCL RECIPIENT ID CODE/NANE PMR-A PD2 PD ELD/HDBi NRR DIR COPIES LTTR ENCL EXTERNAL: LPDR NSIC 03 05 NRC PDR 02 TOTAL NUF1BER OF COPIES REQUIRED: LTTR i 1 ENCL 1 e"I fr
Package of'omments urging denial of util v equest f ov exemption fv om v equiv ement to conduct full participation emergency v esponse exev c isei per iOCFR50i App E:
DISTRIBUTION CODE: YE03D COP IEB RECEIVED: LTR           ENCL       BI ZE:
TITLE: Request fov NRR Action (e. g. 2. 206 Petitions) i Related             Cov v espondenc NOTES: Application fov permit renewal filed.                                       05000400 RECIPIENT         COP IEB          RECIPIENT          COPIES ID CODE/MANE       LTTR ENCL      ID CODE/NANE        LTTR ENCL PMR-A PD2 LA                         PMR-A PD2 PD BUCNLEY, 8     Oi INTERNAL: EDO/ACB                               ELD/HDBi ELD/                                 NRR DIR EXTERNAL: LPDR             03                   NRC PDR       02 NSIC          05 TOTAL NUF1BER OF COPIES REQUIRED: LTTR         i1  ENCL


==Dear Mr.Denton:==
1 e
I,wish to urge denial of CPS,L's req8'est for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full par ticipation exercise of the Emergency Response t Plan for its Shearon Harris nuclear power plan within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, DR goOC 86O9gg~O92aooy3 H 0500oypp PDR Mr.Harold Denton Director, Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 (301)492-7000  
"I fr
 
==Dear Mr. Denton:==
 
I,wish to urge denial of CPS,L's req8'est for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full par ticipation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plan t within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at   all.
Sincerely,
            ~O92aooy3 DR goOC 86O9gg H           0500oypp PDR
 
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 492-7000


==Subject:==
==Subject:==
Shearon Harris nuclear plant, Carolina Power&Light, Emergency Plan  
Shearon Harris nuclear plant, Carolina Power & Light, Emergency Plan
 
==Dear Mr. Denton,==
 
Carolina Power    6  Light  Company  has  not conducted a '(full participation test of the present        emergency  plan for the Shearon  Harris    nuclear plant as      'required by federal regulation,  10 CPR  Part 50.
This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn, from the emergency plan.      Thus, no plan which could actually be implemented  if  the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is Q fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely,
 
N II ph
 
==Dear Mr. Denton:==
 
l  wish ' to urge denial of CPS,L's request for p        rom the requirement, under 110 CFR
    'p          that the Company conduct a full 50'xemption E
pa rtici ation exercise o f thee Emergency Response Plan for its Shearon H arri rris nuclear power plant within one      ear before ne year    e    beginning commercial o eration of the plant or beforee o    operating at greater g          th an five i percent of rated power.
Because o th e need for changes in the evacua-e i tion plan, I believe      this exercise shouldd be conducted before the plant is permit    itted to operate at    all.
Sincerely,
 
et
 
==Dear Mr. Denton:==


==Dear Mr.Denton,==
a ~
Carolina Power 6 Light Company has not conducted a'(full participation test of the present emergency plan for the Shearon Harris nuclear plant as'required by federal regulation, 10 CPR Part 50.This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn, from the emergency plan.Thus, no plan which could actually be implemented if the plant were to operate has been tested.In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.Clearly, any such action would further complicate this matter.At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is Q fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.Sincerely, N II ph
I wish to  urge denial of OPAL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company coney~ a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at  all.
Sincerely,


==Dear Mr.Denton:==
==Dear Mr. Denton:==
l wish to urge denial of of CPS,L's request for 10 CFR 50'xemption rom p'the requirement, under 1 E that the Company conduct a full f the Emergency Response pa'p rtici ation exercise o e H rris nuclear power plant Plan for its Shearon arri ne ear before beginning commercial within one year e before operating at o eration of the plant or e o g h five percent of rated power.greater t an i Because o e th need for changes in the evacua-I believe this exercise should d be tion plan, e i itted to conducted before the plant is permit operate at all.Sincerely, et


