ML18038B518: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/07/1995
| issue date = 11/07/1995
| title = Provides Notification of Completion or Status of Restart Issues,Identified in 910710 Ltr,Which Described Overall Regulatory Framework for Restart of Unit 3
| title = Provides Notification of Completion or Status of Restart Issues,Identified in 910710 Ltr,Which Described Overall Regulatory Framework for Restart of Unit 3
| author name = MACHON R D
| author name = Machon R
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:'0 INDEX TO ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)STATUS OF UNIT 3 ISSUES TOPIC PAGE BACKGROUND E1-1 10 CFR 55.45(B)(2)(III) and (IV)-Plant Simulator....E1-2 Bulletin 79-02-Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts[TAC R00017]E1-2 Bulletin 79-12-Short Period Scrams at BWR Facilities
{{#Wiki_filter:INDEX TO ENCLOSURE
..E1-3 Bulletin 79-14-Seismic Analysis for As-Built Safety-Related Piping Systems[TAC R00017]Bulletin 79-18-Audibility Problems Bulletin 80-06-Engineered Safety Feature (ESF)Reset C ontrols~~~~~~~~~~~~~~~~~~~~~~Bulletin 83-08-Electrical Circuit Breakers with an Undervoltage Trip Feature in Use in Safety-Related Applications Other Than the Reactor Trip System Bulletin 84-02-Failures of General Electric Type HFA Relays in Use in Class 1E Safety Systems[TAC M73854]'Bulletin 86-02-Static"0" Ring (SOR)Differential Pressure Switches E1-4 E1-5 E1-6 E1-7 A El-8 E1-8 Bulletin 88-03-Inadequate Latch Engagement in HFA Type Relays Manufactured by General Electric Company[TAC M73854]....................E1-10 Bulletin 88-04, Potential Safety-Related Pump Loss[TAC M69890]....................El-10 Bulletin 88-07-Power Oscillations in Boiling Water Reactors, and Supplement 1[TAC M72769].......El-12 Bulletin 90-01-Loss of Fill Oil in Rosemount Transmitters
'0                          TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
[TAC M85363]~.~~.~~~.~~~...~~..~.E1-13 Bulletin 93-02-Debris Plugging of Emergency Core Cooling Suction Strainers, and Supplement 1[TAC M86537 and M89279]........,..........-....E1-13 Bulletin 93-03-Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs[TAC M86884].....................E1-15.9511090054)  
STATUS OF UNIT 3 ISSUES TOPIC                                     PAGE BACKGROUND                                                                       E1-1 10 CFR 55.45(B)(2)(III) and (IV) Plant Simulator . .                     . . E1-2 Bulletin 79-02 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts [TAC R00017]                                 E1-2 Bulletin   79-12     Short Period Scrams at BWR Facilities                 . . E1-3 Bulletin   79-14 Seismic Analysis for As-Built Safety-Related Piping Systems [TAC R00017]                                   E1-4 Bulletin 79-18 Audibility Problems                                             E1-5 Bulletin   80-06   Engineered       Safety Feature       (ESF) Reset C ontrols     ~ ~ ~ ~   ~ ~ ~ ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ ~ ~ ~ ~ ~   E1-6 Bulletin   83-08 Electrical         Circuit Breakers with an Undervoltage Trip Feature in Use in Safety-Related Applications Other Than the Reactor Trip System                             E1-7 A
Bulletin   84-02 Failures of General Electric Type HFA Relays in Use in Class 1E Safety Systems [TAC M73854]                       El-8
  'Bulletin   86-02 Static "0" Ring (SOR)             Differential Pressure Switches                                                           E1-8 Bulletin   88-03 Inadequate Latch Engagement in HFA Type Relays Manufactured by General Electric Company
[TAC M73854]         . .   . . . . . . . . . .   . . . . . . . . E1-10 Bulletin 88-04, Potential Safety-Related               Pump   Loss
[TAC M69890]         . .   . . . . . . . . .   . . . . . . . . . El-10 Bulletin   88-07 Power Oscillations in Boiling Water Reactors, and Supplement 1 [TAC M72769] . . . .                     . . . El-12 Bulletin   90-01   Loss   of   Fill Oil in   Rosemount       Transmitters
[TAC M85363]       ~ .   ~ ~ . ~ ~ ~ . ~ ~   ~ ...   ~ ~ . . ~ . E1-13 Bulletin   93-02   Debris     Plugging of Emergency Core Cooling Suction Strainers, and Supplement               1 [TAC M86537 and M89279]     . . . . .   . . .,. . . . . . . . . . - . . .       . E1-13 Bulletin   93-03 Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs
[TAC M86884]       . .   . . ... . . . . .   . . . . . . . . . E1-15
              .9511090054)


TOPIC PAGE Bulletin 95-02-Unexpected Clogging of a Residual Heat Removal (RHR)Pump Strainer While Operating in Suppression Pool Cooling Mode Cable Ampacxty E1-15 El-15 Cable Installation Issue Number 1-Brand Rex Cable Issues E1-16 Cable Installation Issue Number 2-Cable Separations Issues[TAC M85298].................E1-17 Cable Installation Issue Number 3-Low Voltage Vertical Cable Supports....................E1-24 Cable Installation Issue Number 4-Medium Voltage Cable Bend Radius[TAC M86255]..............E1-25 Cable Installation Issue Number 5-Missing Conduit Bushings~~~~~~~~~~~~~~~~~~~~~~E1-26 Cable Installation Issue Number 6-Sidewall Pressure, Cable Pullbys, Cable Jamming, Pulling Around 90 Degree Condulets and thru Mid-Run Flex Conduit Issues...E1-27 Cable Installation Issue Number 7-Use of Condulets as Pull Points.....................E1-28 Cable Installation Issue Number 8-Medium Voltage Vertical Cable Supports...................E1-29 Cable Tray Supports[TAC M80684]Component and Piece Part Qualification
TOPIC                                 PAGE Bulletin   95-02 Unexpected Clogging of a Residual Heat Removal (RHR) Pump Strainer While Operating in Suppression Pool Cooling Mode                                   E1-15 Cable Ampacxty                                                        El-15 Cable Installation Issue     Number 1 Brand Rex Cable     Issues   E1-16 Cable Installation Issue     Number 2 Cable Separations Issues   [TAC M85298]   . . . . . . . . . . . . . .   . . . E1-17 Cable Installation Issue     Number 3 Low Voltage Vertical Cable Supports     . . . . . . . . ... . . . . . .   . . . E1-24 Cable Installation Issue     Number 4 Medium Voltage Cable Bend Radius   [TAC M86255]   . . . . . . . . . . . . . . E1-25 Cable Installation Issue     Number 5 Missing Conduit Bushings     ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ E1-26 Cable Installation Issue     Number 6 Sidewall   Pressure, Cable Pullbys, Cable Jamming, Pulling Around 90 Degree Condulets and thru Mid-Run Flex Conduit Issues             . . . E1-27 Cable Installation Issue     Number 7 Use of Condulets     as Pull Points     . . . . . . . . . . . . . . . . . .   . . . E1-28 Cable Installation Issue     Number 8 Medium   Voltage Vertical Cable Supports     . . . . . . . . . . . . . . . .   . . . E1-29 Cable Tray Supports     [TAC M80684]                                   E1-30 Component and Piece     Part Qualification   [TAC M83828]           ~ E1-31 Conduit Supports [TAC M80690 and R00024]                               E1-32 Configuration Management/Design Baseline [TAC M80688]                 E1-33 Containment Coatings                                                   E1-33 Control   Rod Drive (CRD) Insert and Withdrawal Piping                 E1-34 Design Calculations Review                                             E1-35 Environmental Qualification [TAC M42483]                               E1-36 Fire Protection/10 CFR 50, Appendix R [TAC M48136 and M85254]   ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~   ~     E1-36
[TAC M83828]Conduit Supports[TAC M80690 and R00024]Configuration Management/Design Baseline[TAC M80688]Containment Coatings Control Rod Drive (CRD)Insert and Withdrawal Piping Design Calculations Review Environmental Qualification
[TAC M42483]Fire Protection/10 CFR 50, Appendix R[TAC M48136 and M85254]~~~~~~~~~~~~~~~~~~~~~E1-30~E1-31 E1-32 E1-33 E1-33 E1-34 E1-35 E1-36 E1-36 5
TOPIC PAGE F uses El-38 Generic Letter 82-33-Instrumentation to Follow the Course of an Accident-Regulatory Guide 1.97[TAC M51075].El-39 Generic Letter 83-28-Salem ATWS, Item 1.2, Post Trip Review (Data and Information Capability)
[TAC M53573]El-41 Generic Letter 83-28-Salem ATWS, Item 4.5.2, Periodic On-Line Testing[TAC M53966]............El-42 Generic Letter 83-28-Salem ATWS, Item 4.5.3, Intervals for On-Line Testing[TAC M53966]..........El-43 Generic Letter 83-36-NUREG-0737 Technical Specifications El-44 Generic Letter 88-01-NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping[TAC M85296]...El-46 Generic Letter 88-11-Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations
[TAC M71469].~...~~~..~~~~......El-47 Generic Letter 88-14-Instrument Air Supply System Problems Affecting Safety-Related Equipment[TAC M71633]....................El-48 Generic Letter 88-20-Initiation of the Individual Plant Examination for Severe Accident Vulnerabilities
[TAC M74385]....................El-48 Generic Letter 88-20, Supplement 4-Individual Plant Examination of External Events (IPEEE)for Severe Accident Vulnerabilities
[TAC M83597]........El-50 Generic Letter 89-06-Safety Parameter Display System[TAC M51225 and M73636]El-51 Generic Letter 89-08-Erosion/Corrosion-Induced Pipe Wall~Thinning[TAC M73459]................El-53 Generic Letter 89-10-Safety-Related Motor-Operated Valve Testing and Surveillance
[TAC M75637]........El-54 Generic Letter 89-13-Service Water Systems Problems Affecting Safety-Related Equipment[TAC M73972]...El-55 Generic Letter 89-16-Installation of a Hardened Wetwell Vent[TAC M74860]..................El-56 Generic Letter 89-19-Request for Action Related to Resolution of Unresolved Safety Issue A-47,"Safety 0'I TOPIC PAGE Implication of Control Systems in LWR Nuclear Power Plants"[TAC M74917]................E1-56 Generic Letter 91-06-Resolution of Generic Issue A-30,"Adequacy of Safety-Related DC Power Supplies"...E1-58 Generic Letter 91-11-Resolution of Generic Issues 48,"LCOs for Class lE Vital Instrument Buses," and 49,"Interlocks and LCOs for Class 1E Tie Breakers"...E1-58 Generic.Letter 92-01-Reactor Vessel Structural Integrity, Revision 1, and Revision 1 Supplement 1[TAC M83440 and M92651].....................E1-59 Generic Letter 92-04-Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in BWRs[TAC M84271]...~~.~~~~...~~.....E1-60 Generic Letter 92-08-Thermo-Lag 330-1 Fire Barriers[TAC M85525]........~.....~.....E1-61 Generic Letter 94-02-Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors~~~~~~~~~~~~~~~~~~~~~~E1-63 Generic Letter 94-03-Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors[TAC M90083]E1-64 Generic Safety Issue 40 (MPA B-065)-Safety Concerns Associated with Pipe Breaks in the BWR Scram System[TAC M43736]....................E1-64 Generic Safety Issue 41 (MPA B-058)-BWR Scram Discharge Volume System[TAC M51014].............E1-65 Generic Safety Issue 43 (MPA B-107)-Reliability of Systems[TAC M71633]Air E1-67 Generic Safety Issue 51 (MPA L-913)-Improving the Reliability of Open-Cycle Service Water Systems[TAC M73972]HVAC Duct Supports[TAC M82127 and R00300]Instrument Sensing Lines[TAC M80017]Instrument Tubing[TAC M80036]Intergranular Stress Corrosion Cracking (IGSCC)E1-67 E1-67 E1-68 E1-69 E1-70 4I 0~~~~
TOPIC PAGE Long Term Torus Integrity Program[TAC M07391 and M80686].E1-70 Lower Drywell Platforms and Miscellaneous Steel[TAC M80620, R00297 and R00303]...........E1-72 Miscellaneous Steel Frames................E1-73 Moderate Energy Line Break (MELB).............E1-73 Multi-Plant Action Item A-01-10 CFR 50.55A(G)-Inservice Inspection
.....................E1-74 Multi-Plant Action Xtem A-04-10 CFR 50, Appendix J-Containment Leak Testing[TAC M08717]........E1-75 Multi-Plant Action Item B-41-10 CFR 50, Appendix R-Fire Protection
[TAC M48136]...............E1-76 Multi-Plant Action Item C-10-Control of Heavy Loads-Phase I (NUREG-0612)
[TAC M08438]..........E1-76 Multi-Plant Action Item C-11-Reactor Protection System Power Supply[TAC M08931].....;........E1-77 Multi-Plant Action Item D-25-Relocation of Radiological Effluent Technical Specifications
..........E1-80 NUREG-0737 (TMX Action Plan), Action Item X.D.1-Control Room Design Review[TAC M45778 and M56106].....E1-80 NUREG-0737 (TMI Action Plan), Action Item I.D.2-Safety Parameter Display Console[TAC M51225 and M74612]..E1-82 NUREG-0737, (TMI Action Plan), Action Item II.E.4.2.1 Containment Isolation Dependability
-Implement Diverse Isolation[TAC M74615]...........E1-83 NUREG-0737 (TMI Action Plan), Action Item II.E.4.2.6-.Containment Isolation Dependability
-Containment Purge Valves[TAC M74616]NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.A-Accident-Monitoring
-Noble Gas Monitor[TAC M44905]E1-84 E1-85 NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.B-Accident-Monitoring
-Iodine/Particulate Monitor[TAC M44976]-..........-.......E1-86 NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.C-I Accident-Monitoring
-Containment High Range Radiation[TAC M45047]E1-88


TOPIC PAGE t NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.D-Accident-Monitoring
5 TOPIC                                     PAGE F uses                                                                      El-38 Generic Letter 82-33      Instrumentation        to Follow the    Course of an  Accident  Regulatory Guide        1.97 [TAC M51075] . El-39 Generic Letter 83-28      Salem ATWS,     Item 1.2, Post Trip Review (Data and Information      Capability) [TAC M53573]         El-41 Generic Letter 83-28  Salem        ATWS, Item 4.5.2, Periodic On-Line Testing [TAC M53966]           . . . . . . . . . . . . El-42 Generic Letter 83-28  Salem ATWS, Item 4.5.3, Intervals for On-Line Testing [TAC M53966] . . . . . . . .               .  . El-43 Generic Letter 83-36      NUREG-0737     Technical Specifications          El-44 Generic Letter 88-01    -  NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping [TAC M85296]                . . . El-46 Generic Letter 88-11  Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations
-Containment Pressure[TAC M47584]....................E1-88 NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.E-Accident-Monitoring
[TAC M71469]   .  ~  . . . ~  ~ ~  . . ~  ~ ~  ~  . . . . . . El-47 Generic Letter 88-14      Instrument    Air Supply      System Problems Affecting Safety-Related Equipment
-Containment Water Level[TAC M47655]....................E1-89 NUREG-0737 (TMI Action Plan), Action Item II.F.2.4 (Generic Letter 84-23)-Instrumentation for Detection of Inadequate Core Cooling[TAC M45118]........E1-90 NUREG-0737 (TMI Action Plan), Action Item II.K.3.13 HPCI/RCIC Initiation Levels[TAC M45534]......E1-91 NUREG-0737 (TMI Action Plan), Action Item II.K.3.18-ADS Actuation Modifications
[TAC M71633]   .   . . . . . . .   . . . . . . . . . . . . El-48 Generic Letter 88-20  Initiation of the Individual Plant Examination for Severe Accident Vulnerabilities
[TAC M45682]........E1-92 NUREG-0737, Item II.K.3.27-Common Reference Level for Vessel Level Instrumentation
[TAC M74385]    .   . . . . . . .   . . . . . . . . . . . . El-48 Generic Letter 88-20, Supplement 4  Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities [TAC M83597] . . . . .               . . . El-50 Generic Letter 89-06      Safety    Parameter Display System
[TAC M45778]......E1-93NUREG-0737 (TMI Action Plan), Action Item II.K.3.28 Qualification of ADS Accumulators
[TAC M51225 and M73636]                                              El-51 Generic Letter 89-08  Erosion/Corrosion-Induced Pipe Wall
[TAC M48262]...E1-94 Operational Readiness...................E1-95 Platform Thermal Growth..................E1-95 Probabilistic Risk Assessment for Multi-Unit Operation..E1-96 Restart Test Program[TAC M81791].............E1-97 Seismic Class II Over I/Spacial Systems Interactions and Water Spray[TAC M80015]..............E1-98 Small Bore Piping[TAC M80013 and R00306].........E1-99.Unresolved Safety Issue A-7 (MPA D-01)-Mark I Long-Term Program[TAC M80686 and M07931]...........E1-99 Unresolved Safety Issue A-9-Anticipated Transients Without Scram (ATWS)[10 CFR 50.62][TAC M59074].E1-100 Unresolved Safety Issue A-24 (MPA B-60)-Qualification of Class IE Safety-Related Equipment[TAC M42483]..E1-101 Unresolved Safety Issue A-36 (MPA C-10)-Control of Heavy Loads Near Spent Fuel Pool[TAC M08438]......E1-101 Unresolved Safety Issue A-42 (MPA B-05)-Pipe Cracks in Boiling Water Reactors[TAC M85296]........E1-102
    ~
Thinning [TAC M73459] . . . . . . . . . . . . . . . . El-53 Generic Letter 89-10  Safety-Related Motor-Operated Valve Testing and Surveillance [TAC M75637] . . . . . . . . El-54 Generic Letter 89-13      Service    Water Systems Problems Affecting Safety-Related Equipment [TAC M73972] . .               . El-55 Generic Letter 89-16  Installation of a Hardened Wetwell Vent [TAC M74860]     . . .  . . .   . . . . . . . . . . . El-56 Generic Letter 89-19  Request for Action Related to Resolution of Unresolved Safety Issue A-47, "Safety


TOPIC PAGE Unresolved Safety Issue A-44-Station Blackout[10 CFR 50.63][TAC M68519]............E1-102 Unresolved Safety Issue A-46-Seismic Qualification of Equipment in Operating Plants[TAC M69432]....El-103 Unresolved Safety Issue A-48 (MPA A-19)-Hydrogen Control Measures and Effects of Hydrogen Burns[TAC M55955]E1-105 E1-vii
0
'I


ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)STATUS OF UNIT 3 1SSUES BACKGROUND The regulatory framework for the restart of Unit 2 after its extended outage was unusual.TVA's submittal of the Browns Ferry Nuclear Performance Plan and NRC's review and issuance of Safety Evaluation Reports for each individual program was atypical.While this level of NRC involvement did result in added confidence for the approval of Unit 2 restart, it required significant TVA and NRC resources to negotiate the approval of individual programs and criteria.In most cases, TVA began the implementation of these programs"at risk", which meant prior to NRC approval.Significant redesign and additional modifications were required whenever the criteria was changed during the approval process.The overall regulatory framework for the restart of Unit 3 was described in Reference 1 and is more consistent with normal industry practice.The program establishes a high degree of confidence that the facility and personnel are ready to restart and operate Unit 3 in a safe and reliable manner, and promote the efficient utilization of TVA and NRC resources.
TOPIC                                PAGE Implication of Control Systems in LWR Nuclear Power Plants" [TAC M74917]      . . . . . . . . . . . . . . .      . E1-56 Generic Letter 91-06  Resolution of Generic Issue A-30, "Adequacy of Safety-Related DC Power Supplies"            . . . E1-58 Generic Letter 91-11  Resolution of Generic Issues 48, "LCOs for Class lE Vital Instrument Buses," and 49, "Interlocks and LCOs for Class 1E Tie Breakers" . .          . E1-58 Generic. Letter 92-01    Reactor    Vessel Structural    Integrity, Revision 1, and Revision      1 Supplement 1 [TAC M83440 and M92651]    . .  . . .  . . . . . . . . . . . . . . .      . E1-59 Generic Letter 92-04  Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in BWRs
TVA's program for the restart of Unit 3 is based on the corrective action programs, commitments, technical specification improvements, and internally identified deficiencies and concerns which were resolved prior to the restart of Unit 2.NRC approval of the overall regulatory framework for the restart of Unit 3 is documented in References 2 and 3.Commitments from the Regulatory Framework for the Restart of Units 1 and 3 letter are listed below, by topic, in alphabetical order.Other pertinent generic issues (e.g., bulletins and generic letters)issued since TVA's regulatory framework submittal have also been included.This enclosure lists each commitment, references key correspondence, discusses the background of the issue, and describes the closure or status of each commitment, as appropriate.
[TAC M84271]    .  . . ~  ~  .  ~ ~  ~ ~ .  . . ~ ~  . . . . . E1-60 Generic Letter 92-08      Thermo-Lag    330-1 Fire Barriers
REFERENCES 1.TVA letter to NRC, dated July 10, 1991, Regulatory Framework for the Restart of Units 1 and 3 2.NRC letter to TVA, dated August 1, 1991, Return to Service of Browns Ferry, Units 1 and 3 3.NRC letter to TVA, dated April 1, 1992, Return to Service of Browns Ferry, Units 1 and 3 10 CFR 55.45 (B)(2)(III)and (IV)-Plant Simulator Commitment:
[TAC M85525]    .  . . . . . .    .  ~ . .  . . . ~  . . . . . E1-61 Generic Letter 94-02  Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors    ~  ~ ~  ~ ~ ~  ~  ~  ~ ~  ~ ~ ~  ~ ~ ~ ~  ~ ~ ~ ~ ~ E1-63 Generic Letter 94-03  Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors
Discussion:
[TAC M90083]                                                    E1-64 Generic Safety Issue 40 (MPA B-065)  Safety Concerns Associated with Pipe Breaks in the BWR Scram System
Status: The BFN simulator would be modified to a plant referenced simulator and that TVA would certify by March 1991, in accordance with 10 CFR 55, that this modification would be completed.
[TAC M43736]    .  . . .  .  .  . .  . . . . . . . . . . . . E1-64 Generic Safety Issue 41    (MPA  B-058) BWR Scram Discharge Volume System [TAC M51014]        .  . . .  . . . . . . . . . E1-65 Generic Safety Issue    43 (MPA B-107)     Reliability of Air Systems  [TAC M71633]                                          E1-67 Generic Safety Issue 51    (MPA  L-913) Improving the Reliability  of Open-Cycle Service Water Systems E1-67
Reference 1 requested a temporary exemption, until December 31, 1991, for the simulator certification requirements of 10 CFR 55.45(b)(2)(iii).
[TAC M73972]
This exemption was granted in Reference 2.Complete.In Reference 3, TVA certified the plant reference simulator in accordance with 10 CFR 55.45(b)(5)
HVAC  Duct Supports [TAC M82127 and R00300]                          E1-67 Instrument Sensing Lines [TAC M80017]                                E1-68 Instrument Tubing [TAC M80036]                                        E1-69 Intergranular Stress Corrosion Cracking        (IGSCC)              E1-70
.


==References:==
4I 0 ~ ~
~  ~


1.2~TVA letter to NRC, dated July 13, 1990, Request for Temporary Exemption from 10 CFR 55.45(b)NRC letter to TVA, dated January 2, 1991, Exemption from 10 CFR 55.45(b)(2)(iii) and (iv)3~TVA letter to NRC, dated December 17, 1991, Certification of the BFN Simulation Facility Bulletin 79-02-Expansion Anchor Pipe Support Base Plate Designs Using Concrete Bolts[TAC R00017]Commitment:
TOPIC                              PAGE Long Term Torus    Integrity Program [TAC M07391 and M80686]      . E1-70 Lower Drywell Platforms and Miscellaneous Steel
Discussion:
[TAC M80620, R00297 and R00303]    . . . . .  .  .  . . . . E1-72 Miscellaneous Steel Frames . . .      . . .  .  . . . .  .  . . . . E1-73 Moderate Energy Line Break (MELB)    . . .  .  . . . .  .  . . . . E1-73 Multi-Plant Action Item A-01  10     CFR 50.55A(G) Inservice Inspection    . . . . . . .  . . . . . . . . . . . . . . E1-74 Multi-Plant Action Xtem A-04  10 CFR 50, Appendix        J-Containment Leak Testing [TAC M08717] . . . . . . . . E1-75 Multi-Plant Action Item B-41  10 CFR 50, Appendix R  Fire Protection [TAC M48136] . . . . . . . . . . . . . . . E1-76 Multi-Plant Action Item C-10  Control of Heavy Loads Phase  I (NUREG-0612) [TAC M08438]    .  . . . .  .  . . . . E1-76 Multi-Plant Action Item    C-11  Reactor Protection System Power Supply [TAC M08931] . . . . . ; . . . . . . .        . E1-77 Multi-Plant Action Item D-25  Relocation of Radiological Effluent Technical Specifications . . . . . . . . .         . E1-80 NUREG-0737  (TMX  Action Plan), Action Item X.D.1    Control Room  Design Review [TAC M45778 and M56106]        .  . . . . E1-80 NUREG-0737  (TMI  Action Plan), Action Item I.D.2  Safety Parameter Display Console [TAC M51225 and M74612] . . E1-82 NUREG-0737, (TMI Action Plan), Action Item II.E.4.2.1-4 Containment Isolation Dependability  Implement Diverse Isolation [TAC M74615]      . . . . . . . . . . . E1-83 NUREG-0737 (TMI Action Plan), Action Item II.E.4.2.6
TVA will complete Bulletin 79-02.TVA initiated programs in 1979 to comply with Bulletins 79-02 and 79-14 regarding the adequacy of piping system supports and anchor bolts.The BFN programs involved the reanalysis of pipe stress problems using the as-built configuration and amplified response spectra for Seismic Class I structures and the evaluation of the acceptability of the associated pipe supports.The scope of the program included Unit 3 safety-related large bore (greater than 2Q inches in diameter)piping and computer analyzed small bore piping that was not included in the Small Bore Piping Program.Pipe stress analysis and pipe support evaluations were based on walkdown inspection data for the safety-related piping systems.The walkdown 0 A inspections were instituted to determine the actual field configuration of the Class I piping systems and supports.NRC approval of TVA's program for the resolution of Bulletins 79-02 and 79-14 is documented in Reference 1.Status: Open.The field work associated with this issue has been completed.
      .Containment Isolation Dependability  Containment Purge Valves [TAC M74616]                                    E1-84 NUREG-0737  (TMI  Action Plan), Action Item II.F.1.2.A-Accident  Monitoring  Noble Gas    Monitor [TAC M44905] E1-85 NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.B-Accident  Monitoring  Iodine/Particulate Monitor I
TVA is currently in the process of paper closure and independent verification.
[TAC M44976]    - . . .  . . . . . .  .  - .  .  .  . . . . E1-86 NUREG-0737  (TMI  Action Plan), Action Item II.F.1.2.C Accident  Monitoring  Containment    High Range Radiation  [TAC M45047]                                      E1-88
These remaining items will be completed prior to restart.NRC has reviewed the pipe stress analysis, pipe support design calculations, and inspected the completed pipe support modifications.
Based on the results of this review, the inspector concluded that this issue is resolved for Unit 3 restart.This is documented in Reference 2.


==References:==
t NUREG-0737  (TMI Accident
[TAC M47584]    .  . . .
TOPIC Action Plan), Action Item II.F.1.2.D Monitoring  Containment Pressure PAGE
                                                                  . E1-88 NUREG-0737  (TMI Action Plan), Action Item  II.F.1.2.E-Accident  Monitoring  Containment  Water Level
[TAC M47655]    .  . . . . . . . . . .  .  . .  . . . .  . . E1-89 NUREG-0737  (TMI Action Plan), Action Item II.F.2.4 (Generic Letter 84-23)  Instrumentation for Detection of Inadequate Core Cooling [TAC M45118]      . . . .  . .  . . E1-90 NUREG-0737 (TMI Action Plan), Action Item II.K.3.13 HPCI/RCIC Initiation Levels [TAC M45534]        . . . .  . . E1-91 NUREG-0737  (TMI Action Plan), Action Item II.K.3.18  ADS Actuation Modifications [TAC M45682]      . . . . . . .  . E1-92 NUREG-0737, Item II.K.3.27  Common Reference Level for Vessel Level Instrumentation [TAC M45778] . . . . .        . E1-93 NUREG-0737 (TMI Action Plan), Action Item II.K.3.28 Qualification of ADS Accumulators [TAC M48262]        . .  . E1-94 Operational Readiness . . . . . . . . . . . . . .. . . .        . E1-95 Platform Thermal Growth . . . . . . . . . . . . . . . . .        . E1-95 Probabilistic Risk Assessment for Multi-Unit Operation .        . E1-96 Restart Test Program    [TAC M81791] . . . . . . . . . . . . . E1-97 Seismic Class  II Over I/Spacial Systems Interactions and Water Spray [TAC M80015]    . . . . . . . . . . . . .    . E1-98 Small Bore Piping [TAC M80013 and R00306] . .      .  . . . .  . . E1-99.
Unresolved Safety Issue A-7 (MPA D-01)  Mark      I Long-Term Program [TAC M80686 and M07931]    . .  .  . .  . . . .  . . E1-99 Unresolved Safety Issue A-9  Anticipated Transients Without Scram (ATWS) [10 CFR 50.62] [TAC M59074]        . E1-100 Unresolved Safety Issue A-24 (MPA B-60)  Qualification of Class IE Safety-Related Equipment [TAC M42483]        . . E1-101 Unresolved Safety Issue A-36 (MPA C-10)  Control of Heavy Loads Near Spent Fuel Pool [TAC M08438] . . . . . . E1-101 Unresolved Safety Issue A-42 (MPA B-05)  Pipe Cracks      in Boiling Water Reactors [TAC M85296] . . . . . .      .  . E1-102


1.2~NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2-Browns Ferry, Unit 2, Section 2.2.3.1 (Page 2-8)NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52[Section 3.5, page 5]Bulletin 79-12-Short Peri.od Scrams at BWR Facilities Commitment:
TOPIC                          PAGE Unresolved Safety Issue A-44  Station Blackout
Discussion:
[10 CFR 50.63] [TAC M68519] . . . . . . .    . . . . . E1-102 Unresolved Safety Issue A-46  Seismic Qualification of Equipment in Operating Plants [TAC M69432]    . . . . El-103 Unresolved Safety Issue A-48  (MPA A-19) Hydrogen Control Measures and Effects of Hydrogen Burns  [TAC M55955]  E1-105 E1-vii
TVA will complete Bulletin 79-12.In response to Bulletin 79-12, TVA committed to perform unit and cycle specific analyses of control rod withdrawal sequences in order to ensure that rod notch worths were acceptable (References 1 and 2).In Reference 3, TVA notified NRC that it was implementing the generic Banked Position Withdrawal Sequence and Reduced Notch Worth Procedure.
The resulting withdrawal sequences ensure that the notch worths are sufficiently small so as to minimize the possibility of a fast period scram.Therefore, cycle specific analyses of control rod withdrawal sequences were no longer required.Status: Complete.The Banked Position Withdrawal Sequence and Reduced Notch Worth Procedures have been incorporated into plant procedures for Unit 3.NRC has reviewed Bulletin 79-12, Unit 3 Technical Specifications and Surveillance Requirements that reflect TVA's current position on withdrawal sequences and reduced notch worths.Based on


this review, the inspector concluded that this item is closed for Unit 3.This is documented in Reference 4.
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT  (BFN)
STATUS OF UNIT 3 1SSUES BACKGROUND The  regulatory framework for the restart of Unit 2 after its extended outage was unusual. TVA's submittal of the Browns Ferry Nuclear Performance Plan and NRC's review and issuance of Safety Evaluation Reports for each individual program was atypical.
While this level of NRC involvement did result in added confidence  for the approval of Unit 2 restart, it required significant TVA and NRC resources to negotiate the approval of individual programs and criteria. In most cases, TVA began the implementation of these programs "at risk", which meant prior to NRC approval. Significant redesign and additional modifications were required whenever the    criteria was changed  during the approval process.
The  overall regulatory framework for the restart of Unit 3 was described in Reference 1 and is more consistent with normal industry practice. The program establishes a high degree of confidence that the facility and personnel are ready to restart and operate Unit 3 in a safe and reliable manner, and promote the efficient utilization of TVA and NRC resources. TVA's program for the restart of Unit 3 is based on the corrective action programs, commitments, technical specification improvements, and internally identified deficiencies and concerns which were resolved prior to the restart of Unit 2. NRC approval of the overall regulatory framework for the restart of Unit 3 is documented in References 2 and 3.
Commitments from the Regulatory Framework for the Restart of Units 1 and 3 letter are listed below, by topic, in alphabetical order. Other pertinent generic issues (e.g., bulletins and generic letters) issued since TVA's regulatory framework submittal have also been included. This enclosure lists each commitment, references key correspondence, discusses the background of the issue, and describes the closure or status of each commitment, as appropriate.
REFERENCES
: 1. TVA  letter to  NRC, dated July 10, 1991, Regulatory Framework for the Restart of Units    1 and 3
: 2. NRC  letter to  TVA, dated August 1, 1991, Return  to Service of  Browns Ferry, Units  1 and 3
: 3. NRC letter to    TVA, dated  April 1,    1992, Return to Service of Browns  Ferry, Units    1 and 3 10 CFR 55. 45 (B) (2) (III) and  (IV) - Plant Simulator Commitment:        The BFN  simulator would be modified to a plant referenced simulator and that TVA would certify by March 1991,    in accordance with    10 CFR 55,  that this modification    would be completed.
Discussion:        Reference  1 requested    a  temporary exemption, until December 31, 1991, for the simulator certification requirements of 10 CFR  55.45(b)(2)(iii). This       exemption was granted in Reference 2.
Status:            Complete. In Reference 3, TVA certified the plant reference simulator in accordance with 10 CFR  55.45(b)(5)  .


==References:==
==References:==
: 1. TVA  letter to  NRC,  dated July 13, 1990, Request for  Temporary  Exemption    from 10 CFR 55.45(b) 2 ~  NRC  letter to  TVA,  dated January 2, 1991, Exemption from 10    CFR  55.45(b)(2)(iii)  and  (iv) 3 ~  TVA  letter to NRC, dated December 17, 1991, Certification of the BFN Simulation Facility Bulletin 79 Pipe Support        Base  Plate Designs Using Concrete Expansion Anchor Bolts [TAC R00017]
Commitment:        TVA  will complete Bulletin      79-02.
Discussion:        TVA  initiated programs in 1979 to comply with Bulletins 79-02 and 79-14 regarding the adequacy of piping system supports and anchor bolts. The BFN programs involved the reanalysis of pipe stress problems using the as-built configuration and amplified response spectra for Seismic Class I structures and the evaluation of the acceptability of the associated pipe supports.
The scope of the program included Unit 3 safety-related large bore (greater than 2Q inches in diameter) piping and computer analyzed small bore piping that was not included in the Small Bore Piping Program.
Pipe stress analysis and pipe support evaluations were based on walkdown inspection data for the safety-related piping systems. The walkdown


1.2.TVA letter to NRC, dated July 30, 1979, Office of Inspection and Enforcement Bulletin 79-12-RII:JPO 50-259,-260,-296-Br'owns Ferry Nuclear Plant Units 1, 2, and 3 TVA letter to NRC, dated August 19, 1981, Office of Inspection and Enforcement Bulletin 79-12 RII:JPO 50-259,-260,-296-Browns Ferry Nuclear Plant 3~4~TVA letter to NRC, dated January 4, 1990, Office of Inspection and Enforcement Bulletin 79-12 Commitment Revisions Regarding Fast Period Scrams NRC letter to TVA, dated October 13, 1995, NRC Inspection Report 95-51[Section 5.3, page 29]Bulletin 79-14-Seismic Analysis for As-Built Safety-Related Piping Systems[TAC R00017]Commitment:
0 A
Discussion:
 
TVA will complete Bulletin 79-14.TVA initiated programs in 1979 to comply with Bulletins 79-02 and 79-14 regarding the adequacy of piping system supports and anchor bolts.The BFN programs involved the reanalysis of pipe stress problems using the as-built configuration and amplified response spectra for Seismic Class I structures and the evaluation of the acceptability of the associated pipe supports.The scope of the program included Unit 3 safety-related large bore (greater than 2>inches in diameter)piping and computer analyzed small bore piping that was not included in the Small Bore Piping Program.Pipe stress analysis and pipe support evaluations were based on walkdown inspection data for the safety-related piping systems.The walkdown inspections were=instituted to determine the actual field configuration of the Class I piping systems and supports.NRC approval of TVA's program for the resolution of Bulletins 79-02 and 79-14 is documented in Reference 1.Open.The field work associated with this issue has been completed.
inspections were instituted to determine the actual field configuration of the Class I piping systems and supports.       NRC approval of TVA's program for the resolution of Bulletins 79-02 and 79-14   is documented   in Reference 1.
TVA is currently in the process of paper closure and independent verification.
Status:            Open. The field work associated with this issue has been completed.     TVA is currently in the process   of paper closure   and independent verification. These remaining items will be completed   prior to restart.
These remaining items will be completed prior to restart.NRC has reviewed the pipe stress analysis, pipe support design calculations, and inspected the completed pipe support modifications.
NRC has reviewed the pipe stress analysis, pipe support design calculations, and inspected the completed pipe support modifications. Based on the results of this review, the inspector concluded that this issue is resolved for Unit 3 restart. This is documented in Reference 2.
Based on the results of this review, the inspector concluded that this issue is resolved for Unit 3 restart.This is documented in Reference 2.


==References:==
==References:==
: 1. NRC  letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2  Browns Ferry, Unit 2, Section 2.2.3.1 (Page 2-8) 2 ~  NRC  letter to  TVA,  dated October 12, 1995,  NRC Inspection Report 95-52 [Section 3.5, page 5]
Bulletin  79-12  -  Short Peri.od Scrams at    BWR Facilities Commitment:      TVA  will complete Bulletin    79-12.
Discussion:        In response to Bulletin 79-12, TVA committed to perform    unit and cycle specific analyses of control rod withdrawal sequences in order to ensure that rod notch worths were acceptable (References 1 and 2).      In Reference 3, TVA notified NRC that    it was implementing the generic Banked Position Withdrawal Sequence and Reduced Notch Worth Procedure.        The resulting withdrawal sequences ensure that the notch worths are sufficiently small so as to minimize the possibility of a fast period scram. Therefore, cycle specific analyses of control rod withdrawal sequences were no longer required.
Status:            Complete. The Banked Position Withdrawal Sequence and Reduced Notch Worth Procedures have been incorporated into plant procedures for Unit 3.
NRC has reviewed Bulletin 79-12, Unit 3 Technical Specifications and Surveillance Requirements that reflect TVA's current position on withdrawal sequences    and reduced notch worths. Based on


1.NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2-Browns Ferry, Unit 2, Section 2.2.3.1 (Page 2-8)2~NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52[Section 3.5, page 5]Bulletin 79-18-Audibility Problems Commitment:
this review, the inspector concluded that this item is closed for Unit 3. This is documented in Reference 4.
Discussion:
TVA will complete Bulletin 79-18.In response to Bulletin 79-18, Audibility Problem Encountered on Evacuation of Personnel from High-Noise Areas, TVA initiated a design change to improve the public address and evacuation system.The noise levels within the plant were determined and equipment upgrades were recommended for in-plant and onsite buildings.
The NRC staff closed this Bulletin in Reference 1.A weakness in onsite accountability was identified in Reference 2.Reference 3 reflects TVA's commitment to improve the public address and evacuation system before restart from the Unit 2 Cycle 6 outage.The status of this commitment was discussed in Reference 4.Status: Complete.The upgrade to the public address and evacuation system was completed during the Unit 2 Cycle 6 outage.Notification of the completion of this commitment was provided in Reference 5.Although Reference 5 applied only to the Unit 2 docket, the public address system is common to all three units and the commitment was completed for all three units at that time.Explicit notification of the completion of this Bulletin for Units 1 and 3 was provided in Reference 6.In order to verify system operability and readiness, NRC requested activation of the system in various plant locations.
The test took place on June 1, 1995.Based on the results, NRC e
concluded that the system appeared to function as designed.The results are documented in Reference 7.


==References:==
==References:==
: 1. TVA  letter to NRC, dated July 30, 1979, Office of Inspection and Enforcement Bulletin 79-12 RII:JPO 50-259, -260, -296  Br'owns Ferry Nuclear Plant Units 1, 2, and 3
: 2. TVA letter to NRC, dated August 19, 1981, Office of Inspection and Enforcement Bulletin 79-12 RII:JPO 50-259, -260, -296  Browns Ferry Nuclear Plant 3 ~ TVA letter to NRC, dated January 4, 1990, Office of Inspection and Enforcement Bulletin 79-12 Commitment Revisions Regarding Fast Period Scrams 4 ~ NRC  letter to  TVA,  dated October 13, 1995,  NRC Inspection Report 95-51 [Section 5.3, page 29]
Bulletin  79 Seismic Analysis    for As-Built Safety-Related Piping Systems [TAC R00017]
Commitment:      TVA  will complete Bulletin    79-14.
Discussion:      TVA  initiated  programs in 1979 to comply with Bulletins  79-02 and 79-14 regarding the adequacy of piping  system supports and anchor bolts. The BFN programs involved the reanalysis of pipe stress problems using the as-built configuration and amplified response spectra for Seismic Class I structures and the evaluation of the acceptability of the associated pipe supports.
The scope  of the program included Unit 3 safety-related large bore (greater than 2> inches in diameter) piping and computer analyzed small bore piping that was not included in the Small Bore Piping Program.
Pipe stress analysis and pipe support evaluations were based on walkdown inspection data for the safety-related piping systems. The walkdown inspections were=instituted to determine the actual field configuration of the Class I piping systems and supports.      NRC approval of TVA's program for the resolution of Bulletins 79-02 and 79-14  is  documented  in Reference  1.
Open. The field work associated with this issue has been completed.      TVA is currently in the process of paper closure and independent


1.2~NRC letter to TVA, dated February 4, 1986, Report Nos.50-259/86-01, 50-260/86-01, and 50-296/86-01 NRC letter to TVA, dated November 15, 1988, NRC Inspection Report Nos.50-259/88-30, 50-260/88-30, and 50-296/88-30 3~NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2-Browns Ferry Unit 2[Section 4.9, Page 4-4]4~5.TVA letter to NRC, dated September 20, 1991, Status and Schedule for Completion of Unit 2 Post-Restart Issues[Section III.8.0, Page 11]TVA letter to NRC, dated June 22, 1993, Completion of Unit 2 Post-Restart Issues 6.TVA letter to NRC, dated October 21, 1994, Completion of Bulletin 79-18 for Unit 1 and 3 Restart Issues 7~NRC letter to TVA, dated June 23, 1995, NRC Inspection Report 95-30[Section 2.b., page 3]Bulletin 80-06-Engineered Safety Feature (ESF)Reset Controls Commitment:
verification. These remaining items will be completed prior to restart.
Discussion:
NRC has reviewed the pipe stress analysis, pipe support design calculations, and inspected the completed pipe support modifications. Based on the results of this review, the inspector concluded that this issue is resolved for Unit 3 restart. This is documented in Reference 2.
Status: TVA will complete Bulletin 80-06.In Reference 1, TVA stated that the need for modification to the Traversing Incore Probe (TIP)was identified as a result of the reviews performed for Bulletin 80-06.TVA informed NRC that the remaining testing of Unit 3 was complete and no other problems were identified.
In Reference 3, TVA committed to perform the modification to the TIP system prior to restart.Complete.The automatic reset circuitry was removed and a manual pushbutton reset was installed.
NRC has reviewed the design change notice (DCN), has observed installation of the isolation reset switches, and considers this issue closed for Unit 3.The results are documented in Reference 4.
8


==References:==
==References:==
: 1. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2  Browns Ferry, Unit 2, Section 2.2.3.1 (Page 2-8) 2 ~ NRC  letter to  TVA,  dated October 12, 1995, NRC Inspection Report 95-52 [Section 3.5, page 5]
Bulletin  79-18  Audibility Problems Commitment:      TVA  will complete Bulletin  79-18.
Discussion:      In response to Bulletin 79-18, Audibility Problem Encountered on Evacuation of Personnel from High-Noise Areas, TVA initiated a design change to improve the public address and evacuation system. The noise levels within the plant were determined and equipment upgrades were recommended for in-plant and onsite    buildings.
The NRC staff closed this Bulletin    in Reference 1.
A weakness  in onsite accountability was identified in Reference 2. Reference 3 reflects TVA's commitment to improve the public address and evacuation system before restart from the Unit 2 Cycle 6 outage. The status of this commitment was discussed in Reference 4.
Status:          Complete. The upgrade to the public address and evacuation system was completed during the Unit 2 Cycle 6 outage. Notification of the completion of this commitment was provided in Reference 5.
Although Reference 5 applied only to the Unit 2 docket, the public address system is common to all three units and the commitment was completed for all three units at that time. Explicit notification of the completion of this Bulletin for Units 1 and 3 was provided in Reference 6.
In order to verify system operability and readiness, NRC requested activation of the system in various plant locations. The test took place on June 1, 1995. Based on the results, NRC


1.TVA letter to NRC,'dated December 4g 1981I in regards to Bulletin 80-06 2~TVA letter to NRC, dated May 12, 1983, OIE Bulletin 80-06-Engineered Safety Feature (ESF)Reset Controls-Browns Ferry Nuclear Plant Units 2 and 3 3.TVA letter to NRC, dated April 28, 1988, IE Bulletin No.80-06-Engineered Safety Feature (ESF)Reset Control 4.NRC letter to TVA, dated May 8, 1995, NRC Inspection Report 95-22[Section 6.c., page 19]Bulletin 83-08-Electrical Circuit Breakers with an Undervoltage Trip Feature in Use in Safety-Related Applications Other Than the Reactor Trip System Commitment:
e concluded that the system appeared to function as designed. The results are documented in Reference 7.
Discussion:
Status: TVA will replace the General Electric (GE)molded case circuit breakers that are used on the output of the reactor protection system (RPS)motor-generator (MG)sets.The replacement breakers do not utilize the undervoltage release feature.Undervoltage and overvoltage protection is provided using a combination of contactors and relays.TVA responded to Bulletin 83-08 in Reference 1.Complete.TVA installed two class 1E detection and isolation assemblies in each of the three sources of power to the RPS.Each assembly includes a circuit breaker and a monitoring module consisting of an undervoltage, an overvoltage and an underfrequency sensing relay.The protective assembly relays operate to disconnect the abnormal source of supply from the RPS bus.NRC inspectors have reviewed the design change for Unit 3, walked down the completed modification, and considers this issue closed for Unit 3.This is documented in Reference 2.


==References:==
==References:==
: 1. NRC  letter to  TVA, dated February 4, 1986, Report Nos. 50-259/86-01,  50-260/86-01, and 50-296/86-01 2 ~  NRC  letter to  TVA, dated November 15, 1988,    NRC Inspection Report Nos. 50-259/88-30, 50-260/88-30, and 50-296/88-30 3 ~  NRC  letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2  Browns      Ferry Unit 2 [Section 4.9, Page 4-4]
4 ~  TVA  letter to NRC, dated September 20, 1991, Status and Schedule for Completion of Unit 2 Post-Restart Issues [Section III.8.0, Page 11]
: 5. TVA  letter to  NRC, dated June 22, 1993, Completion of Unit  2 Post-Restart Issues
: 6. TVA  letter to  NRC, dated October 21, 1994, Completion of  Bulletin  79-18  for Unit  1 and 3 Restart Issues 7 ~  NRC  letter to  TVA, dated June 23, 1995,    NRC Inspection Report 95-30 [Section 2.b., page 3]
Bulletin  80-06  -  Engineered Safety Feature    (ESF) Reset  Controls Commitment:        TVA  will complete Bulletin  80-06.
Discussion:        In Reference 1, TVA stated that the need for modification to the Traversing Incore Probe (TIP) was identified as a result of the reviews performed for Bulletin 80-06. TVA informed NRC that the remaining testing of Unit 3 was complete and no other problems were identified. In Reference 3, TVA committed to perform the modification to the TIP system prior to restart.
Status:            Complete. The automatic reset circuitry was removed and a manual pushbutton reset was installed.
NRC  has reviewed the design change notice (DCN),
has observed installation of the isolation reset switches, and considers this issue closed for Unit 3. The results are documented in Reference  4.


1.TVA letter to NRC, dated March 29, 1984, Inspection and Enforcement Bulletin 83-08-Electrical Circuit Breakers with an Undervoltage Trip Feature in Use in Safety-Related Applications other than the Reactor Trip System 2~NRC letter to TVA, dated May 8, 1995, NRC Inspection Report 95-22[Section 6.d., page 19]
8


Bulletin 84-02-Failures of General Electric Type HFA Relays in Use in Class 1E Safety Systems[TAC M73854]Commitment:
==References:==
Discussion:
: 1. TVA  letter to NRC, 'dated December 4g 1981I in regards to Bulletin 80-06 2 ~  TVA letter to NRC, dated May 12, 1983, OIE Bulletin 80-06      Engineered Safety Feature (ESF)
Status: TVA will replace relay coil spools in HFA relays in the reactor protection system (RPS)and other safety systems.TVA responded to Bulletin 84-02 by Reference 1.Closed.Unit 3 HFA relay coil replacement has been completed.
Reset Controls        Browns Ferry Nuclear Plant Units  2  and  3
Relays requiring coil replacement included the following:
: 3. TVA  letter to NRC, dated April 28, 1988, IE Bulletin No. 80-06  Engineered Safety Feature (ESF) Reset Control
1.Normally energized a/c relays in the RPS or other safety-related systems with Nylon or Lexan coil spools.2.Normally deenergized relays in the RPS or other safety-related systems with Nylon coil spools'he NRC inspected the HFA coil replacement.
: 4. NRC  letter to    TVA,  dated May 8, 1995, NRC Inspection Report 95-22 [Section 6.c., page 19]
This is documented in Reference 2.NRC selected various relays at random and verified that the activities were completed.
Bulletin  83-08  - Electrical Circuit      Breakers with an Undervoltage Trip Feature in Use in Safety-Related Applications Other Than the Reactor Trip System Commitment:       TVA will replace     the General Electric (GE) molded case  circuit    breakers that are used on the output of the reactor protection system (RPS) motor-generator (MG) sets. The replacement breakers do not utilize the undervoltage release feature.
Based on this review, the inspector considers this issue closed for Unit.3.
Undervoltage and overvoltage protection is provided using a combination of contactors and relays.
Discussion:      TVA responded     to Bulletin 83-08 in Reference 1.
Status:           Complete. TVA installed two class 1E detection and isolation assemblies in each of the three sources of power to the RPS. Each assembly includes    a circuit breaker and a monitoring module    consisting of an undervoltage, an overvoltage and an underfrequency sensing relay.
The protective assembly relays operate to disconnect the abnormal source of supply from the RPS bus.
NRC inspectors have reviewed the design change for Unit 3, walked down the completed modification, and considers this issue closed for Unit 3. This is documented in Reference 2.


==References:==
==References:==
: 1. TVA  letter to    NRC, dated March 29, 1984, Inspection    and Enforcement Bulletin 83-08 Electrical    Circuit Breakers with an Undervoltage Trip Feature in Use in Safety-Related Applications other than the Reactor Trip System 2 ~  NRC letter to TVA, dated May 8, 1995, NRC Inspection Report 95-22 [Section 6.d., page 19]


1.TVA letter to NRC, dated July 10, 1984, Inspection and Enforcement Bulletin 84-02-Failures of General Electric Type HFA Relays in Use in Class 1E Safety Systems-Browns Ferry, Sequoyah, Watts Bar, and Bellefonte Nuclear Plants 2.NRC letter to TVA, dated August 31, 1995, NRC Inspection Report 95-43[Section 6.5, page 13]Bulletin 86-02-Static"0" Ring (SOR)Differential Pressure Switches Commitment:
Bulletin 84 Failures of General Electric         Type HFA Relays   in Use in Class 1E Safety Systems [TAC M73854]
Discussion:
Commitment:      TVA  will replace relay coil spools in HFA relays in the reactor protection system (RPS) and other safety systems.
TVA will complete Bulletin 86-02.TVA responded to Bulletin 86-02 by Reference 1.Two Static"0" Ring differential pressure switches were installed (or planned for installation) in the Residual Heat Removal (RHR)E1-8 system minimum flow recirculation lines.TVA committed to: 1.Revise the RHR pump flow rate test to include steps to verify minimum flow switch operability, 2.Perform maintenance instructions semiannually until two consecutive tests were attained, and Status: 3.Evaluate the SOR test report and adjust setpoints, as required.Complete.TVA has installed two Static"0" Ring differential pressure switches in the Unit 3 RHR system and the RHR Pump Surveillance Instruction has been revised to include steps to verify proper switch operation.
Discussion:     TVA responded     to Bulletin 84-02 by Reference 1.
The commitment to perform the maintenance instruction semiannually has been evaluated in accordance with the commitment management process and deleted.NRC was notified of the commitment deletion by Reference 2.The SOR test report has been evaluated and the setpoint calculations have been revised.Bulletin 86-02 has been closed for Unit 3.However, an Inspector Followup Item was opened as a restart item for Unit 3.This is documented in Reference 3.NRC inspectors reviewed the engineering change notice (ECN), calculations, calibration results, and functional testing requirements.
Status:         Closed. Unit 3 HFA relay coil replacement has been completed.       Relays requiring coil replacement included the following:
Based on the results of this review, NRC considers this issue closed for Unit 3.This is documented in Reference 4.
: 1. Normally energized a/c relays in the RPS or other safety-related systems with Nylon or Lexan    coil spools.
: 2. Normally deenergized relays in the       RPS or other safety-related systems with Nylon coil spools'he NRC inspected the HFA coil replacement.         This is documented in Reference 2. NRC selected various relays at random and verified that the activities were completed. Based on this review, the inspector considers this issue closed for Unit. 3.


==References:==
==References:==
: 1. TVA  letter to NRC, dated July 10, 1984, Inspection and Enforcement Bulletin 84                  Failures of General Electric Type HFA Relays in Use in Class 1E Safety Systems  Browns Ferry, Sequoyah, Watts Bar, and Bellefonte Nuclear Plants
: 2. NRC  letter to    TVA,  dated August 31, 1995,  NRC Inspection Report 95-43 [Section 6.5, page 13]
Bulletin  86 Static "0"      Ring  (SOR)  Differential Pressure Switches Commitment:      TVA  will complete Bulletin      86-02.
Discussion:      TVA  responded    to Bulletin 86-02 by Reference 1.
Two  Static "0" Ring differential pressure switches were installed (or planned for installation) in the Residual Heat Removal (RHR)
E1-8


1.TVA letter to NRC, dated July 20, 1987, NRC Office of Inspection and Enforcement, (IE)Bulletin 86-02-Static"0" Ring (SOR)Differential Pressure Switches 2.TVA letter to NRC, dated August 17, 1995, BFN Revision To Commitments To Perform Testing Of Static-0-Ring Differential Pressure Switches And Voltage Verification Testing Of Reactor Protective System Equipment 3..NRC letter to TVA, dated March 18, 1993, NRC Inspection Report 93-04[Section 5, page 13]
system minimum flow      recirculation lines. TVA committed to:
'I h w~lt 4.NRC letter to TVA, dated January 17, 1995, NRC Inspection Report 94-31[Section 6, page 14]Bulletin 88-03-Inadequate Latch Engagement in HFA Type Relays Manufactured hy General Electric Company[TAC M73854]Commitment:
: 1. Revise the RHR pump flow rate test to include steps to verify minimum flow switch operability,
Discussion:
: 2. Perform maintenance instructions semiannually until  two consecutive tests were attained, and
TVA will complete Bulletin 88-03.TVA originally responded to Bulletin 88-03 in Reference 1.TVA stated the BFN inspections and the repair or replacement of the relays which fail the inspection criteria are scheduled to be completed before restart of each unit.Status:
: 3. Evaluate the    SOR  test report and adjust setpoints,   as  required.
Status:        Complete. TVA has installed two Static "0" Ring differential pressure switches in the Unit 3 RHR system and the RHR Pump Surveillance Instruction has been revised to include steps to verify proper switch operation.
The commitment to perform the maintenance instruction semiannually has been evaluated in accordance with the commitment management process and deleted. NRC was notified of the commitment deletion by Reference 2.
The SOR test report has been evaluated and the setpoint calculations have been revised.
Bulletin 86-02 has been closed for Unit 3.
However, an Inspector Followup Item was opened as a restart item for Unit 3. This is documented in Reference 3.
NRC inspectors reviewed the engineering change notice (ECN), calculations, calibration results, and functional testing requirements.       Based on the results of this review, NRC considers this issue closed for Unit 3. This is documented in Reference 4.