==Dear Mr.Denton:==
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company condqbt a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
a~I wish to urge denial of OPAL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company coney~a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,  
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,


==Dear Mr.Denton:==
rr 4
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company condqbt a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, rr 4  


==Dear Hr.Denton:==
==Dear Hr. Denton:==
l wish to urge denial gi,CPSL',request for c>50 exemp'xemption from the requirement-, under l0 CFR Appendix E, that the Company conduA a fu 1 1 participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated pover.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, 90~~Pf I~~~~
 
l wish ' to urge denial gi,CPSL',request c>
for xemption from the requirement-, under exemp                                    10 CFR 50 Appendix E, that the Company conduA a     fu 1 1 participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated pover.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at   all.
Sincerely, 90~~   Pf
 
I
      ~ ~
~   ~


==Dear"-bir.-Denton:==
==Dear"-bir.-Denton:==


I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct.ai full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,%IS.  
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct .ai full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at   all.
Sincerely,
                      %IS.
 
==Dear Mr. Denton:==
 
I wish to urge denial of CPS,L's request for exemption from the requirement;, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise:of the Emergep~ Response Plan for its Shearon Harris nuclear pbi~er plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at  all.
 
==Dear Hr. Denton:==
 
I wish to urge denial of CPSL's request for exemption from the requirement, uIder 10 CFR 50, Appendix E, that tg@.Company condUdt a full p articipation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at  all.
Sincerely,
 
I QP, fl P) c$
Qi I


==Dear Mr.Denton:==
p  '
I wish to urge denial of CPS,L's request for exemption from the requirement;, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise:of the Emergep~Response Plan for its Shearon Harris nuclear pbi~er plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.  
      ~ ~ /g IP
          ~  ~
1 Dear Hr. Denton I wish to urge denial of .C(SL's request for exemption from the requiie'ment, under 10 CFR 50, Appendix E, that the Company conduat a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at     all.
Sincerely, gS r


==Dear Hr.Denton:==
I
I wish to urge denial of CPSL's request for exemption from the requirement, uIder 10 CFR 50, Appendix E, that tg@.Company condUdt a full p articipation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, I QP, fl P)c$Qi I p'~IP~/g~~1
  ",Dear Mr.
Denton.'ish to urge denial of C14L's request for exemption from the requirement, undy'0 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at           all.
Sincerely, E I eu&b.


==Dear Hr.Denton I wish to urge denial of.C(SL's request for exemption from the requiie'ment,==
t
under 10 CFR 50, Appendix E, that the Company conduat a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, gS r I
                          ~ g
",Dear Mr.Denton.'ish to urge denial of C14L's request for exemption from the requirement, undy'0 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,'E I eu&b.
                          ~
                            ~


==Dear Mr.Denton:==
==Dear Mr. Denton:==
t~g~~I wish to urge denia-3.of CPS,L's<request for exemption from the requirement,~3nder 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant'ithin one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion p3.an, I believe this exercise should be conducted, before the plant is permitted to operate at all.Sincerely, C)
 
J  
I wish to urge denia-3. of CPS,L's<request for 50, exemption from the     requirement,     ~3nder 10 CPR Appendix E, that the Company           conduct a full of the participation exerciseHarris nuclear    Emergency Response power plant Plan for its Shearon           beginning  commercial one year before operating at
                                                          'ithin operation of the plant or before of rated power.
greater than five percent for     changes in the evacua-Because of the  need tion p3.an, I believe   this exercise shouldto be conducted, before the plant is permitted operate at all.
Sincerely, C)
 
J


==Dear:==
==Dear:==
-Nr.Denton: I wish to urge denial of CPBL's request for exemption from the requirem'ent, under, 10 CFR 50, Appendix E, that the Company conduct&'p full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of.rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, c>It 0 ,IJ  
-Nr. Denton:
I wish to urge denial of CPBL's request for exemption from the requirem'ent, under, 10 CFR 50, Appendix E, that the Company conduct&'p full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of. rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at   all.
Sincerely,
 
c>
It 0
    ,IJ
 
==Dear Mr. Denton:==
 
I wish to ur'ge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that ting Company conduct a full participation exercise of the Emergency Response Plan for. its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at  all.
Sincerely,
 