==References:==
==References:==
: 1. TVA  letter to NRC, dated July 20, 1987, NRC Office of Inspection and Enforcement, (IE)
Bulletin 86-02  Static "0" Ring (SOR)
Differential    Pressure  Switches
: 2. TVA  letter to NRC, dated August 17, 1995, BFN Revision To Commitments To Perform Testing Of Static-0-Ring Differential Pressure Switches And Voltage Verification Testing Of Reactor Protective  System Equipment
: 3. .NRC  letter to  TVA,  dated March 18, 1993, NRC Inspection Report    93-04  [Section 5, page 13]


1.Complete.In Reference 2, NRC closed Bulletin 88-03.However, TVA was still required to notify the NRC of inspection results for Unit 3.In Reference 3, TVA informed NRC that no inadequate latch engagement had been identified during the inspection of the HFA relays in Unit 3.TVA letter to NRC, dated July 6, 1988, Nuclear Regulatory Commission (NRC)Bulletin 88-03, Inadequate Latch Engagement in HFA-Type Latching Relays Manufactured by General Electric (GE)Company 2.3~NRC letter to TVA, dated August 2, 1990, Closure of NRC Bulletin 88-03 for the Browns Ferry Nuclear Plant (TAC NOS.73852, 73853, and 73854)TVA letter to NRC, dated April 11, 1994, NRC Bulletin No.88-03 Inspection Results Bulletin 88-04, Potential Safety-Related Pump Loss[TAC M69890]Commitment:
'I h
Discussion:
w  ~
TVA will complete Bulletin 88-04.NRC Bulletin 88-04 requested licensees to investigate and correct, as applicable, two miniflow design concerns for safety-related system pumps.The first concern involved the potential for dead-heading one or more pumps.The second concern was whether or not the installed miniflow capacity was adequate.TVA responded to the Bulletin (Reference 1), endorsing the BWR Owners'roup response and providing BFN specific information.
lt
NRC requested additional information in Reference 2, which was provided by TVA in Reference 3.
: 4. NRC letter to TVA,   dated January 17, 1995,     NRC Inspection Report 94-31 [Section 6, page 14]
e~0 44*4, Status: Complete.The following actions were taken: 1~The design calculation for the Unit 2 Core Spray system miniflow bypass orifice size was expanded to include Unit 3 with the same results.The affected orifices were removed and inspected to verify proper sizing and if not, bored to the proper size.The system drawings were revised as necessary to reflect the correct orifice size.2~A review of the Residual Heat Removal Service Water (RHRSW)operating instructions was performed during the resolution of this Bulletin for Unit 2.This review identified that the RHRSW pumps are started prior to opening the discharge flow control valves.The calculation for the RHRSW pumps determined that pump damage would not occur for 43 minutes when the RHRSW pumps were started with the pump discharge valves closed.Based on this, the RHRSW operating instruction was revised to include a precaution that pump damage may occur if RHRSW outlet valves are not opened.3~The design calculation for the Unit 2 RHRSW system was expanded to include Unit 3 with the same results.Since the RHRSW system operating instruction is a common instruction for both Units 2 and 3, no further changes were required.Reference 4 documents NRR closure of this issue for Unit 3.NRC has examined associated issue equipment, modifications, documentation and calculations.
Bulletin 88 Inadequate Latch Engagement in HFA Type Relays Manufactured hy General Electric Company [TAC M73854]
Based on this review and the NRR closure letter, NRC closed this issue for Unit 3.This is documented in Reference 5.
Commitment:     TVA will complete Bulletin     88-03.
Discussion:    TVA originally  responded   to Bulletin 88-03 in Reference 1. TVA stated the BFN        inspections and the repair or replacement of the        relays which fail the inspection criteria are        scheduled to be unit.
completed before restart of each Status:         Complete. In Reference 2,      NRC closed Bulletin 88-03. However, TVA was the NRC  of inspection still  required to notify results for Unit 3. In Reference 3,   TVA informed NRC that no inadequate latch engagement had been identified during the inspection of the HFA relays in Unit 3.


==References:==
==References:==
: 1. TVA letter to NRC, dated July 6, 1988, Nuclear Regulatory Commission (NRC) Bulletin 88-03, Inadequate Latch Engagement in HFA-Type Latching Relays Manufactured by General        Electric  (GE)
Company
: 2. NRC  letter to  TVA,  dated August 2, 1990, Closure of  NRC  Bulletin  88-03  for the  Browns Ferry Nuclear Plant    (TAC NOS. 73852,    73853, and 73854) 3 ~ TVA  letter to  NRC,  dated  April 11,  1994,  NRC Bulletin  No. 88-03  Inspection Results Bulletin 88-04, Potential Safety-Related      Pump  Loss [TAC M69890]
Commitment:    TVA  will complete Bulletin    88-04.
Discussion:    NRC  Bulletin  88-04 requested    licensees to investigate and correct, as applicable, two miniflow design concerns for safety-related system pumps. The first concern involved the potential for dead-heading one or more pumps.
The second concern was whether or not the installed miniflow capacity was adequate.
TVA responded to the Bulletin (Reference 1),
endorsing the BWR Owners'roup response and providing BFN specific information. NRC requested additional information in Reference 2, which was provided by TVA in Reference 3.


1~Letter from TVA to NRC dated September 30, 1988, Browns Ferry (BFN), Watts Bar (WBN), and Bellefonte (BLN)Nuclear Plants-NRC Bulletin (NRCB)88-04, Potential Safety-Related Pump Loss 2~Letter from NRC to TVA dated March 1, 1989, Response to NRC Bulletin 88-04-Browns Ferry Nuclear Plant, Units 1, 2, and 3 3~Letter from TVA to NRC dated April 05, 1989, Browns Ferry Nuclear Plant (BFN)Units 1 W'
e    ~
and 3-Additional Response to NRC Bulletin 88-04 (NRCB 88-04)-Potential Safety-Related Pump Loss 4.Letter from NRC to TVA, dated May 8, 1989, Response to NRC Bulletin 88-04-Browns Ferry Nuclear Plant, Units 1 and 3 5.Letter from NRC to TVA, dated June 28, 1995, NRC Inspection Report 95-31[Section 7.b., page 18]Bulletin 88-07-Power Oscillations in Boiling Water Reactors, and Supplement 1[TAC M72769]Commitment:
0 44  *4,
Discussion:
 
Status: TVA will complete Bulletin 88-07.TVA responded to Bulletin 88-07 by Reference 1 and confirmed that the actions required by the Bulletin were implemented.
Status:    Complete. The  following actions were taken:
TVA responded to Supplement 1 to Bulletin 88-07 by Reference 2 and confirmed its plans to implement the General Electric interim stability recommendations.
1~ The design calculation for the Unit 2 Core Spray system miniflow bypass orifice size was expanded to include Unit 3 with the same results. The affected orifices were removed and inspected to verify proper sizing and if not, bored to the proper size. The system drawings were revised as necessary to reflect the correct orifice size.
The proposed Technical Specification changes to implement the reactor core thermal-hydraulic stability recommendations contained in Supplement 1 to Bulletin 88-07 were provided by Reference 3 and approved in Reference 4.Complete.TVA has implemented the General Electric interim stability recommendations into plant procedures.
2 ~ A review of the Residual Heat Removal Service Water (RHRSW) operating instructions was performed during the resolution of this Bulletin for Unit 2. This review identified that the RHRSW pumps are started prior to opening the discharge flow control valves.
Refer to the topic entitled Generic Letter 94-02-Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors for additional actions TVA'as taken to address this issue.
The calculation for the RHRSW pumps determined that pump damage would not occur for 43 minutes when the RHRSW pumps were started with the pump discharge valves closed. Based on this, the RHRSW operating instruction was revised to include a precaution that pump damage may occur if RHRSW  outlet valves are not opened.
3 ~ The design calculation for the Unit 2 RHRSW system was expanded to include Unit 3 with the same results. Since the RHRSW system operating instruction is a common instruction for both Units 2 and 3, no further changes were required.
Reference   4 documents NRR closure of this issue for Unit 3. NRC has examined associated issue equipment, modifications, documentation and calculations. Based on this review and the NRR closure letter, NRC closed this issue for Unit 3. This is documented in Reference 5.


==References:==
==References:==
1~  Letter from  TVA to NRC dated September 30,    1988, Browns Ferry (BFN),
Watts Bar (WBN), and Bellefonte (BLN) Nuclear Plants - NRC Bulletin (NRCB) 88-04, Potential Safety-Related Pump Loss 2 ~ Letter from  NRC to TVA dated March 1, 1989, Response to  NRC Bulletin 88-04  Browns Ferry Nuclear Plant, Units 1, 2, and 3 3 ~ Letter from TVA to NRC dated April 05, 1989, Browns Ferry Nuclear Plant (BFN) Units 1


1.TVA letter to NRC, dated November 4, 1988, NRC Bulletin 88-07: Power Oscillations in Boiling Water Reactors 2.TVA letter to NRC, dated March 6, 1989, NRC Bulletin 88-07, Supplement 1-Power Oscillations in Boiling Water Reactors (BWRs)3.TVA letter to NRC, dated January 14 1992)TVA BFN Technical Specification (TS)No.300 Reactor Core Thermal-Hydraulic Stability 4.NRC letter to TVA, dated May 31, 1994, Issuance of Technical Specification Amendments for the Browns Ferry Nuclear Plant Units 1 and 3 (TS 300) 0 a Bulletin 90-01[TAC M85363]-Loss of Fill Oil in Rosemount Transmitters Commitment:
W
Discussion:
 
Status: TVA will complete Bulletin 90-01.TVA originally responded to Bulletin 90-01 in Reference 1.TVA responded to Supplement 1 to Bulletin 90-01 in Reference 2.The commitments made in Reference 2 superseded the commitments made in Reference 1.In Reference 2, TVA committed to replace or refurbish the Model 1153 Series B, Model 1153 Series D, and the Model 1154 Rosemount transmitters, which were manufactured prior to July 11, 1989, in Unit 3 safety-related or Anticipated Transient Without Scram (ATWS)applications.
and  3  - Additional    Response  to NRC Bulletin 88-04  (NRCB  88-04)    Potential  Safety-Related Pump  Loss
Complete.TVA has replaced or refurbished the Model 1153 Series B, Model 1153 Series D, and Model 1154 Rosemount transmitters, which were manufactured prior to July 11, 1989, in Unit 3 safety-related or ATWS applications.
: 4. Letter from    NRC  to TVA, dated May    8, 1989, Response    to NRC Bulletin 88-04  Browns Ferry Nuclear Plant, Units 1 and 3
NRC has reviewed TVA's response and concluded that TVA conforms to the requested actions of Bulletin 90-01, Supplement 1.This is documented in Reference 4.
: 5. Letter from NRC to TVA, dated June 28, 1995, NRC Inspection Report 95-31 [Section 7.b.,
page 18]
Bulletin  88 Power Oscillations      in Boiling Water Reactors, and Supplement 1 [TAC M72769]
Commitment:     TVA will complete Bulletin       88-07.
Discussion:      TVA responded     to Bulletin 88-07 by Reference 1 and confirmed    that the actions required by the Bulletin were implemented. TVA responded to Supplement 1 to Bulletin 88-07 by Reference 2 and confirmed its plans to implement the General Electric interim stability recommendations. The proposed Technical Specification changes to implement the reactor core thermal-hydraulic stability recommendations contained in Supplement 1 to Bulletin 88-07 were provided by Reference 3 and approved in Reference 4.
Status:          Complete. TVA has   implemented the General Electric interim stability recommendations into plant procedures. Refer        to the topic entitled Generic Letter 94-02  Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors for additional actions TVA'as taken to address this issue.


==References:==
==References:==
: 1. TVA letter to NRC, dated November 4, 1988, NRC Bulletin 88-07: Power Oscillations in Boiling Water Reactors
: 2. TVA  letter to NRC, dated March 6, 1989, NRC Bulletin 88-07, Supplement 1  Power Oscillations in Boiling Water Reactors (BWRs)
: 3. TVA letter to NRC, dated January 14 1992) TVA BFN Technical Specification        (TS) No. 300  Reactor Core Thermal-Hydraulic      Stability
: 4. NRC  letter to    TVA,  dated May 31, 1994, Issuance of Technical Specification Amendments for the Browns Ferry Nuclear Plant Units 1 and 3 (TS 300)


1.2~TVA letter to NRC, dated July 18, 1990, Response to NRC Bulletin No.90-01: Loss of Fill-Oil in Transmitters Manufactured by Rosemount TVA letter to NRC, dated March 5, 1993, Response to NRC Bulletin No.90-01, Supplement 1-Loss of Fill Oil in Transmitters Manufactured by Rosemount 3~4 NRC letter to TVA, dated May 31, 1995, NRC Inspection Report 95-29[Section 2.0-7.0]NRC letter to TVA, dated April 4, 1995, NRC Bulletin 90-01, Supplement 1, Loss of Fill-Oil in Transmitters Manufactured by Rosemount Bulletin 93-02-Debris Plugging of Emergency Core Cooling Suction Strainers, and Supplement 1[TAC M86537 and M89279]Commitments:
0 a
TVA will complete Bulletin 93-02 and Supplement 1 prior to restart.E1-13


Discussion:
Bulletin  90-01  -  Loss  of Fill Oil in Rosemount    Transmitters
TVA responded to Bulletin 93-02 in Reference 1 and committed to: 1.Evaluate Unit 3 for permanent fibrous material.2.Inspect Unit 3 and remove temporary fibrous material.3.Confirming completion of the above listed activities before startup.In TVA's response to Supplement 1 of Bulletin 93-02 (Reference 2), TVA committed to augment the operator's required reading program, conduct classroom and/or simulator training, revise appendices in the BFN Emergency Operating Instructions (EOIs)to include caution statements and actions for monitoring net positive suction head, and change the applicable design control procedure to require evaluation of fibrous material being introduced into the drywell.In Reference 3, NRC stated that TVA's response to Supplement 1 adequately addressed the actions TVA would take to assure continued Emergency Core Cooling System (ECCS)suction capability.
[TAC M85363]
TVA notified NRC of the completion of the commitments made in response to Supplement 1 of Bulletin 93-02 in Reference 4.Status: Open.TVA has completed the walkdown for permanent fibrous material.Administrative procedures are in place which require documentation of the removal of temporary fibrous air filters or other sources of fibrous material prior to drywell closure.This will be completed prior to restart.
Commitment:        TVA  will complete Bulletin  90-01.
Discussion:       TVA originally responded to Bulletin 90-01 in Reference 1. TVA responded to Supplement 1 to Bulletin 90-01 in Reference 2. The commitments made in Reference 2 superseded the commitments made in Reference 1. In Reference 2, TVA committed to replace or refurbish the Model 1153 Series B, Model 1153 Series D, and the Model 1154 Rosemount transmitters, which were manufactured prior to July 11, 1989, in Unit 3 safety-related or Anticipated Transient Without Scram (ATWS) applications.
Status:            Complete. TVA has replaced or refurbished the Model 1153 Series B, Model 1153 Series D, and Model 1154 Rosemount transmitters, which were manufactured prior to July 11, 1989, in Unit 3 safety-related or  ATWS  applications.
NRC has reviewed TVA's response     and concluded that TVA conforms to the requested actions of Bulletin 90-01, Supplement 1. This is documented in Reference 4.


==References:==
==References:==
: 1. TVA letter to NRC, dated July 18, 1990, Response to NRC Bulletin No. 90-01: Loss of Fill-Oil in Transmitters Manufactured by Rosemount 2 ~  TVA  letter to NRC,  dated March 5, 1993, Response to NRC  Bulletin No. 90-01, Supplement    1  Loss of Fill Oil in Transmitters Manufactured      by Rosemount 3 ~  NRC  letter to TVA,  dated May 31, 1995,    NRC Inspection Report 95-29 [Section 2.0-7.0]
4    NRC  letter to TVA,  dated  April 4,  1995,  NRC Bulletin 90-01,  Supplement 1, Loss    of Fill-Oil in Transmitters Manufactured by Rosemount Bulletin  93-02  -  Debris Plugging of Emergency Core Cooling Suction Strainers, and Supplement      1 [TAC M86537  and M89279]
Commitments:      TVA will complete Bulletin    93-02 and Supplement  1 prior to restart.
E1-13


1.TVA letter to NRC, dated May 23, 1993, NRC Bulletin No.93-02,"Debris Plugging of Emergency Core Cooling Suction Strainers" 2~TVA letter to NRC, dated April 18, 1994, NRC Bulletin 93-02, Supplement 1-Debris Plugging of Emergency Core Cooling System (ECCS)Suction Strainers 3~NRC letter to TVA, dated July 19, 1994, Response to NRC Bulletin 93-02-Supplement 1,"Debris Plugging of Emergency Core Cooling Suction Strainers" 4~TVA letter to NRC, dated July 29, 1994, NRC Bulletin 93-02, Supplement 1-Debris Plugging of  
Discussion:    TVA  responded  to Bulletin 93-02 in Reference 1 and committed    to:
: 1. Evaluate Unit 3 for permanent fibrous material.
: 2. Inspect Unit 3 and remove temporary fibrous material.
: 3. Confirming completion of the above listed activities before startup.
In TVA's response to Supplement 1 of Bulletin 93-02 (Reference 2), TVA committed to augment the operator's required reading program, conduct classroom and/or simulator training, revise appendices in the BFN Emergency Operating Instructions (EOIs) to include caution statements and actions for monitoring net positive suction head, and change the applicable design control procedure to require evaluation of fibrous material being introduced into the drywell.
In Reference 3, NRC stated that TVA's response to Supplement 1 adequately addressed the actions TVA would take to assure continued Emergency Core Cooling System (ECCS) suction capability. TVA notified NRC of the completion of the commitments made in response to Supplement 1 of Bulletin 93-02 in Reference 4.
Status:        Open. TVA has  completed the walkdown for permanent  fibrous material. Administrative procedures are in place which require documentation of the removal of temporary fibrous air filters or other sources of fibrous material prior to drywell closure. This will be completed prior to restart.
 
==References:==
: 1. TVA letter to NRC, dated May 23, 1993, NRC Bulletin No. 93-02, "Debris Plugging of Emergency Core Cooling Suction Strainers" 2 ~ TVA letter to NRC, dated April 18, 1994, NRC Bulletin 93-02, Supplement 1 Debris Plugging of Emergency Core Cooling System (ECCS) Suction Strainers 3 ~ NRC letter to TVA, dated July 19, 1994, Response to NRC Bulletin 93-02 Supplement 1, "Debris Plugging of Emergency Core Cooling Suction Strainers" 4 ~ TVA letter to NRC, dated July 29, 1994,     NRC Bulletin 93-02, Supplement 1 Debris Plugging of


Emergency Core Cooling System (ECCS)Suction Strainers-Commitment Completion Bulletin 93-03-Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs[TAC M86884]Commitment:
Emergency Core Cooling System (ECCS) Suction Strainers Commitment Completion Bulletin 93-03 - Resolution of   Issues Related to Reactor Vessel Water Level Instrumentation     in BWRs [TAC M86884]
TVA intends to complete a modification which will prevent the buildup of noncondensables in water level reference legs by injecting CRD system charging water into the reference legs.Discussion:
Commitment:       TVA intends to complete a modification which will prevent the buildup of noncondensables in water level reference legs by injecting CRD system charging water into the reference legs.
TVA's response to Bulletin 93-03 was provided by Reference 1.A description of the modification installed on Unit 2 was provided in Reference 2.Status: Complete.TVA has performed the modification which provides a continuous backfill to the reactor reference lines as required by NRC Bulletin 93-03.
Discussion:       TVA's response to Bulletin 93-03 was provided by Reference 1. A description of the modification installed on Unit 2 was provided in Reference 2.
Status:           Complete. TVA has performed the modification which provides a continuous backfill to the reactor reference lines as required by NRC Bulletin 93-03.


==References:==
==References:==
: 1. TVA letter to NRC, dated July 30, 1993, Response to NRC Bulletin (NRCB) 93-03, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in Boiling Water Reactors 2 ~  TVA letter to NRC, dated December 14, 1994, Hardware Modification Completion and Description in Response to Bulletin 93-03, Resolution of Issues Related to Reactor Vessel. Water Level Instrumentation in Boiling Water Reactors Bulletin  95>>02  -  Unexpected Clogging of a Residual Heat Removal (RHR) Pump  Strainer While Operating in Suppression Pool Cooling Mode Commitment:        TVA  will provide a report indicating the actions taken in order to comply with the requested action of Bulletin 95-02.
Discussion:        None.
Status:            Open. TVA  will provide the report by November 13, 1995.


1.TVA letter to NRC, dated July 30, 1993, Response to NRC Bulletin (NRCB)93-03, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in Boiling Water Reactors 2~TVA letter to NRC, dated December 14, 1994, Hardware Modification Completion and Description in Response to Bulletin 93-03, Resolution of Issues Related to Reactor Vessel.Water Level Instrumentation in Boiling Water Reactors Bulletin 95>>02-Unexpected Clogging of a Residual Heat Removal (RHR)Pump Strainer While Operating in Suppression Pool Cooling Mode Commitment:
==References:==
TVA will provide a report indicating the actions taken in order to comply with the requested action of Bulletin 95-02.Discussion:
None.
None.Status: Open.TVA will provide the report by November 13, 1995.
E1-15


==References:==
0 I 4


None.E1-15 0 I 4 Cable Ampacity Discussion:
Cable Ampacity The cable ampacity   issue will be   resolved in accordance with the Unit     2 precedent.
Status: The cable ampacity issue will be resolved in accordance with the Unit 2 precedent.
Discussion:      TVA developed a new electrical design standard to address ampacities for cables in conduits, cable trays, and duct banks, as well as derating factors for cable coatings, fire wraps, cable tray covers, and cable tray bottoms. Approval of this program is contained in NUREG-1232 (Reference 1).
TVA developed a new electrical design standard to address ampacities for cables in conduits, cable trays, and duct banks, as well as derating factors for cable coatings, fire wraps, cable tray covers, and cable tray bottoms.Approval of this program is contained in NUREG-1232 (Reference 1).Complete.In addition to developing a new electrical design standard, TVA has performed calculations to determine limiting ampacity values based on environment and the requirements of nonconforming cable installations that are documented and tracked through the Conditions Adverse to Quality Report (CAQR)program.The ampacity calculations have been reviewed by NRC and found to be adequate in determining the ampacity of installed cable.The inspector also determined that the ampacity concerns for Unit 3 were addressed consistent with the methodology and approach accepted in Reference 1.This is documented in Reference 2.
Status:          Complete. In addition to developing a new electrical design standard, TVA has performed calculations to determine limiting ampacity values based on environment and the requirements of nonconforming cable installations that are documented and tracked through the Conditions Adverse to Quality Report (CAQR) program.
The ampacity calculations have been reviewed by NRC and found to be adequate in determining the ampacity of installed cable. The inspector also determined that the ampacity concerns for Unit         3 were addressed consistent with the methodology and approach accepted in Reference 1. This is documented in Reference 2.


==References:==
==References:==
: 1. NRC  letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2  Browns        Ferry Unit 2 I'Section 3.11.3, Page 3-9]
2 ~  NRC  letter to  TVA, dated March 16, 1995,      NRC Inspection Report 94-35    [Summary  Results, page 2]
Cable  Installation Issue    Number 1  Brand Rex Cable    Issues Commitment:      The Brand Rex cable    issue  will be  resolved in accordance with the Unit    2 precedent.
Discussion:      The  action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, the Staff found implementing the corrective actions for the Brand Rex cable issue in accordance with the Unit 2 precedent to be acceptable pending the results of additional qualification testing being performed by TVA.


1.NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2-Browns Ferry Unit 2 I'Section 3.11.3, Page 3-9]2~NRC letter to TVA, dated March 16, 1995, NRC Inspection Report 94-35[Summary Results, page 2]Cable Installation Issue Number 1-Brand Rex Cable Issues Commitment:
Status:           Complete. TVA has identified contract number 80K6-825419 as the source of the Brand Rex cables issue for BFN. Additional testing demonstrated the ability of the cables to perform their intended safety function for a qualified life of 40 years. A'review of Unit 3, 10CFR50.49 cables indicated   that no cable of this type is installed in 10CFR50.49   applications. TVA has removed all non-installed Brand Rex cable furnished on contract 80K6-825419. Administrative controls are in place to prevent future applications of this cable type and manufacturer from being installed at BFN.
The Brand Rex cable issue will be resolved in accordance with the Unit 2 precedent.
Discussion:
The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1.The Safety Evaluation on this program was provided by Reference 2.In summary, the Staff found implementing the corrective actions for the Brand Rex cable issue in accordance with the Unit 2 precedent to be acceptable pending the results of additional qualification testing being performed by TVA.
Status: Complete.TVA has identified contract number 80K6-825419 as the source of the Brand Rex cables issue for BFN.Additional testing demonstrated the ability of the cables to perform their intended safety function for a qualified life of 40 years.A'review of Unit 3, 10CFR50.49 cables indicated that no cable of this type is installed in 10CFR50.49 applications.
TVA has removed all non-installed Brand Rex cable furnished on contract 80K6-825419.
Administrative controls are in place to prevent future applications of this cable type and manufacturer from being installed at BFN.


==References:==
==References:==
: 1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations
: 2. NRC  letter to  TVA,  dated April 8, 1992, Safety Evaluation of    TVA  Plans to Resolve Electrical Cable Installation and Separation Issues Cable  Installation Issue    Number 2  -  Cable Separations Issues
[TAC M85298]
'Commitments:      TVA  committed  to the following:
The  sixteen V4 and V5 cables originating from safety-related power supplies and that were deenergized for Unit 2 restart will be modified as appropriate.
2 ~  The eight nondivisional V3 cables originating from safety-related power supplies and that were deenergized for Unit 2 restart will be modified as appropriate.
3    The 604 divisional and nondivisional cables designated with a "IE" suffix will be
                    ~
corrected by retagging both the cables and the appropriate raceway. The five cables that were deenergized for Unit 2 restart will be modified as appropriate.
: 4. The 109 nondivisional V4 and V5 cables contained in the project Q-list will be corrected by retagging both the cable and the appropriate raceway.
: 5. The project Q-list will be revised to remove the V1, V2, V3, V4 and V5 sample cables determined by the evaluation to be nonsafety-


1.TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2.NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues Cable Installation Issue Number 2-Cable Separations Issues[TAC M85298]'Commitments:
1 I related and nondivisional. Additional Q-list evaluations will be handled in accordance with SSP-3.10.
TVA committed to the following:
: 6. The following categories of separations discrepancies will be resolved in accordance with the Unit 2 precedent:
The sixteen V4 and V5 cables originating from safety-related power supplies and that were deenergized for Unit 2 restart will be modified as appropriate.
: a. A 100-percent review of V4/V5 cables which originate from safety-related power supplies,
2~3~4.5.The eight nondivisional V3 cables originating from safety-related power supplies and that were deenergized for Unit 2 restart will be modified as appropriate.
: b. A random sample of nondivisional V4/V5 cables which originate from nonsafety-related power supplies,
The 604 divisional and nondivisional cables designated with a"IE" suffix will be corrected by retagging both the cables and the appropriate raceway.The five cables that were deenergized for Unit 2 restart will be modified as appropriate.
: c. A 100-percent review of V3 nondivisional cables which originate from safety-related power supplies,
The 109 nondivisional V4 and V5 cables contained in the project Q-list will be corrected by retagging both the cable and the appropriate raceway.The project Q-list will be revised to remove the V1, V2, V3, V4 and V5 sample cables determined by the evaluation to be nonsafety-1 I related and nondivisional.
: d. A random sample on nondivisional V3 cables which originate from nonsafety-related power supplies,
Additional Q-list evaluations will be handled in accordance with SSP-3.10.6.The following categories of separations discrepancies will be resolved in accordance with the Unit 2 precedent:
: e. A generic analysis of typical nondivisional V1/V2 circuits which originate from both safety-related and nonsafety-related power supplies,
a.A 100-percent review of V4/V5 cables which originate from safety-related power supplies, b.A random sample of nondivisional V4/V5 cables which originate from nonsafety-related power supplies, c.A 100-percent review of V3 nondivisional cables which originate from safety-related power supplies, d.A random sample on nondivisional V3 cables which originate from nonsafety-related power supplies, e.A generic analysis of typical nondivisional V1/V2 circuits which originate from both safety-related and nonsafety-related power supplies, f.A 100-percent review of cables designated with a suffix of"IE" or"IES", and g.A generic analysis of typical divisional V1/V2 circuits.7.The resolution of the following cable separation discrepancies will deviate from the Unit 2 precedent:
: f. A 100-percent review of cables designated with a suffix of "IE" or "IES", and
a~Review of field verified cable routing data from TVA's cable ampacity and Appendix R program-The cable and conduit database will be verified for divisional separation by random sample analysis and confirmation by walkdown and/or signal tracing to the relevant design criteria and meet the 95/95 confidence level criteria.b.Nondivisional V1, V2, V3, V4 and V5 cables contained in the Q-List-The unit 3 Q-list will establish a list of equipment and device IDs for safety-related and quality-related systems.
: g. A generic analysis of typical divisional V1/V2 circuits.
f 4~$E Circuit block diagrams will be analyzed to identify cables required in support of these equipment and device functions.
: 7. The resolution of the following cable separation discrepancies will deviate from the Unit 2 precedent:
The resulting list will be compared against the cable database to determine if cables are correctly identified as divisional.
a ~   Review of field verified cable routing data from TVA's cable ampacity and Appendix R program The cable and conduit database will be verified for divisional separation by random sample analysis and confirmation by walkdown and/or signal tracing to the relevant design criteria and meet the 95/95 confidence level criteria.
If it is determined that a change in divisional status is required, the respective cables will be evaluated against the separation criteria.Corrective actions will be implemented prior to fuel load.c~Cables contained in divisional and nondivisional cable trays that physically connect-Corrective actions involving cable separation discrepancies resolved for unit 2 restart by opening breakers will be implemented prior to Unit 3 fuel load.8.Cable PL1163 will be double isolated prior to restart of Unit 3.Discussion:
: b. Nondivisional V1, V2, V3, V4 and V5 cables contained in the Q-List The unit 3 Q-list will establish a list of equipment and device IDs for safety-related and quality-related systems.
~~9.Cable 3PL575 will be rerouted to correct the deficiency in accordance with the TVA design requirements prior to Unit 3 restart.TVA had identified instances where the electrical separation requirements had not been met at BFN.These discrepancies were discovered while implementing design changes and conducting reviews as part of the BFN Unit 2 recovery effort and was documented in LER 88-032, dated October 21, 1988 (Reference 1)and subsequent condition adverse to quality reports (CAQRs).TVA submitted the Reference 2 cable separation report to the NRC to describe TVA's plan for evaluating the problem and correcting discrepancies for Unit 2 restart.Revisions 1, 2, and 3 to this report were submitted by References 3, 4 and 5 respectively.
The cable separation report provided the details of the evaluation and the results.In addition, some corrective actions were identified which required implementation prior to Unit 2 restart and some were required after Unit 2 restart.The corrective actions required prior to Unit 2 restart were subsequently completed.
The post Unit 2 restart items included commitments 1 through 5 above.In addition to the post Unit 2 restart corrective actions that resulted from the Unit 2 evaluation, a Units 1 and 3 specific action plan to
<~lf'+5 disposition concerns related to cable installation issues, including cable separation, was provided in Reference 6.The Unit 3 plans for resolution are included in Commitments 6 and 7 above.The following deviations were proposed from the Unit 2 precedent:
1.Unit 2 cables were manually routed.Since Unit 3 was constructed using a computerized cable routing system, two random samples would be analyzed to verify cable routing data to the same 95/95 confidence level as was used for Unit 2.2.The development of the Q-List will identify the safety and quality related systems.Circuit block diagrams will be analyzed to identify the associated cables.A comparison of the cable database will be performed to determine if the cables're correctly identified as divisional.
3.For cables contained in divisional and nondivisional cable trays, corrective actions involving cable separation discrepancies will be resolved.The Safety Evaluation on this program was provided by Reference 7.In summary, the seven categories of separation discrepancies that were to be resolved in accordance with the Unit 2 precedent were adequate to resolve these discrepancies for Unit 3.In addition: 1.The action plan and the acceptance criteria for the review of field verified cable routing data was considered adequate to resolve the cable routing validation issue for Unit 3, 2.The action plan for,resolving the nondivisional cables issue was considered adequate, and 3.Additional information was requested regarding the corrective actions to be implemented for discrepancies associated with the two cables contained in divisional and nondivisional cable trays that physically connect.This additional information was provided by TVA in Reference 8.The information provided specifically described the corrective actions to implement commitment 7.c above which resulted in 1~
commitments 8 and 9 above.The NRC Staff accepted this determination in Reference 9.Complete.1~2~The sixteen V4 and V5 cables originating from safety-related power supplies and that were deenergized for Unit 2.restart have been appropriately modified.Seven of the eight nondivisional V3 cables originating from safety-related power supplies that were deenergized for Unit 2 restart have been appropriately modified.The remaining one cable affects Unit 1 only and will be appropriately modified prior to Unit 1 restart.3~600 of the 604 divisional and nondivisional cables designated with a"IE" suffix were corrected by updating the design drawings.An exception was issued for three cables.One cable is a Unit 1 only cable and will be corrected prior to restart of Unit 1.Physical retagging was determined by the commitment management process to be unnecessary.
Cables that were deenergized for Unit 2 restart were appropriately modified.4.The 109 nondivisional V4 and V5 cables contained in the project Q-list were corrected by updating the design drawings.Physical retagging was determined by the commitment management process to be unnecessary.
5.The project Q-list has been revised to remove the V1, V2, V3, V4, and V5 sample cables determined by the evaluation to be nonsafety-related and nondivisional.
6~a~b.V4 and V5 cables originating from safety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent.
Breakage identified by the evaluation has been resolved by modifications.
V4 and V5 nondivisional cables originating from nonsafety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent.
Breakage identified by, the evaluation has been resolved by modifications.
I C~V3 nondivisional cables originating from safety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent.
Breakage identified by the evaluation has been resolved by modifications.
d.e.go V3 nondivisional cables originating from nonsafety-related power supplies were evaluated for separation in, accordance with the Unit 2 precedent.
Breakage identified by the evaluation has been resolved by modifications.
V1 and V2 nondivisional cables originating from both safety-related and nonsafety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent.
The evaluation concluded there is not a concern relative to the separation of these cables.These are low energy cables and therefore do not result in a concern using the separation criteria.Cables designated with a"IE" or"IES" suffix were evaluated and rerouted and/or downgraded as required.V1 and V2 divisional cables were evaluated for separation in accordance with the Unit 2 precedent.
The evaluation concluded there is not a concern relative to the separation of these cables.These are low energy cables and therefore do not result in a concern using the separation criteria.7~a 0 b.The Unit 3 Consolidated Cable Routing System (CCRS)database information was validated for divisional separation to a 95/95 confidence level using two random samples.The samples were analyzed either by walkdown and/or signal tracing to the relevant design criteria.Nondivisional V1, V2, V3, V4 and V5 cables contained in the Q-list were evaluated against the separation criteria.Breakage identified by the evaluation consisted of either cables which were incorrectly identified as having a safety-related active function or required rework to conform to the separation criteria.Cables were either E1-22 r ii 1 appropriately downgraded, modified or justified for use-as-is based on a specific evaluation., The specific steps to implement this commitment have been modified in accordance with the commitment management process.NRC was notified of these changes by Reference 10.c~Cable routed through node points where divisional and nondivisional cable trays are physically connected were evaluated against the separation criteria.In cases where cable breakage was identified, cables were either rerouted, retagged, double isolated and/or exceptions to the criteria were approved.See commitments 8 and 9 below.8.Cable PL1163 has been double isolated.9.Cable 3PL575 has been rerouted.


==References:==
E f 4 ~


1.Licensee Event Report (LER)259-88-032 dated 10/21/88, Violation of Electrical Separation Requirements 2.TVA letter to NRC dated 1/6/89, Electrical Cable Separ ation 3.TVA letter to NRC dated 6/9/89, Electrical Cable Separation 4.TVA letter to NRC, dated 10/23/89, Electrical Cable Separation 5.TVA letter to NRC dated 12/14/89, Electrical Cable Separation 6.TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 7.NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues 8.TVA letter to NRC, dated December 29, 1992, Response to Request for Additional Information on Electrical Cables in Divisional and Nondivisional Trays Which Are Physically Connected 9.NRC letter to TVA, dated January 28, 1993, Resolution of Cable Separation Discrepancies ii 10.TVA letter to NRC, dated October 25, 1995, Browns Ferry Nuclear Plant (BFN)-Units 1, 2, and 3 Revision to Commitments to Provide Continuous Indication of Containment Pressure, Piece Part Component, Qualification, and Cable Separation for Non-Divisional Cables on the Q-List Cable Installation Issue Number 3-Low Voltage Vertical Cable Supports Commitment:
Circuit block diagrams will be analyzed to identify cables required in support of these equipment and device functions.
The resulting list will be compared against the cable database to determine if cables are correctly identified as divisional. If it is determined that a change in divisional status is required, the respective cables will be evaluated against the separation criteria.
Corrective actions will be implemented prior to fuel load.
c ~  Cables contained in divisional and nondivisional cable trays that physically connect  Corrective actions involving cable separation discrepancies resolved for unit 2 restart by opening breakers will be implemented prior to Unit 3 fuel load.
: 8. Cable PL1163  will be double isolated  prior to restart of Unit  3.
: 9. Cable 3PL575 will be rerouted to correct the deficiency in accordance with the TVA design requirements prior to Unit 3 restart.
Discussion:
Discussion:
TVA will resolve the low voltage vertical cable supports issue in accordance with the Unit 2 precedent.
~      ~
The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1.The Safety Evaluation on this program was provided by Reference 2.In summary, since no Unit 2 cables with acceptable sidewall bearing pressure failed Hi-Pot testing, the walkdowns and evaluation of Class 1E low voltage power, control and instrumentation cables is adequate to satisfactorily resolve the vertical support issue.Status: Complete.TVA has analyzed safety-related low voltage cables that were installed in vertical raceways.Cables in one conduit exceeded the specified cable support spacing and the sidewall pressure limit.Insulation damage was also found on this cable.Additional supports were added and conduits/cables were replaced as required.
TVA had identified instances where the electrical separation requirements had not been met at BFN.
These discrepancies were discovered while implementing design changes and conducting reviews as part of the BFN Unit 2 recovery effort and was documented in LER 88-032, dated October 21, 1988 (Reference 1) and subsequent condition adverse to quality reports (CAQRs).
TVA submitted the Reference 2 cable separation report to the NRC to describe TVA's plan for evaluating the problem and correcting discrepancies for Unit 2 restart. Revisions 1, 2, and 3 to this report were submitted by References 3, 4 and 5 respectively. The cable separation report provided the details of the evaluation and the results. In addition, some corrective actions were identified which required implementation prior to Unit 2 restart and some were required after Unit 2 restart. The corrective actions required prior to Unit 2 restart were subsequently completed. The post Unit 2 restart items included commitments 1 through 5 above.
In addition to the post Unit 2 restart corrective actions that resulted from the Unit 2 evaluation, a Units 1 and 3 specific action plan to


==References:==
<~ lf '+5 disposition concerns related to cable installation issues, including cable separation, was provided in Reference 6. The Unit 3 plans for resolution are included in Commitments 6 and 7 above. The following deviations were proposed from the Unit 2 precedent:
: 1. Unit 2 cables were manually routed. Since Unit 3 was constructed using a computerized cable routing system, two random samples would be analyzed to verify cable routing data to the same 95/95 confidence level as was used for Unit 2.
: 2. The development of the Q-List will identify the safety and quality related systems.
Circuit block diagrams will be analyzed to identify the associated cables. A comparison of the cable database will be performed to determine if the cables're correctly identified as divisional.
: 3. For cables contained in divisional and nondivisional cable trays, corrective actions involving cable separation discrepancies will be resolved.
The Safety Evaluation on this program was provided by Reference 7. In summary, the seven categories of separation discrepancies that were to be resolved in accordance with the Unit 2 precedent were adequate to resolve these discrepancies for Unit 3. In addition:
: 1. The action plan and the acceptance criteria for the review of field verified cable routing data was considered adequate to resolve the cable routing validation issue for Unit 3,
: 2. The action plan for,resolving the nondivisional cables issue was considered adequate,  and
: 3. Additional information was requested regarding the corrective actions to be implemented for discrepancies associated with the two cables contained in divisional and nondivisional cable trays that physically connect.
This additional information was provided by TVA in Reference 8. The information provided specifically described the corrective actions to implement commitment 7.c above which resulted  in
 
1 ~
commitments  8 and 9  above. The NRC  Staff accepted  this determination in    Reference 9.
Complete.
1 ~ The  sixteen V4 and V5 cables originating from safety-related power supplies and that were deenergized for Unit 2.restart have been appropriately modified.
2 ~ Seven of the eight nondivisional V3 cables originating from safety-related power supplies that were deenergized for Unit 2 restart have been appropriately modified.
The remaining one cable affects Unit 1 only and will be appropriately modified prior to Unit 1 restart.
3 ~ 600 of the 604 divisional and nondivisional cables designated with a "IE" suffix were corrected by updating the design drawings.
An exception was issued for three cables.
One cable is a Unit 1 only cable and will be corrected prior to restart of Unit 1.
Physical retagging was determined by the commitment management process to be unnecessary. Cables that were deenergized for Unit 2 restart were appropriately modified.
: 4. The 109 nondivisional V4 and V5 cables contained in the project Q-list were corrected by updating the design drawings.
Physical retagging was determined by the commitment management    process  to  be unnecessary.
: 5. The  project Q-list has been revised to remove the V1, V2, V3, V4, and V5 sample cables determined by the evaluation to be nonsafety-related  and nondivisional.
6 ~ a ~  V4 and V5  cables originating from safety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent. Breakage identified by the evaluation has been resolved by modifications.
: b. V4 and V5 nondivisional cables originating from nonsafety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent.
Breakage identified by, the evaluation has been resolved by modifications.
 
I C~ V3  nondivisional cables originating from safety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent. Breakage identified by the evaluation has been resolved by modifications.
: d. V3 nondivisional cables originating from nonsafety-related power supplies were evaluated for separation in, accordance with the Unit 2 precedent. Breakage identified by the evaluation has been resolved by modifications.
: e. V1 and V2 nondivisional cables originating from both safety-related and nonsafety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent. The evaluation concluded there is not a concern relative to the separation of these cables. These are low energy cables and therefore do not result in a concern using the separation  criteria.
Cables designated with a "IE" or "IES" suffix were evaluated and rerouted and/or downgraded as required.
go V1 and V2  divisional cables were evaluated for separation in accordance with the Unit 2 precedent. The evaluation concluded there is not a concern relative to the separation of these cables. These are low energy cables and therefore do not result in a concern using the separation criteria.
7 ~ a0 The Unit 3 Consolidated  Cable Routing System (CCRS) database  information was validated for divisional separation to a 95/95 confidence level using two random samples. The samples were analyzed either by walkdown and/or signal tracing to the relevant design criteria.
: b. Nondivisional V1, V2, V3, V4 and V5 cables contained in the Q-list were evaluated against the separation criteria. Breakage identified by the evaluation consisted of either cables which were incorrectly identified as having a safety-related active function or required rework to conform to the separation criteria. Cables were either E1-22


1.TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2.NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues E1-24 r~~1 4<4 Cable Installation Issue Number 4-Medium Voltage Cable Bend Radius[TAC M86255]Commitment:
r 1
Safety-related medium voltage cables will be identified, walked down and evaluated against the bend radius criteria used for Unit 2 (General Construction Specification G-38).The following corrective actions will be completed:
ii
A.Group 1 cables, with bend radius of less than 6 times the cable outside diameter (OD)will be replaced.B.Group 2 cables, with bend radius from 6 to less than 8 times the cable OD will be tested prior to restart and during subsequent outages to facilitate a trend analysis.C.Group 3 cables, with bend radius 8 times or greater than the cable OD will be allowed to remain in.service and be subjected to only normal maintenance testing.Discussion:
The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1.The Safety Evaluation of this program was provided by Reference 2.In summary, since safety-related medium voltage cables are to be identified, walked down and evaluated against the bend radius acceptance criteria contained in Construction Specification G-38 and dispositioned in accordance with the same criteria used for Unit 2, the proposed corrective actions are adequate.In Reference 3, TVA proposed a new program and corrective actions for medium cable bend radius issues.Results of reinspections were presented to NRC and Hi-Pot testing was replaced with Load Cycle and Corona Testing.Additional information regarding the revised program was requested in Reference 4, which was provided by TVA in Reference 5.NRC issuance of a Safety Evaluation for this program and a request for additional information was contained in Reference 6.TVA replied in Reference 7 and the Supplemental Safety Evaluation Report was provided in Reference 8.Status: Complete.TVA has performed an evaluation of the cable bend radius of Unit 3 safety-related medium voltage power cables against the TVA minimum bending radius criteria.Among the cables


Status: were the Type PN.Replacing this type of cable in Unit 3 10 CFR 50.49 circuits was considered adequate to resolve this issue.Complete.All type PN cables in 10 CFR 50.49 circuits have been replaced in Unit 3.In addition, conduit bushings were installed during the cable installation.
appropriately downgraded, modified or justified for use-as-is based on a specific evaluation., The specific steps to implement this commitment have been modified in accordance with the commitment management process.     NRC was notified of these changes by Reference 10.
TVA has analyzed other Unit 3, 10CFR50.49 cables for missing conduit bushings.Some cables have been replaced because of other issues and the conduit bushings were installed during the cable installation.
c ~  Cable routed through node points where divisional and nondivisional cable trays are physically connected were evaluated against the separation criteria. In cases where cable breakage was identified, cables were either rerouted, retagged, double isolated and/or exceptions to the criteria were approved. See commitments 8 and 9 below.
Protective sleeves have been installed on the remaining cables.
: 8. Cable PL1163 has been double    isolated.
: 9. Cable 3PL575 has been rerouted.


==References:==
==References:==
: 1. Licensee Event Report (LER) 259-88-032 dated 10/21/88, Violation of Electrical Separation Requirements
: 2. TVA  letter to  NRC  dated 1/6/89,  Electrical  Cable Separ  ation
: 3. TVA  letter to  NRC  dated 6/9/89,  Electrical  Cable Separation
: 4. TVA  letter to  NRC,  dated 10/23/89,  Electrical Cable Separation
: 5. TVA  letter to  NRC  dated 12/14/89,  Electrical Cable Separation
: 6. TVA  letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations
: 7. NRC  letter to  TVA,  dated April 8, 1992, Safety Evaluation of    TVA  Plans to Resolve Electrical Cable Installation and Separation Issues
: 8. TVA  letter to  NRC,  dated December 29, 1992, Response  to Request for Additional Information on Electrical Cables in Divisional and Nondivisional Trays Which Are Physically Connected
: 9. NRC letter to TVA, dated January 28, 1993, Resolution of Cable Separation Discrepancies


1.2~TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues Cable Installation Issue Number 6-Sidewall Pressure, Cable Pullbys, Cable Jamming, Pulling Around 90 Degree Condulets and thru Mid-Run Flex Conduit Issues Commitment:
ii
TVA will implement a confirmatory cable issues walkdown using the Unit 2 methodology for the sidewall pressure,'able pullbys, cable jamming, pulling around 90 degree condulets and thru mid-run flex conduit issues.Discussion:
: 10. TVA letter to NRC,   dated October 25, 1995, Browns Ferry Nuclear Plant (BFN)  Units 1, 2, and 3 Revision to Commitments to Provide Continuous Indication of Containment Pressure, Piece Part Component, Qualification, and Cable Separation for Non-Divisional Cables on the Q-List Cable Installation Issue Number   3  - Low  Voltage Vertical Cable Supports Commitment:     TVA will resolve the low voltage vertical cable supports issue in accordance with the Unit 2 precedent.
The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1.Information regarding cable walkdowns and cable routing system database validation was provided in Reference 2.A Safety Evaluation on cable installation and separation and request for additional information on divisional/nondivisional separation discrepancies was provided in Reference 3.In summary, cable damage was not identified on Unit 2 during the resolution of the sidewall pressure, cable pullbys, cable jamming and pulling around 90-degree condulets and through mid-run flex conduits issues.Confirmatory walkdowns are adequate to address this issue for Unit 3.El-27 w" , I I lt'l
Discussion:     The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, since no Unit 2 cables with acceptable sidewall bearing pressure failed Hi-Pot testing, the walkdowns and evaluation of Class 1E low voltage power, control and instrumentation cables is adequate to satisfactorily resolve the vertical support issue.
Status:          Complete. TVA has    analyzed safety-related low voltage cables that were installed in vertical raceways. Cables in one conduit exceeded the specified cable support spacing and the sidewall pressure limit. Insulation damage was also found on this cable. Additional supports were added and conduits/cables were replaced as required.


==References:==
==References:==
: 1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations
: 2. NRC  letter to  TVA,  dated April 8, 1992, Safety Evaluation of  TVA  Plans to Resolve Electrical Cable Installation and Separation Issues E1-24


1.2~3.4~5.6.addressed in the evaluation, five cables were replaced because of other cable issues.There were three other cables identified as Group 3 cables which will be allowed to remain in service and be subjected to only normal maintenance testing.TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues TVA letter to NRC, dated March 17, 1993, Medium Voltage Cable Bend Radius Issues NRC letter to TVA, dated August 23, 1993, Request for Additional Information Regarding Medium Voltage Cable Bend Radius TVA letter to NRC, dated January 10, 1994, Response to Request for Additional Information Regarding Medium Voltage Cable Bend Radius NRC letter to TVA, dated July 1, 1994, Safety Evaluation and Request for Additional Information Regarding Medium Voltage Cable Bend Radius Issues 7~TVA letter to NRC, dated September 15, 1994, Reply to NRC Request for additional Information (RAI)Regarding Medium Voltage Cable Bend Radius Issues 8.NRC letter to TVA, dated January 9, 1995, Supplemental Safety Evaluation for Medium Voltage Cable Bend Radius Cable Installation Issue Number S>>Missing Conduit Bushings Commitment:
~ 1 r
Discussion:
4<4
Type PN cables in 10 CFR 50.49 circuits will be replaced under the Environmental Qualification program.The action plan to disposition concern's related to cable installation issues, including cable separation, was provided in Reference 1.The Safety Evaluation on this program was provided by Reference 2.In summary, the only cables found damaged on Unit 2 as a result of pulling the cables over a conduit end with a missing bushing E1-26 lg,ll Status: Complete..TVA has performed confirmatory walkdowns~o address this issue for Unit There was nS sidewall pressure (SWP)in uc damage observe.However, cables with grea er than 360 degree<~of total bend between pu points were evalu ted and one cable with excessive sidewall pressure was found.This cable has been replace The results of the walkd wn also indicated that there was no damage obser~d as a result o pullbys, cable jamming, or cbulls around 90 degree condulets.
      ~
In addition, ther~were no mid-run flex conduits observed during th~walkdgyi.t.o these observations, no further ac%on concerning this issue is required.Ref erence's:=~1.(i='i~~1 TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2~TVA letter to NRC, dated March 6, 1992, Additional Information on TVA's Action Plan for Units 1 and 3 Cable Installation Issues Including Cable Separations 3~NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues Cable Installation Issue Number 7-Use of Condulets as Pull Points Commitment:
The 600V safety-related cables that are susceptible to damage from the use of condulets as pull points will be resolved in accordance with the Unit 2 precedent.
Discussion:
The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1.The Safety Evaluation on this program was provided by Reference 2.In summary, TVA's evaluation of this issue for Unit 2 determined that the type of conduit configurations susceptible to this problem was limited to several cases of 600 volt cables in three inch conduits.Therefore, TVA's program to identify and correct other susceptible Unit 3 conduits was satisfactory.
Complete.TVA performed an evaluation of 600 volt safety-related cables, installed in conduit, E1-28
~~1 I 0 for damage resulting from the use of condulet fittings as pullpoints.
There were six cases of jacket damage and two cases of insulation damage identified.
These cables have been replaced.


==References:==
Cable Installation Issue Number    4  - Medium  Voltage Cable Bend Radius [TAC M86255]
Commitment:     Safety-related medium voltage cables will be identified, walked down and evaluated against the bend radius criteria used for Unit 2 (General Construction Specification G-38). The following corrective actions will be completed:
A. Group 1 cables, with bend radius of less than 6 times the cable outside diameter (OD) will be  replaced.
B. Group 2 cables, with bend radius from 6 to less than 8 times the cable OD will be tested prior to restart and during subsequent outages to facilitate a trend analysis.
C. Group 3 cables, with bend radius 8 times or greater than the cable OD will be allowed to remain in .service and be subjected to only normal maintenance    testing.
Discussion:      The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation of this program was provided by Reference 2. In summary, since safety-related medium voltage cables are to be identified, walked down and evaluated against the bend radius acceptance criteria contained in Construction Specification G-38 and dispositioned in accordance with the same criteria used for Unit 2, the proposed corrective actions are adequate.
In Reference 3, TVA proposed a new program and corrective actions for medium cable bend radius issues. Results of reinspections were presented to NRC and Hi-Pot testing was replaced with Load Cycle and Corona Testing. Additional information regarding the revised program was requested in Reference 4, which was provided by TVA in Reference 5. NRC issuance of a Safety Evaluation for this program and a request for additional information was contained in Reference 6. TVA replied in Reference 7 and the Supplemental Safety Evaluation Report was provided in Reference 8.
Status:          Complete. TVA has  performed an evaluation of the cable bend radius of Unit 3 safety-related medium voltage power cables against the TVA minimum bending radius criteria. Among the cables


1.TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2~NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues Cable Installation Issue Number 8-Medium Voltage Vertical Cable Supports Commitment:
were the Type PN.     Replacing this type of cable in Unit  3  10 CFR 50.49  circuits was considered adequate to resolve this issue.
The medium voltage vertical cable supports issue will be resolved by evaluating cables not meeting the vertical cable support criteria for static sidewall bearing pressure (SSBP).Cables with unacceptable SSBP will be Hi-Pot tested.Cables passing the Hi-Pot test will be supported in accordance with G-38.Cables failing the Hi-Pot test will be replaced.Discussion:
Status:            Complete. All type PN cables in 10 CFR 50.49 circuits have been replaced in Unit 3. In addition, conduit bushings were installed during the cable installation. TVA has analyzed other Unit 3, 10CFR50.49 cables for missing conduit bushings. Some cables have been replaced because of other issues and the conduit bushings were installed during the cable installation.
The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1.The Safety Evaluation on this program was provided by Reference 2.In summary, since no Unit 2 cables with acceptable sidewall bearing pressure failed Hi-Pot testing, the walkdowns and evaluation of Class 1E medium voltage cables is adequate to satisfactorily resolve the vertical support issue.Status: Complete.TVA has analyzed safety-related medium voltage cables that were installed in vertical raceways.*Cables in three conduits exceeded the specified cable support spacing and the sidewall pressure limit.Additional supports were added and conduits/cables were replaced as required.
Protective sleeves have been installed on the remaining cables.


==References:==
==References:==
: 1. TVA  letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2 ~  NRC  letter to  TVA, dated  April 8, 1992, Safety Evaluation of    TVA Plans  to Resolve Electrical Cable  Installation  and Separation Issues Cable  Installation Issue    Number 6 - Sidewall Pressure, Cable Pullbys,  Cable  Jamming,  Pulling  Around 90 Degree Condulets and thru Mid-Run Flex Conduit Issues Commitment:      TVA will implement a confirmatory cable issues walkdown using the Unit 2 methodology for the sidewall pressure,'able pullbys, cable jamming, pulling around 90 degree condulets and thru mid-run  flex conduit issues.
Discussion:      The  action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1.
Information regarding cable walkdowns and cable routing system database validation was provided in Reference 2.
A  Safety Evaluation on cable installation and separation and request for additional information on divisional/nondivisional separation discrepancies was provided in Reference 3. In summary, cable damage was not identified on Unit 2 during the resolution of the sidewall pressure, cable pullbys, cable jamming and pulling around 90-degree condulets and through mid-run flex conduits issues. Confirmatory walkdowns are adequate to address this issue for Unit 3.
El-27


1.2~TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues El-29 0 4 Cable Tray Supports[TAC M80684]Discussion:
w" I I lt 'l
TVA intends to utilize the Seismic Qualification Utility Group (SQUG)Generic Implementation Procedure (GIP)for seismic qualification of cable trays.The original action plan to disposition concerns related to Unit 3 cable tray supports was provided in Reference 1.However, due to the issuance of Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI)A-46, BFN submitted a revised program in order to take advantage of the NRC approved process for resolving USI A-46 (Reference 2).NRC requested additional information regarding the schedule for implementing the revised program in Reference 3.In Reference 4, TVA committed to implement the long-term qualification of cable trays and supports prior to Unit 3 restart.In Reference 5, NRC determined that it was acceptable for TVA to complete the portion of its USI A-46 program that pertain to cable trays, including their supports, prior to Unit 3 restart.Status:
 
addressed in the evaluation, five cables were replaced because of other cable issues. There were three other cables identified as Group 3 cables which will be allowed to remain in service and be subjected to only normal maintenance testing.


==References:==
==References:==
: 1. TVA  letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2 ~  NRC  letter to  TVA,  dated April 8, 1992, Safety Evaluation of  TVA  Plans to Resolve Electrical Cable Installation and Separation Issues
: 3. TVA letter to NRC, dated March 17, 1993, Medium Voltage Cable Bend Radius Issues 4 ~  NRC letter to TVA, dated August 23, 1993, Request for Additional Information    Regarding Medium Voltage Cable Bend Radius
: 5. TVA letter to NRC, dated January 10, 1994, Response to Request for Additional Information Regarding Medium Voltage Cable Bend Radius
: 6. NRC letter to TVA, dated July 1, 1994, Safety Evaluation and Request for Additional Information Regarding Medium Voltage Cable Bend Radius Issues 7 ~  TVA  letter to  NRC, dated September 15, 1994, Reply to  NRC  Request for additional Information (RAI) Regarding Medium Voltage Cable Bend Radius Issues
: 8. NRC  letter to TVA, dated January 9, 1995, Supplemental Safety Evaluation for Medium Voltage Cable Bend Radius Cable Installation Issue  Number  S  >>  Missing Conduit Bushings Commitment:      Type PN cables  in  10 CFR  50.49 circuits will be replaced under the Environmental Qualification program.
Discussion:      The  action plan to disposition concern's related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, the only cables found damaged on Unit 2 as a result of pulling the cables over a conduit end with a missing bushing E1-26


1.Open.The field work associated with this issue has been completed.
lg, ll
TVA is currently in the process of paper closure and independent verification.
 
These remaining items will be completed prior to restart.TVA letter to NRC, dated March 27, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Tray Supports 2~3~TVA letter to NRC, dated September 21, 1992, Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI)A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE)for Severe Accident Vulnerabilities NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant 4~TVA letter to NRC, dated January 19, 1993, Generic Letter (GL)87-02, Supplement 1, 120-Day Response, Request for Additional Information El-30 i~a 5.NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant Component and Piece Part Qualification
Status:                Complete.   .TVA has performed confirmatory walkdowns ~o address this issue for Unit There was nS sidewall pressure (SWP) in uc damage observe.      However, cables with grea er than 360 degree<~ of total bend between pu points were evalu ted and one cable with excessive sidewall pressure was found. This cable has been replace The results of the walkd wn also indicated that there was no damage obser ~d as a result o degree pullbys, cable jamming, or cbulls around mid-run 90 condulets. In addition, ther~ were no flex conduits observed during th ~ walkdgyi.
[TAC M83828]Commitment:
t.o these observations, no further ac%on concerning this issue is required.
Discussion:
Ref erence's:=~1.       TVA letter to NRC, dated May 10, 1991, Action
Status:
              = 'i~~ Plan to Disposition Concerns Related to Units 1 (i
1 and 3 Cable Installation Issues Including Cable Separations 2 ~   TVA letter to NRC, dated March 6, 1992, Additional Information on TVA's Action Plan for Units 1 and 3 Cable Installation Issues Including Cable Separations 3  ~  NRC letter to TVA,   dated April 8, 1992, Safety Evaluation of  TVA  Plans to Resolve Electrical Cable Installation and Separation Issues Cable  Installation Issue        Number 7  - Use of Condulets as Pull Points Commitment:            The 600V  safety-related cables that are susceptible to damage from the use of condulets as pull points will be resolved in accordance with the Unit 2 precedent.
Discussion:            The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, TVA's evaluation of this issue for Unit 2 determined that the type of conduit configurations susceptible to this problem was limited to several cases of 600 volt cables in three inch conduits. Therefore, TVA's program to identify and correct other susceptible Unit 3 conduits was satisfactory.
Complete. TVA performed an evaluation of 600 volt safety-related cables, installed in conduit, E1-28


==References:==
  ~~
1 I
0


1.TVA will implement a component and piece part qualification program.In Reference 1, TVA provided a change in methodology in performing the component and piece part qualification for safety-related components in 10 CFR 50.49 applications.
for  damage  resulting from the use of condulet fittings  as pullpoints. There were six cases of jacket damage and two cases of insulation damage identified. These cables have been replaced.
TVA proposed to use statistical sampling techniques to achieve a 95/95 confidence level of qualification adequacy as opposed to the 100 percent verification performed for Unit 2.Additional information was requested by the NRC Staff in Reference 2, which was provided by TVA in Reference 3.In Reference 4, NRC responded that this issue would be addressed by inspection rather than a revision to the Safety Evaluation.
Since this correspondence, TVA has decided to perform a 100 percent verification as performed on Unit 2.Open.The field work associated with this issue has been completed.
TVA is currently in the process of paper closure and independent verification.
These remaining items will be completed prior to restart.TVA letter to NRC, dated June 12';1992, Request for Revision to Safety Evaluation Issued by NRC on January 10,1990, Related to Component and Piece Part Qualification Plan 2~NRC letter to TVA, dated October 29, 1992, Request for Additional Information Regarding Browns Ferry Nuclear Plant Units 1 and 3 Component and Piece Parts Qualification Program 3~TVA letter to NRC, dated December 17, 1992, Request for Additional Information (RAI)Regarding BFN Units 1 and 3 Component and Piece Parts Qualification Plan 4~NRC letter to TVA, dated December 7, 1993, Browns Ferry Nuclear Plant Units 1 and 3 Component and Piece Parts Qualification Program El-3 1 0\4 J Conduit Supports[TAC M80690 and R00024]Commitment:
Discussion:
Status:


==References:==
==References:==
 
: 1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2 ~ NRC letter to   TVA,   dated April 8, 1992, Safety Evaluation of   TVA  Plans to Resolve Electrical Cable Installation and Separation Issues Cable Installation Issue Number      8 - Medium Voltage Vertical Cable Supports Commitment:     The medium    voltage vertical cable supports issue will be  resolved by evaluating cables not meeting the vertical cable support criteria for static sidewall bearing pressure (SSBP). Cables with unacceptable SSBP will be Hi-Pot tested. Cables passing the Hi-Pot test will be supported in accordance with G-38. Cables failing the Hi-Pot test will be replaced.
1.TVA intends to utilize the Seismic Qualification Utility Group (SQUG)Generic Implementation Procedure (GIP)for seismic qualification of conduit supports.The original action plan to disposition concerns related to Unit 3 conduits and conduit supports was provided in References 1 through 3 and approved in Reference 4.However, due to the issuance of Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI)A-46, BFN submitted a revised program in order to take advantage of the NRC approved process for resolving USI A-46 (Reference 5).NRC requested additional information regarding the schedule for implementing the revised program in Reference 6.In Reference 7, TVA committed to implement the long-term qualification of conduits and conduit supports prior to Unit 3 restart.In Reference 8, NRC determined that it was acceptable for TVA to complete the portion of its USI A-46 program that pertain to conduits and conduit supports, prior to Unit 3 restart in lieu of its prior restart commitments.
Discussion:     The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, since no Unit 2 cables with acceptable sidewall bearing pressure failed Hi-Pot testing, the walkdowns and evaluation of Class 1E medium voltage cables is adequate to satisfactorily resolve the vertical support issue.
Open.The field work associated with this issue has been completed.
Status:         Complete. TVA has  analyzed safety-related medium voltage cables that were installed in vertical raceways. *Cables in three conduits exceeded the specified cable support spacing and the sidewall pressure limit. Additional supports were added and conduits/cables were replaced as required.
TVA is currently in the process of paper closure and independent verification.
These remaining items will be completed prior to restart.TVA letter to NRC, dated May 6, 1991, Program for Resolving Conduit.and Conduit Supports Issue Prior to the Restart of Units 1 and 3 2~TVA letter to NRC, dated December 12, 1991, Small Bore Piping Program, Tubing, and Conduit Support Plans for Units 1 and 3-Additional Information 3~TVA letter to NRC, dated January 29, 1992, Action Plan to Disposition Concerns Related to Units 1 and 3 Conduit and Conduit Support-Additional Information 4~NRC letter to TVA, dated March 20, 1992, Safety Evaluation of Action Plan to Resolve Conduit and Conduit Supports Issues for the Browns Ferry Nuclear Plant Units 1 and 3 El-32 8*s~
5.TVA letter to NRC, dated September 21, 1992, Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI)A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE)for Severe Accident Vulnerabilities 6.NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant 7~8.TVA letter to NRC, dated January 19, 1993, Generic Letter (GL)87-02, Supplement 1, 120-Day Response, Request for Additional Information NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant Configuration Management/Design Baseline fTAC M80688]Commitment:
The Unit 3 Design Baseline Verification Program (DBVP)will consolidate the two-phase (pre-and post-restart) approach performed on Unit 2.Discussion:
The objective of the DBVP was to re-establish the design basis and evaluate the plant configuration to ensure that it satisfies the design basis.The DBVP, including a discussion of lessons learned from the Unit 2 precedent, was provided in Reference 1.In Reference 2, NRC determined that this commitment was more comprehensive than that accepted by the staff for Unit 2, and was therefore acceptable.
Status: Open.TVA will complete this item prior to restart.


==References:==
==References:==
: 1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2 ~  NRC  letter to  TVA, dated April 8, 1992, Safety Evaluation of    TVA Plans to Resolve Electrical Cable  Installation    and Separation Issues El-29


l.TVA letter to NRC, dated June 13, 1991, Design Baseline Verification Program (DBVP).2~NRC letter to TVA, dated November 21, 1991, Assessment of Browns Ferry Nuclear Plant, Units 1 and 3 Design Baseline Verification Program Containment Coatings The containment coating program will be implemented in accordance with the Unit 2 precedent.
0 4
E1-33


Discussion:
Cable Tray Supports [TAC M80684]
Status: TVA performed walkdown inspections of unqualified coating on components installed inside primary containment on Unit 2 to baseline the uncontrolled coating log.An analysis was performed to determine the maximum allowable quantity of coating debris which could be transported to the suction strainers without affecting the ability of the ECCS pumps to perform their post-Loss of Coolant Accident (LOCA)function.Corrective actions were taken to ensure that the amount of unqualified coating is maintained below the maximum allowable quantity.On June 23, 1994, NRC issued a Notice of Violation for the misapplication of protective coatings on BFN Unit 2 suppression chamber T-quenchers (Reference 1).As part of the July 17, 1994, reply to the Notice of Violation (Reference 2), TVA committed to remove the misapplied coating from the Unit 3 T-quenchers, sample other stainless steel components within the Unit 3 primary containment, and'ake appropriate action to ensure that other similar unanalyzed coating conditions do not exist.As discussed in Reference 3, TVA identified other instances of coated stainless steel.The coating exhibited a high degree of resiliency to several removal methods.Therefore, TVA is pursuing the qualification of this coating for stainless steel applications.
TVA intends to   utilize    the Seismic Qualification Utility Group    (SQUG)  Generic Implementation Procedure  (GIP)  for  seismic qualification of cable trays.
Complete.The containment coating program has been implemented for Unit 3.
Discussion:    The  original action plan to disposition concerns related to Unit 3 cable tray supports was provided in Reference 1. However, due to the issuance of Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46, BFN submitted a revised program in order to take advantage of the NRC approved process for resolving USI A-46 (Reference 2). NRC requested additional information regarding the schedule for implementing the revised program in Reference 3.
In Reference 4, TVA committed to implement the long-term qualification of cable trays and supports prior to Unit 3 restart. In Reference 5, NRC determined that      it was acceptable for TVA to complete the portion of its USI A-46 program that pertain to cable trays, including their supports, prior to Unit      3 restart.
Status:        Open. The field work associated with this issue has been completed.       TVA is currently in the process of paper closure and independent verification. These remaining items        will be completed  prior to restart.


==References:==
==References:==
: 1. TVA  letter to NRC, dated March 27, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Tray Supports 2 ~ TVA  letter to  NRC,    dated September 21, 1992, Supplement  1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities 3 ~ NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear      Plant 4 ~ TVA  letter to  NRC,    dated January 19, 1993, Generic Letter    (GL) 87-02, Supplement 1, 120-Day Response,  Request    for Additional Information El-30


1.NRC letter to TVA, dated June 23, 1994, Notice of Violation (NRC Inspection Report 50-260/94-09) 2~TVA letter to NRC, dated July 17, 1994, Reply to Notice of Violation (NOV)Regarding Inappropriate T-Quencher Coating (NRC Inspection Report 50-260/94-09) 3~TVA letter to.NRC, dated November 10, 1994/Evaluation of Epoxy Coating on Stainless Steel Components Inside the Unit 2 Suppression Chamber Control Rod Drive (CRD)Insert and lifithdrawal Piping Commitment:
i ~ a
The seismic qualification of the CRD insert and withdrawal piping will be implemented in accordance with the Unit 2 precedent.
: 5. NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement  1 Response  Browns Ferry Nuclear Plant Component and Piece  Part Qualification  [TAC M83828]
E1-34 Discussion:
Commitment:     TVA  will implement  a component and  piece part qualification program.
TVA's program for the seismic qualification of the 185 CRD insert and withdrawal lines on Unit 2 was provided in Reference 1 and approved by NRC in Reference 2.Status: Complete.The Unit 3 CRD insert and withdrawal piping supports have been modified as determined by stress analyses performed on the installed piping configurations.
Discussion:     In Reference 1, TVA provided a change in methodology in performing the component and piece part qualification for safety-related components in 10 CFR 50.49 applications. TVA proposed to use statistical sampling techniques to achieve a 95/95 confidence level of qualification adequacy as opposed to the 100 percent verification performed for Unit 2. Additional information was requested by the NRC Staff in Reference 2, which was provided by TVA in Reference 3. In Reference 4, NRC responded that this issue would be addressed by inspection rather than a revision to the Safety Evaluation. Since this correspondence, TVA has decided to perform a 100 percent verification as performed on Unit 2.
The modifications for Unit 3 consisted of the installation of new pipe support frames rather than the modification of the original framing as was performed for the Unit 2 piping.NRC has conducted a walkdown inspection of the Unit 3 CRD pipe support frames.The inspector concluded that the modifications were implemented in accordance with design requirements and this issue is resolved for Unit 3 restart.This is documented in Reference 3.
Status:        Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.


==References:==
==References:==
: 1. TVA letter to NRC, dated June 12'; 1992, Request for Revision to Safety Evaluation Issued by NRC on January 10,1990, Related to Component and Piece Part Qualification Plan 2 ~ NRC letter to TVA, dated October 29, 1992, Request for Additional Information Regarding Browns Ferry Nuclear Plant Units 1 and 3 Component and Piece Parts Qualification Program 3 ~ TVA letter to NRC, dated December 17, 1992, Request for Additional Information (RAI)
Regarding BFN Units 1 and 3 Component and Piece Parts Qualification Plan 4 ~ NRC letter to TVA, dated December 7, 1993, Browns Ferry Nuclear Plant Units 1 and 3 Component and Piece Parts Qualification Program El-3 1


1.TVA letter to NRC, dated December 11, 1989, Revised Program Plan-Seismic Qualification of the Control Rod Drive Hydraulic (CRDH)Piping System 2.NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2-Browns Ferry, Unit 2, Section 2.2.3.2 (Page 2-9)3~NRC letter to TVA, dated October 12, 1995,, NRC Inspection Report 95-52[Section 3.4, page 5]Design Calculations Review Commitment:
0
Discussion:
\ 4 J
The design calculations review will be implemented in accordance with the Unit 2 precedent.
 
The reconciliation of the plants configuration to engineering design documents, including essential calculations, is included as part of the Design Baseline Verification Program.Status: Refer to the section entitled Configuration Management/Design Baseline
Conduit Supports [TAC M80690 and R00024]
Commitment:    TVA intends to   utilize  the Seismic Qualification Utility Group    (SQUG)  Generic Implementation Procedure  (GIP) for  seismic qualification of conduit supports.
Discussion:    The original action plan to disposition concerns related to Unit 3 conduits and conduit supports was provided in References 1 through 3 and approved in Reference 4. However, due to the issuance of Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46, BFN submitted a revised program in order to take advantage of the NRC approved process for resolving USI A-46 (Reference 5). NRC requested additional information regarding the schedule for implementing the revised program in Reference 6.
In Reference 7, TVA committed to implement the long-term qualification of conduits and conduit supports prior to Unit 3 restart. In Reference 8, NRC determined that      it was acceptable for TVA to complete the portion of its USI A-46 program that pertain to conduits and conduit supports, prior to Unit 3 restart in lieu of  its prior restart commitments.
Status:         Open. The field work associated with this      issue has been completed.     TVA  is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.


==References:==
==References:==
: 1. TVA letter to NRC, dated May 6, 1991, Program      for Resolving Conduit. and Conduit Supports Issue Prior to the Restart of Units 1 and 3 2 ~ TVA  letter to NRC, dated December 12, 1991, Small Bore Piping Program, Tubing, and Conduit Support Plans for Units 1 and 3  Additional Information 3 ~ TVA  letter to NRC, dated January 29, 1992, Action Plan to Disposition Concerns Related to Units 1 and 3 Conduit and Conduit Support  Additional Information 4 ~ NRC  letter to TVA, dated March 20, 1992, Safety Evaluation of Action Plan to Resolve Conduit and Conduit Supports Issues for the Browns Ferry Nuclear Plant Units 1 and 3 El-32


None.E1-35 4 v~~
8 s ~
Environmental Qualification
: 5. TVA  letter to  NRC,  dated September 21, 1992, Supplement 1    to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities
[TAC M42483]Commitment:
: 6. NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear      Plant 7 ~ TVA  letter to NRC, dated January 19, 1993, Generic Letter (GL) 87-02, Supplement 1, 120-Day Response,    Request  for Additional Information
Discussion:
: 8. NRC  letter to  TVA,  dated March 19, 1993, Generic Letter 87-02,    Supplement 1 Response  Browns Ferry Nuclear Plant Configuration Management/Design Baseline      fTAC M80688]
Status: TVA will complete the qualification of Class IE safety-related equipment.
Commitment:     The  Unit  3  Design Baseline    Verification Program (DBVP) will consolidate    the two-phase (pre- and post-restart) approach performed on Unit 2.
The qualification of Class IE safety-related equipment will be accomplished when BFN certifies compliance with 10 CFR 50.49, Environmental qualification of electric equipment important to safety for nuclear power plants.Open.The field work associated with this issue has been completed.
Discussion:    The objective of the DBVP was to re-establish the design basis and evaluate the plant configuration to ensure that it satisfies the design basis.
TVA is currently in the process of paper closure and independent verification.
The DBVP, including a discussion of lessons learned from the Unit 2 precedent, was provided in Reference 1. In Reference 2, NRC determined that this commitment was more comprehensive than that accepted by the staff for Unit 2, and was therefore acceptable.
These remaining items will be completed prior to restart.
Status:        Open. TVA will complete this item prior to restart.


==References:==
==References:==
: l. TVA letter to NRC, dated June 13, 1991, Design Baseline Verification Program (DBVP).
2 ~ NRC letter to TVA, dated November 21, 1991, Assessment of Browns Ferry Nuclear Plant, Units 1 and 3 Design Baseline Verification Program Containment Coatings The containment    coating program  will be implemented    in accordance with the Unit    2 precedent.
E1-33


None.Fire Protection/10 CFR 50, Appendix R[TAC M48136 and M85254]Commitment:
Discussion:     TVA  performed walkdown inspections of unqualified coating on components installed inside primary containment on Unit 2 to baseline the uncontrolled coating log. An analysis was performed to determine the maximum allowable quantity of coating debris which could be transported to the suction strainers without affecting the ability of the ECCS pumps to perform their post-Loss of Coolant Accident (LOCA) function. Corrective actions were taken to ensure that the amount of unqualified coating is maintained below the maximum allowable quantity.
Discussion:
On June 23, 1994, NRC issued a Notice of Violation for the misapplication of protective coatings on BFN Unit 2 suppression chamber T-quenchers (Reference 1). As part of the July 17, 1994, reply to the Notice of Violation (Reference 2), TVA committed to remove the misapplied coating from the Unit 3 T-quenchers, sample other stainless steel components within the Unit 3 primary containment, and'ake appropriate action to ensure that other similar unanalyzed coating conditions do not exist. As discussed in Reference 3, TVA identified other instances of coated stainless steel. The coating exhibited a high degree of resiliency to several removal methods. Therefore, TVA is pursuing the qualification of this coating for stainless steel applications.
TVA will implement a Fire Protection/10 CFR 50, Appendix R program.The overall action plan and schedule for the BFN Appendix R program was submitted in Reference 1.The Appendix R Safe Shutdown Program was provided in Reference 2.Required Technical Specification changes were requested in Reference 3.Status: Open.TVA will Implement a Fire Protection/10 CFR 50, Appendix R program prior to restart.
Status:         Complete. The containment coating program has been implemented for Unit 3.


==References:==
==References:==
: 1. NRC  letter to  TVA,  dated June 23, 1994, Notice of Violation  (NRC  Inspection Report 50-260/94-09) 2 ~ TVA letter to NRC, dated July 17, 1994, Reply to Notice of Violation (NOV) Regarding Inappropriate T-Quencher Coating (NRC Inspection Report 50-260/94-09) 3 ~ TVA  letter to. NRC, dated November 10, 1994/
Evaluation of Epoxy Coating on Stainless Steel Components Inside the Unit 2 Suppression Chamber Control  Rod Drive  (CRD)  Insert  and lifithdrawal Piping Commitment:      The seismic qualification of the CRD insert and withdrawal piping will be implemented in accordance with the Unit 2 precedent.
E1-34


1.2~3.TVA letter to NRC, dated July 11, 1991, Overall Action Plan and Schedule for the Appendix R Program for Unit 3 TVA letter to NRC, dated December 15, 1992, Unit 3 Appendix R'Program Submittal TVA letter to NRC, dated September 30, 1993, TVA BFN Technical Specification (TS)No.337, Appendix R License Amendment Flexible Conduits Commitment:
Discussion:      TVA's program  for the seismic qualification of the 185 CRD  insert and withdrawal lines on Unit 2 was  provided in Reference 1 and approved by NRC in Reference   2.
Actions necessary to disposition flexible conduit concerns for the 10 CFR 50.49.equipment will be completed prior to restart.Flexible conduits E1-36 E S attached to safety-related electrical equipment not.covered by 10 CFR 50.49 and within the scope of USI A-46 will be evaluated for seismic adequacy using the BFN A-46 program.Discussion:
Status:          Complete. The Unit 3 CRD insert and withdrawal piping supports have been modified as determined by stress analyses performed on the installed piping configurations. The modifications for Unit 3 consisted of the installation of new pipe support frames rather than the modification of the original framing as was performed for the Unit 2 piping.
The program and schedule for the resolution of flexible conduit issues for Unit 3 has been provided to the NRC as part of the resolution of Generic Letter 87-02.In Reference 1, TVA provided a schedule for flexible conduits associated with the resolution of USI A-46.NRC requested additional information regarding the schedule'in Reference 2..In Reference 3, TVA provided the schedule for completing flexible conduit concerns in two phases.Flexible conduits attached to electrical equipment covered by 10 CFR 50.49 would be resolved prior to restart of Unit 3.Seismic qualification of flexible conduit other than those connected to electrical equipment covered by 10 CFR 50.49 (i.e., important to safety, but in a mild environment) and within the scope of USI A-46 would be included as part of the resolution of USI A-46.In Reference 4, NRC found this program acceptable; however, additional information was requested regarding two separate issues regarding flexible conduit.TVA provided the requested information in Reference 5.Additional information was provided by TVA in Reference 6.NRC subsequently provided a supplemental safety evaluation in Reference 7.Status: Open.The restart portions of this issue have been completed by resolving those actions necessary for flexible conduits attached to electrical equipment covered by 10 CFR 50.49.These flexible conduits were analyzed per the requirements of TVA General Engineering Specification G-40.Any necessary modifications were identified and have been completed.
NRC has conducted a walkdown inspection of the Unit 3 CRD pipe support frames. The inspector concluded that the modifications were implemented in accordance with design requirements and this issue is resolved for Unit 3 restart. This is documented  in Reference 3.
Flexible conduits attached to safety-related electrical equipment.
not covered by 10 CFR 50.49 and within the scope of USI A-46 will be evaluated as part of the resolution of USI A-46.


==References:==
==References:==
 
: 1. TVA letter to NRC, dated December 11, 1989, Revised Program Plan  Seismic Qualification of the Control  Rod Drive Hydraulic  (CRDH) Piping System
1.TVA letter to NRC, dated September 21, 1992, Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI)A-46 and Supplement 4 to Generic Letter 88-20, Individual E1-37 Plant Examination of External Events (IPEEE)for Severe Accident Vulnerabilities 2~3 0 4~5.NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant TVA letter to NRC, dated January 19, 1993, Generic Letter (GL)87-02, Supplement 1, 120-Day Response, Request for Additional Information NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant TVA letter to NRC, dated October 15, 1993, Generic Letter (GL)87-02, Supplement 1, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI)A-46-Response to Request for Additional Information Regarding the Evaluation of the Seismic Adequacy of Flexible Conduit 6.7.TVA letter to NRC, dated September 28, 1995, Browns Ferry Nuclear Plant (BFN)-Units 1, 2, and 3-Seismic Adequacy of Flexible Conduits NRC letter to TVA, dated October 3, 1995, Supplemental Safety Evaluation of Flexible Conduit Seismic Design and Installation Criteria Fuses Commitment:
: 2. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement Browns Ferry, Unit 2, Section 2.2.3.2 (Page 2-9) 3 NRC letter to TVA, dated October 12, 1995,, NRC Inspection Report 95-52 [Section 3.4, page 5]
Discussion:
Design Calculations Review Commitment:     The design  calculations review will be implemented  in accordance with the Unit   2 precedent.
Status: The fuse issue will be resolved in accordance with the Unit 2 precedent.
Discussion:      The  reconciliation of the plants configuration to engineering design documents, including essential calculations, is included as part of the Design Baseline Verification Program.
NRC approval of TVA's fuse program is documented in NUREG-1232 (Reference 1).The completion plan for the fuse program'was provided by Reference 2.TVA committed to remove the reference to amperage from drawings and replace them with the appropriate unique identifier for Class 1E fuses and install permanent fuse labeling.Complete.The inspection of this issue by the NRC is documented in References 3 and 4.
Status:          Refer to the section entitled Configuration Management/Design Baseline


==References:==
==References:==
None.
E1-35


1.NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2-Browns Ferry, Unit 2, Section 3.11.2 (Page 3-9)2.TVA letter to NRC, dated January 29, 1992, Completion Plan for the Fuse Program El-38 t~)'
4 v ~~
3~4.NRC letter to TVA, dated February 21, 1995, NRC Inspection Report 95-02[Section 2, page 1]NRC letter to TVA, dated September 29, 1995, NRC Inspection:Report 95-45[Section 2, page 1]Generic Letter 82-33-Instrumentation to Follow the Course of an Accident-Regulatory Guide 1.97[TAC M51075]Commitment:
Environmental Qualification    [TAC M42483]
Discussion:
Commitment:     TVA will complete the qualification of Class IE safety-related equipment.
TVA will complete Generic Letter 82-33 Instrumentation to Follow the Course of an Accident-Regulatory Guide 1.97.Supplement 1 to NUREG-0737, which included the request to review Regulatory Guide 1.97, was sent to TVA in Reference 1.TVA originally responded to Generic Letter 82-33 in Reference 2.TVA was ordered to submit a report to NRC describing how the requirements of Supplement 1 to NUREG-0737 have been or will be met and an implementation schedule (Reference 3).NRC requested additional information and/or justification in Reference 4.TVA responded to this request in Reference 5.TVA provided updated information regarding Reactor Coolant System pressure indication in Reference 6.A Safety Evaluation Report (SER)was issued by NRC in Reference 7.As part of this SER, TVA was directed to qualify the instrumentation that measures seven variables in accordance with 10 CFR 50.49.TVA either provided additional justification or committed to upgrade the instrumentation discussed in the SER in Reference 8.A revised SER was issued as part of the NRC's February 8, 1990 letter (Reference 9).This revised SER also directed TVA to install a qualified neutron monitoring system.In Reference 10, TVA requested further BFN specific actions regarding the neutron flux monitoring instrumentation be deferred pending the resolution of the BUR Owners'roup appeal.In Reference 11, TVA identified previously submitted deviation to Regulatory Guide 1.97 for which NRC review was still required, addressed discrepancies between TVA letters and NRC SERs, and identified new deviations for NRC review.Additional information regarding emergency damper position indication was provided by TVA in Reference 12.The deviations addressed above were addressed in the NRC's May 10, 1991 SER Status: (Reference 13).In addition, implementation of qualified neutron flux monitoring capability was deferred pending review of an appeal by the BWR Owners Group.A revised SER regarding neutron flux monitoring instrumentation was issued in Reference 14.TVA's review of the BFN neutron flux monitoring instrumentation against the criteria referenced by the SER was provided in References 15 and 16.NRC acceptance of the deviation requested by TVA was documented in the May 3, 1994 SER (Reference 17).Complete.NRC has reviewed drawings, calculations, design criteria, and the Unit 3 Regulatory Guide 1.97 Compliance Report.In addition, walkd'owns of selected instrumentation was performed.
Discussion:      The qualification of Class IE safety-related equipment will be accomplished when BFN certifies compliance with 10 CFR 50.49, Environmental qualification of electric equipment important to safety for nuclear power plants.
Based on the results, NRC concluded that the Unit 3 Regulatory Guide 1.97 program.was being adequately implemented.
Status:         Open. The field work associated with this issue has been completed.       TVA is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.
This is documented in Reference 18.


==References:==
==References:==
None.
Fire Protection/10  CFR  50, Appendix    R [TAC M48136  and M85254]
Commitment:      TVA  will implement    a  Fire Protection/10  CFR 50, Appendix  R program.
Discussion:      The overall action plan and schedule for the BFN Appendix R program was submitted in Reference 1.
The Appendix R Safe Shutdown Program was provided in Reference 2. Required Technical Specification changes were requested in Reference 3.
Status:          Open. TVA  will Implement    a Fire Protection/10    CFR  50, Appendix  R  program  prior to restart.


1.2~NRC letter to All Licensees of Operating Reactors, Applicants for Operating Licenses, and Holders of Construction Permits, dated December 17, 1982, Supplement 1 to NUREG-0737-Requirements for Emergency Response Capability (Generic Letter 82-33)TVA letter to NRC, dated April 30, 1984, in regards to Generic Letter 82-33 3.NRC letter to TVA, dated June 12, 1984, Issuance of Orders Confirming Licensee Commitments on Emergency Response Capability 4~NRC letter to TVA, dated January 23, 1985, Emergency Response Capability
==References:==
-Conformance to R.G.1.97, Rev.2 5.6.TVA letter to NRC, dated May 7, 1985, in regards to conformance with Regulatory Guide 1.97 TVA letter to NRC, dated November 20, 1985, in regards to conformance with Regulatory Guide 1.97 7~NRC letter to TVA, date June 23, 1988, Generic Letter 82-33, Request for Compliance with the Guidelines of Regulatory Guide (R.G.)1.97 as Applied to Emergency Response Facilities 8.TVA letter to NRC, dated August 23, 1988, Response to NRC's Safety Evaluation Report on E1-40 r~I 9.10.12.13.14.15.16.17.18.Regulatory Guide'1.97 as Applied to Emergency Response Facilities Dated June 23, 1988 NRC letter to TVA, dated February 8, 1990, Emergency Response Capability
: 1. TVA letter to NRC, dated July 11, 1991, Overall Action Plan and Schedule for the Appendix R Program for Unit 3 2 ~ TVA letter to   NRC, dated December 15,     1992, Unit  3 Appendix  R 'Program Submittal
-Conformance to Regulatory Guide 1.97.Revision 3 TVA letter to NRC, dated September 14, 1990, Response to NRC's February 8, 1990 Safety Evaluation Report Regarding Conformance to Regulatory Guide 1.97, Revision 3-Neutron Flux Monitoring Instrumentation TVA letter to NRC, dated October 15, 1990, Response to NRC Supplemental Safety Evaluation Report (SER)on Regulatory Guide (RG)1.97 Compliance dated February 8, 1990.TVA letter to NRC, dated December 21, 1990, Regulatory Guide (RG)1.97 Emergency Ventilation Dampers Position Indication NRC letter to TVA, dated May 10, 1991, Safety Evaluation of Emergency Response Capability-Conformance to Regulatory Guide 1.97, Revision 3 NRC letter to TVA, dated May 27, 1993, Regulatory Guide 1.97-Boiling Water Reactor Neutron Flux Monitoring TVA letter to NRC, dated July 30, 1993, Regulatory Guide 1.97-Boiling Water Reactor Neutron Flux Monitoring TVA letter to NRC, dated March 10, 1994, Regulatory Guide 1.97-Boiling Water Reactor Neutron Flux Monitoring NRC letter to TVA, dated May 3, 1994, Boiling Water Reactor Neutron Flux Monitoring for the Browns Ferry Nuclear Plant NRC letter to TVA, dated August 25, 1995, NRC Inspection Report 95-39[Summary Results, Enclosure page 1]Generic Letter 83-28<<Salem ATWS, Item 1.2, Post Trip Review (Data and Information Capability)
: 3. TVA letter to   NRC, dated September 30, 1993,   TVA BFN  Technical Specification (TS) No. 337, Appendix  R License Amendment Flexible Conduits Commitment:     Actions necessary to disposition flexible conduit concerns for the 10 CFR 50.49.equipment will be completed prior to restart.       Flexible conduits E1-36
[TAC M53573]Commitment:
TVA will complete Generic Letter 83-28-Salem ATWS, Item 1.2.
i~" I.(
Discussion:
In response to Generic Letter 83-28, Item 1.2, TVA committed in Reference 1 to the installation of an upgraded process computer and an enhanced sequence of events recording capability.
TVA's response was found to be acceptable in the NRC's Safety Evaluation provided by Reference 2.As discussed in Reference 3, the discussed equipment has been replaced with more modern and sophisticated hardware, since the time of the original TVA submittal.
The previously described upgrade to a Digital VAX 11/750 process computer system was accomplished using a Digital VAX 6000 system.The functions previously performed by the sequence of events and time history recorder are now accomplished using the process computer system.However, the guidance contained in the Generic Letter and the requirements of the Safety Evaluation continue to be met.Status:


==References:==
E S


1.Complete.TVA has installed an upgraded process computer system which provides an enhanced sequence of evens recording capability.
attached to safety-related    electrical  equipment not. covered by 10 CFR 50.49 and within the scope of USI A-46 will be evaluated for seismic adequacy using the BFN A-46 program.
TVA letter to NRC, dated November 7, 1983, in regards to Generic Letter 83-28 2~NRC letter to TVA, dated June 12, 1985, Safety Evaluation for Generic Letter 83-28, Item 1.2, Post Trip Review (Data and Information Capability) 3.TVA letter to NRC, dated November 9, 1993, Completion of Unit 2 Commitment for Generic Letter 83-28, Item 1.2-Post-Trip Review-Data and Information Capability (GSI 75/MPA B-085)Generic Letter 83-28-Salem ATWS, Item 4.5.2, Periodic On-Line Testing[TAC M53966]Commitment:
Discussion:    The program and schedule    for the resolution of flexible conduit issues for Unit 3 has been provided to the NRC as part of the resolution of Generic Letter 87-02. In Reference 1, TVA provided a schedule for flexible conduits associated with the resolution of USI A-46. NRC requested additional information regarding the schedule'in Reference 2.. In Reference 3, TVA provided the schedule for completing flexible conduit concerns in two phases. Flexible conduits attached to electrical equipment covered by 10 CFR 50.49 would be resolved prior to restart of Unit 3. Seismic qualification of flexible conduit other than those connected to electrical equipment covered by 10 CFR 50.49 (i.e., important to safety, but in a mild environment) and within the scope of USI A-46 would be included as part of the resolution of USI A-46.
Discussion:
In Reference 4,  NRC  found  this program acceptable; however, additional information was requested regarding two separate issues regarding flexible conduit. TVA provided the requested information in Reference 5. Additional information was provided by TVA in Reference 6.
TVA will complete Generic Letter 83-28-Salem ATWS, Item 4.5.2.The NRC's position on this item was that plants not currently designed to permit periodic on-line testing shall justify not making modifications to permit such testing.Alternatives to on-line testing proposed by licensees will be considered where special circumstances exist and where the objective of high reliability can be met in another way.TVA's initial response to this item (Reference 1), stated that online testing was being evaluated.
NRC subsequently provided a supplemental safety evaluation in Reference 7.
A description of the Reactor Protection System (RPS)functional testing and
Status:        Open. The restart    portions of this issue have been completed by  resolving those actions necessary for flexible conduits attached to electrical equipment covered    by 10 CFR 50.49.
'I 0 reliability was provided by TVA in Reference 2.The NRC Safety Evaluation states the on-line testing capability of the BFN RPS meets the intent of this item and is therefore acceptable (Reference 3).Status:
These  flexible conduits were  analyzed per the requirements of  TVA  General Engineering Specification G-40. Any necessary modifications were identified and have been completed.
Flexible conduits attached to safety-related electrical equipment. not covered by 10 CFR 50.49 and within the scope of USI A-46 will be evaluated as part of the resolution of USI A-46.


==References:==
==References:==
: 1. TVA letter to NRC, dated September 21, 1992, Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual E1-37


1.2~Complete.TVA letter to NRC, dated November 7, 1983, in regards to Generic Letter 83-28 TVA letter to NRC, dated March 15, 1984, in regards to Generic Letter 83-28 3~NRC letter to TVA, dated September 2, 1986, Reactor Trip System Reliability, On-Line Testing, Generic Letter 83-28, Item 4.5.2 Generic Letter 83-28-Salem ATWS, Item 4.5.3, Intervals for On-Line Testing fTAC M53966]Commitment:
Plant Examination of External Events      (IPEEE) for Severe Accident Vulnerabilities 2 ~ NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant 3 0 TVA letter to NRC, dated January 19, 1993, Generic Letter (GL) 87-02, Supplement 1, 120-Day Response,  Request  for Additional Information 4 ~ NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement 1 Response  Browns Ferry Nuclear Plant
Discussion:
: 5. TVA letter to NRC, dated October 15, 1993, Generic Letter (GL) 87-02, Supplement 1, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46  Response to Request for Additional Information Regarding the Evaluation of the Seismic Adequacy of Flexible Conduit
TVA will complete Generic Letter 83-28-Salem ATWS, Item 4.5.3.The NRC Staff has reviewed the General Electric Topical Reports NEDC-30844, BWR Owners'roup (BWROG)Response to NRC Generic Letter 83-28, Item 4.5.3, and NEDC-30851Pg Technical Specifications Improvement Analysis for BWR Reactor Protection System, and issued a favorable Safety Evaluation Report (Reference 1).In Reference 2, TVA endorsed the BWROG position and stated the analysis presented in NEDC-30851P were applicable to BFN.No Technical Specification instrument calibration frequency extensions were requested based on these reports.Differences between the parts of the BFN Reactor Protection System (RPS)that perform the trip functions and those of the base case plant were analyzed using the procedures of Appendix K of NEDC-30851P to demonstrate no appreciable change in RPS availability or public risk.The Safety Evaluation that closed this item was provided by Reference 3.Status: Complete.TVA evaluated the BFN RPS and determined it was in conformance with the requirements contained in NEDC 30844A.
: 6. TVA letter to NRC, dated September 28, 1995, Browns Ferry Nuclear Plant (BFN)- Units 1, 2, and 3 Seismic Adequacy of Flexible Conduits
: 7. NRC letter to TVA, dated October 3, 1995, Supplemental Safety Evaluation of Flexible Conduit Seismic Design and Installation Criteria Fuses Commitment:    The fuse issue  will be  resolved in accordance with the Unit 2 precedent.
Discussion:    NRC approval of TVA's fuse program is documented in NUREG-1232 (Reference 1). The completion plan for the fuse program'was provided by Reference 2.
TVA committed to remove the reference to amperage from drawings and replace them with the appropriate unique identifier for Class 1E fuses and install permanent fuse labeling.
Status:         Complete. The inspection of this issue by the NRC is  documented  in References  3  and 4.


==References:==
==References:==
: 1. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2  Browns Ferry, Unit 2, Section 3.11.2 (Page 3-9)
: 2. TVA letter to  NRC,  dated January 29, 1992, Completion Plan  for the  Fuse Program El-38


1.NRC letter to BWR Owners Group, dated July 15, 1987, General Electric Company (GE)Topical Reports NEDC-30844,"BWR Owners'1-43 Group Response to NRC Generic Letter 83-28," and NEDC 30851PI Technical Specifications Improvement Analysis for BWR RPS" 2.TVA letter to NRC, dated July 5, 1990, Generic Letter 83-28, Required Actions Based on Generic Implications of Salem ATWS Events, Item 4.5.3, Reactor Trip System Reliability 3.NRC letter to TVA, dated-August 17, 1990, Safety Evaluation of Generic Letter 83-28, Item 4.5.3, Reactor Trip Reliability
t ~)'
-On-Line Functional Testing of the Reactor Trip System Generic Letter 83-36-NUREG-0737 Technical Specifications Commitment:
3 ~ NRC letter to TVA, dated February 21, 1995, NRC Inspection Report 95-02 [Section 2, page 1]
Discussion:
: 4. NRC letter to TVA, dated September 29, 1995, NRC Inspection:Report 95-45 [Section 2, page 1]
TVA will complete Generic Letter 83-36.Generic Letter 83-36 (Reference 1), dated November 1, 1983, requested Licensees implement Technical Specification changes resulting from the reviews of the Three Mile Island incident.The status of each item is referenced below:~Reactor Coolant System Vents (II.B.1)The Generic Letter states that there are no changes required in Technical Specification requirements for BWRs that do not have isolation condensers.
Generic Letter 82 Instrumentation to Follow the Course of an Accident - Regulatory Guide 1.97 [TAC M51075]
BFN does not have isolation condensers.
Commitment:     TVA will complete Generic Letter 82-33 Instrumentation to Follow the Course of an Accident  Regulatory Guide 1.97.
Thus the item is considered closed.~Post-accident Sampling System (II.B.3)The changes for the Post-Accident Sampling System were proposed by TVA letter, dated April 1, 1992 (Technical Specification No.302).These changes were approved as Amendment 180 on June 21, 1994.Thus the item is considered closed.~Noble Gas Effluent Monitors (II.F.1.1)
Discussion:    Supplement 1 to NUREG-0737, which included the request to review Regulatory Guide 1.97, was sent to TVA in Reference 1. TVA originally responded to Generic Letter 82-33 in Reference 2.
Technical Specification No.313 proposed the changes associated with the Noble Gas Effluent Monitor on October 7, 1993.These changes were approved in Amendment 187, dated December 21, 1994.Thus the item is considered closed.~Sampling and Analysis of Plant Effluents (II.F.1.2)
TVA was ordered to submit a report to NRC describing how the requirements of Supplement 1 to NUREG-0737 have been or will be met and an implementation schedule (Reference 3).
E1-44 0~r Amendment No.171, which was approved by NRC on August 22, 1989, removed the monitoring of iodides and particulates from the Unit 2 Technical Specifications.
NRC requested additional information and/or justification in Reference 4. TVA responded to this request in Reference 5. TVA provided updated information regarding Reactor Coolant System pressure indication in Reference 6.
Iodines and particulates are now measured by onsite laboratory analysis of particulate and carbon filters installed in the continuous flow effluent sample line.This amendment found these provisions to be in compliance with the requirements of Item ZI.F.2 and Regulatory Guide 1.97.Thus the item is considered closed.~Containment High-Radiation Monitor (II'.1.3)Technical Specification No.313, dated October 7, 1993 proposed the addition of two drywell radiation monitors changes.These changes were approved in Amendment 187, dated December 21, 1994.Thus the item is considered closed.~Containment Pressure Monitor (II.F.1.4)
A Safety Evaluation Report (SER) was issued by NRC in Reference 7. As part of this SER, TVA was directed to qualify the instrumentation that measures seven variables in accordance with 10 CFR 50.49. TVA either provided additional justification or committed to upgrade the instrumentation discussed in the SER in Reference 8. A revised SER was issued as part of the NRC's February 8, 1990 letter (Reference 9).
Amendment No.78, which was approved by NRC on August 27, 1984, referenced this TMI Action Item and stated that the operability and surveillance requirements on the new Unit 3 monitoring system are acceptable.
This revised SER also directed TVA to install a qualified neutron monitoring system. In Reference 10, TVA requested further BFN specific actions regarding the neutron flux monitoring instrumentation be deferred pending the resolution of the BUR Owners'roup appeal.
Thus the item is considered closed.~Containment Water Level Monitor (II.F.1.5)
In Reference 11, TVA identified previously submitted deviation to Regulatory Guide 1.97 for which NRC review was still required, addressed discrepancies between TVA letters and NRC SERs, and identified new deviations for NRC review.
Amendment No.78, which was approved by NRC on August 27, 1984, referenced this TMI Action Item and stated that the operability and surveillance requirements on the new monitoring system are acceptable for Unit 3.Thus the item is considered closed.~Containment Hydrogen Monitor (II.F.1.6)
Additional information regarding emergency damper position indication was provided by TVA in Reference 12. The deviations addressed above were addressed in the NRC's May 10, 1991 SER
TVA letter, dated March 7, 1984, stated that Browns Ferry Units 1, 2, and 3 had adequate technical specifications on the containment hydrogen monitors.Thus the item is considered closed.~Control Room Habitability Requirements (III.D.3.4)" TVA letter, dated March 7, 1984, stated that Table 3.2.G of the Technical Specifications listed the control room isolation E1-45


instrumentationg therefore, no revisions were required.Thus the item is considered closed.Status:  
(Reference 13). In addition, implementation of qualified neutron flux monitoring capability was deferred pending review of an appeal by the BWR Owners Group.
A  revised SER regarding neutron flux monitoring instrumentation was issued in Reference 14.
TVA's review of the BFN neutron flux monitoring instrumentation against the criteria referenced by the SER was provided in References 15 and 16.
NRC acceptance    of the deviation requested by TVA was documented in the May 3, 1994 SER (Reference 17) .
Status:         Complete. NRC  has reviewed drawings, calculations, design criteria, and the Unit 3 Regulatory Guide 1.97 Compliance Report. In addition, walkd'owns of selected instrumentation was performed. Based on the results, NRC concluded that the Unit 3 Regulatory Guide 1.97 program.was being adequately implemented. This is documented in Reference 18.


==References:==
==References:==
: 1. NRC letter to All Licensees of Operating Reactors, Applicants for Operating Licenses, and Holders of Construction Permits, dated December 17, 1982, Supplement 1 to NUREG-0737 Requirements for Emergency Response Capability (Generic Letter 82-33) 2 ~ TVA letter to NRC, dated April 30, 1984, in regards to Generic Letter 82-33
: 3. NRC letter to TVA, dated June 12, 1984, Issuance of Orders Confirming Licensee Commitments on Emergency Response Capability 4 ~ NRC letter to TVA, dated January 23, 1985, Emergency Response Capability  Conformance to R.G. 1.97, Rev. 2
: 5. TVA  letter to NRC, dated May 7, 1985, in regards to conformance with Regulatory Guide 1.97
: 6. TVA letter to NRC, dated November 20, 1985, in regards to conformance with Regulatory Guide 1.97 7 ~ NRC letter to TVA, date June 23, 1988, Generic Letter 82-33, Request for Compliance with the Guidelines of Regulatory Guide (R.G.) 1.97 as Applied to Emergency Response Facilities
: 8. TVA letter to NRC, dated August 23, 1988, Response to NRC's Safety Evaluation Report on E1-40
r
~ I


1.Complete.As discussed above for each specific item, TVA has completed the NUREG-0737 Technical Specifications changes associated with Generic Letter 83-36.NRC letter to All Boiling Water Reactor Licensees, dated November 1, 1983, NUREG-0737 Technical Specifications (Generic Letter No.83-36)Generic Letter 88-01-NRC Position on ZGSCC in BWR Austenitic Stainless Steel Piping fTAC M85296]Commitment:
Regulatory Guide'1.97 as Applied to Emergency Response  Facilities Dated June 23, 1988
Discussion:
: 9. NRC  letter to TVA, dated February      8, 1990, Emergency Response    Capability    Conformance  to Regulatory Guide 1.97. Revision 3
TVA will complete Generic Letter 88-01-NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.TVA's program to address Generic Letter 88-01 was provided by Reference 1.The Safety Evaluation documenting the acceptability of the program was included in Reference 2.Status: Complete.In order to reduce the potential for Intergranular Stress Corrosion Cracking (IGSCC), TVA has performed Nondestructive Examination (NDE), repair, stress improvement, and pipe replacement on Unit 3.NRC has reviewed TVA's actions regarding Generic Letter 88-01.Based on this review, no IGSCC issues were found that would negatively impact Unit 3 restart.This is documented in Reference 4.
: 10. TVA letter to NRC, dated September 14, 1990, Response to NRC's February 8, 1990 Safety Evaluation Report Regarding Conformance to Regulatory Guide 1.97, Revision 3  Neutron Flux Monitoring Instrumentation TVA  letter to   NRC, dated October 15, 1990, Response  to NRC  Supplemental Safety Evaluation Report (SER) on Regulatory Guide (RG) 1.97 Compliance dated February 8, 1990.
: 12. TVA letter to  NRC, dated December 21, 1990, Regulatory Guide    (RG) 1.97 Emergency Ventilation Dampers  Position Indication
: 13. NRC letter to TVA, dated May 10, 1991, Safety Evaluation of Emergency Response Capability Conformance  to Regulatory Guide 1.97, Revision 3
: 14. NRC letter to TVA, dated May 27, 1993, Regulatory Guide 1.97  Boiling Water Reactor Neutron Flux Monitoring
: 15. TVA letter to NRC, dated July 30, 1993, Regulatory Guide 1.97  Boiling Water Reactor Neutron Flux Monitoring
: 16. TVA letter to NRC, dated March 10, 1994, Regulatory Guide 1.97  Boiling Water Reactor Neutron Flux Monitoring
: 17. NRC letter to TVA, dated May 3, 1994,      Boiling Water Reactor Neutron Flux Monitoring      for the Browns Ferry Nuclear      Plant
: 18. NRC letter to  TVA,  dated August 25, 1995,    NRC Inspection Report 95-39      [Summary  Results, Enclosure page 1]
Generic Letter 83-28  << Salem ATWS,    Item 1.2, Post  Trip Review (Data and Information Capability) [TAC M53573]
Commitment:    TVA  will complete    Generic Letter 83-28    Salem ATWS, Item 1.2.


==References:==
i
~ " I
  .(


1.TVA letter to NRC, dated December 28, 1992, Supplemental Response to Generic Letter (GL)88-01, NRC Position on Intergranular Stress Corrosion Cracking (IGSCC)in BWR Austenitic Stainless Steel Piping NRC letter to TVA, dated December 3, 1993, Safety Evaluation of Supplemental Response to Generic Letter 88-01 3~TVA letter to NRC, dated November 25, 1992, Browns Ferry Nuclear Plant (BFN)-Request for NRC Approval of Alternate Methods for the Reactor Water Cleanup (RWCU)and Residual Heat Removal E1-46 (RHR)Inservice Inspections Required by Generic Letter 88-01 4.NRC letter to TVA, dated August 30, 1995, NRC Inspection Report 95-44[Section 3.b., page 6]Generic Letter 88-11-Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations fTAC M71469]Commitment:
Discussion:      In response to Generic Letter 83-28, Item 1.2, TVA committed in Reference 1 to the installation of an upgraded process computer and an enhanced sequence of events recording capability. TVA's response was found to be acceptable in the NRC's Safety Evaluation provided by Reference 2. As discussed in Reference 3, the discussed equipment has been replaced with more modern and sophisticated hardware, since the time of the original TVA submittal. The previously described upgrade to a Digital VAX 11/750 process computer system was accomplished using a Digital VAX 6000 system. The functions previously performed by the sequence of events and time history recorder are now accomplished using the process computer system. However, the guidance contained in the Generic Letter and the requirements of the Safety Evaluation continue to be met.
Discussion:
Status:         Complete. TVA has installed an upgraded process computer system which provides an enhanced sequence of evens recording capability.
TVA will complete Generic Letter 88-11-Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations.
TVA responded to Generic Letter 88-11 in Reference 1.TVA concluded that the current pressure-temperature curves in each plant's Technical Specifications were valid through the next two fuel cycles when compared to the Regulatory Guide 1.99, Revision 2, methodology.
Supplemental information was provided for BFN in References 2 and 3.In Reference 4, TVA proposed Technical Specification changes to incorporate pressure-temperature curves calculated using Regulatory Guide 1.99, Revision 2, methodology.
NRC requested additional information in Reference 5, which was provided by TVA in Reference 6.The proposed Technical Specifications were issued by Reference 7.Status:  


==References:==
==References:==
: 1. TVA  letter to NRC, dated November 7, 1983, in regards to Generic Letter 83-28 2 ~ NRC letter to TVA, dated June 12, 1985, Safety Evaluation for Generic Letter 83-28, Item 1.2, Post Trip Review (Data and Information Capability)
: 3. TVA  letter to NRC, dated November 9, 1993, Completion of Unit 2 Commitment for Generic Letter 83-28, Item 1.2  Post-Trip Review  Data and  Information Capability    (GSI 75 / MPA B-085)
Generic Letter 83-28  -  Salem ATWS, Item  4.5.2, Periodic On-Line Testing  [TAC M53966]
Commitment:      TVA  will complete  Generic Letter 83-28    Salem ATWS,  Item 4.5.2.
Discussion:      The NRC's    position on this item was that plants not currently designed to permit periodic on-line testing shall justify not making modifications to permit such testing. Alternatives to on-line testing proposed by licensees will be considered where special circumstances exist and where the objective of high reliability can be met in another way. TVA's initial response to this item (Reference 1), stated that online testing was being evaluated. A description of the Reactor Protection System (RPS) functional testing and


l.Complete.TVA letter to NRC, dated November 30, 1988, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN)-Response to Generic Letter 88-11-NRC Position on Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations 2~3~TVA letter to NRC, dated February 28, 1991, TVA Supplemental Response to Generic Letter 88-11, NRC Position of Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations TVA letter to NRC, dated April 30, 1991, TVA Supplemental Response to Generic Letter 88-11, NRC Position of, Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations El-47 0 k,l 4~5.6.7~TVA letter to NRC, dated July 19, 1991, TVA BFN Technical Specification (TS)No.293-NRC letter to TVA, dated August 28, 1991, Pressure-Temperature Limits Pursuant to Generic Letter 88-11 as Reflected in Proposed Amendment to Technical Specification (TS 293)TVA letter to NRC, dated October 24, 1991, TVA BFN Technical Specification (TS)No.293 Radiation Embrittlement of Reactor Vessel Material and its Impact on Plant Operations-Response to Request for Additional Information NRC letter to TVA, dated January 8, 1993, Issuance of Amendments for the Browns Ferry Nuclear Plant (TS 293)Generic Letter 88-14-Instrument Air Supply System Problems Affecting Safety-Related Equipment[TAC M71633]Commitment:
'I 0
Discussion:
 
~~Status: TVA will complete Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment.
reliability was      provided by TVA in Reference 2.
The original response to Generic Letter 88-14 was included as part of Reference 1.Additional information regarding the dew point of air being supplied to certain components was provided in Reference 2.Open.TVA will complete this item prior to restart.
The NRC   Safety Evaluation states the on-line testing capability of the BFN RPS meets the intent of this item and is therefore acceptable (Reference 3).
Status:         Complete.