5'4 J
 
g~
O~    (4f'q~
 
==Dear Hr. Denton:==
 
I wish to urge denial oof CPSL's request            for exemption from the req                      4 ' 1 CFR 50, re uirement, un@5'r Appendix E that the Company conduc a full            u articipation exercise oof thee Emergency Response Plan  for xitss Shearon Harris nuclear power      ~er p lant an within one year before beginning commercial operation o f thee plant or before operating at reater than five percent of rated p ower.
Because of the h nee d for changes in the evacua-tion plan, I believe e            this exercise should be conducted before the plant is permiitted        e  to operate at all.
Sincerely,
 
~ I P ~
lf f4 t
Dea'r- Mr . Den ton I wish to urge denial of CPSL's request for exemption from the requj.rement, under 10 CFR 50, Appendix E, that the Comp'any conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginn'ing commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at    all.
Sincerely,
 
                      /Q


==Dear Mr.Denton:==
==Dear Mr. Denton:==
I wish to ur'ge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that ting Company conduct a full participation exercise of the Emergency Response Plan for.its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, 5'4 J g~(4f'q~O~


==Dear Hr.Denton:==
I wish to urge denial of CPS.L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
I wish to urge denial o of CPSL's request for 4'CFR 50, exemption from the req re uirement, un@5'r 1 a full E that the Company conduc a u Appendix of the Emergency Response articipation exercise o e~er lant its Shearon Harris nuclear power p an Plan for x s within one year before beginning commercial f the plant or before operating at operation o e ower.reater than five percent of rated p h d for changes in the evacua-Because of the nee be I believe this exercise should tion plan, e itted to conducted before the plant is permi e operate at all.Sincerely,
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
~I P~
Sincerely,
lf f4 t Dea'r-Mr.Den ton I wish to urge denial of CPSL's request for exemption from the requj.rement, under 10 CFR 50, Appendix E, that the Comp'any conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginn'ing commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,  
/Q


==Dear Mr.Denton:==
~ V ~ p}}
I wish to urge denial of CPS.L's request for exemption from the requirement, under l0 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,
~V~p}}

Latest revision as of 19:02, 3 February 2020

Package of Comments Urging Denial of Util Request for Exemption from Requirement to Conduct Full Participation Emergency Response Exercise,Per 10CFR50,App E
ML18022A423
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/16/1986
From: Bawden R, Brache M, Counts C, Davis V, Dowdy D, Evans C, Foster D, Franklin S, Thomas Greene, May C, Neville C, Ransdell R, Rego C, Rego P, Tiedeman M, Wilson R
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8609220043
Download: ML18022A423 (27)


Text

RE('ULA Y INFORMATION DISTR IBUTI ~YBTEl'I (R IDS)

ACCESSION NOR: 8609220043 DOC. DATE: 86/09/i6 NOTARIZED: NO DOCKET 0 FACIL: 50-400 Shearon Hav v is Nuclear Power Plant> Unit i. Cav olina 05000400 AUTH. MANE AUT)lOR AFFILIATION REQ0>. P. Affiliation Not Assigned REQOi C. Affiliation Not Assigned EVANS> C. Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONi H. R. Office of Nuc 1eav'eactor Regulationi Direc tov (p ost 85i i25

SUBJECT:

Package of'omments urging denial of util v equest f ov exemption fv om v equiv ement to conduct full participation emergency v esponse exev c isei per iOCFR50i App E:

DISTRIBUTION CODE: YE03D COP IEB RECEIVED: LTR ENCL BI ZE:

TITLE: Request fov NRR Action (e. g. 2. 206 Petitions) i Related Cov v espondenc NOTES: Application fov permit renewal filed. 05000400 RECIPIENT COP IEB RECIPIENT COPIES ID CODE/MANE LTTR ENCL ID CODE/NANE LTTR ENCL PMR-A PD2 LA PMR-A PD2 PD BUCNLEY, 8 Oi INTERNAL: EDO/ACB ELD/HDBi ELD/ NRR DIR EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 TOTAL NUF1BER OF COPIES REQUIRED: LTTR i1 ENCL

1 e

"I fr

Dear Mr. Denton:

I,wish to urge denial of CPS,L's req8'est for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full par ticipation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plan t within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

~O92aooy3 DR goOC 86O9gg H 0500oypp PDR

Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power & Light, Emergency Plan

Dear Mr. Denton,

Carolina Power 6 Light Company has not conducted a '(full participation test of the present emergency plan for the Shearon Harris nuclear plant as 'required by federal regulation, 10 CPR Part 50.