==References:==
==References:==
: 1. TVA  letter to NRC, dated November 7, 1983, in regards to Generic Letter 83-28 2  ~ TVA letter to NRC, dated March 15, 1984, in regards to Generic Letter 83-28 3 ~ NRC  letter to TVA, dated September 2, 1986, Reactor Trip System Reliability, On-Line Testing, Generic Letter 83-28, Item 4.5.2 Generic Letter 83 Salem      ATWS,  Item 4.5.3, Intervals                  for On-Line Testing fTAC M53966]
Commitment:      TVA  will complete    Generic Letter 83-28                  Salem ATWS,  Item 4.5.3.
Discussion:      The NRC    Staff  has reviewed the General                  Electric Topical Reports NEDC-30844,      BWR (BWROG)  Response  to NRC Generic Owners'roup Letter 83-28, Item 4.5.3, and NEDC-30851Pg Technical Specifications Improvement Analysis for BWR  Reactor Protection System, and issued a favorable Safety Evaluation Report (Reference 1).
In Reference 2, TVA endorsed the BWROG position and stated the analysis presented in NEDC-30851P were applicable to BFN. No Technical Specification instrument calibration frequency extensions were requested based on these reports.
Differences between the parts of the BFN Reactor Protection System (RPS) that perform the trip functions and those of the base case plant were analyzed using the procedures of Appendix K of NEDC-30851P to demonstrate no appreciable change in RPS availability or public risk. The Safety Evaluation that closed this item was provided by Reference 3.
Status:          Complete. TVA evaluated the BFN RPS and determined    it  was in conformance with the requirements contained in NEDC 30844A.


1.2~TVA letter to NRC, dated February 23, 1989, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN)-Response to Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment TVA letter to NRC, dated July 30, 1993, Supplemental Response to Generic Letter (GL)88-14, Instrument Air Supply System Problems Affecting Safety-Related Equipment Generic Letter 88>>20-Initiation of the Individual Plant Examination for Severe Accident Vulnerahilities
==References:==
[TAC M74385]Commitment:
: 1. NRC letter to   BWR  Owners Group, dated July 15, 1987,     General  Electric Company                  (GE)
TVA committed to complete a Level 1 Probabilistic Risk Assessment (PRA)and containment analysis, E1-48 Discussion:
Topical Reports    NEDC-30844, "BWR Owners'1-43
Status:


==References:==
Group Response to NRC Generic Letter 83-28," and NEDC  30851PI Technical Specifications Improvement Analysis    for BWR RPS"
: 2. TVA  letter to NRC, dated July 5, 1990, Generic Letter 83-28, Required Actions Based on Generic Implications of Salem ATWS Events, Item 4.5.3, Reactor Trip System Reliability
: 3. NRC letter to TVA, dated-August 17, 1990, Safety Evaluation of Generic Letter 83-28, Item 4.5.3, Reactor Trip Reliability  On-Line Functional Testing of the Reactor Trip System Generic Letter 83-36  - NUREG-0737  Technical Specifications Commitment:    TVA  will complete  Generic Letter 83-36.
Discussion:    Generic Letter 83-36 (Reference 1), dated November 1, 1983, requested Licensees implement Technical Specification changes resulting from the reviews of the Three Mile Island incident.
The status of each item is referenced below:
                  ~ Reactor Coolant System Vents    (II.B.1)
The Generic Letter states that there are no changes required in Technical Specification requirements for BWRs that do not have isolation condensers. BFN does not have isolation condensers. Thus the item is considered closed.
                  ~ Post-accident Sampling System (II.B.3)
The changes for the Post-Accident Sampling System were proposed by TVA  letter, dated April 1,  1992  (Technical Specification No. 302). These changes were approved as Amendment 180 on June 21, 1994. Thus the item  is considered closed.
                  ~ Noble Gas  Effluent Monitors (II.F.1.1)
Technical Specification No. 313 proposed the changes associated with the Noble Gas Effluent Monitor on October 7, 1993. These changes were approved in Amendment 187, dated December 21, 1994. Thus the item  is considered closed.
                  ~
Sampling and Analysis  of Plant Effluents (II.F.1.2)
E1-44


1.2~in accordance with the requirements of Generic Letter 88-20, and submit the results by September 1, 1992.In Reference 1, the NRC staff requested all licensees perform an Individual Plant Examination (IPE)for severe accident vulnerabilities.
0
TVA responded to this request in Reference 2.The IPE for BFN was forwarded to NRC on September 1, 1992 (Reference 3), as requested by Generic Letter 88-20.NRC requests for additional information were issued in References 4 and 6.TVA's responses were provided by References 5 and 7.The NRC Safety Evaluation for the BFN IPE was issued by Reference 8.Responses to the open items were provided in Reference 9.Complete.NRC letter to All Licensees, dated November 23, 1988, Individual Plant Examination for Severe Accident Vulnerabilities-10 CFR 50.54(f)TVA letter to NRC, dated October 30, 1989, Proposed Program in Response to Generic Letter 88-20-Individual Plant Examination (IPE)for Severe Accident Vulnerabilities 3~TVA letter to NRC, dated September 1, 1992, Response to Generic Letter 88-20, Individual Plant Examination for Severe Accident Vulnerabilities 4~NRC letter to TVA, dated August 4, 1993, Request for Additional Information Regarding the Browns Ferry Unit 2 Individual Plant Examination 5.6.TVA letter to NRC, dated September 21, 1993, Response to Request for Additional Information Regarding the Individual Plant Examination (IPE)NRC letter to TVA, dated November 19, 1993, Request for Additional Information Regarding the Browns Ferry Unit 2 Individual Plant Examination 7~TVA letter to NRC, dated December 23, 1993, Response to Request for Additional Information Regarding the Individual Plant Examination (IPE)8.NRC letter to TVA, dated September 28, 1994, Individual Plant Examination Submittal for Internal Events E1-49 L;g 9.TVA letter to NRC, dated April 14, 1995, Multi-Unit Probabilistic Risk Assessment (PRA)Generic Letter 88-20, Supplement 4-Individual Plant Examination of External Events (IPEEE)for Severe Accident Vulnerabilities
~ r
[TAC M835977 Commitment:
Discussion:
TVA will complete an Individual Plant Examination of External Events (IPEEE)In Reference 1, TVA described the BFN program and schedule for completing the internal fires, high winds, external floods, and transportation and nearby facility accidents portions of the IPEEE.TVA committed to: 1.Complete the internal fires IPEEE and provide a summary report to NRC within one hundred twenty days after the restart of Unit 3 from its first refueling outage following restart.2.Complete the high winds, external floods, and transportation and nearby facility accidents IPEEE for all three units and provide a summary report to NRC within one hundred twenty days after the restart of Unit 2 from the Cycle 7 refueling outage.NRC acceptance of the methods and schedules for the addressed portions of the IPEEE was documented in Reference 2.Due', in part, to a request from NRC to expand the scope of the multi-unit Probabilistic Risk Assessment submittal, TVA rescheduled the portions of the IPEEE discussed in Item 2, above, to June 26, 1995 (Reference.
6).This revised date was discussed with the NRC's Project Manager.TVA provided its initial program and schedule for responding to the seismic portion of the IPEEE in Reference 3.NRC requested additional information on this subject in Reference 4, which TVA provided.in Reference 5.The summary report for the high winds, external floods, and transportation and nearby facility accidents IPEEE was provided by TVA in Reference 7.Status: Open.The seismic portion of the IPEEE will be submitted by March 19, 1996.TVA will complete the internal fires IPEEE and provide a summary El-50


==References:==
Amendment No. 171, which was approved by NRC on August 22, 1989, removed the monitoring of iodides and particulates from the Unit 2 Technical Specifications. Iodines and particulates are now measured by onsite laboratory analysis of particulate and carbon filters installed in    the continuous flow effluent  sample line. This amendment found these provisions to be in compliance with the requirements of Item ZI.F.2 and Regulatory Guide 1.97. Thus the item is considered closed.
~ Containment High-Radiation Monitor (II'.1.3)
Technical Specification No. 313, dated October 7, 1993 proposed the addition of two drywell radiation monitors changes. These changes were approved in Amendment 187, dated December 21, 1994. Thus the item is considered closed.
~ Containment Pressure Monitor (II.F.1.4)
Amendment No. 78, which was approved by NRC on August 27, 1984, referenced this TMI Action Item and stated that the operability and surveillance requirements on the new Unit  3 monitoring system are acceptable.
Thus  the item is considered closed.
~ Containment Water Level Monitor (II.F.1.5)
Amendment No. 78, which was approved by NRC on August 27, 1984, referenced this TMI Action Item and stated that the operability and surveillance requirements on the new monitoring system are acceptable for Unit 3.
Thus the item is considered closed.
~ Containment Hydrogen Monitor (II.F.1.6)
TVA letter, dated March 7, 1984, stated that Browns Ferry Units 1, 2, and 3 had adequate technical specifications on the containment hydrogen monitors. Thus the item is considered closed.
~ Control Room Habitability Requirements (III.D.3.4)"
TVA  letter, dated March 7, 1984, stated that Table 3.2.G of the Technical Specifications listed the control  room  isolation E1-45


1.2~3.report to NRC within one hundred twenty days from its first refueling outage following restart.TVA letter to NRC, dated December 20, 1991, Individual Plant Examination of External Events (IPEEE)for Severe Accident Vulnerabilities (Generic Letter 88-20, Supplement 4)NRC letter to TVA, dated July 2, 1992, Review of Response to Generic Letter 88-20, Supplement No.4-Individual Plant Examinations for External Events TVA letter to NRC, dated September 21, 1992, Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI)A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE)for Severe Accident Vulnerabilities 4~5.6.7~NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response TVA letter to NRC, dated January 19, 1993, Generic Letter (GL)87-02, Supplement 1, 120-Day Response, Request for Additional Information TVA letter to NRC, dated January 19, 1995, Schedule for Submittal of the Expanded (Multi-Unit)
instrumentationg therefore, no revisions were required. Thus the item is considered closed.
Probabilistic Risk Assessment (PRA)and Portions of the Individual Plant Examination of External Events (IPEEE)TVA letter to NRC, dated July 24, 1995, Browns Ferry Nuclear Plant-Generic Letter 88-20, Supplement 4, Individual Plant Examination of External Events (IPEEE)for Severe Accident Vulnerabilities
Status:        Complete. As discussed  above  for each specific item,   TVA has completed the NUREG-0737 Technical Specifications changes associated with Generic Letter 83-36.
-Partial Submittal of Report Generic Letter 89-06-Safety Parameter Display System[TAC M51225 and M73636]Commitment:
Discussion:
~~TVA will install and make operational a Safety Parameter Display System (SPDS)and certify that the SPDS fully meets the requirements of NUREG-0737, Supplement 1, taking into account the information provided in NUREG-1342.
Certification that the BFN SPDS fully meets the requirements of NUREG-0737, Supplement 1, taking 0
Status:


==References:==
==References:==
: 1. NRC  letter to All Boiling Water Reactor Licensees, dated November 1, 1983, NUREG-0737 Technical Specifications (Generic Letter No. 83-36)
Generic Letter 88-01  -  NRC Position  on ZGSCC  in BWR Austenitic Stainless Steel Piping  fTAC M85296]
Commitment:    TVA  will complete  Generic Letter 88-01    NRC Position on IGSCC in    BWR  Austenitic Stainless Steel Piping.
Discussion:    TVA's program to address Generic Letter 88-01 was provided by Reference 1. The Safety Evaluation documenting the acceptability of the program was included in Reference 2.
Status:        Complete. In order to reduce the potential for Intergranular Stress Corrosion Cracking (IGSCC),
TVA has performed Nondestructive Examination (NDE), repair, stress improvement, and pipe replacement on Unit 3.
NRC  has reviewed TVA's actions regarding Generic Letter 88-01. Based on this review, no IGSCC issues were found that would negatively impact Unit 3 restart. This is documented in Reference    4.


1.2~into account the information provided in NUREG-1342, was requested by Generic Letter 89-06 (Reference 1).TVA's commitment to implement an SPDS on Unit 2 before restart is contained in Reference 2.The final design description for the SPDS was provided by TVA in References 3 and 4.The initial Safety Evaluation Report (SER)of the SPDS design description was documented in Reference 5.TVA responded to the SER open items in Reference 6.NRC concluded in a Supplemental SER that TVA's SPDS design description fully met the requirements of NUREG-0737, Supplement 1 (Reference 7).Open.The SPDS is fully functional.
==References:==
In accordance with Generic Letter 89-06, TVA will certify its compliance with the requirements of NUREG-0737, Supplement 1, within two months after the SPDS is declared fully operational.
: 1. TVA letter to NRC, dated December 28, 1992, Supplemental Response to Generic Letter (GL) 88-01, NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping NRC letter to TVA, dated December 3, 1993, Safety Evaluation of Supplemental Response to Generic Letter 88-01 3  TVA letter to NRC, dated November 25, 1992, Browns Ferry Nuclear Plant (BFN) - Request for
TVA will evaluate the performance of the SPDS and the new process computer during the power ascension test program and for a few weeks during normal operation.
              ~
Pending the successful demonstration of the SPDS and process computer, TVA intends to declare the SPDS fully operational.
NRC Approval of Alternate Methods for the Reactor Water Cleanup  (RWCU) and Residual Heat Removal E1-46
This includes evaluating and certifying its compliance with the requirements of NUREG-0737, Supplement 1.TVA is committed to provide this certification within two months after the SPDS is declared fully operational.
The certification includes completion of the Generic Letter 89-06 SPDS Certification Checklist, control room overview and workstation photographs, and color screen prints of the SPDS display screens.NRC letter to All Licensees of Operating Plants, Applicants for Operating Licenses and Holders of Construction Permits, dated April 12, 1989, Task Action Plan Item I.D.2-Safety Parameter Display System-10 CFR$50.54(f)-(Generic Letter No.89-06)TVA letter to NRC, dated April 7, 1987, Safety Parameter Display System (SPDS)-Schedule for Response to Request for Additional Information 3~TVA letter to NRC, dated October 22, 1990, Notification of Implementation of NUREG-0737 (TMI Action Plan), Item I.D.2.1, Safety Parameter Display System (SPDS), Phase I Installation and Final Design Description E1-52


4~5.6.TVA letter'to NRC, dated December 11, 1990, Notification of Implementation of NUREG-0737 (TMI Action Plan), Item I.D.2.1, Safety Parameter Display System (SPDS), Final Design Description NRC letter to TVA, dated March 6, 1991, Interim and Final Design of the Safety Parameter Display System at the Browns Ferry Nuclear Plant TVA letter to NRC, dated December 17, 1991, Safety Parameter Display System (SPDS), Response.to NRC Safety Evaluation Report (SER)Open Items 7~NRC letter to TVA, dated February 5, 1992, Safety Parameter Display System-Browns Ferry Nuclear Plant, Units 1, 2, and 3)Generic Letter 89-08-Erosion/Corrosion-Induced Pipe Wall Thinning[TAC M734597 Commitment:
(RHR) Inservice Inspections Required by Generic Letter 88-01
TVA will complete Generic Letter 89-08-Erosion/Corrosion-Induced Pipe Wall Thinning Discussion:
: 4. NRC letter to TVA, dated August 30, 1995, NRC Inspection Report 95-44 [Section 3.b., page 6]
TVA responded to Generic Letter 89-08 in Reference 1 and committed to implement a long-term monitoring program (single and dual phase piping).Status: Complete.Plant instructions for Unit 3 have been prepared and implemented for the dual phase and single phase flow monitoring requirements for Unit 3.These instructions require pipe wall thickness measurements each outage at established monitoring locations.
Generic Letter 88 Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations fTAC M71469]
They also provide direction on trending of data as well as engineering review for any necessary corrective action.The monitoring points were selected using the EPRI CHECWORKS program: The inspections in accordance with the instructions have been completed for Unit 3.Inspected components were either acceptable or maintenance was completed.
Commitment:     TVA will complete Generic Letter 88-11 Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations.
NRC has reviewed documentation to evaluate the Flow Accelerated Corrosion (FAC)program.Based on this review, NRC concluded that the erosion/corrosion program is acceptable for restart of Unit 3.This is documented in Reference 2.
Discussion:     TVA responded to Generic Letter 88-11 in Reference 1. TVA concluded that the current pressure-temperature curves in each plant's Technical Specifications were valid through the next two fuel cycles when compared to the Regulatory Guide 1.99, Revision 2, methodology.
Supplemental information was provided for BFN in References 2 and 3.
In Reference 4, TVA proposed Technical Specification changes to incorporate pressure-temperature curves calculated using Regulatory Guide 1.99, Revision 2, methodology.
NRC requested additional information in Reference 5, which was provided by TVA in Reference 6. The proposed Technical Specifications were issued by Reference 7.
Status:        Complete.


==References:==
==References:==
: l. TVA  letter to NRC, dated November 30, 1988, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN)  Response to Generic Letter 88-11 NRC Position on Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations 2 ~ TVA  letter to NRC, dated February 28, 1991, TVA Supplemental Response to Generic Letter 88-11, NRC  Position of Radiation Embrittlement of Reactor Vessel Materials and  its  Impact on Plant Operations 3 ~ TVA  letter to NRC, dated April 30, 1991,  TVA Supplemental Response to Generic Letter  88-11, NRC Position of, Radiation Embrittlement  of Reactor Vessel Materials and its Impact  on Plant Operations El-47


1.TVA letter to NRC, dated July 19, 1989, Response to Generic Letter 89-08-Erosion/Corrosion-Induced Pipe Wall Thinning E1-53
0 k,l


2.NRC letter to TVA, dated September 8, 1995, NRC Inspection Report 95-41[Section 3, page 5]Generic Letter 89-10-Safety-Related Motor-Operated Valve Testing and Surveillance
4 ~  TVA  letter to NRC, dated July 19, 1991, TVA BFN Technical Specification (TS) No. 293-
[TAC M75637]Commitment:
: 5. NRC letter to TVA, dated August 28, 1991, Pressure-Temperature Limits Pursuant to Generic Letter 88-11 as Reflected in Proposed Amendment to Technical Specification (TS 293)
TVA will complete Generic Letter 89-10-Safety-Related Motor-Operated Valve Testing and Surveillance.
: 6. TVA letter to NRC, dated October 24, 1991, TVA BFN Technical Specification (TS) No. 293 Radiation Embrittlement of Reactor Vessel Material and its Impact on Plant Operations Response to Request for Additional Information 7 ~  NRC letter to TVA, dated January 8, 1993, Issuance of Amendments for the Browns Ferry Nuclear Plant (TS 293)
Generic Letter 88-14  - Instrument Air Supply    System Problems Affecting Safety-Related   Equipment [TAC M71633]
Commitment:     TVA will complete   Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment.
Discussion:
Discussion:
TVA responded to Generic Letter 89-10 in Reference 1 and committed to implement a comprehensive motor operated valve program within the requested 5-year implementation schedule.Additional schedule information was provided by NRC in Reference 2.TVA provided the 30-day response to Generic Letter 89-10, Supplement 3 by Reference 3 and informed the Staff that the plant specific safety assessment was available for review.TVA also responded to Reference 2 and informed the Staff in Reference 4 that the program description for implementing Generic Letter 89-10 was also available for review.Status: The 120-day response requested in Supplement 3 to the Generic Letter was provided by TVA in Reference 5.It states that no deficiencies were identified in the motor-operated valves for primary containment isolation for the High Pressure Coolant Injection and Reactor Core Isolation Cooling steam supply lines or the Reactor Water Cleanup water supply line.In Reference 6, TVA clarified the implementation schedule for Unit 3.Based on test requirements and system configurations, it would be necessary to perform differential pressure testing on some motor operated valves during the power ascension test program.Consequently, TVA committed to complete the required testing within 30 days following the completion of the power ascension test program.This implementation schedule was acknowledged by the NRC Staff in Reference 7.Open.The majority of the motor operated valves have been successfully tested.Two HPCI valves remain to be tested during the power ascension testing.TVA letter to NRC, dated December 21, 1989, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN)-Response to Generic Letter 89 t r Safety-Related Motor-Operated Valve (MOV)Testing and Surveillance 2~NRC letter to TVA, dated September 14, 1990, Response to Generic Letter 89-10."Safety-Related Motor-Operated Valve Testing and Surveillance" for the Browns Ferry, Sequoyah, Watts Bar and Bellefonte Nuclear Plants (MPA B-110)3~TVA letter to NRC, dated December 10, 1990, Response to Generic Letter (GL)89-10, Supplement 3-"Consideration of the Results of NRC-Sponsored Tests of Motor-Operated Valves" (MOV)4~TVA letter to NRC, dated December 21, 1990, Response to Generic Letter 89-10."Safety-Related Motor-Operated Valve Testing and Surveillance" 5.6.TVA letter to NRC, dated March 31, 1991, Response to Generic Letter (GL)89-10, Supplement 3-"Consideration of the Results of NRC-Sponsored Tests of Motor-Operated Valves" (MOV)TVA letter to NRC, dated April 14, 1992, Generic Letter (GL)89-10,"Safety-Related Motor-Operated Valve Testing and Surveillance"-Implementation Schedule 7~NRC letter to TVA, dated June 30, 1992, Implementation Schedule for Generic Letter 89-10 Generic Letter 89-13-Servi.ce Water Systems Problems Affecting Safety-Related Equipment[TAC M73972]Commitment:
~      ~
Discussion:
The  original  response  to Generic Letter 88-14 was included as part of Reference 1. Additional information regarding the dew point of air being supplied to certain components was provided in Reference 2.
TVA will complete Generic Letter 89-13-Service Water Systems Problems Affecting Safety-Related Equipment.
Status:         Open. TVA will complete this    item prior to restart.
TVA responded to Generic Letter 89-13 in Reference 1.Three of the near-term commitments were rescheduled in Reference 2.NRC was notified of the completion of the majority of the commitments made in response to Generic Letter 89-13 in Reference 3.The remaining commitment on Unit 3 was to verify that portions of the Residual Heat Removal Service Water (RHRSW)and Emergency Equipment Cooling Water (EECW)systems satisfied their design criteria.Status: Complete.The RHRSW and EECW systems have been verified to meet their design criteria.Engineering has verified that both systems can E1-55
~h h~s h~
perform their intended function as stated in the Updated Final Safety Analysis Report.


==References:==
==References:==
: 1. TVA  letter to  NRC,  dated February 23, 1989, Browns  Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN)  Response to Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment 2 ~  TVA  letter to NRC, dated July 30, 1993, Supplemental Response to Generic Letter (GL) 88-14, Instrument Air Supply System Problems Affecting Safety-Related Equipment Generic Letter 88>>20 - Initiation of the Individual Plant Examination for Severe Accident Vulnerahilities [TAC M74385]
Commitment:      TVA  committed  to complete  a Level 1 Probabilistic Risk Assessment    (PRA) and  containment analysis, E1-48


l.2~3~TVA letter to NRC, dated March 16, 1990, Response to Generic Letter (GL)89-13 Service Water System Problems Affecting Safety-Related Equipment TVA letter to NRC, dated December 31, 1990, Generic Letter (GL)89-13, Service Water System Problems Affecting Safety-Related Equipment TVA letter to NRC, dated August 17, 1995, Browns Ferry Nuclear Plant (BFN)-Response to Generic Letter (GL)89-13-Service Water System (SWS)Problems Affecting Safety-Related Equipment Generic Letter 89-16-Installation of a Hardened Wetwell Vent[TAC M74860]Commitment:
in accordance with the requirements of Generic Letter 88-20, and submit the results by September  1, 1992.
TVA will complete Generic Letter 89-16-Installation of a Hardened Wetwell Vent.Discussion:
Discussion:    In Reference 1, the    NRC staff requested    all licensees perform an Individual Plant Examination (IPE) for severe accident vulnerabilities. TVA responded  to this request in Reference 2. The IPE for BFN was forwarded      to NRC on September  1, 1992 (Reference 3), as requested by Generic   Letter 88-20. NRC requests for additional information      were issued in References 4 and 6. TVA's responses were provided by References 5 and 7. The NRC Safety Evaluation for the BFN IPE was issued by Reference 8. Responses to the open items were provided in Reference 9.
In Reference 1, NRC requested Licensees with Mark I containments voluntarily install a hardened vent.In response, TVA committed to install a hardened vent prior to restart in Reference 2.Status: Complete.TVA has installed the Hardened Wetwell Vent in Unit 3 as recommended by Generic Letter 89-16.
Status:         Complete.


==References:==
==References:==
: 1. NRC  letter to All Licensees,    dated November 23, 1988,    Individual Plant Examination for  Severe Accident  Vulnerabilities 10 CFR  50.54(f) 2 ~ TVA  letter to NRC, dated October 30, 1989, Proposed Program in Response to Generic Letter 88-20  Individual Plant Examination (IPE) for Severe Accident Vulnerabilities 3 ~ TVA  letter to  NRC,  dated September 1, 1992, Response to Generic Letter 88-20, Individual Plant Examination for Severe Accident Vulnerabilities 4 ~ NRC letter to TVA, dated August 4, 1993, Request for Additional Information Regarding the Browns Ferry Unit 2 Individual Plant Examination
: 5. TVA letter to NRC, dated September 21, 1993, Response to Request for Additional Information Regarding the Individual Plant Examination (IPE)
: 6. NRC letter to TVA, dated November 19, 1993, Request for Additional Information Regarding the Browns Ferry Unit 2 Individual Plant Examination 7 ~ TVA letter to NRC, dated December 23, 1993, Response to Request for Additional Information Regarding the Individual Plant Examination (IPE)
: 8. NRC letter to TVA, dated September 28, 1994, Individual Plant Examination Submittal for Internal Events E1-49


1.NRC letter to All Operating Licensees with Mark I Containments, dated September 1, 1989, Installation of a Hardened Wetwell Vent (Generic Letter 89-16)2~TVA letter to NRC, dated October 30, 1989, Response to Generic Letter 89-16"Installation of Hardened Wetwell Vent" Generic Letter 89-19-Request for Action Related to Resolution of Unresolved Safety Issue A-47,"Safety Implication of Control Systems in LWR Nuclear Power Plants"[TAC M74917]Commitment:
L;g
TVA will complete Generic Letter 89-19-Request for Action Related to Resolution of Unresolved Safety Issue A-47,"Safety Implication of Control Systems in LWR Nuclear Power Plants".E1-56 a'
: 9. TVA letter to NRC, dated April 14, 1995, Multi-Unit Probabilistic Risk Assessment    (PRA)
Generic Letter 88-20, Supplement 4 - Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities
[TAC M835977 Commitment:    TVA  will complete an Individual Plant Examination of External Events (IPEEE)
Discussion:    In Reference 1, TVA described the BFN program and schedule for completing the internal fires, high winds, external floods, and transportation and nearby facility accidents portions of the IPEEE.
TVA  committed  to:
: 1. Complete the  internal fires IPEEE and provide a summary  report to NRC within one hundred twenty days after the restart of Unit 3 from its first refueling outage following restart.
: 2. Complete the high winds, external floods, and transportation and nearby facility accidents IPEEE for all three units and provide a summary report to NRC within one hundred twenty days after the restart of Unit 2 from the Cycle 7 refueling outage.
NRC acceptance  of the methods and schedules for the addressed portions of the IPEEE was documented in Reference 2. Due', in part, to a request from NRC to expand the scope of the multi-unit Probabilistic Risk Assessment submittal, TVA rescheduled the portions of the IPEEE discussed in Item 2, above, to June 26, 1995 (Reference. 6). This revised date was discussed with the NRC's Project Manager.
TVA  provided its initial program and schedule for responding to the seismic portion of the IPEEE in Reference 3. NRC requested additional information on this subject in Reference 4, which TVA provided. in Reference 5.
The summary report for the high winds,    external floods, and transportation and nearby    facility accidents IPEEE was provided by TVA in Reference 7.
Status:        Open. The seismic portion of the IPEEE will be submitted by March 19, 1996. TVA will complete the internal fires IPEEE and provide a summary El-50
 
report to  NRC  within one hundred twenty days from its first refueling  outage following restart.
 
==References:==
: 1. TVA  letter to NRC, dated December 20, 1991, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities (Generic Letter 88-20, Supplement 4) 2 ~ NRC letter to TVA, dated July 2, 1992, Review      of Response to Generic Letter 88-20, Supplement No. 4  Individual Plant Examinations for External Events
: 3. TVA  letter to  NRC, dated September 21, 1992, Supplement 1  to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities 4 ~ NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response
: 5. TVA letter to NRC, dated January 19, 1993, Generic Letter (GL) 87-02, Supplement 1, 120-Day Response, Request for Additional Information
: 6. TVA letter to NRC, dated January 19, 1995, Schedule for Submittal of the Expanded (Multi-Unit) Probabilistic Risk Assessment (PRA) and Portions of the Individual Plant Examination of External Events (IPEEE) 7 ~ TVA letter to NRC, dated July 24, 1995, Browns Ferry Nuclear Plant  Generic Letter 88-20, Supplement 4, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities  Partial Submittal of Report Generic Letter 89-06  - Safety Parameter Display System
[TAC M51225 and M73636]
Commitment:    TVA  will install and  make  operational  a Safety Parameter Display System (SPDS) and    certify that the  SPDS fully meets  the requirements of NUREG-0737, Supplement    1, taking into account the information provided in NUREG-1342.
Discussion:
Discussion:
Status: TVA responded to Generic Letter 89-19 in Reference 1.A revised response was provided in Reference 2 and TVA committed to finalize the engineering calculations that forms the basis for the high vessel feedwater level switches setpoint.A request for additional information regarding TVA's conformance to the generic BWR Owners'roup response was issued by NRC in Reference 3.In Reference 4, TVA stated that BFN was bounded by the BWR Owners'roup response and requested Generic Letter 89-19 be closed.Complete.The engineering calculation for the high vessel feedwater level switches setpoint has been completed and BFN is bounded by the BWR Owners'roup response.NRC has reviewed TVA's August 29, 1994 reply and agrees that the inclusion of the reactor vessel overfill protection system is not required for BFN Units 1, 2, and 3.This is documented in Reference 5.
  ~    ~
Certification that the BFN SPDS fully meets the requirements of NUREG-0737, Supplement 1, taking
 
0 into account the information provided in NUREG-1342, was    requested by Generic Letter 89-06 (Reference 1). TVA's commitment to implement an SPDS on Unit 2 before restart is contained in Reference 2. The final design description for the SPDS was provided by TVA in References  3 and 4. The initial Safety Evaluation Report (SER) of the SPDS design description was documented in Reference 5. TVA responded to the SER open items in Reference 6.
NRC concluded in a Supplemental SER that TVA's SPDS design description fully met the requirements of NUREG-0737, Supplement 1 (Reference 7)  .
Status:        Open. The SPDS  is fully functional. In accordance with Generic Letter 89-06, TVA will certify its compliance with the requirements of NUREG-0737, Supplement 1, within two months after the  SPDS  is declared fully operational.
TVA  will evaluate  the performance of the SPDS and the  new  process computer during the power ascension test program and for a few weeks during normal operation. Pending the successful demonstration of the SPDS and process computer, TVA  intends to declare the SPDS fully operational. This includes evaluating and certifying its compliance with the requirements of NUREG-0737, Supplement 1. TVA is committed to provide this certification within two months after the SPDS is declared fully operational.
The certification includes completion of the Generic Letter 89-06 SPDS Certification Checklist, control room overview and workstation photographs, and color screen prints of the SPDS display screens.


==References:==
==References:==
: 1. NRC letter to All Licensees of Operating Plants, Applicants for Operating Licenses and Holders of Construction Permits, dated April 12, 1989, Task Action Plan Item I.D.2  Safety Parameter Display System  10 CFR $ 50.54(f)  (Generic Letter No. 89-06) 2 ~ TVA  letter to NRC, dated April 7, 1987, Safety Parameter Display System (SPDS)  Schedule for Response to Request for Additional Information 3 ~ TVA letter to NRC, dated October 22, 1990, Notification of Implementation of NUREG-0737 (TMI Action Plan), Item I.D.2.1, Safety Parameter Display System (SPDS), Phase I Installation and Final Design Description E1-52


1.TVA letter to NRC, dated May 4, 1990, Response to Generic Letter 89-19-Request for Action Related to Resolution of Unresolved Safety Issue A-47,"Safety Implication of Control Systems in LWR Nuclear Power Plants" 2~TVA letter to NRC, dated August 17, 1990, Revised Response to Generic Letter (GL)89-19-Request for Action Related to Resolution of Unresolved Safety Issue A-47"Safety Implication of Control Systems in LWR Nuclear Power Plants" and Notification of Commitment Completion 3~NRC letter to TVA, dated June 28, 1994, Request for Additional Information Regarding Generic Letter 89-19,"Safety Implication of Control Systems in LWR Nuclear Power Plants" 4~TVA letter to NRC, dated August 29, 1994, Reply to NRC Request for Additional Information Regarding Generic Letter (GL)89-19 5.NRC letter to TVA, dated September 21, 1994, Response to Generic Letter 89-19-Safety Implications of Control Systems Browns Ferry Nuclear Plant Units 1, 2, and 3 E1-57 l
4 ~ TVA letter'to NRC, dated December 11, 1990, Notification of Implementation of NUREG-0737  (TMI Action Plan), Item I.D.2.1, Safety Parameter Display System (SPDS), Final Design Description
Generic Letter 91-06-Resolution of Generic Issue A-30,"Adequacy of Safety-Related DC Power Supplies" Commitment:
: 5. NRC letter to TVA, dated March 6, 1991, Interim and Final Design of the Safety Parameter Display System at the Browns Ferry Nuclear Plant
TVA will add procedures to provide for reading the bus (250V DC unit and shutdown board batteries, and 125V DC diesel generator batteries) voltmeters and battery ammeters daily.In addition(TVA will provide response procedures for the associated alarms and indications.
: 6. TVA letter to NRC, dated December 17, 1991, Safety Parameter Display System (SPDS), Response.
Discussion:
to NRC Safety Evaluation Report (SER) Open Items 7 ~ NRC letter to TVA, dated February 5, 1992, Safety Parameter Display System  Browns Ferry Nuclear Plant, Units 1, 2, and 3)
TVA responded to Generic Letter 91-06 in Reference 1.Status: Complete.TVA clarified its commitments and notified NRC that the commitments were completed in Reference 2.
Generic Letter 89-08  - Erosion/Corrosion-Induced  Pipe Wall Thinning  [TAC M734597 Commitment:     TVA will complete  Generic Letter 89-08 Erosion/Corrosion-Induced Pipe Wall Thinning Discussion:     TVA responded to Generic Letter 89-08 in Reference 1 and committed to implement a long-term monitoring program (single and dual phase  piping).
Status:         Complete. Plant instructions for Unit 3 have been prepared and implemented for the dual phase and single phase flow monitoring requirements for Unit 3. These instructions require pipe wall thickness measurements each outage at established monitoring locations. They also provide direction on trending of data as well as engineering review for any necessary corrective action. The monitoring points were selected using the EPRI CHECWORKS program: The inspections in accordance with the instructions have been completed for Unit 3. Inspected components were either acceptable or maintenance was completed.
NRC has reviewed documentation to evaluate the Flow Accelerated Corrosion (FAC) program. Based on this review, NRC concluded that the erosion/corrosion program is acceptable for restart of Unit 3. This is documented in Reference 2.


==References:==
==References:==
: 1. TVA  letter to NRC, dated July 19, 1989, Response to Generic Letter 89-08  Erosion/Corrosion-Induced Pipe Wall Thinning E1-53
: 2. NRC  letter to TVA,  dated September 8, 1995,  NRC Inspection Report 95-41 [Section 3, page 5]
Generic Letter 89-10  Safety-Related Motor-Operated Valve Testing and Surveillance [TAC M75637]
Commitment:    TVA  will complete  Generic Letter 89-10  Safety-Related Motor-Operated Valve Testing and Surveillance.
Discussion:    TVA responded to Generic Letter 89-10 in Reference 1 and committed to implement a comprehensive motor operated valve program within the requested 5-year implementation schedule.
Additional schedule information was provided by NRC in Reference 2. TVA provided the 30-day response to Generic Letter 89-10, Supplement 3 by Reference 3 and informed the Staff that the plant specific safety assessment was available for review. TVA also responded to Reference 2 and informed the Staff in Reference 4 that the program description for implementing Generic Letter 89-10 was also available for review.
The 120-day response requested in Supplement 3 to the Generic Letter was provided by TVA in Reference 5. It  states that no deficiencies were identified in the motor-operated valves for primary containment isolation for the High Pressure Coolant Injection and Reactor Core Isolation Cooling steam supply lines or the Reactor Water Cleanup water supply line.
In Reference 6, TVA clarified the implementation schedule for Unit 3. Based on test requirements and system configurations, it would be necessary to perform differential pressure testing on some motor operated valves during the power ascension test program. Consequently, TVA committed to complete the required testing within 30 days following the completion of the power ascension test program. This implementation schedule was acknowledged by the NRC Staff in Reference 7.
Status:        Open. The majority of the motor operated valves have been successfully tested. Two HPCI valves remain to be tested during the power ascension testing.
TVA letter to NRC, dated December 21, 1989, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN)  Response to Generic Letter 89-10


1.TVA letter to NRC, dated October 28, 1991, Response to Generic Letter 91-06, Resolution of Generic Issue (GI)A-30, Adequacy of Safety-Related DC Power Supplies 2~I TVA letter to NRC, dated May 27, 1992, Supplemental Response to Generic Letter (GL)91-06, Resolution of Generic Issue (GI)A-30, Adequacy of Safety-Related DC Power.Supplies Generic Letter 91-11-Resolution of Generic Issues 48,"LCOs for Class 1E Vital Instrument Buses," and 49,"Interlocks and LCOs for Class 1E Tie Breakers" Commitment:
t r Safety-Related Motor-Operated Valve      (MOV) Testing and  Surveillance 2 ~  NRC  letter to    TVA,  dated September 14, 1990, Response  to Generic Letter 89-10. "Safety-Related Motor-Operated Valve Testing and Surveillance" for the Browns Ferry, Sequoyah, Watts Bar and Bellefonte Nuclear Plants (MPA B-110) 3 ~  TVA letter to NRC, dated December 10, 1990, Response to Generic Letter (GL) 89-10, Supplement 3  "Consideration of the Results of NRC-Sponsored Tests of Motor-Operated Valves" (MOV) 4 ~  TVA  letter to    NRC,  dated December 21, 1990, Response  to Generic Letter 89-10. "Safety-Related Motor-Operated Valve Testing and Surveillance"
Discussion:
: 5. TVA letter to NRC, dated March 31, 1991, Response to Generic Letter (GL) 89-10, Supplement 3 "Consideration of the Results of NRC-Sponsored Tests of Motor-Operated Valves" (MOV)
None.TVA responded to Generic Letter 91-11 in Reference 1.Status: Complete.TVA concluded that the existing controls for Class 1E tie-breakers are sufficient to resolve the identified concerns.
: 6. TVA letter to NRC, dated April 14, 1992, Generic Letter (GL) 89-10, "Safety-Related Motor-Operated Valve Testing and Surveillance"        Implementation Schedule 7 ~  NRC  letter to TVA, dated June 30, 1992, Implementation Schedule for Generic Letter 89-10 Generic Letter 89-13    - Servi.ce Water Systems Problems    Affecting Safety-Related  Equipment [TAC M73972]
Commitment:       TVA will complete Generic Letter 89-13  Service Water Systems Problems Affecting Safety-Related Equipment.
Discussion:       TVA responded to Generic Letter 89-13 in Reference 1. Three of the near-term commitments were rescheduled in Reference 2. NRC was notified of the completion of the majority of the commitments made in response to Generic Letter 89-13 in Reference 3. The remaining commitment on Unit 3 was to verify that portions of the Residual Heat      Removal Service Water (RHRSW)  and  Emergency    Equipment Cooling Water (EECW)  systems  satisfied their design criteria.
Status:           Complete. The  RHRSW and EECW systems have been verified to    meet their design criteria.
Engineering has verified that both systems can E1-55


==References:==
  ~ h h ~
s  h  ~


1.TVA letter to NRC, dated April 30, 1992, Generic Letter (GL)91-11, Resolution of Generic Issues (GIs)48,"LCOs for Class 1E Vital Instrument Buses," and 49,"Interlocks and LCOs for Class 1E Tie Breakers" E1-58 0
perform  their intended function    as stated in the Updated Final Safety Analysis Report.
G eneric Letter 92-01-Reactor Vessel Structural Integrity, Revision 1, ance Revision 1 Supplement 1[TAC M83440 and H92651]Commitment:
TVA will submit a summary evaluation of the time and accumulated fluence during intervals of BFN operation below 525'F and its effect on the reference temperature and on the Charpy upper shelf energy.Discussion:
TVA provided an initial response to Generic Letter 92-01 in Reference 1 and made the commitment reiterated above.The summary evaluation of the time and accumulated fluence during intervals of BFN operation below 5254F was provided by TVA in Reference 2.Additional information was requested by the NRC Staff in Reference 3, which was provided by TVA in Reference 4.In Reference 5, NRC requested TVA verify the data entered into the Reactor Vessel Integrity Database.TVA responded to this request in References 6 and 7.Updated material and fluence data was provided by TVA in Reference 8.Status: Complete.In Reference 9, NRC requested Licensees verify the completeness of the information previously submitted by November 15, 1995.TVA's response was provided in Reference 10.


==References:==
==References:==
 
: l. TVA letter to NRC, dated March 16, 1990, Response to Generic Letter (GL) 89-13 Service Water System Problems Affecting Safety-Related Equipment 2 ~ TVA letter to NRC, dated December 31, 1990, Generic Letter (GL) 89-13, Service Water System Problems Affecting Safety-Related Equipment 3 ~ TVA letter to NRC, dated August 17, 1995, Browns Ferry Nuclear Plant (BFN) Response to Generic Letter (GL) 89-13  Service Water System (SWS)
1~TVA letter to NRC, dated July 7, 1992, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN)Response to generic Letter 92-01 (Reactor Vessel Structural Integrity) 2~TVA letter to NRC, dated December 1, 1992, Completion of Commitment Made in Response to Generic Letter 92-01,"Reactor Vessel Structural Integrity" 3~NRC letter to TVA, dated May 27, 1993, Request for Additional Information Regarding TVA Response to Generic Letter 92-01, Revision 1,"Reactor Vessel Structural Integrity" 4.5.TVA letter to NRC, dated August 2, 1993, Response to Request for Additional Information, Generic Letter 92-01, Revision 1 NRC letter to TVA, dated April 19, 1994, Generic Letter 92-01, Revision 1,"Reactor Vessel Structural Integrity" E1-59 0t~a 6.7~8.9.TVA letter to NRC, dated May 23, 1994, TVA's Response to NRC's Letter Dated April 19, 1994, Generic Letter 92-01, Revision 1,"Reactor Vessel Structural Integrity" TVA letter to NRC, dated July 28, 1994, Supplemental Response to TVA letter Dated May 23, 1994, Generic Letter 92-01, Revision 1,"Reactor Vessel Structural Integrity" TVA letter to NRC, dated March 27, 1995, Generic Letter 92-01, Reactor Vessel Structural Integrity,-Update to the Initial Reference Nil-Ductility Temperature (RTN~), Chemical Composition and Fluence Values NRC letter to TVA, dated May 19, 1995, Reactor Vessel Structural Integrity 10.TVA letter to NRC, dated November 7, 1995/Response to NRC Generic Letter (GL)92-01, Revision 1;Supplement 1i Reactor Vessel Structural Integrity-Browns Ferry (BFN), Watts Bar (WBN), and Sequoyah (SQN)Nuclear Plants (TAC Nos~M92649g M92650i M92651g M92730i M92731i M83525, and M83526)Generic Letter 92-04-Resolution of the Issues Related to Reactor Vessel Mater Level Instrumentation in BMRs[TAC M84271]Commitment:
Problems Affecting Safety-Related Equipment Generic Letter 89-16    Installation of   a Hardened  Wetwell Vent
Discussion:
[TAC M74860]
Status: TVA will continue to support the BWR Owners'roup (BWROG)program of analysis, testing, and development of possible hardware changes which is being conducted by the BWROG.TVA will review the results of the BWROG program for potential training requirements for operators.
Commitment:     TVA will complete  Generic Letter 89-16 Installation  of a Hardened Wetwell Vent.
TVA responded to Generic Letter 92-04 by Reference 1.Resolution of the water level instrumentation issue was addressed as part of the previous item entitled Bulletin 93-03-Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs.NRC approval of TVA's program for the resolution of Generic Letter 92-04 is documented in Reference 2.Refer to the previous item entitled Bulletin 93-03-Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs E1-60 0 0 I 6 Z
Discussion:      In Reference 1, NRC requested Licensees with Mark  I containments voluntarily install a hardened vent. In response, TVA committed to install a hardened vent prior to restart in Reference 2.
Status:          Complete. TVA has installed the Hardened Wetwell Vent in Unit 3 as recommended by Generic Letter 89-16.


==References:==
==References:==
: 1. NRC  letter to All Operating  Licensees with Mark I Containments,  dated September 1, 1989, Installation  of a Hardened Wetwell Vent (Generic Letter 89-16) 2 ~ TVA letter to NRC, dated October 30, 1989, Response to Generic Letter 89-16 "Installation of Hardened Wetwell Vent" Generic Letter 89 Request for Action Related to Resolution of Unresolved Safety Issue A-47, "Safety Implication of Control Systems in LWR Nuclear Power Plants" [TAC M74917]
Commitment:      TVA  will complete  Generic Letter 89-19  Request for Action Related to Resolution of Unresolved Safety Issue A-47, "Safety Implication of Control Systems in LWR Nuclear Power Plants".
E1-56


1.TVA letter to NRC, dated September 28, 1992, Response to Generic Letter (GL)92-04 Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in BWRs 2~NRC letter to TVA, dated March 25, 1993, Response to Generic Letter 92-04, Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in Boiling Water Reactors Generic Letter 92-08-Thermo-Lag 330-1 Fire Barriers[TAC M85525]Commitment:
a' Discussion:     TVA responded to Generic Letter 89-19 in Reference 1. A revised response was provided    in Reference 2 and TVA committed to finalize the engineering calculations that forms the basis    for the high vessel feedwater level switches setpoint. A request for additional information regarding TVA's conformance to the generic BWR Owners'roup response was issued by NRC in Reference 3. In Reference 4, TVA stated that BFN was bounded by the BWR Owners'roup response and requested Generic Letter 89-19 be closed.
TVA committed to: Discussion:
Status:        Complete. The engineering calculation for the high vessel feedwater level switches setpoint has been completed and BFN is bounded by the BWR Owners'roup response.
1.Install isolation fuses in the 4KV Shutdown Board AC power circuit, and 2.Replace the Thermo-Lag material currently installed in the Intake Pumping Station.TVA responded to Generic Letter 92-08 in Reference 1.TVA requested an exemption from 10 CFR 50, Appendix R requirements for Residual Heat Removal Service Water (RHRSW)system power cables in the Intake Pumping Station and notified NRC of its intent to perform modifications that would allow BFN to comply with Section III.G of Appendix R without the use of Thermo-Lag 330-1 fire barrier systems.NRC denied TVA's request for an exemption to Appendix R.TVA performed the modifications to comply with Section III.G of Appendix R without the use of Thermo-Lag in all areas except the Intake Pumping Station prior to Unit 2 Cycle 7 operation.
NRC  has reviewed TVA's August 29, 1994  reply and agrees  that the inclusion of the reactor vessel overfill protection system is not required for BFN Units 1, 2, and 3. This is documented in Reference 5.
In-Reference 2, TVA notified NRC of a Thermo-Lag related problem affecting the availability of a required 4kV Shutdown Board.TVA committed to install isolation fuses in the AC power circuit and maintain a fire watch in the affected area until the modification was implemented.
TVA implemented this modification prior to Unit 2 Cycle 8 operation.
In a separate letter (Reference 3)the Staff also requested additional information regarding long-term compliance with Appendix R and identified concerns regarding test results and criteria.TVA responded in Reference 4 and committed to complete the modifications necessary to bring the RHRSW system power cables into compliance with Appendix R by July 26, 1995.
0 Status:


==References:==
==References:==
: 1. TVA  letter to NRC, dated May 4, 1990, Response to Generic Letter 89-19  Request for Action Related to Resolution of Unresolved Safety Issue A-47, "Safety Implication of Control Systems in  LWR Nuclear Power Plants" 2 ~ TVA  letter to NRC,  dated August 17, 1990, Revised Response to Generic Letter (GL) 89-19  Request for Action Related to Resolution of Unresolved Safety Issue A-47 "Safety Implication of Control Systems in LWR Nuclear Power Plants" and Notification of Commitment Completion 3 ~ NRC letter to TVA, dated June 28, 1994, Request for Additional Information Regarding Generic Letter 89-19, "Safety Implication of Control Systems in LWR Nuclear Power Plants" 4 ~ TVA letter to NRC, dated August 29, 1994, Reply to NRC Request for Additional Information Regarding Generic Letter (GL) 89-19
: 5. NRC letter to TVA, dated September 21, 1994, Response to Generic Letter 89-19  Safety Implications of Control Systems Browns Ferry Nuclear Plant Units 1, 2, and  3 E1-57


1.An indictment of Thermal Science Incorporated and deficiencies in Thermo-Lag barriers installed at Comanche Peak resulted in an NRC request, for additional information regarding Thermo-Lag materials and fire barriers at BFN (Reference 5).TVA responded in Reference 6, and committed to remove the Thermo-Lag material currently installed in the Intake Pumping Station and replace this material with new material obtained from the Watts Bar Nuclear Plant.TVA intends to complete this modification prior to performing reactor pressure vessel hydrostatic testing on Unit 3.This commitment supersedes the previous commitment to complete modifications necessary to bring the RHRSW system power cables into compliance with Appendix R (Reference 4).Complete.TVA has installed isolation fuses in the 4KV Shutdown Board AC power circuit and the Thermo-Lag material in the Intake Pumping Station has been replaced.TVA letter to NRC, dated May 10, 1993, Generic Letter (GL)92-08-Thermo-Lag 330-1 Fire Barriers, Revision 1 2~TVA letter to NRC, dated July 1, 1993, Generic Letter (GL)92-08-Thermo-Lag 330-1 Fire Barriers, Revision 1 (Supplement) 3~NRC letter to TVA, dated January 18, 1994, Denial of Exemption from Section III.G of Appendix R to 10 CFR Part 50 and Request for Additional Information 4~5.TVA letter to NRC, dated March 10, 1994, Response to Nuclear Regulatory Commission (NRC)Request for Additional Information Regarding Generic Letter 92-08,"Thermo-Lag 330-1 Fire Barriers" NRC letter to TVA, dated December 22, 1994, Request for Additional Information Regarding Generic Letter 92-08, Issued Pursuant to 10 CFR 50.54(f)6.TVA letter to NRC, dated March 22, 1995, Request for Additional (RAI)Information Regarding Generic Letter (GL)92-08,"Thermo-Lag 330-1 Fire Barriers" E1-62 Generic Letter 94-02-Long-Term Solutions and Upgrade of Interim t Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors Commitment:
l Generic Letter 91-06      - Resolution of   Generic Issue A-30, "Adequacy  of Safety-Related      DC Power  Supplies" Commitment:         TVA will add procedures to provide for reading the bus (250V DC unit and shutdown board batteries, and 125V DC diesel generator batteries) voltmeters and battery ammeters daily.
1.2~Discussion:
In addition( TVA will provide response procedures for the associated alarms and indications.
TVA will modify BFN operating procedures and training programs to make them consistent or more conservative than the interim BWR Owners'roup (BWROG)guidelines.
Discussion:        TVA responded to Generic Letter 91-06      in Reference 1.
TVA will implement the BWROG Option III methodology for the stability long-term solution.This is a post Unit 3 restart commitment.
Status:            Complete. TVA clarified its  commitments and notified NRC that the     commitments were completed in Reference 2.
TVA responded to Generic Letter 94-02 in Reference 1.In Reference 2, TVA notified NRC that the Unit 3 procedure revisions would be completed prior to restart.TVA intends to have the power range neutron monitoring (PRNM)upgrade with the Option III trip in the"indicate only>>mode installed during the Unit 3 Cycle 7 refueling outage.Following one cycle of operation for testing, TVA intends to enable the stability trip function prior to startup from the Cycle 8 refueling outage.TVA's confirmation of the installation schedule was provided in Reference 3.


==References:==
==References:==
 
: 1. TVA letter to   NRC, dated October 28, 1991, Response   to Generic Letter 91-06, Resolution of Generic Issue (GI) A-30, Adequacy of Safety-Related    DC  Power Supplies 2 ~   TVA letter to NRC, dated May 27, 1992, Supplemental Response to Generic Letter (GL) 91-06, Resolution of Generic I Issue (GI) A-30, Adequacy of Safety-Related      DC Power. Supplies Generic Letter 91 Resolution of Generic Issues 48, "LCOs for Class 1E Vital Instrument Buses," and 49, "Interlocks and LCOs for Class 1E Tie Breakers" Commitment:         None.
1.Open.The restart portion of this commitment is complete.TVA has implemented the interim BWROG guidelines into plant procedures.
Discussion:         TVA responded  to Generic Letter 91-11 in Reference 1.
TVA intends to have the neutron monitoring (PRNM)upgrade with the Option III trip in the"indicate only" mode installed during the Unit 3 Cycle 7 refueling outage.Following one cycle of operation for testing, TVA intends to enable the stability trip function prior to startup from the Cycle 8 outage.TVA letter to NRC, dated September 8, 1994, Response to NRC Generic Letter (GL)94-02-Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors 2~TVA letter to NRC, dated December 22, 1994, NRC Generic Letter (GL)94-02, Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors-Completion of Requested Action 1, Interim Corrective Actions 3~TVA letter to NRC, dated October 4, 1995, Browns Ferry Nuclear Plant (BFN)-Units 1, 2, and 3-TVA Confirmation of the Installation Schedule for E1-63 0,
Status:             Complete. TVA concluded  that the existing controls for Class 1E tie-breakers are sufficient to resolve the identified concerns.
the Stability Long-Term Solution for NRC Generic Letter (GL)94-02 Generic Letter 94-03-Zntergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors fTAC M90083]Commitment:
Discussion:
None.TVA performed core shroud inspections in Unit 3 during June and July 1994.The results of the Unit 3 inspections indicated that severe core shroud cracking is not occurring at BFN.TVA analyzed the Unit 3 inspection results and determined that Unit 3 can safely be returned to service and operated for at least one cycle of operation without repairs.The results of the Unit 3 inspection were provided as part of TVA's response to Generic Letter 94-03 (Reference 1).The NRC's Safety Evaluation is contained in Reference 2.Status: Complete.NRC has reviewed TVA's actions regarding Generic Letter 94-03.TVA's actions for long-term mitigation of Intergranular Stress Corrosion Cracking (IGSCC)of Unit 3 reactor.vessel internals were found to be aggressive and satisfactory.
Based on this review, no IGSCC issues were found that would negatively impact Unit 3 restart.This is documented in Reference 3.