This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn, from the emergency plan. Thus, no plan which could actually be implemented if the plant were to operate has been tested.

In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is Q fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.

Sincerely,

N II ph

Dear Mr. Denton:

l wish ' to urge denial of CPS,L's request for p rom the requirement, under 110 CFR

'p that the Company conduct a full 50'xemption E

pa rtici ation exercise o f thee Emergency Response Plan for its Shearon H arri rris nuclear power plant within one ear before ne year e beginning commercial o eration of the plant or beforee o operating at greater g th an five i percent of rated power.

Because o th e need for changes in the evacua-e i tion plan, I believe this exercise shouldd be conducted before the plant is permit itted to operate at all.

Sincerely,

et

Dear Mr. Denton:

a ~

I wish to urge denial of OPAL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company coney~ a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company condqbt a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

rr 4

Dear Hr. Denton:

l wish ' to urge denial gi,CPSL',request c>

for xemption from the requirement-, under exemp 10 CFR 50 Appendix E, that the Company conduA a fu 1 1 participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated pover.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, 90~~ Pf

I

~ ~

~ ~

Dear"-bir.-Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct .ai full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

%IS.

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement;, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise:of the Emergep~ Response Plan for its Shearon Harris nuclear pbi~er plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Dear Hr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, uIder 10 CFR 50, Appendix E, that tg@.Company condUdt a full p articipation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

I QP, fl P) c$

Qi I

p '

~ ~ /g IP

~ ~

1 Dear Hr. Denton I wish to urge denial of .C(SL's request for exemption from the requiie'ment, under 10 CFR 50, Appendix E, that the Company conduat a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, gS r

I

",Dear Mr.

Denton.'ish to urge denial of C14L's request for exemption from the requirement, undy'0 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, E I eu&b.

t

~ g

~

~

Dear Mr. Denton:

I wish to urge denia-3. of CPS,L's<request for 50, exemption from the requirement, ~3nder 10 CPR Appendix E, that the Company conduct a full of the participation exerciseHarris nuclear Emergency Response power plant Plan for its Shearon beginning commercial one year before operating at

'ithin operation of the plant or before of rated power.

greater than five percent for changes in the evacua-Because of the need tion p3.an, I believe this exercise shouldto be conducted, before the plant is permitted operate at all.

Sincerely, C)

J

Dear:

-Nr. Denton:

I wish to urge denial of CPBL's request for exemption from the requirem'ent, under, 10 CFR 50, Appendix E, that the Company conduct&'p full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of. rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

c>

It 0

,IJ

Dear Mr. Denton:

I wish to ur'ge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that ting Company conduct a full participation exercise of the Emergency Response Plan for. its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

5'4 J

g~

O~ (4f'q~

Dear Hr. Denton:

I wish to urge denial oof CPSL's request for exemption from the req 4 ' 1 CFR 50, re uirement, un@5'r Appendix E that the Company conduc a full u articipation exercise oof thee Emergency Response Plan for xitss Shearon Harris nuclear power ~er p lant an within one year before beginning commercial operation o f thee plant or before operating at reater than five percent of rated p ower.

Because of the h nee d for changes in the evacua-tion plan, I believe e this exercise should be conducted before the plant is permiitted e to operate at all.

Sincerely,

~ I P ~

lf f4 t

Dea'r- Mr . Den ton I wish to urge denial of CPSL's request for exemption from the requj.rement, under 10 CFR 50, Appendix E, that the Comp'any conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginn'ing commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

/Q

Dear Mr. Denton:

I wish to urge denial of CPS.L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

~ V ~ p