==References:==
==References:==
: 1. TVA letter to NRC, dated April 30, 1992, Generic Letter (GL) 91-11, Resolution of Generic Issues (GIs) 48, "LCOs for Class 1E Vital Instrument Buses," and 49, "Interlocks and LCOs for  Class  1E  Tie Breakers" E1-58


1.TVA letter to NRC, dated August 23, 1994, Response to NRC Generic Letter (GL)94-03 Intergranular Stress Corrosion Cracking (IGSCC)of Shrouds in Boiling Water Reactors 2.NRC letter to TVA, dated January 13, 1995, Browns Ferry Nuclear Plant Units 1, 2, and 3 Safety Evaluation of Response to Generic Letter 94-03 (IGSCC of Core Shroud in BWRs)3~NRC letter to TVA, dated August 30, 1995, NRC Inspection Report 95-44[Section 3.b., page 6]Generic Safety Issue 40 (MPA B-065)-Safety Concerns Associated with Pipe Breaks in the BWR Scram System[TAC M43736]Commitment:
0 G eneric Letter 92 Reactor Vessel Structural Integrity, Revision 1, ance Revision 1 Supplement 1 [TAC M83440 and H92651]
TVA will complete Generic Safety Issue (GSI)40 (MPA B-065)-Safety Concerns Associated with Pipe Breaks in the BWR Scram System.
Commitment:       TVA will submit a summary  evaluation of the time and accumulated  fluence during intervals of BFN operation below 525'F and its effect on the reference temperature and on the Charpy upper shelf energy.
0 0 P S~
Discussion:       TVA  provided an initial response to Generic Letter 92-01 in Reference 1 and made the commitment reiterated above. The summary evaluation of the time and accumulated fluence during intervals of BFN operation below 5254F was provided by TVA in Reference 2. Additional information was requested by the NRC Staff in Reference 3, which was provided by TVA in Reference 4.
Discussion:
In Reference 5, NRC requested TVA verify the data entered into the Reactor Vessel Integrity Database. TVA responded to this request in References 6 and 7. Updated material and fluence data was provided by TVA in Reference 8.
Status: NRC closure of this GSI was documented in Generic Letter 86-01, Safety Concerns Associated with Pipe Breaks in the BWR Scram System.During the preparation of BFN's response to Generic Letter 90-04, Request for Information on the Status of Licensee Implementation of Generic Safety Issues Resolved with Impositions of-Requirements or Corrective Actions, TVA identified a discrepancy between TVA's programs and the NRC assumptions which were the basis for the closure of GSI 40.Specifically, NRC cited leak testing recommended by the Boiling Water Reactor Owners Group (BWROG)in BWROG-8420.
Status:            Complete. In Reference 9, NRC requested Licensees verify the completeness of the information previously submitted by November 15, 1995. TVA's response was provided in Reference 10.
In order to resolve this issue, TVA revised the Abnormal Operating Instruction (AOI)for Reactor Scram to require the scram discharge volume be visually inspected for leaks within 30 minutes of the first reactor scram, following a refueling outage, from rated temperature and pressure (Reference 1).Complete.TVA has revised this commitment to allow leak inspection of the scram discharge volume piping during refueling outages in lieu of the post-scram walkdown.This requirement has been implemented in plant procedures.


==References:==
==References:==
1 ~ TVA  letter to NRC,  dated July 7, 1992, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN)
Response to generic Letter 92-01 (Reactor Vessel Structural Integrity) 2 ~  TVA letter to NRC, dated December 1, 1992, Completion of Commitment Made in Response to Generic Letter 92-01, "Reactor Vessel Structural Integrity" 3 ~  NRC letter to TVA, dated May 27, 1993, Request for Additional Information Regarding TVA Response to Generic Letter 92-01, Revision 1, "Reactor Vessel Structural Integrity"
: 4. TVA letter to NRC, dated August 2, 1993, Response to Request for Additional Information, Generic Letter 92-01, Revision 1
: 5. NRC letter to TVA, dated April 19, 1994, Generic Letter 92-01, Revision 1, "Reactor Vessel Structural Integrity" E1-59


1.TVA letter to NRC, dated October 1, 1990, Browns Ferry Nuclear Plant (BFN)-Safety Concerns Associated with Pipe Breaks in the Boiling Water Reactor (BWR)Scram System (GSI 40 and Generic Letter 86-01)Generic Safety Issue 41 (MPA B-058)-BHR Scram Discharge Volume System[TAC M51014]Commitment:
0 t
TVA will complete Generic Safety Issue (GSI)41 (MPA B-058)-BWR Scram Discharge Volume System.Discussion:
~ a
The NRC Staff's Generic Safety Evaluation regarding the BWR Scram Discharge System was issued by Reference 1.TVA provided a description of the long term scram discharge volume modifications in Reference 2.NRC issued an Order to TVA on June 24, 1983 (Reference 3), to require the installation of the long term modifications.
: 6. TVA  letter to  NRC,  dated May 23, 1994, TVA's Response to    NRC's  Letter  Dated April 19, 1994, Generic Letter 92-01, Revision 1, "Reactor Vessel Structural Integrity" 7 ~ TVA letter to NRC, dated July 28, 1994, Supplemental Response to TVA letter Dated May 23, 1994, Generic Letter 92-01, Revision 1, "Reactor Vessel Structural Integrity"
TVA's previous analysis of the Unit 2 scram discharge system indicated that a successful scram would be achieved without the scram pilot air header low pressure switches, provided that the Control Rod Drive (CRD)stall flow rate and the scram discharge volume water level
: 8. TVA letter to NRC, dated March 27, 1995, Generic Letter 92-01, Reactor Vessel Structural Integrity,  Update to the Initial Reference Nil-Ductility Temperature        (RTN ~), Chemical Composition and Fluence Values
: 9. NRC  letter to  TVA,  dated May 19, 1995, Reactor Vessel Structural    Integrity
: 10. TVA  letter to  NRC,  dated November 7, 1995/
Response    to NRC Generic Letter (GL) 92-01, Revision 1; Supplement 1i Reactor Vessel Structural Integrity  Browns Ferry (BFN), Watts Bar (WBN), and Sequoyah      (SQN)  Nuclear Plants (TAC Nos ~  M92649g M92650i M92651g M92730i M92731i M83525, and M83526)
Generic Letter 92 Resolution of the Issues Related to Reactor Vessel Mater Level Instrumentation in BMRs [TAC M84271]
Commitment:     TVA will continue to    support the    BWR (BWROG)   program  of analysis, testing, and Owners'roup development of possible hardware changes which is being conducted by the      BWROG.
TVA  will review  the results of the BWROG              program for potential    training  requirements for operators.
Discussion:     TVA responded to Generic Letter 92-04 by Reference 1. Resolution of the water level instrumentation issue was addressed as part of the previous item entitled Bulletin 93-03 Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs. NRC approval of TVA's program for the resolution of Generic Letter 92-04    is  documented    in Reference 2.
Status:          Refer to the previous item entitled Bulletin 93-03  Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs E1-60


instrumentation response characteristics remain within acceptable limits.TVA has noted higher CRD stall flow rates during the first part of the operating cycle following a refueling outage, which preclude conformance with these acceptance limits.Therefore, a revision to the long term modifications was provided by Reference 4.TVA determined that a design change notice would be implemented on Unit 3 to install a qualified scram pilot air header low pressure switch scram function prior to restart.However, TVA continues to pursue the overall reactor protection system.design issue and the long-term need for the scram pilot air header low pressure trip function.In addition, TVA would also submit a proposed Unit 3 Technical Specification amendment that adds the scram pilot air header low pressure switch scram function.The associated Technical Specification changes were requested by Reference 5 and supplemented by Reference 6.NRC approval of the proposed Technical Specification was provided in Reference 7.Status: Complete.TVA has performed the required modifications.
0 0
I 6 Z


==References:==
==References:==
: 1. TVA  letter to    NRC, dated September 28, 1992, Response    to Generic Letter  (GL) 92-04 Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in BWRs 2 ~ NRC  letter to TVA, dated March 25, 1993, Response to Generic Letter 92-04, Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in Boiling Water Reactors Generic Letter 92-08  -  Thermo-Lag 330-1  Fire Barriers
[TAC M85525]
Commitment:      TVA  committed    to:
: 1. Install isolation fuses in the    4KV Shutdown Board  AC power  circuit,  and
: 2. Replace the Thermo-Lag material      currently installed in the Intake Pumping Station.
Discussion:      TVA responded to Generic Letter 92-08 in Reference 1. TVA requested an exemption from 10 CFR 50, Appendix R requirements for Residual Heat Removal Service Water (RHRSW) system power cables in the Intake Pumping Station and notified NRC of its intent to perform modifications that would allow BFN to comply with Section III.G of Appendix R without the use of Thermo-Lag 330-1 fire barrier systems. NRC denied TVA's request for an exemption to Appendix R. TVA performed the modifications to comply with Section III.G of Appendix R without the use of Thermo-Lag in all areas except the Intake Pumping Station prior to Unit 2 Cycle 7 operation. In-Reference 2, TVA notified NRC of a Thermo-Lag related problem affecting the availability of a required 4kV Shutdown Board. TVA committed to install isolation fuses in the AC power circuit and maintain a fire watch in the affected area until the modification was implemented. TVA implemented this modification prior to Unit 2 Cycle  8  operation.
In a separate letter (Reference 3) the Staff also requested additional information regarding long-term compliance with Appendix R and identified concerns regarding test results and criteria. TVA responded in Reference 4 and committed to complete the modifications necessary to bring the RHRSW system power cables into compliance with Appendix R by July 26, 1995.


1.NRC letter to All BWR Licensees, dated December 9, 1980, BWR Scram Discharge System 2~TVA letter to NRC, dated October 6, 1982, in regards to the Scram Discharge System Long Term Modifications 3~NRC letter to TVA, dated June 24, 1983, in regards to Confirmatory Order for the Scram Discharge System Long Term Modifications 4~TVA letter to NRC, dated April 28, 1995, Description of BWR Scram Discharge Volume Long-Term Modifications and Withdrawal of Technical Specification (TS)No.312 5.TVA letter to NRC, dated May 11, 1995, Technical Specification (TS)No.359-Scram Pilot Air Header Low Pressure Trip 6.TVA letter to NRC, dated June 30, 1995, Supplemental Information for Proposed Technical Specification (TS)No.359-Scram Pilot Air Header Low Pressure Trip El-66
0 An  indictment of Thermal Science Incorporated and deficiencies in Thermo-Lag barriers installed at Comanche Peak resulted in an NRC request, for additional information regarding Thermo-Lag materials and fire barriers at BFN (Reference 5).
~'k 4 7~NRC letter to TVA, dated August 29, 1995, Issuance of Technical Specification Amendments for the Browns Ferry Nuclear Plant Units 1, 2, and 3 (TAC Nos.M92315, 92316, and 92317)(TS)359.Generic Safety Issue 43 (MPA B-107)>>Reliabili.ty of Air Systems[TAC M71633]Commitment:
TVA responded in Reference 6, and committed to remove the Thermo-Lag material currently installed in the Intake Pumping Station and replace this material with new material obtained from the Watts Bar Nuclear Plant. TVA intends to complete this modification prior to performing reactor pressure vessel hydrostatic testing on Unit 3. This commitment supersedes the previous commitment to complete modifications necessary to bring the RHRSW system power cables into compliance with Appendix R (Reference 4).
Discussion:
Status:        Complete. TVA has installed isolation fuses in the 4KV Shutdown Board AC power circuit and the Thermo-Lag material in the Intake Pumping Station has been replaced.
Status:


==References:==
==References:==
: 1. TVA  letter to  NRC, dated May 10, 1993, Generic Letter  (GL) 92-08  Thermo-Lag 330-1 Fire Barriers, Revision 1 2 ~ TVA letter to NRC, dated July 1, 1993, Generic Letter (GL) 92-08  Thermo-Lag 330-1 Fire Barriers, Revision 1 (Supplement) 3 ~ NRC letter to TVA, dated January 18, 1994, Denial of Exemption from Section III.G of Appendix R to 10 CFR Part 50 and Request for Additional Information 4 ~ TVA  letter to NRC, dated March 10, 1994, Response to Nuclear Regulatory Commission (NRC) Request for Additional Information Regarding Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers"
: 5. NRC letter to TVA, dated December 22, 1994, Request for Additional Information Regarding Generic Letter 92-08, Issued Pursuant to 10 CFR  50.54(f)
: 6. TVA  letter to  NRC,  dated March 22, 1995, Request for Additional    (RAI) Information Regarding Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers" E1-62


TVA will complete Generic Safety Issue (GSI)43 (MPA B-107)-Reliability of Air Systems.The resolution of GSI 43 was addressed as part of Generic Letter 88-14.Refer to the previous topic entitled Generic Letter 88-14-Instrument Air Supply System Problems Affecting Safety-Related Equipment for the additional discussion of this item.Refer to the previous topic entitled Generic Letter 88-14-Instrument Air Supply System Problems Affecting Safety-Related Equipment.
t Generic Letter 94 Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors Commitment: 1. TVA will modify  BFN to operating procedures and training  programs      make them consistent or more conservative than the interim BWR (BWROG) guidelines.
None.Generic Safety Issue 51 (MPA L-913)-Improving the Reliability of Open-Cycle Service Water Systems[TAC M73972]Commitment:
Owners'roup 2 ~ TVA will implement the BWROG Option methodology for the stability long-term solution.
Discussion:
III This is a post Unit 3 restart commitment.
Status:
Discussion:    TVA responded to Generic Letter 94-02 in Reference 1. In Reference 2, TVA notified NRC that the Unit 3 procedure revisions would be completed prior to restart. TVA intends to have the power range neutron monitoring (PRNM) upgrade with the Option    III  trip in the "indicate only>>
mode installed during the Unit 3 Cycle 7 refueling outage. Following one cycle of operation for testing, TVA intends to enable the stability trip function prior to startup from the Cycle 8 refueling outage. TVA's confirmation of the installation schedule was provided in Reference 3.
Open. The restart portion of this commitment is complete. TVA has  implemented the interim BWROG guidelines into plant procedures. TVA intends to have the neutron monitoring (PRNM) upgrade with the Option III trip in the "indicate only" mode installed during the Unit 3 Cycle 7 refueling outage. Following one cycle of operation for testing, TVA intends to enable the stability trip function prior to startup from the Cycle 8 outage.


==References:==
==References:==
: 1. TVA  letter to NRC, dated September 8, 1994, Response to NRC Generic Letter (GL) 94-02 Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors 2 ~ TVA letter to NRC, dated December 22, 1994,            NRC Generic Letter (GL) 94-02, Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors  Completion of Requested Action 1, Interim Corrective Actions 3 ~ TVA  letter to  NRC,  dated October 4, 1995, Browns Ferry Nuclear Plant (BFN)  Units 1, 2, and 3 TVA Confirmation of the Installation Schedule for E1-63


'TVA will complete Generic Safety Issue (GSI)51 (MPA L-913)-Improving the Reliability of Open-Cycle Service Water Systems.The resolution of GSI 51 was addressed as part of Generic Letter 89-13.Refer to the previous topic entitled Generic Letter 89-13-Service Water Systems Problems Affecting Safety-Related Equipment.
0, the Stability Long-Term Solution for      NRC Generic Letter   (GL) 94-02 Generic Letter 94-03    - Zntergranular  Stress Corrosion Cracking of Core Shrouds  in Boiling Water Reactors    fTAC M90083]
Refer to the previous topic entitled Generic Letter 89-13-Service Water Systems Problems Affecting Safety-Relate'd Equipment.
Commitment:      None.
None.HVAC Duct Supports[TAC M82127 and R00300]Commitment:
Discussion:       TVA  performed core shroud inspections in Unit 3 during June and July 1994. The results of the Unit 3 inspections indicated that severe core shroud cracking is not occurring at BFN. TVA analyzed the Unit 3 inspection results and determined that Unit 3 can safely be returned to service and operated for at least one cycle of operation without repairs. The results of the Unit 3 inspection were provided as part of TVA's response to Generic Letter 94-03 (Reference 1).
The HVAC Duct Supports program will be implemented in accordance with the Unit 2 precedent.
The NRC's Safety Evaluation is contained in Reference 2.
E1-67 o
Status:           Complete. NRC has reviewed TVA's actions regarding Generic Letter 94-03. TVA's actions for long-term mitigation of Intergranular Stress Corrosion Cracking (IGSCC) of Unit 3 reactor
Discussion:
                .vessel internals were found to be aggressive and satisfactory. Based on this review, no IGSCC issues were found that would negatively impact Unit 3 restart. This is documented in Reference 3.
The approval of the program for the seismic qualification of HVAC duct supports is contained in NUREG-1232 (Reference 1).The design criteria for the seismic qualification of the HVAC and supports was submitted in Reference 2.The NRC staff's Safety Evaluation Report (SER)on the criteria was included in Reference 3.Status: Complete.For Unit 3, a review was performed to identify the areas of Class I HVAC ductwork that were not previously qualified for Unit 2 operation.
The only areas specific to Unit 3 thus identified were the ductwork associated with the pump motor coolers for the Unit 3 Residual Heat, Removal system and Core Spray system.Based upon the seismic qualification calculations, modifications were completed as necessary to ensure that this ductwork was qualified to the long term requirements of the design criteria.NRC has reviewed design change notices and performed walkdown inspections of the HVAC duct supports that were modified on Unit 3.Based on the results of this review, the inspector concluded that this issue is resolved for Unit 3 restart.This is documented in Reference 4.


==References:==
==References:==
: 1. TVA letter to NRC, dated August 23, 1994, Response to NRC Generic Letter (GL) 94-03 Intergranular Stress Corrosion Cracking (IGSCC) of Shrouds in Boiling Water Reactors
: 2. NRC letter to TVA, dated January 13, 1995, Browns Ferry Nuclear Plant Units 1, 2, and 3 Safety Evaluation of Response to Generic Letter 94-03 (IGSCC of Core Shroud in BWRs) 3 ~  NRC letter to TVA, dated August 30, 1995, NRC Inspection Report 95-44 [Section 3.b., page 6]
Generic Safety Issue 40    (MPA B-065) - Safety  Concerns Associated with Pipe Breaks in the    BWR Scram System [TAC M43736]
Commitment:      TVA will complete  Generic Safety Issue (GSI) 40 (MPA B-065)    Safety Concerns Associated with Pipe Breaks  in the BWR Scram System.


l.NRC letter to TVAi dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2-Browns Ferry, Unit 2,'Section 2.2.2.4 (Page 2-5)2~TVA letter to NRC, dated November 15, 1991, Heating, Ventilation and Air Conditioning (HVAC)Seismic Design Criteria 3~NRC letter to TVA, dated July 16, 1992, Evaluation of Seismic Design Criteria for Heating Ventilation and Air Conditioning 4~NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52[Section 3.3, page 4]Instrument Sensing Lines[TAC M80017]Commitments:
0 0
1.2.The H)0)analyzers will be modified in accordance with the Unit 2 precedent.
P S~
Where satisfactory operation can not be justified, the sensing lines will be reworked.3~The 10 CFR 50, Appendix R, FSAR Appendix M, and Generic Evaluation of Internally Generated E1-68
 
~'~',f Discussion:
Discussion:      NRC   closure of this GSI was documented in Generic Letter 86-01, Safety Concerns Associated with Pipe Breaks in the BWR Scram System. During the preparation of BFN's response to Generic Letter 90-04, Request for Information on the Status of Licensee Implementation of Generic Safety Issues Resolved with Impositions of- Requirements or Corrective Actions,      TVA  identified  a discrepancy between TVA's programs and the NRC assumptions which were the basis for the closure of GSI 40.
Missiles programs will require evaluations to maintain the integrity of instrument sense line'eparation.
Specifically, NRC cited leak testing recommended by the   Boiling Water Reactor Owners Group (BWROG) in BWROG-8420. In order to resolve this issue, TVA revised the Abnormal Operating Instruction (AOI) for Reactor Scram to require the scram discharge volume be visually inspected for leaks within 30 minutes of the first reactor scram, following a refueling outage, from rated temperature and pressure        (Reference 1).
The action plan for dispositioning instrument sensing line issues, including a discussion of lessons learned from the Unit 2 precedent, was provided in Reference 1.Additional information regarding the similarity of the routing of instrument sensing lines between Unit 2 and Unit 3 was provided in Reference 2.In Reference 3, NRC concluded that the program to address concerns related to instrument sensing lines was adequate.Status: Complete.The sample lines to the H20~analyzers have been modified to assure that there are no moisture traps in the sample lines which would block the air sample flow from the drywell/torus to the analyzers.
Status:         Complete. TVA has revised this commitment to allow  leak  inspection of the scram discharge volume piping during refueling outages in lieu of the post-scram walkdown. This requirement has been implemented in plant procedures.
Safety-related sense lines have been evaluated in order to maintain the integrity of instrument sense line separation as required by the 10 CFR 50, Appendix R, FSAR Appendix M, and Generic Evaluation of Internally Generated Missiles programs.Sense lines were either justified for use-as-is, or modified as required.


==References:==
==References:==
: 1. TVA  letter to    NRC,  dated October 1, 1990, Browns Ferry Nuclear Plant (BFN)  Safety Concerns Associated with Pipe Breaks in the Boiling Water Reactor    (BWR)  Scram System    (GSI 40 and Generic Letter 86-01)
Generic Safety Issue 41    (MPA  B-058)  -  BHR  Scram Discharge Volume System [TAC M51014]
Commitment:      TVA  will complete Generic Safety Issue (GSI) 41 (MPA  B-058)    BWR  Scram Discharge Volume System.
Discussion:      The NRC  Staff's Generic Safety Evaluation regarding the BWR Scram Discharge System was issued by Reference 1. TVA provided a description of the long term scram discharge volume modifications in Reference 2. NRC issued an Order to TVA on June 24, 1983 (Reference 3),
to require the installation of the long term modifications.
TVA's previous analysis of the Unit 2 scram discharge system indicated that a successful scram would be achieved without the scram pilot air header low pressure switches, provided that the Control Rod Drive (CRD) stall flow rate and the scram discharge volume water level


1.TVA letter to NRC, dated February 13, 1991, Action Plan to Disposition Concerns Related to Instrument Sensing Lines for Units 1 and 3 2~TVA letter to NRC, dated November 8, 1991, Physical Separation of Instrument Sensing Lines in Units 1 and 3 3~NRC letter to TVA, dated December 10, 1991, Safety Evaluation
instrumentation response characteristics remain within acceptable limits. TVA has noted higher CRD stall flow rates during the first part of the operating cycle following a refueling outage, which preclude conformance with these acceptance limits.
-TVA Action Plan to Resolve Concerns Related to Instrument Sensing Lines for the Browns Ferry Nuclear Plant, Units 1 and 3 Instrument Tubing fTAC M80036]Commitment:
Therefore, a  revision to the long term modifications  was provided by Reference 4. TVA determined that a design change notice would be implemented on Unit 3 to install a qualified scram pilot air header low pressure switch scram function prior to restart. However, TVA continues to pursue the overall reactor protection system .design issue and the long-term need for the scram pilot air header low pressure trip function. In addition, TVA would also submit a proposed Unit 3 Technical Specification amendment that adds the scram pilot air header low pressure switch scram function. The associated Technical Specification changes were requested by Reference 5 and supplemented by Reference 6. NRC approval of the proposed Technical Specification was provided in Reference 7.
Safety-related instrument tubing will be seismically qualified to meet the final design criteria.Discussion:
Status:         Complete. TVA has performed the required modifications.
The action plan for dispositioning concerns regarding the seismic qualification of instrument tubing, including a discussion of lessons learned from the Unit 2 precedent, was provided in Reference 1.Additional information regarding E1-69 Status:  


==References:==
==References:==
: 1. NRC letter to All BWR Licensees,      dated December 9, 1980,    BWR  Scram Discharge System 2 ~ TVA  letter to NRC, dated October 6, 1982, in regards to the Scram Discharge System Long Term Modifications 3 ~ NRC  letter to TVA, dated June 24, 1983, in regards to Confirmatory Order for the Scram Discharge System Long Term Modifications 4 ~ TVA  letter to  NRC,  dated  April 28, 1995, Description of BWR Scram Discharge Volume Long-Term Modifications and Withdrawal of Technical Specification (TS) No. 312
: 5. TVA  letter to  NRC,  dated May 11, 1995, Technical Specification  (TS) No. 359  Scram Pilot Air Header Low Pressure    Trip
: 6. TVA  letter to NRC, dated June 30, 1995, Supplemental Information for Proposed Technical Specification  (TS) No. 359  Scram    Pilot Air Header Low Pressure    Trip El-66


1.2~inspection attributes and sampling sizes was provided in Reference 2.In Reference 3, NRC concluded that the program was an acceptable basis for restart of Unit 3 provided that the licensee also evaluates the instrument tubing populations in all units for any new attributes which may,be identified during the implementation of the revised program.Open.The field work associated with this issue has been completed.
  ~ 'k 4
TVA is currently in the process of paper closure and independent verification.
 
These remaining items will be completed prior to restart.TVA letter to NRC, dated February 27'991/Action Plan to Disposition Concerns Regarding the Seismic Qualification of Units 1 and 3 Instrument Tubing TVA letter to NRC, dated December 12, 1991, Small Bore Piping Program, Tubing, and Conduit Support Plans for Units 1 and 3-Additional Information.
7 ~ NRC letter to TVA, dated August 29, 1995, Issuance of Technical Specification Amendments for the Browns Ferry Nuclear Plant Units 1, 2, and 3   (TAC Nos. M92315, 92316,  and 92317)
3~NRC letter to TVA, dated February 4, 1992, Safety Evaluation of Small Bore Piping and Seismic Qualification of Instrument Tubing Programs for Browns Ferry Nuclear Plant, Units 1 and 3 Zntergranular Stress Corrosion Cracking (IGSCC)Commitment:
(TS) 359.
Discussion:
Generic Safety Issue    43 (MPA B-107) >>  Reliabili.ty of Air Systems
Status: The Intergranular Stress Corrosion Cracking (IGSCC)program will be implemented in accordance with the Unit 2 precedent.
[TAC M71633]
Refer to previous topic entitled Generic Letter 88-01-NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.~Refer to previous topic entitled Generic Letter 88-01-NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.
Commitment:       TVA  will complete  Generic Safety Issue (GSI)    43 (MPA  B-107)  Reliability of Air Systems.
Discussion:       The  resolution of GSI 43 was addressed as part of Generic Letter 88-14. Refer to the previous topic entitled Generic Letter 88-14  Instrument Air Supply System Problems Affecting Safety-Related Equipment for the additional discussion of this item.
Status:           Refer to the previous topic entitled Generic Letter 88-14  Instrument Air Supply System Problems Affecting Safety-Related Equipment.
 
==References:==
None.
Generic Safety Issue 51 (MPA L-913) - Improving the        Reliability of Open-Cycle Service Water Systems [TAC M73972]
Commitment:      'TVA  will complete  Generic Safety Issue (GSI) 51 (MPA  L-913)  Improving the Reliability of Open-Cycle Service Water Systems.
Discussion:      The  resolution of GSI 51 was addressed as part of Generic Letter 89-13. Refer to the previous topic entitled Generic Letter 89-13  Service Water Systems Problems Affecting Safety-Related Equipment.
Status:          Refer to the previous topic entitled Generic Letter 89-13  Service Water Systems Problems Affecting Safety-Relate'd Equipment.


==References:==
==References:==
None.
HVAC  Duct Supports [TAC M82127 and R00300]
Commitment:      The HVAC Duct Supports program      will be implemented    in accordance with the Unit    2 precedent.
E1-67


None.Long Term Torus Integrity Program[TAC M07391 and M80686]TVA committed to: 1.The resolution of torus attached piping support discrepancies will be implemented, in E1-70 accordance with the Unit 2 criteria and will use the configurational attributes from the Unit 2 implementation precedent.
o Discussion:       The approval  of the program for the seismic qualification of HVAC duct supports is contained in NUREG-1232 (Reference 1). The design criteria for the seismic qualification of the HVAC and supports was submitted in Reference 2. The NRC staff's Safety Evaluation Report (SER) on the criteria was included in Reference 3.
2.The inspection of safety-related torus and torus related structures will exclude the four attributes which did not result in modifications on Unit 2.With the exception of these four attributes, the resolution of discrepancies on the safety-related torus and torus related structures will be implemented, in accordance with the Unit 2 criteria and implementation precedent.
Status:            Complete. For Unit 3, a review was performed to identify the areas of Class I HVAC ductwork that were not previously qualified for Unit 2 operation. The only areas specific to Unit 3 thus identified were the ductwork associated with the pump motor coolers for the Unit 3 Residual Heat, Removal system and Core Spray system.     Based upon the seismic qualification calculations, modifications were completed as necessary to ensure that this ductwork was qualified to the long term requirements of the design criteria.
3.The inspection of the nonsafety-related catwalk will be limited to welds and bolted connections associated with maintaining the integrity of the safety-related structures.
NRC has reviewed design change notices and performed walkdown inspections of the HVAC duct supports that were modified on Unit 3. Based on the results of this review, the inspector concluded that this issue is resolved for Unit 3 restart. This is documented in Reference 4.
The resolution of catwalk discrepancies will be in accordance with the Unit 2 criteria.Discussion:
Status: The action plan for dispos'itioning the long-term torus integrity issue was provided in Reference 1 and approved by NRC in Reference 2.Complete.TVA has performed modifications to resolve torus attached piping support discrepancies, safety-related torus and torus related structure discrepancies, and nonsafety-related catwalk discrepancies in accordance with the Unit 2 precedent.
NRC has reviewed design criteria, design calculations and completed modifications for torus attached piping and pipe supports.Based on this review, the inspector concluded that this issue is resolved for Unit 3 restart.This is documented in Reference 3.


==References:==
==References:==
: l. NRC  letter to TVAi dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2  Browns Ferry, Unit 2,'Section 2.2.2.4 (Page 2-5) 2 ~  TVA  letter to NRC, dated November 15, 1991, Heating, Ventilation and Air Conditioning (HVAC)
Seismic Design Criteria 3 ~  NRC  letter to  TVA,  dated July 16, 1992, Evaluation of Seismic Design Criteria for Heating Ventilation and Air Conditioning 4 ~  NRC  letter to  TVA,  dated October 12, 1995,  NRC Inspection Report 95-52 [Section 3.3, page 4]
Instrument Sensing Lines      [TAC M80017]
Commitments:  1. The H)0) analyzers    will be  modified in accordance with the Unit 2 precedent.
: 2. Where satisfactory operation      can not be justified, the sensing lines    will be reworked.
3 ~ The 10 CFR 50, Appendix R, FSAR Appendix M, and Generic Evaluation of    Internally Generated E1-68


1.TVA letter to NRC, dated April 29, 1991, Program for Resolving Long-Term Torus Integrity Issue Prior to the Restart of Units 1 and 3 2.NRC letter to TVA, dated February 10, 1992, Evaluation of Long-Term Torus Integrity Program for Browns Ferry Nuclear Plant, Units 1 and 3 3.NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52[Section 3.6, page 6]E1-71
~ '~',f Missiles programs will require evaluations to maintain the integrity of instrument sense line
>>I sa Lower Drywell Platforms and Miscellaneous Steel fTAC M80620, t R00297 and R00303]Commitment:
                                                                  'eparation.
The lower drywell steel platforms and miscellaneous steel will be evaluated and modified, if required, to meet the design criteria.Discussion:
Discussion:     The action plan for dispositioning instrument sensing line issues, including a discussion of lessons learned from the Unit 2 precedent, was provided in Reference 1. Additional information regarding the similarity of the routing of instrument sensing lines between Unit 2 and Unit 3 was provided in Reference 2. In Reference 3, NRC concluded that the program to address concerns related to instrument sensing lines  was adequate.
The action plan for dispositioning the Lower Drywell Platforms and Miscellaneous Steel issue was provided in Reference 1.Additional information requested by the Staff was provided in Reference 2.Additional information was requested by the Staff in Reference 3 and provided by TVA in Reference 4.An NRC position regarding the design criteria was.issued by Reference 5 and a subsequent Safety Evaluation and request for additional information was issued as Reference 6.This additional information was provided by TVA in Reference 7.A supplemental Safety Evaluation was issued by NRC in Reference 8.Additional information was provided by TVA in References 9 and 10.The final Safety Evaluation was issued in Reference 11 and the issue closed after an audit of the design criteria implementation as documented in Reference 12.Status: Complete.
Status:        Complete. The sample lines to the H20~ analyzers have been modified to assure that there are no moisture traps in the sample lines which would block the air sample flow from the drywell/torus to the analyzers. Safety-related sense lines have been evaluated in order to maintain the integrity of instrument sense line separation as required by the 10 CFR 50, Appendix R, FSAR Appendix M, and Generic Evaluation of Internally Generated Missiles programs. Sense lines were either justified for use-as-is, or modified    as required.


==References:==
==References:==
: 1. TVA  letter to  NRC,  dated February 13, 1991, Action Plan to Disposition Concerns Related to Instrument Sensing Lines for Units 1 and 3 2 ~ TVA  letter to  NRC,  dated November 8, 1991, Physical Separation of Instrument Sensing Lines in Units 1 and 3 3 ~ NRC  letter to TVA, dated December 10, 1991, Safety Evaluation  TVA Action Plan to Resolve Concerns Related to Instrument Sensing Lines for the Browns Ferry Nuclear Plant, Units 1 and 3 Instrument Tubing  fTAC M80036]
Commitment:    Safety-related instrument tubing will be seismically qualified to meet the final design criteria.
Discussion:    The  action plan for dispositioning concerns regarding the seismic qualification of instrument tubing, including a discussion of lessons learned from the Unit 2 precedent, was provided in Reference 1. Additional information regarding E1-69


1.TVA letter to NRC, dated June 12, 1991, Corrective Action Plan and Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 2~TVA letter to NRC, dated November 8, 1991, Seismic Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 3~NRC letter to TVA, dated December 12, 1991, Request for Additional Information Regarding Browns Ferry Drywell and Miscellaneous Steel Design Criteria 4~TVA letter to NRC, dated February 6, 1992, Lower Drywell-Platforms and Miscellaneous Steel Seismic Criteria 5.NRC letter to TVA, dated March 19, 1992, NRC Staff Position on Proposed Ductility Ratio Design Criteria El-72 0
inspection attributes and sampling sizes was provided in Reference 2. In Reference 3, NRC concluded that the program was an acceptable basis for restart of Unit 3 provided that the licensee also evaluates the instrument tubing populations in all units for any new attributes which may,be identified during the implementation of the revised program.
6.NRC letter to TVA, dated July 13, 1992, Safety Evaluation and Request for Additional Information Regarding Browns Ferry Nuclear Plant Units 1, 2, and 3 Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 7~TVA letter to NRC, dated July 31, 1992, Response to Request for Additional Information Regarding Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 8.NRC letter to TVA, dated October 29, 1992, Supplemental Safety Evaluation of Steel Design Criteria for the Browns Ferry Nuclear Power Plant 9.TVA letter to NRC, dated September 30, 1992, Resolution of the Thermal Growth Issue Outside Containment 10.TVA letter to NRC, dated June 29, 1993, Resolution of the Thermal Growth Issue NRC letter to TVA, dated December 7, 1993, Supplemental Safety Evaluation of Structural Steel Thermal Growth Design Criteria 12.NRC letter to TVA, dated April 20, 1994, Audit of Structural Steel Design Criteria Implementation Miscellaneous Steel Frames Commitment:
Status:            Open. The field work associated with this issue has been completed.     TVA is currently in the process of paper closure and independent verification. These remaining items will be completed  prior to restart.
The lower drywell steel platforms and miscellaneous steel will be evaluated and modified, if required, to meet the design criteria., Discussion:
Status: Refer to the item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel Refer to the item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel


==References:==
==References:==
: 1. TVA  letter to  NRC,  dated February  27'991/
Action Plan to Disposition Concerns Regarding the Seismic Qualification of Units 1 and 3 Instrument Tubing 2 ~  TVA  letter to NRC, dated December 12, 1991, Small Bore Piping Program, Tubing, and Conduit Support Plans for Units 1 and 3  Additional Information.
3 ~  NRC  letter to TVA, dated February 4, 1992, Safety Evaluation of Small Bore Piping and Seismic Qualification of Instrument Tubing Programs for Browns Ferry Nuclear Plant, Units 1 and 3 Zntergranular Stress Corrosion Cracking        (IGSCC)
Commitment:        The  Intergranular Stress Corrosion Cracking (IGSCC) program    will be implemented in accordance with the Unit 2 precedent.
Discussion:        Refer to previous topic entitled Generic Letter 88-01  NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.
Status:            Refer to previous topic entitled Generic Letter 88-01  NRC Position on IGSCC in BWR
                ~
Austenitic Stainless Steel Piping.


None.Moderate Energy Line Break (MELB)Commitment:
==References:==
The Moderate Energy Line Break (MELB)program will be implemented in accordance with the Unit 2 precedent.
None.
f r f i E Discussion:
Long Term Torus    Integrity  Program [TAC M07391 and M80686]
As part of the restart effort on Unit 2, TVA committed to review the effects of flooding due to breaks in moderate energy lines outside primary containment.
TVA  committed  to:
Status: Complete.The critical plant features that.are required to mitigate or limit the consequences of moderate energy piping failures exist in the current BFN design.The results of the evaluation concluded that Browns Ferry Unit 3 conforms to the original licensing basis for MELB flooding and that the existing flooding studies and protective measures are adequate to justify continued operations.
: 1. The resolution of torus attached piping support discrepancies    will be implemented, in E1-70
NRC has reviewed assumptions for MELB analysis, design methodology, design input data and design analysis.Based on this review, the inspector concluded that the MELB program is acceptable for Unit 3 restart.This is documented in Reference 1~
 
accordance with the Unit 2 criteria and will use the configurational attributes from the Unit 2 implementation precedent.
: 2. The inspection of safety-related torus and torus related structures will exclude the four attributes which did not result in modifications on Unit 2. With the exception of these four attributes, the resolution of discrepancies on the safety-related torus and torus related structures will be implemented, in accordance with the Unit 2 criteria and implementation precedent.
: 3. The inspection of the nonsafety-related catwalk will be limited to welds and bolted connections associated with maintaining the integrity of the safety-related structures.
The resolution of catwalk discrepancies will be in accordance with the Unit 2 criteria.
Discussion:    The action plan for dispos'itioning the long-term torus integrity issue was provided in Reference 1 and approved by    NRC in Reference 2.
Status:        Complete. TVA has performed modifications to resolve torus attached piping support discrepancies, safety-related torus and torus related structure discrepancies, and nonsafety-related catwalk discrepancies in accordance with the Unit 2 precedent.
NRC has reviewed design   criteria, design calculations and completed modifications for torus attached piping and pipe supports. Based on this review, the inspector concluded that this issue is resolved for Unit 3 restart. This is documented in Reference 3.


==References:==
==References:==
: 1. TVA letter to NRC, dated April 29, 1991, Program for Resolving Long-Term Torus Integrity Issue Prior to the Restart of Units 1 and 3
: 2. NRC letter to TVA, dated February 10, 1992, Evaluation of Long-Term Torus Integrity Program for Browns Ferry Nuclear Plant, Units 1 and 3
: 3. NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52 [Section 3.6, page 6]
E1-71
I sa


1.NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52[Section 3.2, page 3]Multi-Plant Action Item A-01-10 CFR 50.55A(G)-Inservice Inspection Commitment:
t Lower Drywell Platforms and Miscellaneous Steel fTAC M80620, R00297 and R00303]
TVA will complete Multi-Plant Action Item A-01-10 CFR 50.55A(G)-Inservice Inspection.
Commitment:       The lower drywell steel platforms and miscellaneous steel will be evaluated and modified,  if required, to meet the design criteria.
Discussion:
Discussion:       The  action plan for dispositioning the Lower Drywell Platforms and Miscellaneous Steel issue was provided in Reference 1. Additional information requested by the Staff was provided in Reference 2. Additional information was requested by the Staff in Reference 3 and provided by  TVA in Reference 4.
10 CFR 50.55a(g)requires that American Society of Mechanical Engineers (ASME)Code components meet the requirements of ASME Section XI, Rules for Inservice Inspection (ISI).A subsection of this regulation requires the ISI program be updated every 10 years to meet the requirements of the latest approved applicable edition and addenda of Section XI in effect 12 months before the start of the next 120-month inspection interval.The code also provides for an extension of the interval for extended periods of facility downtime.As discussed in Reference 1, TVA proposed the extension of the first ten-year interval until one year after restart.BFN will complete the first ten-year interval ISI examinations and pressure tests before startup from the current outage.The year following startup allows time for adoption of a new code, program preparation, preparation of implementing instructions, program submittal to NRC, and NRC review and approval.El-74
An NRC  position regarding the design criteria was
~\J The NRC Staff found this proposal to be acceptable in Reference 2.Status: Complete.The ISI Program is in place.
                  . issued by Reference 5 and a subsequent Safety Evaluation and request for additional information was issued as Reference 6. This additional information was provided by TVA in Reference 7.
A  supplemental Safety Evaluation was issued by NRC in Reference 8. Additional information was provided by TVA in References 9 and 10. The final Safety Evaluation was issued in Reference 11 and the issue closed after an audit of the design criteria implementation as documented in Reference 12.
Status:           Complete.


==References:==
==References:==
: 1. TVA  letter to  NRC,  dated June 12, 1991, Corrective Action Plan and Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 2 ~  TVA  letter to  NRC,  dated November 8, 1991, Seismic Design    Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 3 ~  NRC  letter to  TVA,  dated December 12, 1991, Request  for Additional Information Regarding Browns  Ferry Drywell and Miscellaneous Steel Design  Criteria 4 ~  TVA  letter to  NRC,  dated February 6, 1992, Lower Drywell-Platforms and Miscellaneous Steel Seismic Criteria
: 5. NRC  letter to TVA, dated March 19, 1992, NRC Staff Position on Proposed Ductility Ratio Design Criteria El-72


1.2~TVA letter to NRC, dated March 1, 1988, Extension of Ten-Year Inservice Inspection Interval NRC letter to TVA, dated October 20, 1993, Second 10-Year Interval Znservice Inspection Program Plan and Associated Requests for Relief Multi-Plant Action Item A-04-10 CFR 50, Appendix J-Containment Leak Testing[TAC M08717]Commitment:
0
Discussion:
: 6. NRC  letter to TVA, dated July 13, 1992, Safety Evaluation and Request for Additional Information Regarding Browns Ferry Nuclear Plant Units 1, 2, and 3 Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 7 ~ TVA letter to NRC, dated July 31, 1992, Response to Request for Additional Information Regarding Design Criteria for Lower Drywell Steel Platforms and Miscellaneous    Steel
TVA will complete Multi-Plant Action Item A-04 10 CFR 50, Appendix J-Containment Leak Testing.TVA 1n Reference 6 and approved by NR Reference 7.In Reference 1, NRC requested additional information regarding Units 1 and 3 conformance with NUREG-0737, Item II.E.4.2 and 10 CFR 50, Appendix J.In order to minimize the number and scope of updates that would have to be provided to NRC on this issue, TVA replied in Reference 2 using the anticipated configuration at the time of the restart of Unit 3.NRC approval of the Unit 3 containment isolation design is provided in Reference 3.Changes to the preliminary information, including corrections to information previously provided on Unit 2, was provided by TVA in Reference 4.NRC requested additional information in Reference 5, which was provided by C in Status:
: 8. NRC letter to TVA, dated October 29, 1992, Supplemental Safety Evaluation of Steel Design Criteria for the Browns Ferry Nuclear Power Plant
: 9. TVA letter to NRC, dated September 30, 1992, Resolution of the Thermal Growth Issue Outside Containment
: 10. TVA letter to  NRC,  dated June 29, 1993, Resolution of the Thermal Growth Issue NRC letter to TVA, dated December 7, 1993, Supplemental Safety Evaluation of Structural Steel Thermal Growth Design Criteria
: 12. NRC  letter to TVA, dated April 20, 1994, Audit of Structural Steel Design Criteria Implementation Miscellaneous Steel Frames Commitment:      The lower drywell steel platforms and miscellaneous steel will be evaluated and modified, criteria.,
if  required, to meet the design Discussion:      Refer to the item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel Status:          Refer to the item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel


==References:==
==References:==
None.
Moderate Energy Line Break (MELB)
Commitment:      The Moderate Energy    Line Break  (MELB) program will be  implemented  in  accordance with the Unit 2 precedent.


1.Complete.NRC letter to TVA, dated May 5, 1992, Request for Additional Information to Review Browns Ferry Nuclear Plant Units 1 and 3 Compliance with NUREG-0737 Item II.E.4.2 and 10 CFR 50, Appendix J 2~3~TVA letter to NRC, dated September 1, 1992, Response to NRC Request for Additional Information Regarding Units 1 and 3 Conformance with NUREG-0737, Item ZI.E.4.2 and 10 CFR 50, Appendix J NRC letter to TVA, dated January 6, 1995, Browns Ferry Nuclear Plant Units 1 and 3-NUREG-0737, Item II.E.4.2, Containment Isolation Dependability E1-75 L'
f r f i E
4~5.6.7.TVA letter to NRC, dated August 3, 1995, Supplemental Information for Conformance With NUREG-0737, Item II.E.4.2 And 10 CFR 50, Appendix J (TAC NOS.M74615 And M74616).NRC letter to TVA, dated October 3, 1995, Browns Ferry Nuclear Plant Units 2 and 3-Request for Additional Information:
 
Conformance with NUREG-0737 Item II.E.4.2 and 10 CFR 50, Appendix J (TAC NOS.M74615 and M74616)TVA letter to NRC, dated October 4, 1995, Browns Ferry Nuclear Plant (BFN)-Units 2 and 3-Supplemental Information for Conformance with NUREG-0737, Item II.E.4.2 and 10 CFR 50, Appendix J (TAC NOS.M74615 and M74616)NRC letter to TVA, dated October 18, 1995, Browns Ferry Nuclear Plant Units 2 and 3-Supplemental Information:
Discussion:    As  part of the restart effort on Unit 2, TVA committed to review the effects of flooding due to breaks in moderate energy lines outside primary containment.
Conformance with NUREG-0737 Item II.E.4.2 and 10 CFR'50, Appendix J (TAC NOS.M74615 and 74616)Multi-Plant Action Item B-41-10 CFR 50, Appendix R-Fire Protection
Status:        Complete. The  critical plant features that. are required  to mitigate or limit the consequences of moderate energy piping      failures exist in the current BFN design. The results of the evaluation concluded that Browns Ferry Unit 3 conforms to the original licensing basis for MELB flooding and that the existing flooding studies and protective measures are adequate to justify continued operations.
[TAC M48136]Discussion:
NRC has reviewed assumptions for MELB analysis, design methodology, design input data and design analysis. Based on this review, the inspector concluded that the MELB program is acceptable for Unit 3 restart. This is documented in Reference 1~
Status:


==References:==
==References:==
: 1. NRC  letter to  TVA,  dated October 12, 1995,    NRC Inspection Report 95-52 [Section 3.2, page 3]
Multi-Plant Action Item A    10 CFR 50.55A(G)    - Inservice Inspection Commitment:    TVA  will  complete Multi-Plant Action Item      A-01 10 CFR 50.55A(G)  Inservice Inspection.
Discussion:    10 CFR 50.55a(g) requires that American Society of Mechanical Engineers (ASME) Code components meet the requirements of ASME Section XI, Rules for Inservice Inspection (ISI). A subsection of this regulation requires the ISI program be updated every 10 years to meet the requirements of the latest approved applicable edition and addenda of Section XI in effect 12 months before the start of the next 120-month inspection interval. The code also provides for an extension of the interval for extended periods of facility downtime.
As  discussed in Reference 1, TVA proposed the extension of the first ten-year interval until one year after restart.        BFN will complete the first  ten-year  interval  ISI  examinations and from the current pressure  tests  before  startup outage. The  year  following  startup  allows time for adoption    of  a  new  code,  program  preparation, preparation of implementing instructions, program submittal to NRC, and NRC review and approval.
El-74


TVA will complete Multi-Plant Action Item B-41-10 CFR 50, Appendix R-Fire Protection.
~ \ J The NRC Staff found this proposal to be acceptable in Reference 2.
Refer to the previous topic entitled Fire Protection/10 CFR 50, Appendix R.Refer to the previous topic entitled Fire Protection/10 CFR 50, Appendix R.None.Multi-Plant Action Item C-10-Control of Heavy Loads-Phase I (NUREG-0612)
Status:        Complete. The ISI Program is in place.
[TAC M08438]Commitment:
Discussion:
TVA will complete Multi-Plant Action Item C-10.In December 1980 (Reference 1), NRC issued a Generic Letter which disseminated NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, and requested utilities provide additional information.
TVA's responses to this request included References 2 and 3.NRC's closure of Control of Heavy Loads (Phase I)was contained in Reference 4.The generic closure of Phase II of'1-76 Q
Control of Heavy Loads was issued by NRC in Reference 5.Complete.TVA has performed the required modifications.
NRC has reviewed the program for handling critical loads and considers this issue closed for Unit 3.The results are documented in Reference 6.


==References:==
==References:==
 
: 1. TVA  letter to NRC, dated March 1, 1988, Extension of Ten-Year Inservice Inspection Interval 2 ~ NRC letter to TVA, dated October 20, 1993, Second 10-Year Interval Znservice Inspection Program Plan and Associated Requests for Relief Multi-Plant Action Item A-04  10  CFR  50, Appendix  J-Containment Leak Testing [TAC M08717]
1.NRC letter to All Licensees of Operating Plants ad Applicants for Operating Licenses and Holders of Construction Permits, dated December 22, 1980, Control of Heavy Loads 2~3~4.5.TVA letter to NRC, dated January 6, 1984, in regards to NUREG-0612 TVA letter to NRC, dated April 4, 1984, in regards to NUREG-0612 NRC letter to TVA, dated June 6, 1984, Control of Heavy Loads (Phase I)NRC letter to All Licensees for Operating Reactors, dated June 26, 1985, Completion of Phase II of"Control of Heavy Loads at Nuclear Power Plants", NUREG-0612 (Generic Letter 85-11)6.NRC letter to TVA, dated August 7, 1995, NRC Inspection Report 95-38[Section 6.f., page 16]r Multi-Plant Action Item C-11-Reactor Protection System Power Supply[TAC M08931]Commitment:
Commitment:     TVA will complete Multi-Plant      Action Item A-04 10 CFR  50, Appendix J    Containment  Leak Testing.
Discussion:
Discussion:    In Reference 1, NRC requested additional information regarding Units 1 and 3 conformance with NUREG-0737, Item II.E.4.2 and 10 CFR 50, Appendix J. In order to minimize the number and scope of updates that would have to be provided to NRC on this issue, TVA replied in Reference 2 using the anticipated configuration at the time of the restart of Unit 3. NRC approval of the Unit 3 containment isolation design is provided in Reference 3. Changes to the preliminary information, including corrections to information previously provided on Unit 2, was provided by TVA in Reference 4. NRC requested additional information in Reference 5, which was provided by TVA 1n Reference 6 and approved by NRC in Reference 7.
TVA will replace the General Electric (GE)molded case circuit breakers that are used on the output of the reactor protection system (RPS)motor-generator (MG)sets.The replacement breakers provide undervoltage, overvoltage and underfrequency protection by utilizing a combination of contactors and relays.In Reference 1, NRC informed TVA of deficiencies identified in the design of the voltage regulator system of the motor generator sets which supply power to the reactor protection system at another facility.TVA responded in Reference 2.In Reference 3, the NRC Staff recommended that TVA implement modifications similar to those performed at the Hatch facility.In response, E1-77 TVA committed to install a Class IE RPS power supply in Reference 4.NRC requested additional information and proposed Technical Specification changes in Reference 5.The requested information and proposed Technical Specifications for Unit 1 were provided by TVA in Reference 6.Additional information was requested by the NRC Staff in Reference 7 and provided by TVA in Reference 8.Additional information was requested by the NRC Staff in Reference 9 and provided by TVA in Reference 10.NRC Staff acceptance of TVA's modifications was documented in Reference 11.The associated Technical Specifications were proposed by TVA in Reference 12.NRC requested additional information in Reference 13, which TVA provided in Reference 14.The proposed Technical Specifications were approved in Reference 15.Status: Complete.TVA installed two Class 1E detection and isolation assemblies in each of the three sources of power to the RPS.Each assembly includes a circuit breaker and a monitoring module consisting of an undervoltage, an overvoltage and an underfrequency sensing relay.The protective assembly relays operate to disconnect the abnormal source of supply from the RPS bus.NRC has reviewed related documentation and the Unit 3 modifications to the RPS power supply.Based on this review, the inspector considers this issue is closed for Unit 3.This is documented in Reference 16.
Status:         Complete.


==References:==
==References:==
: 1. NRC  letter to TVA,  dated May 5, 1992, Request    for Additional Information to Review Browns Ferry Nuclear Plant Units 1 and 3 Compliance with NUREG-0737 Item II.E.4.2 and 10 CFR 50, Appendix J 2 ~ TVA  letter to NRC,  dated September 1, 1992, Response  to NRC  Request for  Additional Information Regarding Units    1 and 3 Conformance with  NUREG-0737,  Item ZI.E.4.2 and 10 CFR 50, Appendix J 3 ~ NRC  letter to TVA,  dated January 6, 1995, Browns Ferry Nuclear Plant Units 1 and 3  NUREG-0737, Item II.E.4.2, Containment Isolation Dependability E1-75


1.NRC letter to TVA, regards to Reactor Deficiencies dated August 7, 1978, in Protection System Power Supply 2~TVA letter to NRC, regards to Reactor Supplies dated December 13, 1978, in Protection System Power 3~NRC letter to TVA, regards to Reactor Deficiencies dated September 24(1980(in Protection System Power Supply 4~TVA letter to NRC, regards to Reactor Supplies dated December 4g 1980i in Protection System Power E1-78 "f IL J II C 4 ei NRC letter to TVA, dated October 30, 1981, Reactor Protection System (RPS)Power Monitoring System Design Modifications TVA letter to NRC, dated July 13, 1983, in regards to Unit 1 Cycle 6 Technical Specifications NRC letter to TVA, dated October 12, 1983, Reactor Protection System (RPS)Power Monitoring System Design Modifications TVA letter to NRC, dated August 9, 1984, in regards to Reactor Protection System (RPS)Power Monitoring System Design Modifications NRC letter to TVA, dated October 31, 1984, Reactor Protection System (RPS)Power Monitoring System Design Modifications TVA letter to NRC, dated March 1, 1985, in regards to Reactor Protection System (RPS)Power Monitoring System Design Modifications NRC letter to TVA, dated June 27, 1985, Reactor Protection System (RPS)Power Monitoring System Design Modifications TVA letter to NRC, dated June 4, 1990, TVA BFN Technical Specification (TS)No.286-Reactor Protection System (RPS)Circuit Protector Trip Level Setpoint NRC letter to TVA, dated September 27, 1990, Request for Additional Information
L
-Browns Ferry Technical Specification Amendment (TS 286)Regarding Reactor Protection System Circuit Protection Trip Level Setpoints TVA letter to NRC, dated October 24, 1990, TVA'FN Technical Specification (TS)No.286-Reactor Protection System (RPS)Circuit Protector Trip Level Setpoint-Response to Request for Additional Information NRC letter to TVA, dated January 3, 1991, Issuance of Amendments (TS 286)NRC letter to TVA, dated October 13, 1995, NRC Inspection Report 95-51[Section 5.4, page 30]E1-79


Multi-Plant Action Item D-25-Relocation of Radiologi.cal Effluent Technical Specificati.ons Commitment:
4 ~ TVA  letter to NRC, dated August 3, 1995, Supplemental Information for Conformance With NUREG-0737, Item II.E.4.2 And 10 CFR 50, Appendix J (TAC NOS. M74615 And M74616).
Discussion:
: 5. NRC  letter to  TVA, dated October 3, 1995, Browns Ferry Nuclear Plant Units 2 and 3  Request for Additional Information: Conformance with NUREG-0737 Item II.E.4.2 and 10 CFR 50, Appendix J (TAC NOS. M74615 and M74616)
TVA will complete MPA D-25-Relocation of Radiological Effluent Technical Specifications (RETS).In accordance with the guidelines provided in Generic Letter 89-01, TVA submitted a proposed Technical Specification amendment for the relocation of the RETS in Reference 2.Additional information was provided by TVA in References 3 and 4.Status:  
: 6. TVA  letter to  NRC, dated October 4, 1995, Browns Ferry Nuclear Plant (BFN)  Units 2 and 3 Supplemental Information for Conformance with NUREG-0737, Item II.E.4.2 and 10 CFR 50, Appendix J (TAC NOS. M74615 and M74616)
: 7. NRC  letter to TVA, dated October 18, 1995, Browns Ferry Nuclear Plant Units 2 and 3 Supplemental Information: Conformance with NUREG-0737 Item II.E.4.2 and 10 CFR'50, Appendix    J (TAC NOS.
M74615 and 74616)
Multi-Plant Action Item B    10 CFR 50, Appendix  R - Fire Protection [TAC M48136]
TVA will  complete Multi-Plant Action Item    B-41 10 CFR 50, Appendix R  Fire Protection.
Discussion:    Refer to the previous topic    entitled Fire Protection/10 CFR 50, Appendix R.
Status:         Refer to the previous topic entitled Fire Protection/10 CFR 50, Appendix R.


==References:==
==References:==
None.
Multi-Plant Action Item  C-10  -  Control of Heavy Loads    Phase  I (NUREG-0612) [TAC M08438]
Commitment:    TVA will complete Multi-Plant Action    Item C-10.
Discussion:    In December 1980 (Reference 1), NRC issued a Generic Letter which disseminated NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, and requested utilities provide additional information. TVA's responses to this request included References 2 and 3. NRC's closure of Control of Heavy Loads (Phase I) was contained in Reference 4. The generic closure of Phase        II of
                                  '1-76


1.2.3~4~5.Complete.NRC approval of the relocation of RETS is contained in Reference 5.NRC letter to All Power Reactor Licensees and Applicants, dated January 31, 1989, Implementation of Programmatic Controls for Radiological Effluent Technical Specifications in the Administrative Controls Section of the Technical Specifications and the Relocation of Procedural Details of RETS to the Offsite Dose Calculation Manual or to the Process Control Program (Generic Letter 89-01)TVA letter to NRC, dated March 25, 1992, TVA BFN Technical Specification (TS)No.301, Implementation of the Guidance of GL 89-01 TVA letter to NRC, dated January 29, 1993, Technical Specification (TS)No.301-Supplement 1, Implementation of the Guidance of Generic Letter (GL)89-01-Units 1, 2, and 3 TVA letter to NRC, dated August 27, 1993, Clarifications for Proposed Technical Specification No.301 NRC letter to TVA, dated September 22, 1993, Issuance of Amendments (TS 301)MJREG-0737 (TMI Acti.on Plan), Action Item I.D.1-Control Room Design Review[TAC M45778 and M56106]Commitment:
Q Control of Heavy Loads      was issued by  NRC   in Reference 5.
TVA will complete NUREG-0737 (TMI Action Plan)Action Item I.D.1-Control Room Design Review.Pursuant to NUREG-0737 (TMI Action Plan)and Supplement 1, TVA provided its Control Room Design Review (CRDR)corrective action plan and El-80 O V I J 4 f commitments to NRC by letter, dated December 30, 1986, and supplemented by letter, dated November 9, 1988 (References 1 and 2).In Reference 3, TVA also committed to complete all safety and non-safety significant Human Engineering Discrepancies (HEDs)prior to the restart of Units 1 and 3.The final Safety Evaluation Report (SER)for the BFN CRDR was provided in Reference 4.As part of the BFN Operating and Maintenance Cost Reduction Program, TVA submitted a Cost Beneficial Licensing Action to discontinue the cost-benefit analysis of non-safety significant HEDs (Reference 5).NRC approval of this request was contained in Reference 6.Status: Open.The field work associated with this issue has been completed.
Complete. TVA has   performed the required modifications.
TVA is currently in the process of paper closure and independent verification.
NRC has reviewed the program for handling critical  loads and considers this issue closed for Unit 3. The results are documented in Reference 6.
These remaining items will be completed prior to restart.NRC has evaluated the Detailed Control Room Design Review (DCRDR)program.The control board mockups were examined and eleven HEDs were selected for a results comparison between the Unit 2 and Unit 3 control rooms.Based on this review, the previous approval of the Unit 2 DCRDR, and the similarity of the Unit 2 and Unit 3 programs, the inspector considers this issue closed for Unit 3.This is documented in Reference 7.


==References:==
==References:==
: 1. NRC  letter to All Licensees of Operating Plants ad  Applicants for Operating Licenses and Holders of Construction Permits, dated December 22, 1980, Control of Heavy Loads 2 ~ TVA  letter to    NRC, dated January 6, 1984, in regards to  NUREG-0612 3 ~ TVA  letter to    NRC, dated  April 4,  1984,  in regards to  NUREG-0612
: 4. NRC  letter to    TVA, dated June 6, 1984, Control of Heavy Loads (Phase    I)
: 5. NRC  letter to All Licensees for      Operating Reactors,  dated June 26, 1985, Completion of Phase  II  of "Control of Heavy Loads at Nuclear Power Plants", NUREG-0612 (Generic Letter 85-11)
: 6. NRC  letter to    TVA, dated August 7, 1995,    NRC Inspection Report 95-38 [Section r
6.f.,  page 16]
Multi-Plant Action Item  C-11  -  Reactor Protection System Power Supply [TAC M08931]
Commitment:    TVA  will replace    the General Electric (GE) molded case  circuit  breakers that are used on the output of the reactor protection system (RPS) motor-generator (MG) sets. The replacement breakers provide undervoltage, overvoltage and underfrequency protection by utilizing a combination of contactors and relays.
Discussion:    In Reference 1, NRC informed TVA of deficiencies identified in the design of the voltage regulator system of the motor generator sets which supply power to the reactor protection system at another facility. TVA responded in Reference 2. In Reference 3, the NRC Staff recommended that TVA implement modifications similar to those performed at the Hatch facility. In response, E1-77


1.TVA letter to NRC, dated December 30, 1986, Detailed Control Room Design Review (DCRDR)NUREG-0737, Item I.D.1 2~TVA letter to NRC, dated November 9, 1988, Response to NRC Safety Evaluation for the BFN Detailed Control Room Design Review (DCRDR)3~TVA letter to NRC, dated August 22, 1991, Supplemental Response to NRC Safety Evaluation for the BFN Detailed Control Room Design Review (DCRDR)4~NRC letter to TVA, dated October 29, 1991, Safety Evaluation of the Browns Ferry Nuclear Plant Detailed Control Room Design Review 5.TVA letter to NRC, dated December 15, 1993, Operating&Maintenance (0&M)Cost Reduction Program-Cost Beneficial Licensing Action-Revision of Detailed Control Room Design p I~8 l~I~I 6.7~Review (DCRDR)Program to Discontinue Cost-Benefit Analysis of Non-Safety Significant Human Engineering Discrepancies (HEDs)NRC letter to TVA, dated February 4, 1994, Revision of Detailed Control Room Design Review Program to Discontinue Cost-Benefit Analysis of Non-Safety Significant Human Engineering Discrepancies NRC letter to TVA, dated October 7, 1994, NRC Inspection Report 94-21[Section 3.d., page 3]NUREG-0737 (TMI Action Plan), Action Item I.D.2-Safety Parameter Display Console[TAC M51225 and M74612]Commitment:
TVA committed to install a Class IE RPS power supply in Reference 4.
Discussion:
NRC requested additional information and proposed Technical Specification changes in Reference 5.
Status:
The requested information and proposed Technical Specifications for Unit 1 were provided by TVA in Reference 6. Additional information was requested by the NRC Staff in Reference 7 and provided by TVA in Reference 8. Additional information was requested by the NRC Staff in Reference 9 and provided by TVA in Reference 10.
NRC  Staff acceptance of   TVA's modifications was documented  in Reference  11.
The  associated Technical Specifications were proposed by TVA   in Reference 12. NRC requested additional information in Reference 13, which TVA provided in Reference 14. The proposed Technical Specifications were approved in Reference 15.
Status:        Complete. TVA installed two Class 1E detection and  isolation assemblies in each of the three sources of power to the RPS. Each assembly includes a circuit breaker and a monitoring module  consisting of an undervoltage, an overvoltage and an underfrequency sensing relay.
The protective assembly relays operate to disconnect the abnormal source of supply from the RPS  bus.
NRC has reviewed  related documentation and the Unit  3 modifications to the RPS power supply.
Based on this review, the inspector considers this issue is closed for Unit 3. This is documented  in Reference 16.


==References:==
==References:==
: 1. NRC letter to TVA, dated August 7, 1978, in regards to Reactor Protection System Power Supply Deficiencies 2 ~ TVA  letter to  NRC, dated December 13, 1978, in regards to  Reactor  Protection System Power Supplies 3 ~ NRC  letter to  TVA, dated September 24( 1980( in regards to  Reactor  Protection System Power Supply Deficiencies 4 ~ TVA  letter to  NRC,  dated December  4g 1980i in regards to Reactor Protection    System Power Supplies E1-78


TVA will complete NUREG-0737 (TMI Action Plan)Action Item I.D.2-Safety Parameter Display Console.Refer to the previous item entitled Generic Letter 89-06-Safety Parameter Display System-10 CFR 50.54(f).Refer to the previous item entitled Generic Letter 89-06-Safety Parameter Display System-10 CFR 50.54(f)~None.NUREG-0737 (TMI Action Plan), Action Item II.B.3-Post-Accident Sampling System[TAC M44425, M74613, M74614 and M74617]Commitment:
        "f IL J
Discussion:
II C 4 ei
Status:  
 
NRC  letter to TVA, dated October 30, 1981, Reactor Protection System (RPS) Power Monitoring System Design Modifications TVA  letter to NRC, dated July 13, 1983, in regards to Unit  1 Cycle 6 Technical Specifications NRC letter to TVA, dated October 12, 1983, Reactor Protection System (RPS) Power Monitoring System Design Modifications TVA letter to NRC, dated August 9, 1984, in regards to Reactor Protection System (RPS) Power Monitoring System Design Modifications NRC letter to TVA, dated October 31, 1984, Reactor Protection System (RPS) Power Monitoring System Design Modifications TVA letter to NRC, dated March 1, 1985, in regards to Reactor Protection System (RPS) Power Monitoring System Design Modifications NRC letter to TVA, dated June 27, 1985, Reactor Protection System (RPS) Power Monitoring System Design Modifications TVA letter to NRC, dated June 4, 1990, TVA BFN Technical Specification (TS) No. 286  Reactor Protection System (RPS) Circuit Protector Trip Level Setpoint NRC letter to TVA, dated September 27, 1990, Request for Additional Information  Browns Ferry Technical Specification Amendment (TS 286)
Regarding Reactor Protection System Circuit Protection Trip Level Setpoints TVA letter to NRC, dated October 24, 1990, Technical Specification (TS) No. 286 TVA'FN Reactor Protection System (RPS) Circuit Protector Trip Level Setpoint  Response to Request for Additional Information NRC letter to TVA, dated January 3, 1991, Issuance of Amendments (TS 286)
NRC letter to TVA, dated October 13, 1995, NRC Inspection Report 95-51 [Section 5.4, page 30]
E1-79
 
Multi-Plant Action Item D Relocation of Radiologi.cal Effluent Technical Specificati.ons Commitment:     TVA  will complete  MPA D-25  Relocation  of Radiological Effluent Technical Specifications (RETS) .
Discussion:     In accordance with the guidelines provided in Generic Letter 89-01, TVA submitted a proposed Technical Specification amendment for the relocation of the RETS in Reference 2.
Additional information was provided by TVA in References  3 and 4.
Status:         Complete. NRC approval of the relocation of    RETS is contained in Reference 5.


==References:==
==References:==
: 1. NRC letter to All Power Reactor    Licensees and Applicants, dated January 31, 1989, Implementation of Programmatic Controls for Radiological Effluent Technical Specifications in the Administrative Controls Section of the Technical Specifications and the Relocation of Procedural Details of RETS to the Offsite Dose Calculation Manual or to the Process Control Program (Generic  Letter 89-01)
: 2. TVA  letter to NRC, dated March 25, 1992, TVA BFN Technical Specification (TS) No. 301, Implementation of the Guidance of GL 89-01 3 ~ TVA letter to NRC, dated January 29, 1993, Technical Specification (TS) No. 301 Supplement 1, Implementation of the Guidance of Generic Letter (GL) 89-01  Units 1, 2, and 3 4 ~ TVA  letter to NRC, dated August 27, 1993, Clarifications for Proposed Technical Specification No. 301
: 5. NRC letter to TVA, dated September 22, 1993, Issuance of Amendments (TS 301)
MJREG-0737  (TMI Acti.on Plan), Action Item  I.D.1 - Control  Room Design Review [TAC M45778 and M56106]
Commitment:      TVA  will complete  NUREG-0737  (TMI Action Plan)
Action Item I.D.1    Control  Room  Design Review.
Pursuant to NUREG-0737 (TMI Action Plan) and Supplement 1, TVA provided its Control Room Design Review (CRDR) corrective action plan and El-80


1.TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.B.3-Post-Accident Sampling System (PASS)A description of the BFN PASS design was provided in References 1 and 2.The Safety Evaluation Report for this system was provided by Reference 3.Open.The PASS has been installed and is functional.
O V
Testing of the PASS during power ascension testing will confirm agreement with measurements taken at the:normal sampling points.TVA letter to NRC, dated December 19, 1986, NUREG-0737, Item II.B.3-Postaccident Sampling System'E1-82 2~3~TVA letter to NRC, dated April 1, 1987, NUREG-0737, Item II.B.3-Postaccident Sampling System NRC letter to TVA, dated May 27, 1987, Post Accident Sampling System NUREG-0737, (TMZ Action Plan), Action Ztem ZZ.E.4.2.1 Containment Isolation Dependability
I J 4 f
-Implement Diverse Isolation fTAC M74615]Commitment:
 
Discussion:
commitments    to  NRC by  letter,  dated December 30, 1986, and supplemented by letter, dated November 9, 1988 (References 1 and 2).         In Reference 3,    TVA also committed to complete all safety and    non-safety  significant Human Engineering    Discrepancies    (HEDs) prior to the restart of Units 1 and 3. The final Safety Evaluation Report (SER) for the BFN CRDR was provided in Reference 4.
Status: TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.E.4.2.1-4
As part of the BFN Operating and Maintenance Cost Reduction Program, TVA submitted a Cost Beneficial Licensing Action to discontinue the cost-benefit analysis of non-safety significant HEDs (Reference 5).     NRC approval of this request was contained in Reference 6.
-Containment Isolation Dependability
Status:         Open. The field work associated with this issue has been completed.     TVA is currently in the process of paper closure and independent verification. These remaining items will be completed  prior to restart.
-Implement Diverse Isolation In Reference 1, NRC requested additional information regarding Units 1 and 3 conformance with NUREG-0737, Item ZI.E.4.2 and 10 CFR 50, Appendix J.In order to minimize the number and scope of updates that would have to be provided to NRC on this issue, TVA replied in Reference 2 using the anticipated'onfiguration at the time of the restart of Unit 3.NRC approval of the Unit 3 containment isolation design is provided in Reference 3.Changes to the preliminary information was provided by TVA in Reference 4 and approved by NRC,in Reference 5.Complete.The modifications to ensure containment isolation dependability have been installed.
NRC has evaluated the Detailed Control Room Design Review (DCRDR) program. The control board mockups were examined and eleven HEDs were selected for a results comparison between the Unit 2 and Unit 3 control rooms. Based on this review, the previous approval of the Unit 2 DCRDR, and the similarity of the Unit 2 and Unit 3 programs, the inspector considers this issue closed for Unit 3. This is documented in Reference 7.


==References:==
==References:==
: 1. TVA  letter to    NRC, dated December 30, 1986, Detailed  Control Room Design Review (DCRDR)
NUREG-0737,    Item I.D.1 2 ~ TVA  letter to    NRC, dated November 9, 1988, Response  to  NRC  Safety Evaluation    for the BFN Detailed Control Room Design Review (DCRDR) 3 ~ TVA  letter to    NRC, dated August 22, 1991, Supplemental Response to NRC Safety Evaluation for the BFN Detailed Control Room Design Review  (DCRDR) 4 ~ NRC  letter to    TVA, dated October 29, 1991, Safety Evaluation of the Browns Ferry Nuclear Plant Detailed Control Room Design Review
: 5. TVA  letter to    NRC, dated December 15, 1993, Operating  &  Maintenance  (0&M) Cost Reduction Program    Cost  Beneficial  Licensing Action Revision  of  Detailed  Control  Room Design


1.2~3~4~NRC letter to TVA, dated May 5, 1992, Request for Additional Information to Review Browns Ferry Nuclear Plant Units 1 and 3 Compliance with NUREG-0737 Item II.E.4.2 and 10CFR50, Appendix J TVA letter to NRC, dated September 1, 1992, Response to NRC Request for Additional Information Regarding Units 1 and 3 Conformance with NUREG-0737, Item II.E.4.2 and 10CFR50, Appendix J NRC letter to TVA, dated January 6, 1995, Browns Ferry Nuclear Plant Units 1 and 3-NUREG-0737, Item II.E.4.2, Containment Isolation Dependability TVA letter to NRC, dated August 3, 1995, Browns Ferry Nuclear Plant Units 2 and 3-Supplemental Information For Conformance with NUREG-0737, Item II.E.4.2 and 10CFR50, Appendix J El-83
p I  ~8 l ~
-ff 5.NRC letter to TVA, dated October 18, 1995, Browns Ferry Nuclear Plant Units 2 and 3-Supplemental Information:
I
Conformance with NUREG-0737 Item II.E.4.2 and 10 CFR 50, Appendix J (TAC NOS.M74615 and M74616)NUREG-0737 (TMI Action Plan), Action Item ZZ.E.4.2.6-Containment Isolation Dependability
          ~ I
-Containment Purge Valves[TAC M74616]Commitment:
 
Discussion:
Review  (DCRDR) Program to Discontinue Cost-Benefit Analysis of Non-Safety Significant Human Engineering Discrepancies (HEDs)
TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.E.4.2.6
: 6. NRC letter to TVA, dated February 4, 1994, Revision of Detailed Control Room Design Review Program to Discontinue Cost-Benefit Analysis of Non-Safety Significant Human Engineering Discrepancies 7 ~ NRC letter to TVA, dated October 7, 1994, NRC Inspection Report 94-21 [Section 3.d., page 3]
-Containment Isolation Dependability
NUREG-0737 (TMI Action Plan), Action Item I.D.2 - Safety Parameter Display Console [TAC M51225 and M74612]
-Containment Purge Valves TVA addressed the issue of containment purge valve dependability in References 1 through 4.The NRC Staffs determination that the requirements of Item II.E.4.2.6 have been met is contained in Reference 5.Status:  
Commitment:      TVA will complete    NUREG-0737   (TMI Action Plan)
Action Item I.D.2      Safety  Parameter Display Console.
Discussion:      Refer to the previous item entitled Generic Letter 89-06  Safety Parameter Display System 10 CFR  50.54(f).
Status:          Refer to the previous item entitled Generic Letter 89-06  Safety Parameter Display System 10 CFR 50.54(f)  ~
 
==References:==
None.
NUREG-0737 (TMI Action Plan), Action Item II.B.3 - Post-Accident Sampling System [TAC M44425, M74613, M74614 and M74617]
Commitment:     TVA will complete   NUREG-0737 (TMI     Action Plan)
Action Item II.B.3      Post-Accident    Sampling System (PASS)
Discussion:      A description of the     BFN PASS  design was provided in References 1 and 2.       The Safety Evaluation Report for  this  system  was  provided  by Reference 3.
Status:          Open. The PASS has been installed and is functional. Testing of the PASS during power ascension testing will confirm agreement with measurements taken at the:normal sampling points.


==References:==
==References:==
: 1. TVA letter to NRC, dated December 19, 1986, NUREG-0737,  Item  II.B.3  Postaccident    Sampling System
                                  'E1-82


1.2~3~4~5.Complete.The containment purge isolation valves were replaced, debris screens installed on the containment purge lines, and calculations were performed that determined the Reactor Building ductwork, Secondary Containment, and Standby Gas Treatment systems would not be adversely affected by a loss of coolant accident occurring during containment purge operations.
2 ~ TVA letter to   NRC, dated   April 1, 1987, NUREG-0737,   Item  II.B.3    Postaccident  Sampling System 3 ~ NRC letter to   TVA, dated May 27, 1987, Post Accident Sampling System NUREG-0737, (TMZ Action Plan),   Action Ztem ZZ.E.4.2.1 Containment  Isolation Dependability -       Implement Diverse    Isolation fTAC M74615]
TVA letter to NRC, dated June 12, 1979, in regards to Primary Containment Purge System Design TVA letter to NRC, dated December 10, 1979, in regards to Containment Purging and Venting During Normal Operation TVA letter to NRC, dated June 2, 1981, in regards to Containment Purge Valve Operability and Purge Operations TVA letter to NRC, dated January 25, 1985, in regards to Structural Adequacy of Containment Vent and Purge Valves NRC letter to TVA, dated July 1, 1985, Completion of Review of NUREG-0737, Items II.E.4.2.6 and ICE.4.2.7 El-84 U g~1 E~~>II'1 NUREG-0737 (TMZ Action Plan), Action Item XX.F.1.2.A
Commitment:     TVA will complete NUREG-0737 (TMI Action Plan)
-Accident-Monitoring
Action Item II.E.4.2.1-4  Containment Isolation Dependability  Implement Diverse Isolation Discussion:     In Reference 1, NRC requested additional information regarding Units 1 and 3 conformance with NUREG-0737, Item ZI.E.4.2 and 10 CFR 50, Appendix J. In order to minimize the number and scope of updates that would have to be provided to NRC on this issue, TVA replied in Reference 2 using the anticipated'onfiguration at the time of the restart of Unit 3. NRC approval of the Unit 3 containment isolation design is provided in Reference 3. Changes to the preliminary information was provided by TVA in Reference 4 and approved by NRC,in Reference        5.
-Noble Gas Monitor[TAC M44905]I Commitment:
Status:          Complete. The   modifications to ensure containment    isolation dependability have      been installed.
TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.F.1.2.A
-Accident-Monitoring-Noble Gas Monitor Discussion:
In response to NUREG-0737 (TMI Action Plan)Action Item II.F.1.1-Noble Gas Monitor, TVA committed to provide a system to monitor the Browns Ferry stack for high-range noble gas (Reference 1).In response to an NRC request for additional information (Reference 2), TVA stated that the monitoring equipment, which is common to all three units, would be operable with local readout and have instrumentation installed in the Unit 1 control room (Reference 3).In Reference 4, TVA was directed to: 1.Install noble gas effluent monitors with local readout capability by December 31, 1984, and Status: 2.Install control room instrumentation prior to start-up in Cycle 7.TVA requested an extension to the December 31, 1984 completion date in Reference 5.'echnical Specification Amendment Number 85, dated February 12, 1985 (Reference 6), revised the completion date for the March 25, 1983 Order for installation of noble gas monitors with local readout capability from December 31, 1984 to prior to startup of Unit 2 from the current refueling and modification outage.An explanation as to how this license condition was satisfied was provided in Reference 7.Complete.The Wide Range Gaseous Effluent Radiation Monitoring System (WRGERMS), installed at the stack, provides the high-range monitoring capability.
This system was installed prior to the restart of Unit 2, and is common to all Units.In addition, TVA has installed an annunciator in the Unit 3 control room as well as connection to the plant integrated computer system which allows Unit 3 operators to obtain WRGERMS information.


==References:==
==References:==
: 1. NRC  letter to    TVA,  dated May 5, 1992, Request      for Additional Information to Review Browns Ferry Nuclear Plant Units 1 and 3 Compliance with NUREG-0737  Item  II.E.4.2    and 10CFR50, Appendix J 2 ~ TVA  letter to    NRC,  dated September 1, 1992, Response  to  NRC  Request for Additional Information Regarding Units 1 and 3 Conformance with  NUREG-0737,    Item  II.E.4.2  and 10CFR50, Appendix J 3 ~ NRC  letter to    TVA,  dated January 6, 1995, Browns Ferry Nuclear Plant Units 1 and 3  NUREG-0737, Item II.E.4.2, Containment Isolation Dependability 4 ~ TVA  letter to    NRC,  dated August 3, 1995, Browns Ferry Nuclear Plant Units 2 and 3  Supplemental Information For Conformance with NUREG-0737, Item II.E.4.2 and 10CFR50, Appendix J El-83


1.TVA letter to NRC, dated June 17, 1982, in regards to NUREG-0737, Action Items II.B.2, II.F.1.1 and II.F.1.2 E1-85 P
ff
2~NRC letter to TVA, dated February 1, 1983, Schedules on NUREG-0737 Items 3~4~5.TVA letter regards to II.F.1'NRC letter regards to TVA letter regards to II.F.1.2 to NRC, dated February 28, 1983, in NUREG-0737, Items II.F.1.1 and to TVA, dated March 25, 1983, in post-TMI Confirmatory Orders to NRC, dated December 13, 1984, in NUREG-0737, Items II.F.1.1 and 6.NRC letter regards to and 3 to TVA, dated February 12, 1985, in Amendment Nos.110 and 85 for Units 2 7~TVA letter to NRC, dated August 27, 1993, Completion of Unit 3 License Condition Regarding NUREG-0737 (TMI Action Plan)Action Items II.F.1.1-Noble Gas Monitor and II.F.1.2-Iodine/particulate Monitor NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.B
: 5. NRC letter to TVA, dated October 18, 1995, Browns Ferry Nuclear Plant Units 2 and 3  Supplemental Information: Conformance with NUREG-0737 Item II.E.4.2 and 10 CFR 50, Appendix    J  (TAC NOS.
-Accident-Monitoring
M74615 and M74616)
-Iodine/Particulate Monitor[TAG M44976]Commitment:
NUREG-0737 (TMI Action Plan), Action Item ZZ.E.4.2.6-Containment  Isolation Dependability - Containment Purge Valves
Discussion:
[TAC M74616]
TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.F.1.2.B
Commitment:     TVA will complete NUREG-0737 (TMI Action Plan)
-Accident-Monitoring-Iodine/Particulate Monitor In response to NUREG-0737 (TMI Action Plan)Action Item II.F.1.2-Iodine/Particulate Monitor, TVA committed to provide a system to monitor the Browns Ferry stack with particulate and iodine collection on appropriate adsorption media (Reference 1).In response to an NRC request for additional information (Reference 2), TVA stated that the monitoring equipment, which is common to all three units, would be operable with local readout and have instrumentation installed in the Unit 1 control room (Reference 3).In Reference 4, TVA was directed to: 1.Provide capability for effluent monitoring of iodine with local readout capability by~December 31, 1984, and 2.Install control room instrumentation prior to start-up in Cycle 7.E1-86 4
Action Item II.E.4.2.6  Containment Isolation Dependability  Containment Purge Valves Discussion:      TVA addressed the issue of containment purge valve dependability in References 1 through 4.
Status:
The NRC Staffs determination that the requirements of Item II.E.4.2.6 have been met is contained in Reference 5.
Status:          Complete. The containment purge isolation valves were replaced, debris screens installed on the containment purge lines, and calculations were performed that determined the Reactor Building ductwork, Secondary Containment, and Standby Gas Treatment systems would not be adversely affected by a loss of coolant accident occurring during containment purge operations.


==References:==
==References:==
: 1. TVA  letter to NRC, dated June 12, 1979, in regards to Primary Containment Purge System Design 2 ~ TVA  letter to NRC, dated December 10, 1979, in regards to Containment Purging and Venting During Normal Operation 3 ~ TVA  letter to  NRC,  dated June 2, 1981, in regards to Containment Purge Valve Operability and Purge Operations 4 ~ TVA  letter to  NRC,  dated January 25, 1985, in regards to Structural Adequacy of Containment Vent and Purge Valves
: 5. NRC  letter to  TVA, dated  July 1, 1985, Completion of Review of  NUREG-0737,  Items  II.E.4.2.6  and ICE.4.2.7 El-84


1.TVA requested an extension to the December 31, 1984 completion date in Reference 5.Technical Specification Amendment Number 85, dated February 12, 1985 (Reference 6), revised the completion date for the March 25, 1983 Order for installation of iodine effluent monitors with local readout capability from December 31, 1984 to prior to startup of Unit 2 from the current refueling and modification outage.An explanation as to how this license condition was satisfied was provided in Reference 7.Complete.The Wide Range Gaseous Effluent Radiation Monitoring System (WRGERMS), installed at the stack, provides the high-range monitoring capability.
U g
This system was installed prior to the restart of Unit 2, and is common to all Units.In addition, TVA has installed an annunciator in the Unit 3 control room as well as connection to the plant integrated computer system which allows Unit 3 operators to obtain WRGERMS information.
        ~      1 E      ~
t TVA letter to NRC, dated June 17, 1982, in regards to NUREG-0737, Action Items II.B.2, II.F.1.1 and II.F.1.2 2.NRC letter to TVA, dated February 1, 1983, Schedules on NUREG-0737 Items 3.4~5.TVA letter regards to II.F.1.2 NRC letter regards to TVA letter regards to II'.1.2 to NRC, dated February 28, 1983, in NUREG-0737, Items II.F.1.1 and to TVA, dated March 25, 1983, in post-TMI Confirmatory Orders to NRC, dated December 13, 1984, in NUREG-0737, Items II.F.1.1 and 6.NRC letter to TVA, dated February 12, 1985, in regards to Amendment Nos.110 and 85 for Units 2 and 3 7.TVA letter to NRC, dated August 27, 1993, Completion of Unit 3 License Condition Regarding NUREG-0737 (TMI Action Plan)Action Items II.F.1.1-Noble Gas Monitor and II.F.1.2-Iodine/particulate Monitor El-87 NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.C
    ~ >
-Accident-Monitoring
II '1
-Containment High Range Radiation[TAC M45047]Commitment:
 
Discussion:
NUREG-0737  (TMZ Action Plan), Action Item XX.F.1.2.A - Accident-Monitoring Noble Gas Monitor [TAC M44905]        I Commitment:      TVA  will complete  NUREG-0737 (TMI Action Plan)
Status: TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.F.1.,2.C
Action Item II.F.1.2.A    Accident  Monitoring Noble Gas Monitor Discussion:      In response to NUREG-0737 (TMI Action Plan)
-Accident-Monitoring-Containment High Range Radiation In Reference 1, TVA committed to install a containment high range radiation monitor.Reference 2 issued a Confirmatory Order for the installation of the radiation monitors prior to start-up in Cycle 7.Complete.TVA has upgraded the two Unit 3 drywell radiation monitor loops to meet the requirements of NUREG-0737 for Containment High Range Radiation Monitors (CHRRM).The modifications ensure that the CHRRMs are capable of detecting and measuring the radiation levelwithin the drywell during and following an accident.NRC has reviewed applicable calibration records, vendor's test data, environmental qualification work activities associated with each CHRRM, and performed a walkdown of the completed installation.
Action Item II.F.1.1  Noble Gas Monitor, TVA committed to provide a system to monitor the Browns Ferry stack for high-range noble gas (Reference 1). In response to an NRC request for additional information (Reference 2), TVA stated that the monitoring equipment, which is common to all three units, would be operable with local readout and have instrumentation installed in the Unit 1 control room (Reference 3).
Based on this review, the inspector considers this item closed.This is documented in Reference 3.
In Reference 4, TVA was directed to:
: 1. Install noble gas effluent monitors with local readout capability    by December 31, 1984, and
: 2. Install control  room instrumentation prior to start-up in Cycle 7.
TVA  requested an extension to the December 31, 1984 completion date in Reference Specification Amendment Number 85,   5.'echnical dated February 12, 1985 (Reference 6), revised the completion date for the March 25, 1983 Order for installation of noble gas monitors with local readout capability from December 31, 1984 to prior to startup of Unit 2 from the current refueling and modification outage. An explanation as to how this license condition was satisfied was provided in Reference 7.
Status:          Complete. The Wide Range Gaseous   Effluent Radiation Monitoring System (WRGERMS), installed at the stack, provides the high-range monitoring capability. This system was installed prior to the restart of Unit 2, and is common to all Units. In addition, TVA has installed an annunciator in the Unit 3 control room as well as connection to the plant integrated computer system which allows Unit 3 operators to obtain WRGERMS information.


==References:==
==References:==
: 1. TVA  letter to NRC, dated June 17, 1982, in regards to NUREG-0737, Action Items II.B.2, II.F.1.1  and II.F.1.2 E1-85
P 2 ~ NRC    letter to  TVA,  dated February 1, 1983, Schedules    on NUREG-0737 Items 3 ~ TVA    letter to NRC, dated February 28, 1983, in regards to NUREG-0737, Items II.F.1.1 and II.F.1 '
4 ~ NRC    letter to TVA, dated March 25, 1983, in regards to post-TMI Confirmatory Orders
: 5. TVA letter to NRC, dated December 13, 1984, in regards to NUREG-0737, Items II.F.1.1 and II.F.1.2
: 6. NRC    letter to TVA, dated February 12, 1985, in regards to Amendment Nos. 110 and 85 for Units      2 and    3 7 ~ TVA    letter to  NRC,  dated August 27, 1993, Completion of Unit      3 License Condition Regarding NUREG-0737 (TMI Action Plan) Action Items II.F.1.1  Noble Gas Monitor and II.F.1.2 Iodine/particulate Monitor NUREG-0737  (TMI Action Plan), Action Item II.F.1.2.B        Accident-Monitoring - Iodine/Particulate Monitor [TAG M44976]
Commitment:      TVA will complete NUREG-0737 (TMI Action Plan)
Action Item II.F.1.2.B  Accident  Monitoring Iodine/Particulate Monitor Discussion:      In response to NUREG-0737 (TMI Action Plan)
Action Item II.F.1.2  Iodine/Particulate Monitor, TVA committed to provide a system to monitor the Browns Ferry stack with particulate and iodine collection on appropriate adsorption media (Reference 1). In response to an NRC request for additional information (Reference 2),
TVA stated that the monitoring equipment, which is common to all three units, would be operable with local readout and have instrumentation installed in the Unit 1 control room (Reference 3).
In Reference 4, TVA was directed to:
: 1. Provide capability for effluent monitoring of iodine with local readout capability by
                      ~
December 31, 1984, and
: 2. Install control  room instrumentation prior to start-up in  Cycle 7.
E1-86


1.2~TVA letter to NRC, dated December 23, 1980, in regards to post-TMI requirements NRC letter to TVA, dated March 25, 1983, in regards to Confirmatory Order for Post-TMI Related Items Set Forth in NUREG-0737 3~NRC letter to TVA, dated October 18, 1995, NRC Inspection Report, 95-55[Section 3, page 3]NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.D
4 TVA requested an extension to the December 31, 1984 completion date in Reference 5.
-Accident-Monitoring
Technical Specification Amendment Number 85, dated February 12, 1985 (Reference 6), revised the completion date for the March 25, 1983 Order for installation of iodine effluent monitors with local readout capability from December 31, 1984 to prior to startup of Unit 2 from the current refueling and modification outage. An explanation as to how this license condition was satisfied was provided in Reference 7.
-Containment Pressure[TAC M47584]Commitment:
Status:        Complete. The Wide Range Gaseous Effluent Radiation Monitoring System (WRGERMS), installed at the stack, provides the high-range monitoring capability. This system was installed prior to the restart of Unit 2, and is common to all Units. In addition, TVA has installed an annunciator in the Unit 3 control room as well as connection to the plant integrated computer system which allows Unit 3 operators to obtain WRGERMS  information.
TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.F.1.2.D
t
-Accident-Monitoring-Containment Pressure Discussion:
In Reference 1, TVA committed to install a containment pressure monitor.NRC requested additional information in Reference 2, which was provided by TVA in Reference 3.Reference 4 issued a Confirmatory Order for the installation E1-88 c"<"-i:3 of the pressure monitor prior to start-up in Cycle 6.The Safety Evaluation Report that closed this item was issued in Reference 5.Status:


==References:==
==References:==
: 1. TVA letter to NRC, dated June 17, 1982, in regards to NUREG-0737, Action Items II.B.2, II.F.1.1 and II.F.1.2
: 2. NRC letter to TVA, dated    February 1, 1983, Schedules  on NUREG-0737 Items
: 3. TVA  letter to NRC, dated February 28, 1983, in regards to NUREG-0737, Items II.F.1.1 and II.F.1.2 4 ~ NRC letter to  TVA, dated March 25, 1983, in regards to post-TMI Confirmatory Orders
: 5. TVA  letter to NRC, dated December 13, 1984, in regards to NUREG-0737, Items II.F.1.1 and II'.1.2
: 6. NRC  letter to TVA, dated February 12, 1985, in regards to Amendment Nos. 110 and 85 for Units    2 and  3
: 7. TVA  letter to  NRC,  dated August 27, 1993, Completion of Unit    3 License Condition Regarding NUREG-0737 (TMI Action Plan) Action Items II.F.1.1  Noble Gas Monitor and II.F.1.2 Iodine/particulate Monitor El-87


1.2~Complete.In order to achieve compliance with the Drywell pressure monitoring requirements stipulated by NUREG-0737, various Design Change Notices (DCNs)and Engineering Change Notices (ECNs)have been implemented to upgrade the applicable instrumentation loops.TVA letter to NRC, dated December 23, 1980, in regards to post-TMI requirements NRC letter to TVA, dated March 22~1982~NUREG-0737, Items II.F.1.4, Containment Pressure Monitor;II.F.1.5, Containment Water Level Monitor, and II.F.1.6, Containment Hydrogen Monitor 3~TVA letter to NRC, dated April 26, 1982, in regards to NUREG-0737, Items II.F.1.4, II.F.1.5, and II.F.1.6 4~NRC letter to TVA, dated March 25, 1983, in regards to Confirmatory Order for Post-TMI Related Items Set Forth in NUREG-0737 5.NRC letter to TVA, dated June 16, 1983/NUREG-0737, Item II.F.1.4 Containment Pressure Monitor II.F.1.5 Containment Water Level Monitor II.F.1.6 Containment Hydrogen Monitor NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.E
NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.C - Accident-Monitoring Containment High Range Radiation [TAC M45047]
-Accident-Monitoring
Commitment:       TVA will complete NUREG-0737 (TMI Action Plan)
-Containment Water Level[TAC M47655]Commitment:
Accident  Monitoring Action Item II.F.1.,2.C Containment High Range Radiation Discussion:       In Reference 1, TVA committed to install a containment high range radiation monitor.
TVA will complete NUREG-0737 (TMI Action Plan)Action Item ZI.F.1.2.E
Reference 2 issued a Confirmatory Order for the installation of the radiation monitors prior to start-up in Cycle 7.
-Accident-Monitoring-Containment Water Level Discussion:
Status:           Complete. TVA has upgraded the two Unit 3 drywell radiation monitor loops to meet the requirements of NUREG-0737 for Containment High Range Radiation Monitors (CHRRM). The modifications ensure that the CHRRMs are capable of detecting and measuring the radiation levelwithin the drywell during and following an accident.
In Reference 1, TVA committed to install a containment water level monitor.NRC requested additional information in Reference 2, which was provided by TVA in Reference 3.Reference 4 issued a Confirmatory Order for the installation of the water level monitor prior to start-up in Cycle 6.The Safety Evaluation Report that closed this item was issued in Reference 5.Status: Complete.TVA has replaced the existing Drywell"Narrow Range" and"Wide Range" Torus Water Level Transmitters with new equipment.
NRC has reviewed applicable calibration records, vendor's test data, environmental qualification work activities associated with each CHRRM, and performed a walkdown of the completed installation. Based on this review, the inspector considers this item closed. This is documented  in Reference 3.
In addition, El-89 (I'P l f new scales were installed for Level Indicators located in the Unit 3 Control Room.


==References:==
==References:==
: 1. TVA letter to NRC, dated December 23, 1980, in regards to post-TMI requirements 2 ~ NRC letter to TVA, dated March 25, 1983, in regards to Confirmatory Order for Post-TMI Related Items Set Forth in NUREG-0737 3 ~ NRC letter to TVA, dated October 18, 1995, NRC Inspection Report, 95-55 [Section 3, page 3]
NUREG-0737  (TMI Action Plan),  Action Item II.F.1.2.D  - Accident-Monitoring - Containment Pressure    [TAC M47584]
Commitment:      TVA  will complete NUREG-0737  (TMI Action Plan)
Accident  Monitoring Action Item II.F.1.2.D Containment Pressure Discussion:      In Reference 1, TVA committed to install a containment pressure monitor. NRC requested additional information in Reference 2, which    was provided by TVA in Reference 3. Reference 4 issued  a Confirmatory Order for the  installation E1-88


1.TVA letter to NRC, dated December 23, 1980, in regards to post-TMI requirements 2.NRC letter to TVA, dated March 22, 1982, NUREG-0737, Items II.F.1.4, Containment Pressure Monitor;II.F.1.5, Containment Water Level Monitor, and II.F.1.6, Containment Hydrogen Monitor 3.TVA letter to NRC, dated April 26, 1982, in regards to NUREG-0737, Items II.F.1.4, II.F.1.5, and II.F.1.6 4.NRC letter to TVA, dated March 25, 1983, in regards to Confirmatory Order for Post-TMI Related Items Set Forth in NUREG-0737 1 5.NRC letter to TVA, dated June 16, 1983, NUREG-0737, Item II.F.1.4 Containment Pressure Monitor II.F.1.5 Containment Water Level Monitor II.F.1.6 Containment Hydrogen Monitor NUREG-0737 (TMI Action Plan), Action Item II.F.2.4 (Generic Letter 84-23)-Instrumentation for Detection of Inadequate Core Cooling[TAC M45118]Commitment:
c" <"- i:3 of the pressure monitor prior to start-up in Cycle 6. The Safety Evaluation Report that closed this item was issued in Reference 5.
TVA committed to: Discussion:
Status:         Complete. In order to achieve compliance with the Drywell pressure monitoring requirements stipulated by NUREG-0737, various Design Change Notices (DCNs) and Engineering Change Notices (ECNs) have been implemented to upgrade the applicable instrumentation loops.
1.Convert level instruments which initiate the Reactor Protection System (RPS)and Emergency Core Cooling System (ECCS)and provide class 1E level indication in the control room to analog trip units.2.Minimize the effects of high drywell temperature on level indications by limiting the vertical drop of the reference legs inside the drywell to no more than two feet.The long-term modifications to improve the reliability and accuracy of BWR water level measurement and instrumentation were requested by Generic Letter 84-23 (Reference 1).TVA committed in Reference 2 to replace the RPS and ECCS instruments with analog trip units.TVA committed in Reference 3 to minimize the vertical drop of the reference legs inside containment by bringing the reference legs outside the drywell at higher elevations.
This commitment was modified in accordance with the commitment E1-90
:~I~~J',*
management process to limit the vertical drop inside the drywell to be no more than 2 feet 5 inches.The NRC was notified of this change by Reference 4.Status: Open.In order to comply with Generic Letter 84-23, TVA has performed modifications which include converting instruments in the control room to analog trip units, removing the Yarway Temperature Equalizing Columns, and rerouting the reactor vessel sense lines inside the drywell to minimize the vertical drop of the sense lines to 2 feet 5 inches.Installation is complete and equipment operable.Some confirmatory testing is to be performed at power.


==References:==
==References:==
: 1. TVA letter to NRC, dated December 23, 1980, in regards to post-TMI requirements 2 ~ NRC letter to TVA, dated March 22~ 1982~
NUREG-0737, Items  II.F.1.4,  Containment Pressure Monitor; II.F.1.5, Containment Water Level Monitor, and II.F.1.6, Containment Hydrogen Monitor 3 ~ TVA  letter to NRC, dated April 26, 1982, in regards to NUREG-0737, Items II.F.1.4, II.F.1.5, and II.F.1.6 4 ~ NRC letter to TVA, dated March 25, 1983, in regards to Confirmatory Order for Post-TMI Related Items Set Forth in NUREG-0737
: 5. NRC  letter to TVA, dated June 16, 1983/
NUREG-0737,  Item II.F.1.4 Containment Pressure Monitor II.F.1.5 Containment Water Level Monitor II.F.1.6 Containment Hydrogen Monitor NUREG-0737  (TMI Action  Plan),  Action Item II.F.1.2.E - Accident-Monitoring - Containment Water    Level  [TAC M47655]
Commitment:      TVA  will complete  NUREG-0737 (TMI Action Plan)
Accident  Monitoring Action Item ZI.F.1.2.E Containment Water Level Discussion:      In Reference 1, TVA committed to install a containment water level monitor. NRC requested additional information in Reference 2, which was provided by TVA in Reference 3. Reference 4 issued a Confirmatory Order for the installation of the water level monitor prior to start-up in Cycle 6. The Safety Evaluation Report that closed this item was issued in Reference 5.
Status:          Complete. TVA has replaced the existing Drywell "Narrow Range" and "Wide Range" Torus Water Level Transmitters with new equipment. In addition, El-89


1.NRC letter to All Boiling Water Reactor (BWR)Licensees of Operating Reactors (Except LaCrosse, Big Rock Point, Humboldt Bay and Dresden-1), dated October 26, 1984, Reactor Vessel Water Level Instrumentation in BWRs (Generic Letter 84-23)2~TVA letter to NRC, dated April 8, 1995, in regards to Generic Letter 84-23 3~TVA letter to NRC, dated March 12;1986, in regards to Generic Letter 84-23 4~TVA letter to NRC, dated September 5, 1995, Browns Ferry Nuclear Plant (BFN)-Units 1 and 3 Revision to Commitments Concerning The Senior Management Assessment of Readiness Team (SMART)and The Vertical Drop of Reactor Vessel Reference Legs (Generic Letter 84-23)NUREG-0737 (TMI Action Plan), Action Item II.K.3.13-HPCI/RCIC Initiation Levels t'TAC M45534]Commitment:
(
TVA will complete NUREG-0737 (TMI Action Plan)Action.Item II.K.3.13-HPCI/RCIC Initiation Levels Discussion:
I 'P  l f
In Reference 1, TVA states that it concurs with the BWR Owners'roup recommendation that separation of the HPCI/RCIC level setpoints had no substantial benefit and committed to implement an automatic restart of RCIC.In Reference 2, NRC concurred that no significant benefit would be gained by the separation of the HPCI/RCIC initiation levels and requested TVA evaluate the acceptance criteria provided for the RCIC automatic restart.One exception to the criteria III k Status:
 
new  scales were installed for Level Indicators located in the Unit 3 Control Room.


==References:==
==References:==
: 1. TVA  letter to NRC, dated December 23, 1980, in regards to post-TMI requirements
: 2. NRC letter to TVA, dated March 22, 1982, NUREG-0737, Items II.F.1.4, Containment Pressure Monitor; II.F.1.5, Containment Water Level Monitor, and II.F.1.6, Containment Hydrogen Monitor
: 3. TVA  letter to NRC, dated April 26, 1982, in regards to NUREG-0737, Items II.F.1.4, II.F.1.5, and  II.F.1.6
: 4. NRC  letter to  TVA, dated March 25, 1983, in regards to Confirmatory Order for Post-TMI Related Items Set Forth in NUREG-07371
: 5. NRC letter to TVA, dated June 16, 1983, NUREG-0737, Item II.F.1.4 Containment Pressure Monitor II.F.1.5 Containment Water Level Monitor II.F.1.6 Containment Hydrogen Monitor NUREG-0737  (TMI Action Plan), Action Item II.F.2.4 (Generic Letter 84-23) - Instrumentation for Detection of Inadequate    Core Cooling  [TAC M45118]
Commitment:      TVA  committed  to:
: 1. Convert level instruments which initiate the Reactor Protection System (RPS) and Emergency Core Cooling System (ECCS) and provide class 1E level indication in the control room to analog trip units.
: 2. Minimize the effects of high drywell temperature on level indications by limiting the vertical drop of the reference legs inside the drywell to no more than two feet.
Discussion:      The long-term modifications to improve the reliability and accuracy of BWR water level measurement and instrumentation were requested by Generic Letter 84-23 (Reference 1). TVA committed in Reference 2 to replace the RPS and ECCS instruments with analog trip units. TVA committed in Reference 3 to minimize the vertical drop of the reference legs inside containment by bringing the reference legs outside the drywell at higher elevations. This commitment was modified in accordance with the commitment E1-90


1.2~was identified in Reference 3 and approved by NRC in Reference 4.TVA clarified Technical Specification Bases Section 4.2 in Reference 5.The Bases were revised to state that the automatic restart feature is tested during the performance of logic system functional tests.The issuance of these Bases changes was documented in Reference 6.Complete.TVA has implemented a Design Change Notice (DCN)which modified the RCIC logic in order to automatic restart the RCIC system on vessel low water level (without operator action)following a vessel.high water trip.TVA letter to NRC, dated December 23, 1980, in regards to Post-TMI Requirements NRC letter to TVA, dated March 16, 1983, NUREG-0737, Item II.K.3.13,"RCIC Automatic Restart" 3~4~TVA letter to NRC, dated May 24, 1983, in regards to NUREG-0737, Item ZI.K.3.13 NRC letter to TVA, dated September 19, 1983, NUREG-0737, Item II.K.3.13,"RCIC Automatic Restart" 5.6.TVA letter to NRC, dated January 14, 1992, TVA BFN Technical Specification (TS)No.300 Reactor Core Thermal-Hydraulic Stability NRC letter to'VA, dated May 31, 1994, Issuance of Technical Specification Amendments for the Browns Ferry Nuclear Plant Units 1 and 3 (TS 300)NUREG-0737 (TMI Action Plan), Action Item II.K.3.18<<ADS Actuation Modifications
:~ I ~
[TAC M45682]*Commitment:
~ J',*
Discussion:
 
TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.K.3.18-ADS Actuation Modifications In response to Item II.K.3.18, the BWR Owners'roup performed an evaluation of options for compliance.
management  process to limit the vertical    drop inside the drywell to    be no more than    2 feet  5 inches. The NRC  was notified of this    change by Reference 4.
Two of these options were found to be acceptable by the NRC Staff and TVA was requested in Reference 1 to commit to one of these options.TVA chose Option 2, to modify the ADS logic to allow the ADS to initiate vessel depressurization, automatically bypassing the E1-92 C%~.~" fbi Status: high drywell pressure signal 10 minutes after a sustained lo-lo-lo reactor vessel water level signal (Reference 2).Complete.The modifications to the ADS logic which allows the ADS to initiate vessel depressurization has been completed.
Status:          Open. In order to comply with Generic Letter 84-23, TVA has performed modifications which include converting instruments in the control room to analog trip units, removing the Yarway Temperature Equalizing Columns, and rerouting the reactor vessel sense lines inside the drywell to minimize the vertical drop of the sense lines to 2 feet 5 inches.       Installation is complete and equipment operable.       Some confirmatory testing is to be performed at power.


==References:==
==References:==
: 1. NRC letter to All Boiling Water Reactor (BWR)
Licensees of Operating Reactors (Except LaCrosse, Big Rock Point, Humboldt Bay and Dresden-1),
dated October 26, 1984, Reactor Vessel Water Level Instrumentation in BWRs (Generic Letter 84-23) 2 ~ TVA  letter to NRC, dated April 8, 1995, in regards to Generic Letter 84-23 3 ~ TVA  letter to NRC, dated March 12; 1986, in regards to Generic Letter 84-23 4 ~ TVA letter to NRC, dated September 5, 1995, Browns Ferry Nuclear Plant (BFN)  Units 1 and        3 Revision to Commitments Concerning The Senior Management Assessment    of Readiness Team (SMART) and The Vertical Drop    of Reactor Vessel Reference Legs (Generic    Letter 84-23)
NUREG-0737  (TMI Action Plan), Action Item II.K.3.13 - HPCI/RCIC Initiation Levels  t'TAC M45534]
Commitment:      TVA  will complete  NUREG-0737  (TMI  Action Plan)
Action. Item II.K.3.13    HPCI/RCIC  Initiation Levels Discussion:      In Reference 1, TVA states that the BWR  Owners'roup it recommendation concurs with that separation of the HPCI/RCIC    level  setpoints  had no substantial benefit and    committed  to  implement an automatic restart of RCIC. In Reference 2, NRC concurred that no significant benefit would be gained by the separation of the HPCI/RCIC initiation levels and requested TVA evaluate the acceptance criteria provided for the RCIC automatic restart. One exception to the criteria
II I
k


1.NRC letter to TVA, dated June 3, 1983, NUREG-0737, Item II.K.3.18,"ADS Logic Modifications" 2.TVA letter to NRC, dated March 5, 1987, Modifications to Automatic Depressurization System (ADS)Logic-NUREG-0737, Item II.K.3.18 NUREG-0737, Item II.K.3.27-Common Reference Level for Vessel Level Instrumentation
was  identified in Reference 3 and approved by NRC in Reference 4.
[TAC M45778]Commitment:
TVA clarified Technical Specification Bases Section 4.2 in Reference 5. The Bases were revised to state that the automatic restart feature is tested during the performance of logic system functional tests.       The issuance of these Bases changes was documented in Reference 6.
TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.K.3.27-Common Reference Level for Vessel Level Instrumentation Discussion:
Status:          Complete. TVA has   implemented a Design Change Notice (DCN) which modified the RCIC logic in order to automatic restart the RCIC system on vessel low water level (without operator action) following a vessel. high water trip.
Status: In Reference 1, NRC informed TVA of an alternate approach to resolving this issue.This approach was to incorporate the requirement of this TMI Action Item into the control room design review to be performed per TMI Action Item I.D.1.The NRC stated that if TVA committed to utilize this alternate approach, it would provide sufficient bases for considering Item II.K.3.27 complete.TVA accepted this approach in Reference 2.Closed.NRC has reviewed the design change notices (DCN), has walked down the modifications and concluded that this item is closed for Unit 3.This is documented in Reference 3.


==References:==
==References:==
: 1. TVA  letter to  NRC, dated December 23, 1980,          in regards to  Post-TMI  Requirements 2 ~ NRC  letter to  TVA, dated March 16, 1983, NUREG-0737,  Item II.K.3.13, "RCIC Automatic Restart" 3 ~ TVA  letter to  NRC,  dated May 24, 1983, in regards to  NUREG-0737,  Item ZI.K.3.13 4 ~ NRC  letter to  TVA, dated September 19, 1983, NUREG-0737,  Item II.K.3.13, "RCIC Automatic Restart"
: 5. TVA  letter to NRC, dated January 14, 1992, TVA BFN  Technical Specification (TS) No. 300 Reactor Core Thermal-Hydraulic Stability
: 6. NRC  letter to'VA,    dated May 31, 1994, Issuance of Technical Specification Amendments for the Browns Ferry Nuclear Plant Units 1 and 3 (TS 300)
NUREG-0737  (TMI Action Plan), Action Item II.K.3.18      << ADS Actuation Modifications [TAC M45682]*
Commitment:      TVA  will complete    NUREG-0737  (TMI Action Plan)
Action Item II.K.3.18      ADS Actuation Modifications Discussion:      In response to Item II.K.3.18, the BWR performed an evaluation of options for Owners'roup compliance. Two of these options were found to be acceptable by the NRC Staff and TVA was requested in Reference 1 to commit to one of these options. TVA chose Option 2, to modify the ADS logic to allow the ADS to initiate vessel depressurization, automatically bypassing the E1-92
C%
  ~.~" fbi


1.NRC letter to TVA, dated October 28, 1982, NUREG-0737 Action Item II.K.3.27 (Common Reference Level)2.TVA letter to NRC, dated December 3, 1982, in regards to NUREG-0737 Action Item II.K.3.27 3.NRC letter to TVA, dated April 11, 1995, NRC Inspection Report 95-16[Section 6.i., page 24]E1-93
high drywell pressure signal 10 minutes after        a sustained lo-lo-lo reactor vessel water level signal (Reference 2).
Status:        Complete. The modifications to the ADS logic which allows the ADS to initiate vessel depressurization has been completed.


NUREG-0737 (TMI Action Plan), Action Item II.K.3.28-Qualification of ADS Accumulators
==References:==
[TAC M48262]Commitment:
: 1. NRC letter to TVA, dated June 3, 1983, NUREG-0737, Item II.K.3.18, "ADS Logic Modifications"
Discussion:
: 2. TVA letter to NRC, dated March 5, 1987, Modifications to Automatic Depressurization System (ADS) Logic  NUREG-0737, Item      II.K.3.18 NUREG-0737, Item II.K.3.27  - Common  Reference Level  for  Vessel Level Instrumentation  [TAC M45778]
Status:  
Commitment:     TVA will complete NUREG-0737 (TMI Action Plan)
Action Item II.K.3.27  Common Reference Level for Vessel Level Instrumentation Discussion:     In Reference 1, NRC informed TVA of an alternate approach to resolving this issue. This approach was to incorporate the requirement of this TMI Action Item into the control room design review to be performed per TMI Action Item I.D.1. The NRC stated that if TVA committed to utilize this alternate approach,    it would provide sufficient bases for considering Item II.K.3.27 complete.
TVA  accepted  this  approach  in Reference  2.
Status:         Closed. NRC has reviewed the design change notices (DCN), has walked down the modifications and concluded that this item is closed for Unit
: 3. This is documented in Reference 3.


==References:==
==References:==
: 1. NRC  letter to  TVA,  dated October 28, 1982, NUREG-0737  Action Item II.K.3.27    (Common Reference Level)
: 2. TVA  letter to  NRC,  dated December 3, 1982, in regards to  NUREG-0737  Action Item II.K.3.27
: 3. NRC  letter to  TVA,  dated  April 11,  1995, NRC Inspection Report 95-16 [Section    6.i.,  page 24]
E1-93


1.TVA will complete NUREG-0737 (TMI Action Plan)Action Item II.K.3.28-Qualification of ADS Accumulators TVA responded to Item II.K.3.28 by Reference 1.The NRC Staff requested additional information in Reference 2, which was provided by TVA in Reference 3.Additional information was requested in Reference 4 and provided in Reference 5.TVA responded to a verbal request for additional information in Reference 6.The Safety Evaluation that documents the acceptability of TVA's plan to satisfy Item II.K.3.28 was provided in Reference 7.Complete.TVA has performed modifications to upgrade the ADS accumulator system.This was accomplished by splitting the ring header into two sections, and providing an alternate nitrogen supply to the Drywell Control Air System.TVA letter to NRC, dated December 30, 1981, in regards to NUREG-0737, Items II.K.3.24, II.K.3.28 and II.B.4 2.3~4~5.6.7~NRC letter to TVA, dated May 11, 1983, Request for Additional Information
NUREG-0737  (TMI  Action Plan), Action Item    II.K.3.28-Qualification of  ADS  Accumulators [TAC M48262]
-NUREG-0737,.Item II.K.3.28, Qualification of ADS Accumulators TVA letter to NRC, dated July 8, 1983, in regards to NUREG-0737, Item II.K.3.28 NRC letter to TVA, dated May 29, 194, Request for Additional Information
Commitment:      TVA will complete   NUREG-0737 (TMI Action Plan)
-MPA F-55 (TMI II.K.3.28)"Qualification of ADS Accumulators" TVA letter to NRC, dated July 12, 1984, in regards to NUREG-0737, Item II.K.3.28 TVA letter to NRC, dated July 11, 1985, in regards to NUREG-0737, Item II.K.3.28 NRC letter to TVA, dated July 24, 1985, NUREG-0737, Item II.K.3.28, Qualification of ADS Accumulators El-94 o'k j Operational Readiness Discussion:
Action Item II.K.3.28     Qualification of ADS Accumulators Discussion:      TVA responded to Item II.K.3.28 by Reference 1.
Status: TVA will conduct an Operational Readiness Program to provide assurance that the required systems are operable, personnel are able to conduct operations safely, and the activities, programs, and commitments required for the restart of Unit 3 are complete.The Operational Readiness Program was submitted by TVA in Reference 1.Additional information was incorporated and the program plan was superseded by Reference 2.NRC review of the program is documented in Reference 3.NRC was notified in Reference 4 that the Senior Management Assessment of Readiness Team (SMART)review for Unit 3 will be conducted by the Nuclear Safety Review Board (NSRB).Complete.The Operational Readiness Program is in place and the final recommendations for the restart of Unit 3 have been issued by NSRB.
The NRC   Staff requested additional information in Reference 2, which was provided by TVA in Reference 3. Additional information was requested in Reference 4 and provided in Reference 5. TVA responded to a verbal request for additional information in Reference 6. The Safety Evaluation that documents the acceptability of TVA's plan to satisfy Item II.K.3.28 was provided in Reference 7.
Status:          Complete. TVA has performed modifications to upgrade the ADS accumulator system. This was accomplished by splitting the ring header into two sections, and providing an alternate nitrogen supply to the Drywell Control Air System.


==References:==
==References:==
: 1. TVA letter to NRC, dated December 30, 1981, in regards to NUREG-0737, Items II.K.3.24, II.K.3.28 and II.B.4
: 2. NRC letter to TVA, dated May 11, 1983, Request for Additional Information  NUREG-0737,
                .Item II.K.3.28, Qualification of ADS Accumulators 3 ~  TVA letter to NRC, dated July 8, 1983, in regards to NUREG-0737, Item II.K.3.28 4 ~ NRC letter to TVA, dated May 29, 194, Request for Additional Information  MPA F-55 (TMI II.K.3.28)
                  "Qualification of ADS Accumulators"
: 5. TVA letter to NRC, dated July 12, 1984, in regards to NUREG-0737, Item II.K.3.28
: 6. TVA letter to NRC, dated July 11, 1985, in regards to NUREG-0737, Item II.K.3.28 7 ~  NRC letter to TVA, dated July 24, 1985, NUREG-0737, Item II.K.3.28, Qualification of ADS Accumulators El-94
o 'k j


1.2~TVA letter to NRC, dated November 12, 1991, Units 1 and 3 Operational Readiness Program TVA letter to NRC, dated July 6, 1992, Units 1 and 3 Operational Readiness Program and Employee Concerns 3~NRC letter to TVA, dated October 6, 1992, Browns Ferry Units 1 and 3 Operational Readiness Program 4~TVA letter to NRC, dated September 5, 1995, Browns Ferry Nuclear Plant (BFN)-Units 1 and 3 Revision to Commitments Concerning the Senior Management Assessment of Readiness Team (SMART)and the Vertical Drop of Reactor Vessel Level Reference Legs (Generic Letter 84-23)Platform Thermal Growth Commitment:
Operational Readiness TVA will conduct  an  Operational Readiness Program to provide assurance that the required systems are operable, personnel are able to conduct operations safely, and the activities, programs, and commitments required for the restart of Unit 3 are complete.
The lower drywell steel platforms and miscellaneous steel will be evaluated and modified, if required, to meet the design criteria.Discussion:
Discussion:    The  Operational Readiness Program was submitted by TVA   in Reference 1. Additional information was incorporated and the program plan was superseded by Reference 2. NRC review of the program is documented in Reference 3. NRC was notified in Reference 4 that the Senior Management Assessment of Readiness Team (SMART) review for Unit 3 will be conducted by the Nuclear Safety Review Board (NSRB).
The issue of platform thermal growth was resolved as part of the overall issue regarding the seismic qualification of the lower drywell platforms and miscellaneous steel.Refer to the E1-95
Status:         Complete. The Operational Readiness Program is in place and the final recommendations for the restart of Unit 3 have been issued by NSRB.
'J f(
item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel.Refer to the item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel.


==References:==
==References:==
: 1. TVA letter to NRC, dated November 12, 1991, Units 1 and 3 Operational Readiness Program 2 ~ TVA letter to NRC, dated July 6, 1992, Units 1 and 3 Operational Readiness Program and Employee Concerns 3 ~ NRC  letter to  TVA,  dated October 6, 1992, Browns Ferry Units  1 and 3  Operational Readiness Program 4  TVA  letter to NRC, dated September 5, 1995, Browns Ferry Nuclear Plant (BFN) - Units 1 and 3
              ~
Revision to Commitments Concerning the Senior Management Assessment of Readiness Team (SMART) and the Vertical Drop of Reactor Vessel Level Reference Legs (Generic Letter 84-23)
Platform Thermal Growth Commitment:    The lower  drywell steel platforms and miscellaneous steel will be evaluated and modified, criteria.
if  required, to meet the design Discussion:    The issue of platform thermal growth was resolved as part of the overall issue regarding the seismic qualification of the lower drywell platforms and miscellaneous steel. Refer to the E1-95


None.Probabilistic Risk Assessment for Multi-Unit Operation Commitment:
    'J f(
Discussion:
 
TVA will perform an expanded Probabilistic Risk Assessment (PRA), which addresses all three units in operation.
item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel.
In August of 1990 (Reference 1), NRC noted that the three units at BFN share many important safety systems.NRC expressed a concern with the potential safety implications of shared systems in the various operating modes of the BFN units (e.g., All three units operating, Units 1 and 2 operating with Unit 3 shutdown, etc.).NRC requested TVA provide expanded PRAs that evaluate the entire site as a whole, taking into account the risk significant combinations of unit operational status.In June 1991 (Reference 2), NRC acknowledged that the performance of these expanded PRAs was not required to fulfil Generic Letter 88-20.However, the staff continued to encourage TVA to perform the expanded PRAs for BFN Units 1 and 3.In February 1992 (Reference 3), TVA committed to perform an expanded'PRA.
Refer to the item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel.
TVA stated that it intended to submit a summary report to NRC prior to the restart of Unit,3.However, TVA did not consider completion of this work to be a restart prerequisite.
NRC's review of the TVA approach for addressing multi-unit dependencies was provided in July 1992 (Reference 4).The Staff agreed that this report was not a prerequisite for the restart.of Unit 3.Status: Complete.The BFN Multi-Unit PRA was submitted for NRC review in Reference 5.


==References:==
==References:==
 
None.
1.NRC letter to TVA, dated August 13, 1990, PRA Concerns Regarding Operation of Browns Ferry, Units 1 and 3 2~NRC letter to TVA, dated June 28, 1991, Individual Plant Examination for Severe Accident Vulnerabilities (Generic Letter 88-20), Browns Ferry Nuclear Plant, Units 1, 2, and 3 R I'0 3~TVA letter to NRC, dated February 7, 1992, Expanded Probabilistic Risk Assessment (PRA)Considering Operation of Browns Ferry, Units 1 and 3 4 5.NRC letter to TVA, dated July 22, 1992, TVA Approach for Addressing Inter-Unit Dependencies as part of the Individual Plant Examination for the Browns Ferry Nuclear Plant TVA letter to NRC, dated April 14, 1995, Multi-Unit.
Probabilistic Risk  Assessment  for Multi-Unit Operation Commitment:      TVA will perform  an expanded Probabilistic Risk Assessment  (PRA), which addresses  all  three units in operation.
Probabilistic Risk Assessment (PRA)Restart Test Program[TAC M81791]Commitment:
Discussion:      In August of 1990 (Reference 1), NRC noted that the three units at BFN share many important safety systems. NRC expressed a concern with the potential safety implications of shared systems in the various operating modes of the BFN units (e.g., All three units operating, Units 1 and 2 operating with Unit 3 shutdown, etc.). NRC requested TVA provide expanded PRAs that evaluate the entire site as a whole, taking into account the risk significant combinations of unit operational status. In June 1991 (Reference 2),
Status: For those systems that support safe shutdown, administrative controls for the Restart Test Program will be implemented to insure that an assessment of the Unit 2 System Test Specifications, test procedures, and test results is performed..
NRC acknowledged that the performance of these expanded PRAs was not required to fulfil Generic Letter 88-20. However, the staff continued to encourage TVA to perform the expanded PRAs for BFN  Units 1 and 3.
Administrative controls will be used to insure that the status of the operating unit is considered during the planning and scheduling of restart tests.The restart test program was submitted in Reference 1 and supplemented by References 2 through 5.The NRC's Safety Evaluation of the restart test program was contained in Reference 6.TVA submitted changes to the Restart Test Program in Reference 7.Complete.Site Standard Practice 8.50, Restart Test Program, and 3-STM-001, Startup Test Manual, includes the committed administrative controls.
In February 1992 (Reference 3), TVA committed to perform an expanded'PRA. TVA stated that intended to submit a summary report to NRC prior it to the restart of Unit,3. However, TVA did not consider completion of this work to be a restart prerequisite. NRC's review of the TVA approach for addressing multi-unit dependencies was provided in July 1992 (Reference 4). The Staff agreed  that this report was not a prerequisite for the restart. of Unit 3.
Status:          Complete. The BFN Multi-Unit PRA was submitted for NRC review in Reference 5.


==References:==
==References:==
: 1. NRC  letter to  TVA, dated August 13, 1990,      PRA Concerns Regarding Operation    of  Browns  Ferry, Units 1 and 3 2 ~ NRC  letter to TVA, dated June 28, 1991, Individual Plant Examination for Severe Accident Vulnerabilities (Generic Letter 88-20), Browns Ferry Nuclear Plant, Units 1, 2, and      3


1.TVA letter to NRC, dated September 27, 1991, Restart Test Program (RTP)Description for Units 1 and 3 2~TVA letter to NRC, dated February 18, 1992, Request for Additional Information Regarding the Restart Test Program for Units 1 and 3 3~TVA letter to NRC, dated December 28, 1992, Update of Restart Test Program (RTP)Submittal for Units 1 and 3 4~TVA letter to NRC, dated July 19, 1993, Restart Test Program (RTP)Update for Units 1 and 3 E1-97 5.TVA letter to NRC, dated February 3, 1994, Restart Test Program (RTP)Update for Units 1 and 3 6.NRC letter to TVA, dated August 30, 1994, Browns Ferry Nuclear Plant Units 1 and 3-Restart Test Program 7~TVA letter to NRC, dated October 19, 1995, Browns Ferry Nuclear Plant (BFN)-Unit 3-Changes to Restart Test Program and Power Ascension Program Seismic Class II Over I/Spacial Systems Interactions and Water Spray[TAC M80015]Commitment:
R I'
Discussion:
0
Status: The Seismic Class II Over I/Spacial Systems Interactions and Water Spray program will be implemented in accordance with the Unit 2 precedent.
TVA is utilizing a two phase program to address Class II systems.The action plan for Unit 3 was provided to the NRC in Reference 1.The first phase, to be completed before restart, involves the evaluation of potential seismic-induced water spray effects of Class II systems on Class I systems.The second phase of the program involves the evaluation of potential seismic-induced, spatial interaction effects of Class II systems on Class I systems.The second phase has been incorporated into the resolution of Unresolved Safety Issue (USI)A-46.The approval of the Seismic Class II Over I/Spacial Systems Interactions and Water Spray program is contained in NUREG-1232 (Reference 2).Open.The restart portion of this issue (seismic induced water spray hazards program)has been completed.
Areas where Class II seismic features could possibly interact with Class I seismic features have been evaluated.
The results of the evaluation required minor modifications to piping support configurations in the plant.These modifications have been completed.
The second phase, involving spatial interaction effects of Class II systems on Class I systems has~been incorporated into USI A-46, which will be completed prior to March 19, 1996.TVA letter to NRC dated February 27, 1991, Browns Ferry Nuclear Plant (BFN)-Action Plan to


Disposition Concerns Related to Units 1 and 3 Seismic Class II Piping Over Class I Commodities 2.NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2-Browns Ferry, Unit 2, Section 2.2.4.2 (Page 2-10)Small Bore Piping t'TAC M80013 and R00306]Commitment:
3 ~ TVA  letter to NRC,  dated February 7, 1992, Expanded  Probabilistic Risk    Assessment    (PRA)
Discussion:
Considering Operation of Browns Ferry, Units       1 and 3 NRC letter to TVA, dated   July 22, 1992, TVA Approach  for Addressing Inter-Unit    Dependencies as part of the Individual Plant Examination for the Browns Ferry Nuclear Plant
The Seismic Class I small bore piping will be qualified to meet the final design criteria.TVA's action plan to disposition concerns related to Units 1 and 3 small bore piping was provided in Reference 1 and augmented by Reference 2.NRC approval of this program is documented in the Safety Evaluation transmitted by Reference 3.Status: Open.The field work associated with this issue has been completed.
: 5. TVA letter to NRC, dated April 14, 1995, Multi-Unit. Probabilistic Risk Assessment (PRA)
TVA is currently in the process of paper closure and independent verification.
Restart Test Program  [TAC M81791]
These remaining items will be completed prior to restart.\
Commitment:     For those systems    that support safe    shutdown, administrative controls for the Restart Test Program will be implemented to insure that an assessment of the Unit 2 System Test Specifications, test procedures, and test results is performed.. Administrative controls will be used to insure that the status of the operating unit is considered during the planning and scheduling of restart tests.
The  restart test program was submitted in Reference 1 and supplemented by References 2 through 5. The NRC's Safety Evaluation of the restart test program was contained in Reference 6. TVA submitted changes to the Restart Test Program in Reference 7.
Status:         Complete. Site Standard Practice 8.50, Restart Test Program, and 3-STM-001, Startup Test Manual, includes the committed administrative controls.


==References:==
==References:==
: 1. TVA  letter to  NRC,  dated September 27, 1991, Restart Test Program    (RTP)  Description for Units 1 and 3 2 ~ TVA  letter to  NRC,  dated February 18, 1992, Request for Additional Information Regarding the Restart Test Program for Units 1 and 3 3 ~ TVA  letter to  NRC,  dated December 28, 1992, Update of Restart Test Program      (RTP)  Submittal for Units  1 and 3 4 ~ TVA  letter to  NRC,  dated July 19, 1993, Restart Test Program (RTP) Update      for Units  1  and  3 E1-97
: 5. TVA  letter to  NRC,  dated February 3, 1994, Restart Test Program      (RTP) Update  for Units  1 and  3
: 6. NRC  letter to  TVA,  dated August 30, 1994, Browns Ferry Nuclear Plant Units      1 and 3  Restart Test Program 7 ~  TVA  letter to  NRC,  dated October 19, 1995, Browns Ferry Nuclear Plant (BFN)  Unit 3  Changes to Restart Test Program and Power Ascension Program Seismic Class    II Spray [TAC M80015]
Over I/Spacial Systems Interactions and Water Commitment:        The Seismic Class    II  Over I/Spacial Systems Interactions and Water Spray program      will be implemented  in accordance with the Unit    2 precedent.
Discussion:        TVA  is utilizing a two phase program to address Class  II systems. The action plan for Unit 3 was provided to the NRC in Reference 1. The first phase, to be completed before restart, involves the evaluation of potential seismic-induced water spray effects of Class      II systems on Class The second phase of the program I
systems.
involves the evaluation of potential seismic-induced, spatial interaction effects of Class II systems on Class I systems.        The second phase  has  been  incorporated  into  the resolution of Unresolved Safety Issue (USI) A-46. The approval of the Seismic Class II Over I/Spacial Systems  Interactions and Water Spray program is contained in NUREG-1232 (Reference 2).
Status:            Open. The restart portion of this issue (seismic induced water spray hazards program) has been completed. Areas where Class        II seismic features could possibly interact with Class I seismic features have been evaluated. The results of the evaluation required minor modifications to piping support configurations in the plant. These modifications have been completed.
The second phase,    involving spatial interaction effects of Class    II systems on Class I systems incorporated into USI A-46, which will has ~been be completed  prior to    March 19, 1996.
TVA  letter to  NRC  dated February 27, 1991, Browns Ferry Nuclear Plant      (BFN)  Action Plan to


1.TVA letter to NRC, dated February 27, 1991, Action Plan to Disposition concerns Related to Units 1 and 3 Small Bore Piping 2~TVA letter to NRC, dated December 12, 1991, Small Bore Piping Program, Tubing, and Conduit Support Plans for Units 1 and 3-Additional Information 3~NRC letter to TVA, dated February 4, 1992, Safety Evaluation of Small Bore Piping and Seismic Qualification of Instrument Tubing Programs for Browns Ferry Nuclear Plant, Units 1 and 3 Unresolveck Safety Issue A-7 (MPA D-01)-Mark I Long-Term Program[TAC M80686 and M07931]Commitment:
Disposition Concerns Related to Units 1 and 3 Seismic Class II Piping Over Class I Commodities
Discussion:
: 2. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2  Browns Ferry, Unit 2, Section 2.2.4.2 (Page 2-10)
Status: TVA will complete Unresolved Safety Issue A-7 (MPA D-01)-Mark I Long-Term Program.Refer to the previous item entitled Long Term Torus Integrity Program.Refer to the previous item entitled Long Term Torus Integrity Program.
Small Bore Piping    t'TAC M80013 and R00306]
Commitment:       The Seismic Class    I small bore piping will be qualified to meet    the final design criteria.
Discussion:       TVA's action plan    to disposition concerns related to Units 1 and    3  small bore piping was provided in Reference 1    and augmented by Reference 2. NRC approval of this program is documented in the Safety Evaluation transmitted by Reference 3.
Status:           Open. The field work associated with this issue has been completed.      TVA is currently in the process of paper closure and independent verification. These remaining items will be
            \
completed    prior to restart.


==References:==
==References:==
: 1. TVA  letter to NRC, dated February    27, 1991, Action Plan to Disposition concerns Related to Units 1 and 3 Small Bore Piping 2 ~ TVA  letter to NRC, dated December 12, 1991, Small Bore Piping Program, Tubing, and Conduit Support Plans for Units 1 and 3  Additional Information 3 ~ NRC  letter to TVA, dated February 4, 1992, Safety Evaluation of Small Bore Piping and Seismic Qualification of Instrument Tubing Programs for Browns Ferry Nuclear Plant, Units 1 and 3 Unresolveck Safety Issue A-7 (MPA D-01)      - Mark I Long-Term  Program
[TAC M80686 and M07931]
Commitment:      TVA  will complete  Unresolved Safety Issue A-7 (MPA  D-01)  Mark  I Long-Term  Program.
Discussion:      Refer to the previous item entitled Long Term Torus  Integrity  Program.
Status:          Refer to the previous item entitled Long Term Torus  Integrity  Program.


None.E1-99 8 n~II eX Unresolved Safety Issue A-9-Anticipated Transi.ents Wi.thout t Scram (ATWS)[10 CFR 50.62][TAC M59074]Commitment:
==References:==
Discussion:
None.
Status: TVA committed to: 1.Install an Alternate Rod Insertion (ARI)system, 2.Modify the Standby Liquid Control (SLC)system to ensure that the system will provide the equivalent of injecting a minimum of 86 gallons per minute of 13-weight percent sodium borate solution, and 3.Install an automatic Recirculation Pump Trip (RPT)under conditions of an ATWS.TVA endorsed the BWR Owners'roup recommendations regarding ATWS design in Reference 1.The NRC Staff requested additional information in Reference 2, which was provided by TVA in Reference 3.The required Technical Specification changes were proposed in Reference 4 and approved in Reference 5.NRC verification that TVA's design conformed to the ATWS rule, with the exception of the diversity issue, was provided in Reference 6.TVA committed to implement the diversity requirements in Reference 7.Complete.TVA has performed the required modifications to comply with 10 CFR 50.62, including the diversity requirements listed in Reference 7.
E1-99


==References:==
8    n ~
II eX


1.2~3~4~TVA letter to NRC, dated March 1, 1988, Anticipated Transients Without Scram (ATWS)Rule (10 CFR 50.62)-Plant Specific Design NRC letter to TVA, dated April 13, 1988, Anticipated Transients Without Scram (ATWS)Rule (10 CFR 50.62)-Plant Specific Submittal TVA letter to NRC, dated July 15, 1988, Anticipated Transients Without Scram (ATWS)Rule (10 CFR 50.62)-Detailed Plant Specific Design TVA letter to NRC, dated August 4, 1988, TVA BFN Technical Specification No.252-Anticipated Transients Without Scram (ATWS)-Recirculation Pump Trip (RPT)Section 3.2/4.2 L E1-100 V r kq l>>~l 4 5.6.7~NRC letter to TVA, dated January 26, 1989, Technical Specifications on Anticipated Transients Without Scram (ATWS)-Recirculation Pump Trip (RPT)(TS 252)NRC letter to TVA, dated January 22, 1989,'ompliance with Rule 10 CFR 50.62 Relating to Alternate Rod Injection and Reactor Pump Trip System TVA letter to NRC, dated November 29, 1990, Anticipated Transients Without Scram (ATWS)Response to NRC Followup Items Received During ATWS Inspection Unresolved Safety Issue A-24 (MPA B-60)-Qualification of Class IE Safety-Related Equipment[TAC M42483]Commitment:
t Unresolved Safety Issue A Anticipated Transi.ents Wi.thout Scram (ATWS) [10 CFR 50.62] [TAC M59074]
Discussion:
Commitment:    TVA 1.
committed Install  an to:
Alternate Rod  Insertion    (ARI) system,
: 2. Modify the Standby Liquid Control (SLC) system to ensure that the system will provide the equivalent of injecting a minimum of 86 gallons per minute of 13-weight percent sodium borate solution, and
: 3. Install  an automatic  Recirculation   Pump   Trip (RPT) under conditions of an    ATWS.
Discussion:    TVA endorsed the BWR Owners'roup recommendations regarding ATWS design in Reference 1. The NRC Staff requested additional information in Reference 2, which was provided by TVA in Reference 3. The required Technical Specification changes were proposed in Reference 4 and approved in Reference 5.
NRC verification that TVA's design conformed to the ATWS  rule, with the exception of the diversity issue, was provided in Reference 6.
TVA committed to implement the diversity requirements in Reference 7.
Status:        Complete. TVA has performed the required modifications to comply with 10 CFR 50.62, including the diversity requirements listed in Reference 7.


==References:==
==References:==
: 1. TVA  letter to  NRC, dated March 1, 1988, Anticipated Transients Without Scram (ATWS)
Rule (10 CFR 50.62)  Plant Specific Design 2 ~ NRC  letter to  TVA, dated April 13,  1988, Anticipated Transients Without Scram (ATWS)
Rule (10 CFR 50.62)  Plant Specific Submittal 3 ~ TVA letter to NRC, dated July 15, 1988, Anticipated Transients Without Scram (ATWS)
Rule (10 CFR 50.62)  Detailed Plant Specific Design 4 ~ TVA  letter to  NRC, dated August 4, 1988,
                                                      -          TVA BFN Technical Specification No. 252    Anticipated Transients Without Scram (ATWS) Recirculation Pump Trip (RPT) Section 3.2/4.2 L E1-100


TVA will complete Unresolved Safety Issue (USI)'-24 (MPA B-60)-Qualification of Class IE'afety-Related Equipment.
V r
Refer to the previous issue entitled Environmental Qualification.
l>> ~  l 4kq
: 5. NRC  letter to TVA, dated January 26, 1989, Technical Specifications on Anticipated Transients Without Scram (ATWS)  Recirculation Pump  Trip  (RPT)  (TS 252)
: 6. NRC  letter to  TVA,  dated January 22, with Rule  10 CFR 50.62 Relating to 1989,'ompliance Alternate Rod Injection and Reactor Pump Trip System 7 ~  TVA  letter to  NRC,  dated November 29, 1990, Anticipated Transients Without Scram (ATWS)
Response to NRC Followup Items Received During ATWS Inspection Unresolved Safety Issue A-24 (MPA B-60) - Qualification of Class IE Safety-Related Equipment [TAC M42483]
Commitment:      TVA  will complete Unresolved Safety Issue (USI)'-24 (MPA B-60) Qualification of Class IE'afety-Related Equipment.
Discussion:      Refer to the previous issue entitled Environmental Qualification.
Refer to the previous issue entitled Environmental Qualification.
Refer to the previous issue entitled Environmental Qualification.
None.Unresolved Safety Issue A<<36 (MPA C-10)-Control of Heavy Loads Near Spent Fuel, Pool[TAC M08438]Commitment:
Discussion:
Status:


==References:==
==References:==
None.
Unresolved Safety Issue A<<36 (MPA C-10)      - Control of Heavy Loads Near Spent Fuel, Pool [TAC M08438]
Commitment:      TVA  will complete
                              -      Unresolved Safety Issue A-36 (MPA  C-10)    Control of Heavy Loads Near Spent Fuel Pool.
Discussion:      Refer to previous item entitled Multi-Plant Action Item C-10  Control of Heavy Loads Phase  I  (NUREG-0612) .
Status:          Refer to previous item entitled Multi-Plant Action Item C-10  Control of Heavy Loads Phase  I  (NUREG-0612) .


TVA will complete Unresolved Safety Issue A-36 (MPA C-10)-Control of Heavy Loads Near Spent Fuel Pool.Refer to previous item entitled Multi-Plant Action Item C-10-Control of Heavy Loads-Phase I (NUREG-0612)
==References:==
.Refer to previous item entitled Multi-Plant Action Item C-10-Control of Heavy Loads-Phase I (NUREG-0612)
None.
.None.E1-101  
E1-101


Unresolved Safety Issue A>>42 (MPA B-05)-Pipe Cracks in Boiling t Water Reactors[TAC M85296]Commitment:
t Unresolved Safety Issue A>>42 Water Reactors [TAC M85296]
TVA will complete Unresolved Safety Issue A-42 (MPA B-05)-Pipe Cracks in Boiling Water Reactors.Discussion:
Commitment:      TVA (MPA (MPA will complete B-05)
Status: Refer to previous topic entitled Generic Letter 88-01-NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.Refer to previous topic entitled Generic Letter 88-01-NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.
Reactors.
B-05)  - Pipe Cracks in Boiling Unresolved Safety Issue A-42 Pipe Cracks in Boiling Water Discussion:     Refer to previous topic entitled Generic Letter 88-01 NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.
Status:          Refer to previous topic entitled Generic Letter 88-01 NRC Position on IGSCC in     BWR Austenitic Stainless Steel Piping.


==References:==
==References:==
None.
Unresolved Safety Issue A-44    - Station Blackout  [10 CFR 50.63]
[TAC M68519]
Commitment:      TVA  committed  to the following:
: 1. The safety-related unit batteries 2 and 3 will be replaced with batteries having a higher number of plates per cell and containing  a greater ampere hour capacity,
: 2. The existing Unit Preferred Motor-Motor-Generator (MMG) sets will either be transferred to a nonsafety-related battery or load shed during a Station Blackout (SBO) event, and
: 3. The 120VAC Reactor Core Isolation Cooling (RCIC) system controls, which are currently supplied from the MMG sets, will be transferred to an appropriate source.
Discussion:    'TVA provided information regarding conformance with the Station Blackout Rule for Unit 3 in Reference l. Additional information was requested by the NRC Staff in Reference 2 and provided by TVA in Reference 3. A change in coping strategy and emergency AC group classification was proposed by TVA in Reference 4. In Reference 5, the NRC Staff issued a Safety Evaluation that documents conformance with 10 CFR 50.63 for BFN Units 1, 2, and 3. TVA provided the implementation schedules for conformance with the Station Blackout Rule in Reference 6.
El-102


None.Unresolved Safety Issue A-44-Station Blackout[10 CFR 50.63][TAC M68519]Commitment:
41 E
Discussion:
I I,
TVA committed to the following:
 
1.The safety-related unit batteries 2 and 3 will be replaced with batteries having a higher number of plates per cell and containing a greater ampere hour capacity, 2.The existing Unit Preferred Motor-Motor-Generator (MMG)sets will either be transferred to a nonsafety-related battery or load shed during a Station Blackout (SBO)event, and 3.The 120VAC Reactor Core Isolation Cooling (RCIC)system controls, which are currently supplied from the MMG sets, will be transferred to an appropriate source.'TVA provided information regarding conformance with the Station Blackout Rule for Unit 3 in Reference l.Additional information was requested by the NRC Staff in Reference 2 and provided by TVA in Reference 3.A change in coping strategy and emergency AC group classification was proposed by TVA in Reference 4.In Reference 5, the NRC Staff issued a Safety Evaluation that documents conformance with 10 CFR 50.63 for BFN Units 1, 2, and 3.TVA provided the implementation schedules for conformance with the Station Blackout Rule in Reference 6.El-102 41 E I I, Status:
Status:         Complete. TVA has performed the required modifications to comply with 10 CFR 50.63.
(Note: Unit 1 preferred MMG set normal and alternate feeds have been deenergized by maintaining their feeder breakers open.)


==References:==
==References:==
: l. TVA  letter to Response to    NRC NRC,  dated December 2, 1991, Safety Evaluation (SE) on the Conformance    of BFN Plant with the Station Blackout Rule      (SBO)  (10 CFR 50.63) 2 ~ NRC  letter to TVA, dated March 5, 1992, Request for Additional Information on Station Blackout for Browns Ferry 3 ~ TVA le'tter to NRCi dated March 27 1992 NRC  g Request for Additional Information Regarding TVA's Response to NRC's Safety Evaluation (SE) on the Conformance of BFN Plant with the Station Blackout Rule (SBO) (10 CFR 50.62) 4 ~ TVA  letter to  NRC,  dated May. 28, 1992, Proposed Change in Station Blackout, (SBO) Coping Strategy and Emergency AC (EAC) Group Classification
: 5. NRC  letter to  TVA,  dated September 16, 1992, Station Blackout      Browns  Ferry Units 1, 2, and  3 (MPA-A022)
: 6. TVA letter to NRC, dated October 15, 1992, Response to NRC Supplemental Safety Evaluation on the Conformance of BFN with the Station Blackout    (SBO)  Rule Unresolved Safety Issue A Seismic Qualification of Equipment in Operating Plants [TAC M69432]
Commitment:    The  seismic qualification of mechanical and electrical    equipment will use the approach developed by the Seismic Qualification Utilities Group (SQUG)  .
Discussion:    In Reference    1, the NRC staff stated that the issues relating to the seismic qualification of mechanical and electrical equipment would be resolved when the staff implemented its resolution of USI A-46. The status of this commitment was discussed in Reference 2.
Reference 3 transmitted the NRC staff's Supplemental Safety Evaluation Report (SER) of the SQUG's Generic Implementation Procedure for the resolution of USI A-46. As committed in E1-103
              ~<
U
~ % ~ 4
        ' c
          ~%


l.2~3~4~5.6.Complete.TVA has performed the required modifications to comply with 10 CFR 50.63.(Note: Unit 1 preferred MMG set normal and alternate feeds have been deenergized by maintaining their feeder breakers open.)TVA letter to NRC, dated December 2, 1991, Response to NRC Safety Evaluation (SE)on the Conformance of BFN Plant with the Station Blackout Rule (SBO)(10 CFR 50.63)NRC letter to TVA, dated March 5, 1992, Request for Additional Information on Station Blackout for Browns Ferry TVA le'tter to NRCi dated March 27 1992 g NRC Request for Additional Information Regarding TVA's Response to NRC's Safety Evaluation (SE)on the Conformance of BFN Plant with the Station Blackout Rule (SBO)(10 CFR 50.62)TVA letter to NRC, dated May.28, 1992, Proposed Change in Station Blackout, (SBO)Coping Strategy and Emergency AC (EAC)Group Classification NRC letter to TVA, dated September 16, 1992, Station Blackout-Browns Ferry Units 1, 2, and 3 (MPA-A022)
Reference 4, a Seismic Evaluation Report summarizing the results of the USI A-46 and seismic Individual Plant Examination of External Events (IPEEE) programs for BFN Units 1, 2, and 3 will be submitted to NRC prior to the restart of Unit 1. This report will document the long-term seismic qualification of mechanical and electrical equipment. In Reference 5, NRC stated that TVA's proposed completion date for Units 2 and 3 was unacceptable.
TVA letter to NRC, dated October 15, 1992, Response to NRC Supplemental Safety Evaluation on the Conformance of BFN with the Station Blackout (SBO)Rule Unresolved Safety Issue A-46-Seismic Qualification of Equipment in Operating Plants[TAC M69432]Commitment:
Status:          Open. In Reference 6,  TVA committed  to complete the seismic portion of the USI A-46 program prior to March 19, 1996. The NRC found this commitment to be acceptable as documented in Reference 7.
Discussion:
The seismic qualification of mechanical and electrical equipment will use the approach developed by the Seismic Qualification Utilities Group (SQUG).In Reference 1, the NRC staff stated that the issues relating to the seismic qualification of mechanical and electrical equipment would be resolved when the staff implemented its resolution of USI A-46.The status of this commitment was discussed in Reference 2.Reference 3 transmitted the NRC staff's Supplemental Safety Evaluation Report (SER)of the SQUG's Generic Implementation Procedure for the resolution of USI A-46.As committed in E1-103
~<U'c~%~4'~%
Status:


==References:==
==References:==
: 1. NRC  letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2  Browns    Ferry Unit 2 [Section 2.2.2.3, Page 2-10]
: 2. TVA  letter to NRC, dated September 20, 1991, Status and Schedule for Completion of Unit 2 Post-Restart Issues [Section III.3.12, Page 21]
3 ~ NRC letter to All Unresolved Safety Issue (USI)
A-46 Plant Licensees who are Members of the Seismic Qualification Utility Group (SQUG), dated May 22, 1992, Supplement No. 1 to Generic Letter 87-02 that Transmits Supplemental Safety Evaluation Report No. 2 on SQUG Generic Implementation Procedure, Revision 2, as Corrected on February 14, 1992 4 ~ TVA letter to NRC, dated September 21 1992(
Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities
: 5. NRC  letter to TVA; dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant
: 6. TVA  letter to NRC, dated January 19, 1993, Generic Letter 87-02, Supplement 1, 120-Day Response,  Request  for Additional Information 7 ~  NRC  letter to TVA,  dated March 19, 1993, Generic Letter 87-02,  Supplement 1 Response  Browns Ferry Nuclear Plant E1-104


1.2.3~Reference 4, a Seismic Evaluation Report summarizing the results of the USI A-46 and seismic Individual Plant Examination of External Events (IPEEE)programs for BFN Units 1, 2, and 3 will be submitted to NRC prior to the restart of Unit 1.This report will document the long-term seismic qualification of mechanical and electrical equipment.
t
In Reference 5, NRC stated that TVA's proposed completion date for Units 2 and 3 was unacceptable.
~ 4 I.R
Open.In Reference 6, TVA committed to complete the seismic portion of the USI A-46 program prior to March 19, 1996.The NRC found this commitment to be acceptable as documented in Reference 7.NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2-Browns Ferry Unit 2[Section 2.2.2.3, Page 2-10]TVA letter to NRC, dated September 20, 1991, Status and Schedule for Completion of Unit 2 Post-Restart Issues[Section III.3.12, Page 21]NRC letter to All Unresolved Safety Issue (USI)A-46 Plant Licensees who are Members of the Seismic Qualification Utility Group (SQUG), dated May 22, 1992, Supplement No.1 to Generic Letter 87-02 that Transmits Supplemental Safety Evaluation Report No.2 on SQUG Generic Implementation Procedure, Revision 2, as Corrected on February 14, 1992 4~TVA letter to NRC, dated September 21 1992(Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI)A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE)for Severe Accident Vulnerabilities 5.NRC letter to TVA;dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant 6.7~TVA letter to NRC, dated January 19, 1993, Generic Letter 87-02, Supplement 1, 120-Day Response, Request for Additional Information NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant E1-104 t~4 I.R Unresolved Safety Issue A-48 (MPA A-19)-Hydrogen Control t Measures and Effects of Hydrogen Burns[TAC M55955]Commitment:
 
Discussion TVA will complete Unresolved Safety Issue (USI)A-48 (MPA A-19)-Hydrogen Control Measures and Effects of Hydrogen Burns.USI A-48 is resolved by the implementation of 10 CFR 50.44, Standards for Combustible Gas Control System in Light Water-Cooled Power Reactors.Clarification of these requirements for Mark I BWR plants was provided by Generic Letter 84-09 (Reference 1).TVA's response to Generic Letter 84-09 was provided by Reference 2.The NRC Staff requested additional information in Reference 3, which was provided by TVA in Reference 4.The NRC issued an Evaluation of TVA's response to Generic Letter 84-09 and a request for Technical Specification changes in Reference 5.The requested Technical Specifications were proposed by Reference 6 and approved in Reference 7.Status: Complete.TVA has performed modifications which provide an alternate supply of nitrogen to the Drywell Control Air System.This modification eliminates the need to use air as a pneumatic supply to valves for assuring primary containment integrity.
t Unresolved Safety Issue A-48 Commitment:    TVA (USI) A-48 (MPA (MPA A-19) Hydrogen Control Measures and Effects of Hydrogen Burns [TAC M55955]
The Technical Specifications changes which were approved in Reference 7 will ensure that the control air supply valve for the pneumatic control system is closed prior to reactor startup.NRC has reviewed the correspondence related to Generic Letter 84-09 and the design change associated with the Control Air System modifications.
will complete Unresolved Safety Issue A-19)   Hydrogen Control Measures and Effects of Hydrogen Burns.
Based on this review, the inspector considers this issue closed for Unit 3.This is documented in Reference 8.
Discussion      USI A-48 is resolved by the implementation of 10 CFR 50.44, Standards for Combustible Gas Control System in Light Water-Cooled Power Reactors. Clarification of these requirements for Mark I BWR plants was provided by Generic Letter 84-09 (Reference 1). TVA's response to Generic Letter 84-09 was provided by Reference 2.
The NRC Staff requested additional information in Reference 3, which was provided by TVA in Reference 4.
The NRC issued an   Evaluation of TVA's response to Generic Letter 84-09 and a request for Technical Specification changes in Reference 5. The requested Technical Specifications were proposed by Reference 6 and approved in Reference 7.
Status:         Complete. TVA has performed modifications which provide an alternate supply of nitrogen to the Drywell Control Air System. This modification eliminates the need to use air as a pneumatic supply to valves for assuring primary containment integrity. The Technical Specifications changes which were approved in Reference 7 will ensure that the control air supply valve for the pneumatic control system is closed prior to reactor startup.
NRC has reviewed the correspondence   related to Generic Letter 84-09 and the design change associated with the Control Air System modifications. Based on this review, the inspector considers this issue closed for Unit 3.
This is documented in Reference 8.


==References:==
==References:==
: 1. NRC letter to All Licensees of Operating Reactors, dated May 8, 1994, Recombiner Capability Requirements of 10 CFR 50.44(c)(3)(ii)
(Generic Letter No. 84-09)
: 2. TVA letter to NRC, dated July 2, 1984, in regards to Generic Letter 84-09 3 ~ NRC letter to TVA, dated March 10, 1986, Hydrogen Recombiner Relief
: 4. TVA  letter to NRC, dated May 13, 1986, in regards to  Hydrogen Recombiner  Capability
: 5. NRC  letter to TVA, dated September 9, 1986, Hydrogen Recombiner  Capability
: 6. TVA  letter to NRC, dated June 4, 1987, TVA BFN TS 233
: 7. NRC  letter to TVA, dated February'12, 1988, Technical Specification Change Related to Generic Letter 84-09 Hydrogen Recombiner Capability
: 8. NRC letter to TVA, dated October 13, 1995, NRC Inspection Report 95-51 [Section 5.6, page 31]
E1-106


1.2.NRC letter to All Licensees of Operating Reactors, dated May 8, 1994, Recombiner Capability Requirements of 10 CFR 50.44(c)(3)(ii)(Generic Letter No.84-09)TVA letter to NRC, dated July 2, 1984, in regards to Generic Letter 84-09 3~NRC letter to TVA, dated March 10, 1986, Hydrogen Recombiner Relief 4.TVA letter to NRC, dated May 13, 1986, in regards to Hydrogen Recombiner Capability 5.NRC letter to TVA, dated September 9, 1986, Hydrogen Recombiner Capability 6.TVA letter to NRC, dated June 4, 1987, TVA BFN TS 233 7.NRC letter to TVA, dated February'12, 1988, Technical Specification Change Related to Generic Letter 84-09 Hydrogen Recombiner Capability 8.NRC letter to TVA, dated October 13, 1995, NRC Inspection Report 95-51[Section 5.6, page 31]E1-106
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT    (BFN)


ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
==SUMMARY==
OF REMAINING    UNIT 3 RESTART ISSUES TOPIC                          COMMITMENT                          SCHEDULE          PAGE Bulletin  79-02  Pipe        TVA will complete Bulletin 79-02      The  field work associated with El-2 Support Baseplate Designs                                            this issue has been completed.
Using Concrete Anchor Bolts                                          TVA is currently in the process
[TAC R00017]                                                        of paper closure and independent verification.
These remaining items will be completed prior to restart.
Bulletin  79-14  Seismic      TVA will complete Bulletin 79-14      The  field work associated with El-4 Analyses  for As-Built                                              this issue has been completed.
Safety-Related Piping                                                TVA is currently in the process Systems  [TAC R00017]                                                of paper closure and independent verification.
These remaining items will be completed prior to restart.
Bulletin  93-02 >> Debris      TVA will complete Bulletin 93-02      TVA has  completed the walkdown El-13 Plugging of Emergency Core                                          for permanent fibrous material.
Cooling Suction Strainers,                                          Administrative procedures are and Supplement  1 [TAC M86537                                      in place which require and M89279]                                                          documentation of the removal of temporary fibrous air filters or other sources of fibrous material prior to drywell closure, This will be completed prior to restart.


==SUMMARY==
TOPIC                           COMMITMENT                         SCHEDULE           PAGE Bulletin 95-02  Unexpected  TVA  will provide a report indicating TVA will provide  the report by El-15 Clogging of  a Residual Heat  actions taken in order to comply with November 13, 1995.
OF REMAINING UNIT 3 RESTART ISSUES TOPIC COMMITMENT SCHEDULE PAGE Bulletin 79-02-Pipe Support Baseplate Designs Using Concrete Anchor Bolts[TAC R00017]TVA will complete Bulletin 79-02 The field work associated with this issue has been completed.
Removal (RHR) Pump  Strainer the requested actions of Bulletin While Operating in            95-02.
Suppression Pool Cooling Mode Cable Tray Supports          TVA intends to utilize the Seismic    The  field work. associated with El-30
[TAC M80684]                 Qualification Utility Group (SQUG)    this issue has been completed.
Generic Implementation Procedure      TVA is currently in the process (GIP) for seismic qualification of  of paper closure and cable trays.                          independent verification.
These remaining items will be completed prior to restart.
Component and Piece  Part    TVA will implement  a component and  The field work associated with El-31 Qualification  [TAC M83828]  piece part  qualification program. this .issue has been completed.
TVA is currently in the process of paper closure and independent verification.
TVA is currently in the process of paper closure and independent verification.
These remaining items will be completed prior to restart.El-2 Bulletin 79-14-Seismic Analyses for As-Built Safety-Related Piping Systems[TAC R00017]TVA will complete Bulletin 79-14 The field work associated with this issue has been completed.
These remaining items will be completed prior to restart.
Conduit Supports [TAC M80690  TVA  intends to utilize the seismic  The field work associated with  El-32 and R00024]                  Qualification Utility Group (SQUG)    this issue has been completed.
Generic Implementation Procedures    TVA is currently in the process (GIP) for seismic qualification of  of paper closure and conduit supports.                    independent verification.
These remaining items will be completed prior to restart.
Configuration                The  Unit  3 Design Baseline          TVA  will complete this  item  El-33 Management/Design  Baseline  Verification Program (DBVP) will      prior to restart.
[TAC M80688]                 consolidate the two-phase (pre- and post-restart) approach perform on Unit 2.
E2-
 
TOPIC                          COMMITMENT                              SCHEDULE          PAGE Environmental Qualification  TVA will complete   the qualification    The field work associated with El-36 of Class IE safety-related equipment. this issue has been completed.
TVA is currently in the process of paper closure and independent verification.
TVA is currently in the process of paper closure and independent verification.
These remaining items will be completed prior to restart.El-4 Bulletin 93-02>>Debris Plugging of Emergency Core Cooling Suction Strainers, and Supplement 1[TAC M86537 and M89279]TVA will complete Bulletin 93-02 TVA has completed the walkdown for permanent fibrous material.Administrative procedures are in place which require documentation of the removal of temporary fibrous air filters or other sources of fibrous material prior to drywell closure, This will be completed prior to restart.El-13
These remaining items will be completed prior to restart.
Fire Protection/10  CFR 50,  TVA  will implement  a Fire              TVA will implement  a  Fire    El-36 Appendix  R [TAC M48136 and   Protection/10  CFR  50, Appendix R      Protection/10  CFR 50, M85254]                       Program.                                Appendix  R Program  prior to restart.
Generic Letter 88-14        TVA will complete Generic Letter        TVA will complete this    item  El-48 Instrument Air Supply System  88 Instrument Air Supply System    prior to restart.
Problems  Affecting Safety-  Problems Affecting Safety-Related Related Equipment            Equipment
[TAC M71633]
Instrument Tubing            Safety-Related Instrument Tubing    will The  field work  associated with E1-69
[TAC M80036]                  be seismic  qualified to meet the        this issue has been completed.
final design criteria.                  TVA is currently in the process.
of paper closure and independent verification.
These remaining items will be completed prior to restart.
NUREG-0737 (TMI  Action Plan) TVA  will complete  NUREG-0737 (TMI      The field work associated with  El-80 Action Item I.D.1  Control  Action Plan) Action Item I.D.1-          this issue has been completed.
Room  Design Review          Control Room Design Review              TVA is currently in the process
[TAC M45778 and M56106]                                                of paper closure and independent verification.
These remaining items will be completed prior to restart.


TOPIC COMMITMENT SCHEDULE PAGE Bulletin 95-02-Unexpected Clogging of a Residual Heat Removal (RHR)Pump Strainer While Operating in Suppression Pool Cooling Mode TVA will provide a report indicating TVA will provide the report by actions taken in order to comply with November 13, 1995.the requested actions of Bulletin 95-02.El-15 Cable Tray Supports[TAC M80684]TVA intends to utilize the Seismic Qualification Utility Group (SQUG)Generic Implementation Procedure (GIP)for seismic qualification of cable trays.The field work.associated with this issue has been completed.
          - TOPIC                     COMMITMENT                           SCHEDULE           PAGE Small Bore Piping      The Seismic Class I Small  Bore Pi.ping The field work associated with El-99
TVA is currently in the process of paper closure and independent verification.
[TAC M80013 and R00306] will be qualified to meet the final   this issue has been completed.
These remaining items will be completed prior to restart.El-30 Component and Piece Part Qualification
desi.gn criteria.                       TVA is currently in the process of paper closure and independent verification.
[TAC M83828]Conduit Supports[TAC M80690 and R00024]TVA will implement a component and piece part qualification program.TVA intends to utilize the seismic Qualification Utility Group (SQUG)Generic Implementation Procedures (GIP)for seismic qualification of conduit supports.The field work associated with this.issue has been completed.
These remaining items wi.ll be completed prior to restart.
TVA is currently in the process of paper closure and independent verification.
These remaining items will be completed prior to restart.The field work associated with this issue has been completed.
TVA is currently in the process of paper closure and independent verification.
These remaining items will be completed prior to restart.El-31 El-32 Configuration Management/Design Baseline[TAC M80688]The Unit 3 Design Baseline Verification Program (DBVP)will consolidate the two-phase (pre-and post-restart) approach perform on Unit 2.TVA will complete this item prior to restart.El-33 E2-TOPIC COMMITMENT SCHEDULE PAGE Environmental Qualification TVA will complete the qualification of Class IE safety-related equipment.
The field work associated with this issue has been completed.
TVA is currently in the process of paper closure and independent verification.
These remaining items will be completed prior to restart.El-36 Fire Protection/10 CFR 50, Appendix R[TAC M48136 and M85254]Generic Letter 88-14-Instrument Air Supply System Problems Affecting Safety-Related Equipment[TAC M71633]Instrument Tubing[TAC M80036]NUREG-0737 (TMI Action Plan)Action Item I.D.1-Control Room Design Review[TAC M45778 and M56106]TVA will implement a Fire Protection/10 CFR 50, Appendix R Program.TVA will complete Generic Letter 88-14-Instrument Air Supply System Problems Affecting Safety-Related Equipment Safety-Related Instrument Tubing will be seismic qualified to meet the final design criteria.TVA will complete NUREG-0737 (TMI Action Plan)Action Item I.D.1-Control Room Design Review TVA will implement a Fire Protection/10 CFR 50, Appendix R Program prior to restart.TVA will complete this item prior to restart.The field work associated with this issue has been completed.
TVA is currently in the process.of paper closure and independent verification.
These remaining items will be completed prior to restart.The field work associated with this issue has been completed.
TVA is currently in the process of paper closure and independent verification.
These remaining items will be completed prior to restart.El-36 El-48 E1-69 El-80


-TOPIC COMMITMENT SCHEDULE PAGE Small Bore Piping[TAC M80013 and R00306]The Seismic Class I Small Bore Pi.ping will be qualified to meet the final desi.gn criteria.The field work associated with this issue has been completed.
ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROOMS FERRY NUCLEAR PLANT       tBFN)
TVA is currently in the process of paper closure and independent verification.
These remaining items wi.ll be completed prior to restart.El-99 ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROOMS FERRY NUCLEAR PLANT tBFN)


==SUMMARY==
==SUMMARY==
OF REMAINING UNIT 3 POST-RESTART ISSUES TOPIC COMMITMENT SCHEDULE PACE Flexible Conduits Seismic quali.ficati.on of flexible condui.t, other than those connected to electri.cal equipment covered by 10 CFR 50.49 wi.ll be included as part: of the resolution of USI A-46.The restart portions of this i.ssue have been completed by resolving those actions necessary for flexible conduits attached to electri.cal equipment covered by 10 CFR 50.49.E1-36 Ceneri.c Letter 88-20, Supplement 4, Individual Plant Examination of External Events (IPEEE)TVA will complete the internal fires IPEEE and provide a summary report to NRC.A seismic IPEEE will be submitted prior to March 19, 1996.Flexible conduits'ttached to safety-related electrical
OF REMAINING       UNIT 3 POST-RESTART ISSUES TOPIC                       COMMITMENT                             SCHEDULE           PACE Flexible Conduits       Seismic quali.ficati.on of flexible     The  restart portions of this    E1-36 condui.t, other than those connected   i.ssue have been completed by to electri.cal equipment covered by     resolving those actions 10 CFR 50.49 wi.ll be included as part: necessary    for flexible conduits of the resolution of USI A-46.         attached to electri.cal equipment covered by 10 CFR 50.49.
.=equipment not covered by 10 CFR 50.49 and within the scope of USI A-46 wi.ll be evaluated as part of the resolution of USI A-46, which will be completed prior to March 19, 1996.The seismic portion of the IPEEE will be submitted by March 19, 1996.TVA will complete the internal fires IPEEE and provide a summary report to NRC within one hundred twenty days from its first refueling outage following restart.El-48
Flexible conduits'ttached to safety-related electrical   .=
equipment not covered by 10 CFR 50.49 and within the scope of USI A-46 wi.ll be evaluated as part of the resolution of USI A-46, which will be   completed prior to March 19, 1996.
Ceneri.c Letter 88-20,  TVA will complete  the internal fires  The seismic portion of the         El-48 Supplement 4, Individual IPEEE and provide a summary report  to IPEEE  will be submitted by Plant Examination of    NRC. A seismic IPEEE    will be        March 19, 1996. TVA will External Events (IPEEE)  submitted  prior to  March 19, 1996. complete the   internal fires IPEEE and provide a summary report to NRC within one hundred twenty days from its first refueling outage following restart.
 
TOPIC                            COMMITMENT                              SCHEDULE            PAGE Generic Letter 89          TVA will install  and make  operational The SPDS    is fully functional. E1-51 Safety Parameter Display      a SPDS.                                  In accordance with Generic System (SPDS)                                                          Letter 89-06, TVA will certify its compliance with the requirements of NUREG-0737, Supplement 1, within two months after the SPDS is declared fully operational.
Generic Letter 89-10,          TVA  will complete Generic Letter        The majority of the motor          El-54 Safety-Related                89-10  Safety-Related Motor-Operated    operated valves have been Motor-Operated Valve Testing  Valve Testing and Surveillance during    successfully tested. Two HPCI and  Surveillance              the power ascension test program.        valves remain to be tested during the power ascension testing.
Generic Letter 94-02    Long- TVA  will implement the  BWROG  Option  TVA  intends to have the power      El-63 Term  Solutions and Upgrade of Interim Operating III  methodology for the  stability    range neutron monitoring    (PRNM)
III long-term solution.                      upgrade with the Option Recommendations  for Thermal-                                          trip in  the "indicate only" Hydraulic Instabilities in                                              mode  installed during the Unit Boiling Water Reactors.                                                3 Cycle  7  refueling outage.
Following one cycle of operation for testing, TVA intends to enable the stability trip  function prior to startup from the Cycle 8 refueling outage.
NUREG-0737 (TMI Action Plan)  TVA  will install  a PASS.              The PASS has been    installed and  El-82 Action Item II.B.3                                                    is functional. Testing of the Post-Accident Sampling                                                  PASS  during power ascension System (PASS)                                                          testing will confirm agreement with measurements taken at the normal sampling points.
NUREG  0737 (TMI Action Plan)  Convert level instruments    to analog  Installation is complete and        E1-90 Action Item 2.F.2.4 (Generic  trip units  and  limit vertical  drop of equipment operable. Some Letter 84-23)                  reference legs inside drywell.          confirmatory testing is to be Instrumentation for                                                    performed at power.
Detection of Inadequate  Core Cooling E3-
 
TOPIC                          COMMITMENT                            SCHEDULE            PAGE Seismic Class  II Over I/
Spacial Systems Interactions TVA will evaluate potential            The  restart portion of this      E1-98 seismic-induced, spatial interaction    issue (seismic induced water and Water Spray              effects of Class Class  I II systems  on      spray hazards program) has been systems.                      completed.
The second phase,    involving spatial interaction effects of Class  II  systems on Class I systems has been incorporated into  USI A-46, which  will be completed prior to March 19, 1996.
Unresolved Safety Issue A-46 Seismic Qualification of TVA will complete  the seismic portion This program    will be completed El-103 of the  USI A-46 program.              prior to  March 19, 1996 Ecpxipment in Operating Plants E3-0


TOPIC COMMITMENT SCHEDULE PAGE Generic Letter 89-06-Safety Parameter Display System (SPDS)Generic Letter 89-10, Safety-Related Motor-Operated Valve Testing and Surveillance Generic Letter 94-02-Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors.TVA will install and make operational a SPDS.TVA will complete Generic Letter 89-10-Safety-Related Motor-Operated Valve Testing and Surveillance during the power ascension test program.TVA will implement the BWROG Option III methodology for the stability long-term solution.The SPDS is fully functional.
4 J}}
In accordance with Generic Letter 89-06, TVA will certify its compliance with the requirements of NUREG-0737, Supplement 1, within two months after the SPDS is declared fully operational.
The majority of the motor operated valves have been successfully tested.Two HPCI valves remain to be tested during the power ascension testing.TVA intends to have the power range neutron monitoring (PRNM)upgrade with the Option III trip in the"indicate only" mode installed during the Unit 3 Cycle 7 refueling outage.Following one cycle of operation for testing, TVA intends to enable the stability trip function prior to startup from the Cycle 8 refueling outage.E1-51 El-54 El-63 NUREG-0737 (TMI Action Plan)TVA will install a PASS.Action Item II.B.3-Post-Accident Sampling System (PASS)The PASS has been installed and is functional.
Testing of the PASS during power ascension testing will confirm agreement with measurements taken at the normal sampling points.El-82 NUREG 0737 (TMI Action Plan)Action Item 2.F.2.4 (Generic Letter 84-23)Instrumentation for Detection of Inadequate Core Cooling Convert level instruments to analog trip units and limit vertical drop of reference legs inside drywell.Installation is complete and equipment operable.Some confirmatory testing is to be performed at power.E1-90E3-TOPIC COMMITMENT SCHEDULE PAGE Seismic Class II Over I/Spacial Systems Interactions and Water Spray TVA will evaluate potential seismic-induced, spatial interaction effects of Class II systems on Class I systems.The restart portion of this issue (seismic induced water spray hazards program)has been completed.
E1-98 Unresolved Safety Issue A-46-Seismic Qualification of Ecpxipment in Operating Plants TVA will complete the seismic portion of the USI A-46 program.The second phase, involving spatial interaction effects of Class II systems on Class I systems has been incorporated into USI A-46, which will be completed prior to March 19, 1996.This program will be completed prior to March 19, 1996 El-103 0 E3-4 J}}

Latest revision as of 15:47, 3 February 2020

Provides Notification of Completion or Status of Restart Issues,Identified in 910710 Ltr,Which Described Overall Regulatory Framework for Restart of Unit 3
ML18038B518
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 11/07/1995
From: Machon R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511090054
Download: ML18038B518 (218)


Text

INDEX TO ENCLOSURE

'0 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

STATUS OF UNIT 3 ISSUES TOPIC PAGE BACKGROUND E1-1 10 CFR 55.45(B)(2)(III) and (IV) Plant Simulator . . . . E1-2 Bulletin 79-02 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts [TAC R00017] E1-2 Bulletin 79-12 Short Period Scrams at BWR Facilities . . E1-3 Bulletin 79-14 Seismic Analysis for As-Built Safety-Related Piping Systems [TAC R00017] E1-4 Bulletin 79-18 Audibility Problems E1-5 Bulletin 80-06 Engineered Safety Feature (ESF) Reset C ontrols ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ E1-6 Bulletin 83-08 Electrical Circuit Breakers with an Undervoltage Trip Feature in Use in Safety-Related Applications Other Than the Reactor Trip System E1-7 A

Bulletin 84-02 Failures of General Electric Type HFA Relays in Use in Class 1E Safety Systems [TAC M73854] El-8

'Bulletin 86-02 Static "0" Ring (SOR) Differential Pressure Switches E1-8 Bulletin 88-03 Inadequate Latch Engagement in HFA Type Relays Manufactured by General Electric Company

[TAC M73854] . . . . . . . . . . . . . . . . . . . . E1-10 Bulletin 88-04, Potential Safety-Related Pump Loss

[TAC M69890] . . . . . . . . . . . . . . . . . . . . El-10 Bulletin 88-07 Power Oscillations in Boiling Water Reactors, and Supplement 1 [TAC M72769] . . . . . . . El-12 Bulletin 90-01 Loss of Fill Oil in Rosemount Transmitters

[TAC M85363] ~ . ~ ~ . ~ ~ ~ . ~ ~ ~ ... ~ ~ . . ~ . E1-13 Bulletin 93-02 Debris Plugging of Emergency Core Cooling Suction Strainers, and Supplement 1 [TAC M86537 and M89279] . . . . . . . .,. . . . . . . . . . - . . . . E1-13 Bulletin 93-03 Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs

[TAC M86884] . . . . ... . . . . . . . . . . . . . . E1-15

.9511090054)

TOPIC PAGE Bulletin 95-02 Unexpected Clogging of a Residual Heat Removal (RHR) Pump Strainer While Operating in Suppression Pool Cooling Mode E1-15 Cable Ampacxty El-15 Cable Installation Issue Number 1 Brand Rex Cable Issues E1-16 Cable Installation Issue Number 2 Cable Separations Issues [TAC M85298] . . . . . . . . . . . . . . . . . E1-17 Cable Installation Issue Number 3 Low Voltage Vertical Cable Supports . . . . . . . . ... . . . . . . . . . E1-24 Cable Installation Issue Number 4 Medium Voltage Cable Bend Radius [TAC M86255] . . . . . . . . . . . . . . E1-25 Cable Installation Issue Number 5 Missing Conduit Bushings ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ E1-26 Cable Installation Issue Number 6 Sidewall Pressure, Cable Pullbys, Cable Jamming, Pulling Around 90 Degree Condulets and thru Mid-Run Flex Conduit Issues . . . E1-27 Cable Installation Issue Number 7 Use of Condulets as Pull Points . . . . . . . . . . . . . . . . . . . . . E1-28 Cable Installation Issue Number 8 Medium Voltage Vertical Cable Supports . . . . . . . . . . . . . . . . . . . E1-29 Cable Tray Supports [TAC M80684] E1-30 Component and Piece Part Qualification [TAC M83828] ~ E1-31 Conduit Supports [TAC M80690 and R00024] E1-32 Configuration Management/Design Baseline [TAC M80688] E1-33 Containment Coatings E1-33 Control Rod Drive (CRD) Insert and Withdrawal Piping E1-34 Design Calculations Review E1-35 Environmental Qualification [TAC M42483] E1-36 Fire Protection/10 CFR 50, Appendix R [TAC M48136 and M85254] ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ E1-36

5 TOPIC PAGE F uses El-38 Generic Letter 82-33 Instrumentation to Follow the Course of an Accident Regulatory Guide 1.97 [TAC M51075] . El-39 Generic Letter 83-28 Salem ATWS, Item 1.2, Post Trip Review (Data and Information Capability) [TAC M53573] El-41 Generic Letter 83-28 Salem ATWS, Item 4.5.2, Periodic On-Line Testing [TAC M53966] . . . . . . . . . . . . El-42 Generic Letter 83-28 Salem ATWS, Item 4.5.3, Intervals for On-Line Testing [TAC M53966] . . . . . . . . . . El-43 Generic Letter 83-36 NUREG-0737 Technical Specifications El-44 Generic Letter 88-01 - NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping [TAC M85296] . . . El-46 Generic Letter 88-11 Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations

[TAC M71469] . ~ . . . ~ ~ ~ . . ~ ~ ~ ~ . . . . . . El-47 Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment

[TAC M71633] . . . . . . . . . . . . . . . . . . . . El-48 Generic Letter 88-20 Initiation of the Individual Plant Examination for Severe Accident Vulnerabilities

[TAC M74385] . . . . . . . . . . . . . . . . . . . . El-48 Generic Letter 88-20, Supplement 4 Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities [TAC M83597] . . . . . . . . El-50 Generic Letter 89-06 Safety Parameter Display System

[TAC M51225 and M73636] El-51 Generic Letter 89-08 Erosion/Corrosion-Induced Pipe Wall

~

Thinning [TAC M73459] . . . . . . . . . . . . . . . . El-53 Generic Letter 89-10 Safety-Related Motor-Operated Valve Testing and Surveillance [TAC M75637] . . . . . . . . El-54 Generic Letter 89-13 Service Water Systems Problems Affecting Safety-Related Equipment [TAC M73972] . . . El-55 Generic Letter 89-16 Installation of a Hardened Wetwell Vent [TAC M74860] . . . . . . . . . . . . . . . . . . El-56 Generic Letter 89-19 Request for Action Related to Resolution of Unresolved Safety Issue A-47, "Safety

0

'I

TOPIC PAGE Implication of Control Systems in LWR Nuclear Power Plants" [TAC M74917] . . . . . . . . . . . . . . . . E1-56 Generic Letter 91-06 Resolution of Generic Issue A-30, "Adequacy of Safety-Related DC Power Supplies" . . . E1-58 Generic Letter 91-11 Resolution of Generic Issues 48, "LCOs for Class lE Vital Instrument Buses," and 49, "Interlocks and LCOs for Class 1E Tie Breakers" . . . E1-58 Generic. Letter 92-01 Reactor Vessel Structural Integrity, Revision 1, and Revision 1 Supplement 1 [TAC M83440 and M92651] . . . . . . . . . . . . . . . . . . . . . E1-59 Generic Letter 92-04 Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in BWRs

[TAC M84271] . . . ~ ~ . ~ ~ ~ ~ . . . ~ ~ . . . . . E1-60 Generic Letter 92-08 Thermo-Lag 330-1 Fire Barriers

[TAC M85525] . . . . . . . . ~ . . . . . ~ . . . . . E1-61 Generic Letter 94-02 Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ E1-63 Generic Letter 94-03 Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors

[TAC M90083] E1-64 Generic Safety Issue 40 (MPA B-065) Safety Concerns Associated with Pipe Breaks in the BWR Scram System

[TAC M43736] . . . . . . . . . . . . . . . . . . . . E1-64 Generic Safety Issue 41 (MPA B-058) BWR Scram Discharge Volume System [TAC M51014] . . . . . . . . . . . . . E1-65 Generic Safety Issue 43 (MPA B-107) Reliability of Air Systems [TAC M71633] E1-67 Generic Safety Issue 51 (MPA L-913) Improving the Reliability of Open-Cycle Service Water Systems E1-67

[TAC M73972]

HVAC Duct Supports [TAC M82127 and R00300] E1-67 Instrument Sensing Lines [TAC M80017] E1-68 Instrument Tubing [TAC M80036] E1-69 Intergranular Stress Corrosion Cracking (IGSCC) E1-70

4I 0 ~ ~

~ ~

TOPIC PAGE Long Term Torus Integrity Program [TAC M07391 and M80686] . E1-70 Lower Drywell Platforms and Miscellaneous Steel

[TAC M80620, R00297 and R00303] . . . . . . . . . . . E1-72 Miscellaneous Steel Frames . . . . . . . . . . . . . . . . E1-73 Moderate Energy Line Break (MELB) . . . . . . . . . . . . . E1-73 Multi-Plant Action Item A-01 10 CFR 50.55A(G) Inservice Inspection . . . . . . . . . . . . . . . . . . . . . E1-74 Multi-Plant Action Xtem A-04 10 CFR 50, Appendix J-Containment Leak Testing [TAC M08717] . . . . . . . . E1-75 Multi-Plant Action Item B-41 10 CFR 50, Appendix R Fire Protection [TAC M48136] . . . . . . . . . . . . . . . E1-76 Multi-Plant Action Item C-10 Control of Heavy Loads Phase I (NUREG-0612) [TAC M08438] . . . . . . . . . . E1-76 Multi-Plant Action Item C-11 Reactor Protection System Power Supply [TAC M08931] . . . . . ; . . . . . . . . E1-77 Multi-Plant Action Item D-25 Relocation of Radiological Effluent Technical Specifications . . . . . . . . . . E1-80 NUREG-0737 (TMX Action Plan), Action Item X.D.1 Control Room Design Review [TAC M45778 and M56106] . . . . . E1-80 NUREG-0737 (TMI Action Plan), Action Item I.D.2 Safety Parameter Display Console [TAC M51225 and M74612] . . E1-82 NUREG-0737, (TMI Action Plan), Action Item II.E.4.2.1-4 Containment Isolation Dependability Implement Diverse Isolation [TAC M74615] . . . . . . . . . . . E1-83 NUREG-0737 (TMI Action Plan), Action Item II.E.4.2.6

.Containment Isolation Dependability Containment Purge Valves [TAC M74616] E1-84 NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.A-Accident Monitoring Noble Gas Monitor [TAC M44905] E1-85 NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.B-Accident Monitoring Iodine/Particulate Monitor I

[TAC M44976] - . . . . . . . . . . - . . . . . . . E1-86 NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.C Accident Monitoring Containment High Range Radiation [TAC M45047] E1-88

t NUREG-0737 (TMI Accident

[TAC M47584] . . . .

TOPIC Action Plan), Action Item II.F.1.2.D Monitoring Containment Pressure PAGE

. E1-88 NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.E-Accident Monitoring Containment Water Level

[TAC M47655] . . . . . . . . . . . . . . . . . . . . E1-89 NUREG-0737 (TMI Action Plan), Action Item II.F.2.4 (Generic Letter 84-23) Instrumentation for Detection of Inadequate Core Cooling [TAC M45118] . . . . . . . . E1-90 NUREG-0737 (TMI Action Plan), Action Item II.K.3.13 HPCI/RCIC Initiation Levels [TAC M45534] . . . . . . E1-91 NUREG-0737 (TMI Action Plan), Action Item II.K.3.18 ADS Actuation Modifications [TAC M45682] . . . . . . . . E1-92 NUREG-0737, Item II.K.3.27 Common Reference Level for Vessel Level Instrumentation [TAC M45778] . . . . . . E1-93 NUREG-0737 (TMI Action Plan), Action Item II.K.3.28 Qualification of ADS Accumulators [TAC M48262] . . . E1-94 Operational Readiness . . . . . . . . . . . . . .. . . . . E1-95 Platform Thermal Growth . . . . . . . . . . . . . . . . . . E1-95 Probabilistic Risk Assessment for Multi-Unit Operation . . E1-96 Restart Test Program [TAC M81791] . . . . . . . . . . . . . E1-97 Seismic Class II Over I/Spacial Systems Interactions and Water Spray [TAC M80015] . . . . . . . . . . . . . . E1-98 Small Bore Piping [TAC M80013 and R00306] . . . . . . . . . E1-99.

Unresolved Safety Issue A-7 (MPA D-01) Mark I Long-Term Program [TAC M80686 and M07931] . . . . . . . . . . . E1-99 Unresolved Safety Issue A-9 Anticipated Transients Without Scram (ATWS) [10 CFR 50.62] [TAC M59074] . E1-100 Unresolved Safety Issue A-24 (MPA B-60) Qualification of Class IE Safety-Related Equipment [TAC M42483] . . E1-101 Unresolved Safety Issue A-36 (MPA C-10) Control of Heavy Loads Near Spent Fuel Pool [TAC M08438] . . . . . . E1-101 Unresolved Safety Issue A-42 (MPA B-05) Pipe Cracks in Boiling Water Reactors [TAC M85296] . . . . . . . . E1-102

TOPIC PAGE Unresolved Safety Issue A-44 Station Blackout

[10 CFR 50.63] [TAC M68519] . . . . . . . . . . . . E1-102 Unresolved Safety Issue A-46 Seismic Qualification of Equipment in Operating Plants [TAC M69432] . . . . El-103 Unresolved Safety Issue A-48 (MPA A-19) Hydrogen Control Measures and Effects of Hydrogen Burns [TAC M55955] E1-105 E1-vii

ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

STATUS OF UNIT 3 1SSUES BACKGROUND The regulatory framework for the restart of Unit 2 after its extended outage was unusual. TVA's submittal of the Browns Ferry Nuclear Performance Plan and NRC's review and issuance of Safety Evaluation Reports for each individual program was atypical.

While this level of NRC involvement did result in added confidence for the approval of Unit 2 restart, it required significant TVA and NRC resources to negotiate the approval of individual programs and criteria. In most cases, TVA began the implementation of these programs "at risk", which meant prior to NRC approval. Significant redesign and additional modifications were required whenever the criteria was changed during the approval process.

The overall regulatory framework for the restart of Unit 3 was described in Reference 1 and is more consistent with normal industry practice. The program establishes a high degree of confidence that the facility and personnel are ready to restart and operate Unit 3 in a safe and reliable manner, and promote the efficient utilization of TVA and NRC resources. TVA's program for the restart of Unit 3 is based on the corrective action programs, commitments, technical specification improvements, and internally identified deficiencies and concerns which were resolved prior to the restart of Unit 2. NRC approval of the overall regulatory framework for the restart of Unit 3 is documented in References 2 and 3.

Commitments from the Regulatory Framework for the Restart of Units 1 and 3 letter are listed below, by topic, in alphabetical order. Other pertinent generic issues (e.g., bulletins and generic letters) issued since TVA's regulatory framework submittal have also been included. This enclosure lists each commitment, references key correspondence, discusses the background of the issue, and describes the closure or status of each commitment, as appropriate.

REFERENCES

1. TVA letter to NRC, dated July 10, 1991, Regulatory Framework for the Restart of Units 1 and 3
2. NRC letter to TVA, dated August 1, 1991, Return to Service of Browns Ferry, Units 1 and 3
3. NRC letter to TVA, dated April 1, 1992, Return to Service of Browns Ferry, Units 1 and 3 10 CFR 55. 45 (B) (2) (III) and (IV) - Plant Simulator Commitment: The BFN simulator would be modified to a plant referenced simulator and that TVA would certify by March 1991, in accordance with 10 CFR 55, that this modification would be completed.

Discussion: Reference 1 requested a temporary exemption, until December 31, 1991, for the simulator certification requirements of 10 CFR 55.45(b)(2)(iii). This exemption was granted in Reference 2.

Status: Complete. In Reference 3, TVA certified the plant reference simulator in accordance with 10 CFR 55.45(b)(5) .

References:

1. TVA letter to NRC, dated July 13, 1990, Request for Temporary Exemption from 10 CFR 55.45(b) 2 ~ NRC letter to TVA, dated January 2, 1991, Exemption from 10 CFR 55.45(b)(2)(iii) and (iv) 3 ~ TVA letter to NRC, dated December 17, 1991, Certification of the BFN Simulation Facility Bulletin 79 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts [TAC R00017]

Commitment: TVA will complete Bulletin 79-02.

Discussion: TVA initiated programs in 1979 to comply with Bulletins 79-02 and 79-14 regarding the adequacy of piping system supports and anchor bolts. The BFN programs involved the reanalysis of pipe stress problems using the as-built configuration and amplified response spectra for Seismic Class I structures and the evaluation of the acceptability of the associated pipe supports.

The scope of the program included Unit 3 safety-related large bore (greater than 2Q inches in diameter) piping and computer analyzed small bore piping that was not included in the Small Bore Piping Program.

Pipe stress analysis and pipe support evaluations were based on walkdown inspection data for the safety-related piping systems. The walkdown

0 A

inspections were instituted to determine the actual field configuration of the Class I piping systems and supports. NRC approval of TVA's program for the resolution of Bulletins 79-02 and 79-14 is documented in Reference 1.

Status: Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.

NRC has reviewed the pipe stress analysis, pipe support design calculations, and inspected the completed pipe support modifications. Based on the results of this review, the inspector concluded that this issue is resolved for Unit 3 restart. This is documented in Reference 2.

References:

1. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2 Browns Ferry, Unit 2, Section 2.2.3.1 (Page 2-8) 2 ~ NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52 [Section 3.5, page 5]

Bulletin 79-12 - Short Peri.od Scrams at BWR Facilities Commitment: TVA will complete Bulletin 79-12.

Discussion: In response to Bulletin 79-12, TVA committed to perform unit and cycle specific analyses of control rod withdrawal sequences in order to ensure that rod notch worths were acceptable (References 1 and 2). In Reference 3, TVA notified NRC that it was implementing the generic Banked Position Withdrawal Sequence and Reduced Notch Worth Procedure. The resulting withdrawal sequences ensure that the notch worths are sufficiently small so as to minimize the possibility of a fast period scram. Therefore, cycle specific analyses of control rod withdrawal sequences were no longer required.

Status: Complete. The Banked Position Withdrawal Sequence and Reduced Notch Worth Procedures have been incorporated into plant procedures for Unit 3.

NRC has reviewed Bulletin 79-12, Unit 3 Technical Specifications and Surveillance Requirements that reflect TVA's current position on withdrawal sequences and reduced notch worths. Based on

this review, the inspector concluded that this item is closed for Unit 3. This is documented in Reference 4.

References:

1. TVA letter to NRC, dated July 30, 1979, Office of Inspection and Enforcement Bulletin 79-12 RII:JPO 50-259, -260, -296 Br'owns Ferry Nuclear Plant Units 1, 2, and 3
2. TVA letter to NRC, dated August 19, 1981, Office of Inspection and Enforcement Bulletin 79-12 RII:JPO 50-259, -260, -296 Browns Ferry Nuclear Plant 3 ~ TVA letter to NRC, dated January 4, 1990, Office of Inspection and Enforcement Bulletin 79-12 Commitment Revisions Regarding Fast Period Scrams 4 ~ NRC letter to TVA, dated October 13, 1995, NRC Inspection Report 95-51 [Section 5.3, page 29]

Bulletin 79 Seismic Analysis for As-Built Safety-Related Piping Systems [TAC R00017]

Commitment: TVA will complete Bulletin 79-14.

Discussion: TVA initiated programs in 1979 to comply with Bulletins 79-02 and 79-14 regarding the adequacy of piping system supports and anchor bolts. The BFN programs involved the reanalysis of pipe stress problems using the as-built configuration and amplified response spectra for Seismic Class I structures and the evaluation of the acceptability of the associated pipe supports.

The scope of the program included Unit 3 safety-related large bore (greater than 2> inches in diameter) piping and computer analyzed small bore piping that was not included in the Small Bore Piping Program.

Pipe stress analysis and pipe support evaluations were based on walkdown inspection data for the safety-related piping systems. The walkdown inspections were=instituted to determine the actual field configuration of the Class I piping systems and supports. NRC approval of TVA's program for the resolution of Bulletins 79-02 and 79-14 is documented in Reference 1.

Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent

verification. These remaining items will be completed prior to restart.

NRC has reviewed the pipe stress analysis, pipe support design calculations, and inspected the completed pipe support modifications. Based on the results of this review, the inspector concluded that this issue is resolved for Unit 3 restart. This is documented in Reference 2.

References:

1. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2 Browns Ferry, Unit 2, Section 2.2.3.1 (Page 2-8) 2 ~ NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52 [Section 3.5, page 5]

Bulletin 79-18 Audibility Problems Commitment: TVA will complete Bulletin 79-18.

Discussion: In response to Bulletin 79-18, Audibility Problem Encountered on Evacuation of Personnel from High-Noise Areas, TVA initiated a design change to improve the public address and evacuation system. The noise levels within the plant were determined and equipment upgrades were recommended for in-plant and onsite buildings.

The NRC staff closed this Bulletin in Reference 1.

A weakness in onsite accountability was identified in Reference 2. Reference 3 reflects TVA's commitment to improve the public address and evacuation system before restart from the Unit 2 Cycle 6 outage. The status of this commitment was discussed in Reference 4.

Status: Complete. The upgrade to the public address and evacuation system was completed during the Unit 2 Cycle 6 outage. Notification of the completion of this commitment was provided in Reference 5.

Although Reference 5 applied only to the Unit 2 docket, the public address system is common to all three units and the commitment was completed for all three units at that time. Explicit notification of the completion of this Bulletin for Units 1 and 3 was provided in Reference 6.

In order to verify system operability and readiness, NRC requested activation of the system in various plant locations. The test took place on June 1, 1995. Based on the results, NRC

e concluded that the system appeared to function as designed. The results are documented in Reference 7.

References:

1. NRC letter to TVA, dated February 4, 1986, Report Nos. 50-259/86-01, 50-260/86-01, and 50-296/86-01 2 ~ NRC letter to TVA, dated November 15, 1988, NRC Inspection Report Nos. 50-259/88-30, 50-260/88-30, and 50-296/88-30 3 ~ NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2 Browns Ferry Unit 2 [Section 4.9, Page 4-4]

4 ~ TVA letter to NRC, dated September 20, 1991, Status and Schedule for Completion of Unit 2 Post-Restart Issues [Section III.8.0, Page 11]

5. TVA letter to NRC, dated June 22, 1993, Completion of Unit 2 Post-Restart Issues
6. TVA letter to NRC, dated October 21, 1994, Completion of Bulletin 79-18 for Unit 1 and 3 Restart Issues 7 ~ NRC letter to TVA, dated June 23, 1995, NRC Inspection Report 95-30 [Section 2.b., page 3]

Bulletin 80-06 - Engineered Safety Feature (ESF) Reset Controls Commitment: TVA will complete Bulletin 80-06.

Discussion: In Reference 1, TVA stated that the need for modification to the Traversing Incore Probe (TIP) was identified as a result of the reviews performed for Bulletin 80-06. TVA informed NRC that the remaining testing of Unit 3 was complete and no other problems were identified. In Reference 3, TVA committed to perform the modification to the TIP system prior to restart.

Status: Complete. The automatic reset circuitry was removed and a manual pushbutton reset was installed.

NRC has reviewed the design change notice (DCN),

has observed installation of the isolation reset switches, and considers this issue closed for Unit 3. The results are documented in Reference 4.

8

References:

1. TVA letter to NRC, 'dated December 4g 1981I in regards to Bulletin 80-06 2 ~ TVA letter to NRC, dated May 12, 1983, OIE Bulletin 80-06 Engineered Safety Feature (ESF)

Reset Controls Browns Ferry Nuclear Plant Units 2 and 3

3. TVA letter to NRC, dated April 28, 1988, IE Bulletin No. 80-06 Engineered Safety Feature (ESF) Reset Control
4. NRC letter to TVA, dated May 8, 1995, NRC Inspection Report 95-22 [Section 6.c., page 19]

Bulletin 83-08 - Electrical Circuit Breakers with an Undervoltage Trip Feature in Use in Safety-Related Applications Other Than the Reactor Trip System Commitment: TVA will replace the General Electric (GE) molded case circuit breakers that are used on the output of the reactor protection system (RPS) motor-generator (MG) sets. The replacement breakers do not utilize the undervoltage release feature.

Undervoltage and overvoltage protection is provided using a combination of contactors and relays.

Discussion: TVA responded to Bulletin 83-08 in Reference 1.

Status: Complete. TVA installed two class 1E detection and isolation assemblies in each of the three sources of power to the RPS. Each assembly includes a circuit breaker and a monitoring module consisting of an undervoltage, an overvoltage and an underfrequency sensing relay.

The protective assembly relays operate to disconnect the abnormal source of supply from the RPS bus.

NRC inspectors have reviewed the design change for Unit 3, walked down the completed modification, and considers this issue closed for Unit 3. This is documented in Reference 2.

References:

1. TVA letter to NRC, dated March 29, 1984, Inspection and Enforcement Bulletin 83-08 Electrical Circuit Breakers with an Undervoltage Trip Feature in Use in Safety-Related Applications other than the Reactor Trip System 2 ~ NRC letter to TVA, dated May 8, 1995, NRC Inspection Report 95-22 [Section 6.d., page 19]

Bulletin 84 Failures of General Electric Type HFA Relays in Use in Class 1E Safety Systems [TAC M73854]

Commitment: TVA will replace relay coil spools in HFA relays in the reactor protection system (RPS) and other safety systems.

Discussion: TVA responded to Bulletin 84-02 by Reference 1.

Status: Closed. Unit 3 HFA relay coil replacement has been completed. Relays requiring coil replacement included the following:

1. Normally energized a/c relays in the RPS or other safety-related systems with Nylon or Lexan coil spools.
2. Normally deenergized relays in the RPS or other safety-related systems with Nylon coil spools'he NRC inspected the HFA coil replacement. This is documented in Reference 2. NRC selected various relays at random and verified that the activities were completed. Based on this review, the inspector considers this issue closed for Unit. 3.

References:

1. TVA letter to NRC, dated July 10, 1984, Inspection and Enforcement Bulletin 84 Failures of General Electric Type HFA Relays in Use in Class 1E Safety Systems Browns Ferry, Sequoyah, Watts Bar, and Bellefonte Nuclear Plants
2. NRC letter to TVA, dated August 31, 1995, NRC Inspection Report 95-43 [Section 6.5, page 13]

Bulletin 86 Static "0" Ring (SOR) Differential Pressure Switches Commitment: TVA will complete Bulletin 86-02.

Discussion: TVA responded to Bulletin 86-02 by Reference 1.

Two Static "0" Ring differential pressure switches were installed (or planned for installation) in the Residual Heat Removal (RHR)

E1-8

system minimum flow recirculation lines. TVA committed to:

1. Revise the RHR pump flow rate test to include steps to verify minimum flow switch operability,
2. Perform maintenance instructions semiannually until two consecutive tests were attained, and
3. Evaluate the SOR test report and adjust setpoints, as required.

Status: Complete. TVA has installed two Static "0" Ring differential pressure switches in the Unit 3 RHR system and the RHR Pump Surveillance Instruction has been revised to include steps to verify proper switch operation.

The commitment to perform the maintenance instruction semiannually has been evaluated in accordance with the commitment management process and deleted. NRC was notified of the commitment deletion by Reference 2.

The SOR test report has been evaluated and the setpoint calculations have been revised.

Bulletin 86-02 has been closed for Unit 3.

However, an Inspector Followup Item was opened as a restart item for Unit 3. This is documented in Reference 3.

NRC inspectors reviewed the engineering change notice (ECN), calculations, calibration results, and functional testing requirements. Based on the results of this review, NRC considers this issue closed for Unit 3. This is documented in Reference 4.

References:

1. TVA letter to NRC, dated July 20, 1987, NRC Office of Inspection and Enforcement, (IE)

Bulletin 86-02 Static "0" Ring (SOR)

Differential Pressure Switches

2. TVA letter to NRC, dated August 17, 1995, BFN Revision To Commitments To Perform Testing Of Static-0-Ring Differential Pressure Switches And Voltage Verification Testing Of Reactor Protective System Equipment
3. .NRC letter to TVA, dated March 18, 1993, NRC Inspection Report 93-04 [Section 5, page 13]

'I h

w ~

lt

4. NRC letter to TVA, dated January 17, 1995, NRC Inspection Report 94-31 [Section 6, page 14]

Bulletin 88 Inadequate Latch Engagement in HFA Type Relays Manufactured hy General Electric Company [TAC M73854]

Commitment: TVA will complete Bulletin 88-03.

Discussion: TVA originally responded to Bulletin 88-03 in Reference 1. TVA stated the BFN inspections and the repair or replacement of the relays which fail the inspection criteria are scheduled to be unit.

completed before restart of each Status: Complete. In Reference 2, NRC closed Bulletin 88-03. However, TVA was the NRC of inspection still required to notify results for Unit 3. In Reference 3, TVA informed NRC that no inadequate latch engagement had been identified during the inspection of the HFA relays in Unit 3.

References:

1. TVA letter to NRC, dated July 6, 1988, Nuclear Regulatory Commission (NRC) Bulletin 88-03, Inadequate Latch Engagement in HFA-Type Latching Relays Manufactured by General Electric (GE)

Company

2. NRC letter to TVA, dated August 2, 1990, Closure of NRC Bulletin 88-03 for the Browns Ferry Nuclear Plant (TAC NOS. 73852, 73853, and 73854) 3 ~ TVA letter to NRC, dated April 11, 1994, NRC Bulletin No. 88-03 Inspection Results Bulletin 88-04, Potential Safety-Related Pump Loss [TAC M69890]

Commitment: TVA will complete Bulletin 88-04.

Discussion: NRC Bulletin 88-04 requested licensees to investigate and correct, as applicable, two miniflow design concerns for safety-related system pumps. The first concern involved the potential for dead-heading one or more pumps.

The second concern was whether or not the installed miniflow capacity was adequate.

TVA responded to the Bulletin (Reference 1),

endorsing the BWR Owners'roup response and providing BFN specific information. NRC requested additional information in Reference 2, which was provided by TVA in Reference 3.

e ~

0 44 *4,

Status: Complete. The following actions were taken:

1~ The design calculation for the Unit 2 Core Spray system miniflow bypass orifice size was expanded to include Unit 3 with the same results. The affected orifices were removed and inspected to verify proper sizing and if not, bored to the proper size. The system drawings were revised as necessary to reflect the correct orifice size.

2 ~ A review of the Residual Heat Removal Service Water (RHRSW) operating instructions was performed during the resolution of this Bulletin for Unit 2. This review identified that the RHRSW pumps are started prior to opening the discharge flow control valves.

The calculation for the RHRSW pumps determined that pump damage would not occur for 43 minutes when the RHRSW pumps were started with the pump discharge valves closed. Based on this, the RHRSW operating instruction was revised to include a precaution that pump damage may occur if RHRSW outlet valves are not opened.

3 ~ The design calculation for the Unit 2 RHRSW system was expanded to include Unit 3 with the same results. Since the RHRSW system operating instruction is a common instruction for both Units 2 and 3, no further changes were required.

Reference 4 documents NRR closure of this issue for Unit 3. NRC has examined associated issue equipment, modifications, documentation and calculations. Based on this review and the NRR closure letter, NRC closed this issue for Unit 3. This is documented in Reference 5.

References:

1~ Letter from TVA to NRC dated September 30, 1988, Browns Ferry (BFN),

Watts Bar (WBN), and Bellefonte (BLN) Nuclear Plants - NRC Bulletin (NRCB) 88-04, Potential Safety-Related Pump Loss 2 ~ Letter from NRC to TVA dated March 1, 1989, Response to NRC Bulletin 88-04 Browns Ferry Nuclear Plant, Units 1, 2, and 3 3 ~ Letter from TVA to NRC dated April 05, 1989, Browns Ferry Nuclear Plant (BFN) Units 1

W

and 3 - Additional Response to NRC Bulletin 88-04 (NRCB 88-04) Potential Safety-Related Pump Loss

4. Letter from NRC to TVA, dated May 8, 1989, Response to NRC Bulletin 88-04 Browns Ferry Nuclear Plant, Units 1 and 3
5. Letter from NRC to TVA, dated June 28, 1995, NRC Inspection Report 95-31 [Section 7.b.,

page 18]

Bulletin 88 Power Oscillations in Boiling Water Reactors, and Supplement 1 [TAC M72769]

Commitment: TVA will complete Bulletin 88-07.

Discussion: TVA responded to Bulletin 88-07 by Reference 1 and confirmed that the actions required by the Bulletin were implemented. TVA responded to Supplement 1 to Bulletin 88-07 by Reference 2 and confirmed its plans to implement the General Electric interim stability recommendations. The proposed Technical Specification changes to implement the reactor core thermal-hydraulic stability recommendations contained in Supplement 1 to Bulletin 88-07 were provided by Reference 3 and approved in Reference 4.

Status: Complete. TVA has implemented the General Electric interim stability recommendations into plant procedures. Refer to the topic entitled Generic Letter 94-02 Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors for additional actions TVA'as taken to address this issue.

References:

1. TVA letter to NRC, dated November 4, 1988, NRC Bulletin 88-07: Power Oscillations in Boiling Water Reactors
2. TVA letter to NRC, dated March 6, 1989, NRC Bulletin 88-07, Supplement 1 Power Oscillations in Boiling Water Reactors (BWRs)
3. TVA letter to NRC, dated January 14 1992) TVA BFN Technical Specification (TS) No. 300 Reactor Core Thermal-Hydraulic Stability
4. NRC letter to TVA, dated May 31, 1994, Issuance of Technical Specification Amendments for the Browns Ferry Nuclear Plant Units 1 and 3 (TS 300)

0 a

Bulletin 90-01 - Loss of Fill Oil in Rosemount Transmitters

[TAC M85363]

Commitment: TVA will complete Bulletin 90-01.

Discussion: TVA originally responded to Bulletin 90-01 in Reference 1. TVA responded to Supplement 1 to Bulletin 90-01 in Reference 2. The commitments made in Reference 2 superseded the commitments made in Reference 1. In Reference 2, TVA committed to replace or refurbish the Model 1153 Series B, Model 1153 Series D, and the Model 1154 Rosemount transmitters, which were manufactured prior to July 11, 1989, in Unit 3 safety-related or Anticipated Transient Without Scram (ATWS) applications.

Status: Complete. TVA has replaced or refurbished the Model 1153 Series B, Model 1153 Series D, and Model 1154 Rosemount transmitters, which were manufactured prior to July 11, 1989, in Unit 3 safety-related or ATWS applications.

NRC has reviewed TVA's response and concluded that TVA conforms to the requested actions of Bulletin 90-01, Supplement 1. This is documented in Reference 4.

References:

1. TVA letter to NRC, dated July 18, 1990, Response to NRC Bulletin No. 90-01: Loss of Fill-Oil in Transmitters Manufactured by Rosemount 2 ~ TVA letter to NRC, dated March 5, 1993, Response to NRC Bulletin No. 90-01, Supplement 1 Loss of Fill Oil in Transmitters Manufactured by Rosemount 3 ~ NRC letter to TVA, dated May 31, 1995, NRC Inspection Report 95-29 [Section 2.0-7.0]

4 NRC letter to TVA, dated April 4, 1995, NRC Bulletin 90-01, Supplement 1, Loss of Fill-Oil in Transmitters Manufactured by Rosemount Bulletin 93-02 - Debris Plugging of Emergency Core Cooling Suction Strainers, and Supplement 1 [TAC M86537 and M89279]

Commitments: TVA will complete Bulletin 93-02 and Supplement 1 prior to restart.

E1-13

Discussion: TVA responded to Bulletin 93-02 in Reference 1 and committed to:

1. Evaluate Unit 3 for permanent fibrous material.
2. Inspect Unit 3 and remove temporary fibrous material.
3. Confirming completion of the above listed activities before startup.

In TVA's response to Supplement 1 of Bulletin 93-02 (Reference 2), TVA committed to augment the operator's required reading program, conduct classroom and/or simulator training, revise appendices in the BFN Emergency Operating Instructions (EOIs) to include caution statements and actions for monitoring net positive suction head, and change the applicable design control procedure to require evaluation of fibrous material being introduced into the drywell.

In Reference 3, NRC stated that TVA's response to Supplement 1 adequately addressed the actions TVA would take to assure continued Emergency Core Cooling System (ECCS) suction capability. TVA notified NRC of the completion of the commitments made in response to Supplement 1 of Bulletin 93-02 in Reference 4.

Status: Open. TVA has completed the walkdown for permanent fibrous material. Administrative procedures are in place which require documentation of the removal of temporary fibrous air filters or other sources of fibrous material prior to drywell closure. This will be completed prior to restart.

References:

1. TVA letter to NRC, dated May 23, 1993, NRC Bulletin No. 93-02, "Debris Plugging of Emergency Core Cooling Suction Strainers" 2 ~ TVA letter to NRC, dated April 18, 1994, NRC Bulletin 93-02, Supplement 1 Debris Plugging of Emergency Core Cooling System (ECCS) Suction Strainers 3 ~ NRC letter to TVA, dated July 19, 1994, Response to NRC Bulletin 93-02 Supplement 1, "Debris Plugging of Emergency Core Cooling Suction Strainers" 4 ~ TVA letter to NRC, dated July 29, 1994, NRC Bulletin 93-02, Supplement 1 Debris Plugging of

Emergency Core Cooling System (ECCS) Suction Strainers Commitment Completion Bulletin 93-03 - Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs [TAC M86884]

Commitment: TVA intends to complete a modification which will prevent the buildup of noncondensables in water level reference legs by injecting CRD system charging water into the reference legs.

Discussion: TVA's response to Bulletin 93-03 was provided by Reference 1. A description of the modification installed on Unit 2 was provided in Reference 2.

Status: Complete. TVA has performed the modification which provides a continuous backfill to the reactor reference lines as required by NRC Bulletin 93-03.

References:

1. TVA letter to NRC, dated July 30, 1993, Response to NRC Bulletin (NRCB) 93-03, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in Boiling Water Reactors 2 ~ TVA letter to NRC, dated December 14, 1994, Hardware Modification Completion and Description in Response to Bulletin 93-03, Resolution of Issues Related to Reactor Vessel. Water Level Instrumentation in Boiling Water Reactors Bulletin 95>>02 - Unexpected Clogging of a Residual Heat Removal (RHR) Pump Strainer While Operating in Suppression Pool Cooling Mode Commitment: TVA will provide a report indicating the actions taken in order to comply with the requested action of Bulletin 95-02.

Discussion: None.

Status: Open. TVA will provide the report by November 13, 1995.

References:

None.

E1-15

0 I 4

Cable Ampacity The cable ampacity issue will be resolved in accordance with the Unit 2 precedent.

Discussion: TVA developed a new electrical design standard to address ampacities for cables in conduits, cable trays, and duct banks, as well as derating factors for cable coatings, fire wraps, cable tray covers, and cable tray bottoms. Approval of this program is contained in NUREG-1232 (Reference 1).

Status: Complete. In addition to developing a new electrical design standard, TVA has performed calculations to determine limiting ampacity values based on environment and the requirements of nonconforming cable installations that are documented and tracked through the Conditions Adverse to Quality Report (CAQR) program.

The ampacity calculations have been reviewed by NRC and found to be adequate in determining the ampacity of installed cable. The inspector also determined that the ampacity concerns for Unit 3 were addressed consistent with the methodology and approach accepted in Reference 1. This is documented in Reference 2.

References:

1. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2 Browns Ferry Unit 2 I'Section 3.11.3, Page 3-9]

2 ~ NRC letter to TVA, dated March 16, 1995, NRC Inspection Report 94-35 [Summary Results, page 2]

Cable Installation Issue Number 1 Brand Rex Cable Issues Commitment: The Brand Rex cable issue will be resolved in accordance with the Unit 2 precedent.

Discussion: The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, the Staff found implementing the corrective actions for the Brand Rex cable issue in accordance with the Unit 2 precedent to be acceptable pending the results of additional qualification testing being performed by TVA.

Status: Complete. TVA has identified contract number 80K6-825419 as the source of the Brand Rex cables issue for BFN. Additional testing demonstrated the ability of the cables to perform their intended safety function for a qualified life of 40 years. A'review of Unit 3, 10CFR50.49 cables indicated that no cable of this type is installed in 10CFR50.49 applications. TVA has removed all non-installed Brand Rex cable furnished on contract 80K6-825419. Administrative controls are in place to prevent future applications of this cable type and manufacturer from being installed at BFN.

References:

1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations
2. NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues Cable Installation Issue Number 2 - Cable Separations Issues

[TAC M85298]

'Commitments: TVA committed to the following:

The sixteen V4 and V5 cables originating from safety-related power supplies and that were deenergized for Unit 2 restart will be modified as appropriate.

2 ~ The eight nondivisional V3 cables originating from safety-related power supplies and that were deenergized for Unit 2 restart will be modified as appropriate.

3 The 604 divisional and nondivisional cables designated with a "IE" suffix will be

~

corrected by retagging both the cables and the appropriate raceway. The five cables that were deenergized for Unit 2 restart will be modified as appropriate.

4. The 109 nondivisional V4 and V5 cables contained in the project Q-list will be corrected by retagging both the cable and the appropriate raceway.
5. The project Q-list will be revised to remove the V1, V2, V3, V4 and V5 sample cables determined by the evaluation to be nonsafety-

1 I related and nondivisional. Additional Q-list evaluations will be handled in accordance with SSP-3.10.

6. The following categories of separations discrepancies will be resolved in accordance with the Unit 2 precedent:
a. A 100-percent review of V4/V5 cables which originate from safety-related power supplies,
b. A random sample of nondivisional V4/V5 cables which originate from nonsafety-related power supplies,
c. A 100-percent review of V3 nondivisional cables which originate from safety-related power supplies,
d. A random sample on nondivisional V3 cables which originate from nonsafety-related power supplies,
e. A generic analysis of typical nondivisional V1/V2 circuits which originate from both safety-related and nonsafety-related power supplies,
f. A 100-percent review of cables designated with a suffix of "IE" or "IES", and
g. A generic analysis of typical divisional V1/V2 circuits.
7. The resolution of the following cable separation discrepancies will deviate from the Unit 2 precedent:

a ~ Review of field verified cable routing data from TVA's cable ampacity and Appendix R program The cable and conduit database will be verified for divisional separation by random sample analysis and confirmation by walkdown and/or signal tracing to the relevant design criteria and meet the 95/95 confidence level criteria.

b. Nondivisional V1, V2, V3, V4 and V5 cables contained in the Q-List The unit 3 Q-list will establish a list of equipment and device IDs for safety-related and quality-related systems.

E f 4 ~

Circuit block diagrams will be analyzed to identify cables required in support of these equipment and device functions.

The resulting list will be compared against the cable database to determine if cables are correctly identified as divisional. If it is determined that a change in divisional status is required, the respective cables will be evaluated against the separation criteria.

Corrective actions will be implemented prior to fuel load.

c ~ Cables contained in divisional and nondivisional cable trays that physically connect Corrective actions involving cable separation discrepancies resolved for unit 2 restart by opening breakers will be implemented prior to Unit 3 fuel load.

8. Cable PL1163 will be double isolated prior to restart of Unit 3.
9. Cable 3PL575 will be rerouted to correct the deficiency in accordance with the TVA design requirements prior to Unit 3 restart.

Discussion:

~ ~

TVA had identified instances where the electrical separation requirements had not been met at BFN.

These discrepancies were discovered while implementing design changes and conducting reviews as part of the BFN Unit 2 recovery effort and was documented in LER 88-032, dated October 21, 1988 (Reference 1) and subsequent condition adverse to quality reports (CAQRs).

TVA submitted the Reference 2 cable separation report to the NRC to describe TVA's plan for evaluating the problem and correcting discrepancies for Unit 2 restart. Revisions 1, 2, and 3 to this report were submitted by References 3, 4 and 5 respectively. The cable separation report provided the details of the evaluation and the results. In addition, some corrective actions were identified which required implementation prior to Unit 2 restart and some were required after Unit 2 restart. The corrective actions required prior to Unit 2 restart were subsequently completed. The post Unit 2 restart items included commitments 1 through 5 above.

In addition to the post Unit 2 restart corrective actions that resulted from the Unit 2 evaluation, a Units 1 and 3 specific action plan to

<~ lf '+5 disposition concerns related to cable installation issues, including cable separation, was provided in Reference 6. The Unit 3 plans for resolution are included in Commitments 6 and 7 above. The following deviations were proposed from the Unit 2 precedent:

1. Unit 2 cables were manually routed. Since Unit 3 was constructed using a computerized cable routing system, two random samples would be analyzed to verify cable routing data to the same 95/95 confidence level as was used for Unit 2.
2. The development of the Q-List will identify the safety and quality related systems.

Circuit block diagrams will be analyzed to identify the associated cables. A comparison of the cable database will be performed to determine if the cables're correctly identified as divisional.

3. For cables contained in divisional and nondivisional cable trays, corrective actions involving cable separation discrepancies will be resolved.

The Safety Evaluation on this program was provided by Reference 7. In summary, the seven categories of separation discrepancies that were to be resolved in accordance with the Unit 2 precedent were adequate to resolve these discrepancies for Unit 3. In addition:

1. The action plan and the acceptance criteria for the review of field verified cable routing data was considered adequate to resolve the cable routing validation issue for Unit 3,
2. The action plan for,resolving the nondivisional cables issue was considered adequate, and
3. Additional information was requested regarding the corrective actions to be implemented for discrepancies associated with the two cables contained in divisional and nondivisional cable trays that physically connect.

This additional information was provided by TVA in Reference 8. The information provided specifically described the corrective actions to implement commitment 7.c above which resulted in

1 ~

commitments 8 and 9 above. The NRC Staff accepted this determination in Reference 9.

Complete.

1 ~ The sixteen V4 and V5 cables originating from safety-related power supplies and that were deenergized for Unit 2.restart have been appropriately modified.

2 ~ Seven of the eight nondivisional V3 cables originating from safety-related power supplies that were deenergized for Unit 2 restart have been appropriately modified.

The remaining one cable affects Unit 1 only and will be appropriately modified prior to Unit 1 restart.

3 ~ 600 of the 604 divisional and nondivisional cables designated with a "IE" suffix were corrected by updating the design drawings.

An exception was issued for three cables.

One cable is a Unit 1 only cable and will be corrected prior to restart of Unit 1.

Physical retagging was determined by the commitment management process to be unnecessary. Cables that were deenergized for Unit 2 restart were appropriately modified.

4. The 109 nondivisional V4 and V5 cables contained in the project Q-list were corrected by updating the design drawings.

Physical retagging was determined by the commitment management process to be unnecessary.

5. The project Q-list has been revised to remove the V1, V2, V3, V4, and V5 sample cables determined by the evaluation to be nonsafety-related and nondivisional.

6 ~ a ~ V4 and V5 cables originating from safety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent. Breakage identified by the evaluation has been resolved by modifications.

b. V4 and V5 nondivisional cables originating from nonsafety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent.

Breakage identified by, the evaluation has been resolved by modifications.

I C~ V3 nondivisional cables originating from safety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent. Breakage identified by the evaluation has been resolved by modifications.

d. V3 nondivisional cables originating from nonsafety-related power supplies were evaluated for separation in, accordance with the Unit 2 precedent. Breakage identified by the evaluation has been resolved by modifications.
e. V1 and V2 nondivisional cables originating from both safety-related and nonsafety-related power supplies were evaluated for separation in accordance with the Unit 2 precedent. The evaluation concluded there is not a concern relative to the separation of these cables. These are low energy cables and therefore do not result in a concern using the separation criteria.

Cables designated with a "IE" or "IES" suffix were evaluated and rerouted and/or downgraded as required.

go V1 and V2 divisional cables were evaluated for separation in accordance with the Unit 2 precedent. The evaluation concluded there is not a concern relative to the separation of these cables. These are low energy cables and therefore do not result in a concern using the separation criteria.

7 ~ a0 The Unit 3 Consolidated Cable Routing System (CCRS) database information was validated for divisional separation to a 95/95 confidence level using two random samples. The samples were analyzed either by walkdown and/or signal tracing to the relevant design criteria.

b. Nondivisional V1, V2, V3, V4 and V5 cables contained in the Q-list were evaluated against the separation criteria. Breakage identified by the evaluation consisted of either cables which were incorrectly identified as having a safety-related active function or required rework to conform to the separation criteria. Cables were either E1-22

r 1

ii

appropriately downgraded, modified or justified for use-as-is based on a specific evaluation., The specific steps to implement this commitment have been modified in accordance with the commitment management process. NRC was notified of these changes by Reference 10.

c ~ Cable routed through node points where divisional and nondivisional cable trays are physically connected were evaluated against the separation criteria. In cases where cable breakage was identified, cables were either rerouted, retagged, double isolated and/or exceptions to the criteria were approved. See commitments 8 and 9 below.

8. Cable PL1163 has been double isolated.
9. Cable 3PL575 has been rerouted.

References:

1. Licensee Event Report (LER) 259-88-032 dated 10/21/88, Violation of Electrical Separation Requirements
2. TVA letter to NRC dated 1/6/89, Electrical Cable Separ ation
3. TVA letter to NRC dated 6/9/89, Electrical Cable Separation
4. TVA letter to NRC, dated 10/23/89, Electrical Cable Separation
5. TVA letter to NRC dated 12/14/89, Electrical Cable Separation
6. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations
7. NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues
8. TVA letter to NRC, dated December 29, 1992, Response to Request for Additional Information on Electrical Cables in Divisional and Nondivisional Trays Which Are Physically Connected
9. NRC letter to TVA, dated January 28, 1993, Resolution of Cable Separation Discrepancies

ii

10. TVA letter to NRC, dated October 25, 1995, Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 Revision to Commitments to Provide Continuous Indication of Containment Pressure, Piece Part Component, Qualification, and Cable Separation for Non-Divisional Cables on the Q-List Cable Installation Issue Number 3 - Low Voltage Vertical Cable Supports Commitment: TVA will resolve the low voltage vertical cable supports issue in accordance with the Unit 2 precedent.

Discussion: The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, since no Unit 2 cables with acceptable sidewall bearing pressure failed Hi-Pot testing, the walkdowns and evaluation of Class 1E low voltage power, control and instrumentation cables is adequate to satisfactorily resolve the vertical support issue.

Status: Complete. TVA has analyzed safety-related low voltage cables that were installed in vertical raceways. Cables in one conduit exceeded the specified cable support spacing and the sidewall pressure limit. Insulation damage was also found on this cable. Additional supports were added and conduits/cables were replaced as required.

References:

1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations
2. NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues E1-24

~ 1 r

4<4

~

Cable Installation Issue Number 4 - Medium Voltage Cable Bend Radius [TAC M86255]

Commitment: Safety-related medium voltage cables will be identified, walked down and evaluated against the bend radius criteria used for Unit 2 (General Construction Specification G-38). The following corrective actions will be completed:

A. Group 1 cables, with bend radius of less than 6 times the cable outside diameter (OD) will be replaced.

B. Group 2 cables, with bend radius from 6 to less than 8 times the cable OD will be tested prior to restart and during subsequent outages to facilitate a trend analysis.

C. Group 3 cables, with bend radius 8 times or greater than the cable OD will be allowed to remain in .service and be subjected to only normal maintenance testing.

Discussion: The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation of this program was provided by Reference 2. In summary, since safety-related medium voltage cables are to be identified, walked down and evaluated against the bend radius acceptance criteria contained in Construction Specification G-38 and dispositioned in accordance with the same criteria used for Unit 2, the proposed corrective actions are adequate.

In Reference 3, TVA proposed a new program and corrective actions for medium cable bend radius issues. Results of reinspections were presented to NRC and Hi-Pot testing was replaced with Load Cycle and Corona Testing. Additional information regarding the revised program was requested in Reference 4, which was provided by TVA in Reference 5. NRC issuance of a Safety Evaluation for this program and a request for additional information was contained in Reference 6. TVA replied in Reference 7 and the Supplemental Safety Evaluation Report was provided in Reference 8.

Status: Complete. TVA has performed an evaluation of the cable bend radius of Unit 3 safety-related medium voltage power cables against the TVA minimum bending radius criteria. Among the cables

were the Type PN. Replacing this type of cable in Unit 3 10 CFR 50.49 circuits was considered adequate to resolve this issue.

Status: Complete. All type PN cables in 10 CFR 50.49 circuits have been replaced in Unit 3. In addition, conduit bushings were installed during the cable installation. TVA has analyzed other Unit 3, 10CFR50.49 cables for missing conduit bushings. Some cables have been replaced because of other issues and the conduit bushings were installed during the cable installation.

Protective sleeves have been installed on the remaining cables.

References:

1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2 ~ NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues Cable Installation Issue Number 6 - Sidewall Pressure, Cable Pullbys, Cable Jamming, Pulling Around 90 Degree Condulets and thru Mid-Run Flex Conduit Issues Commitment: TVA will implement a confirmatory cable issues walkdown using the Unit 2 methodology for the sidewall pressure,'able pullbys, cable jamming, pulling around 90 degree condulets and thru mid-run flex conduit issues.

Discussion: The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1.

Information regarding cable walkdowns and cable routing system database validation was provided in Reference 2.

A Safety Evaluation on cable installation and separation and request for additional information on divisional/nondivisional separation discrepancies was provided in Reference 3. In summary, cable damage was not identified on Unit 2 during the resolution of the sidewall pressure, cable pullbys, cable jamming and pulling around 90-degree condulets and through mid-run flex conduits issues. Confirmatory walkdowns are adequate to address this issue for Unit 3.

El-27

w" I I lt 'l

addressed in the evaluation, five cables were replaced because of other cable issues. There were three other cables identified as Group 3 cables which will be allowed to remain in service and be subjected to only normal maintenance testing.

References:

1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2 ~ NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues
3. TVA letter to NRC, dated March 17, 1993, Medium Voltage Cable Bend Radius Issues 4 ~ NRC letter to TVA, dated August 23, 1993, Request for Additional Information Regarding Medium Voltage Cable Bend Radius
5. TVA letter to NRC, dated January 10, 1994, Response to Request for Additional Information Regarding Medium Voltage Cable Bend Radius
6. NRC letter to TVA, dated July 1, 1994, Safety Evaluation and Request for Additional Information Regarding Medium Voltage Cable Bend Radius Issues 7 ~ TVA letter to NRC, dated September 15, 1994, Reply to NRC Request for additional Information (RAI) Regarding Medium Voltage Cable Bend Radius Issues
8. NRC letter to TVA, dated January 9, 1995, Supplemental Safety Evaluation for Medium Voltage Cable Bend Radius Cable Installation Issue Number S >> Missing Conduit Bushings Commitment: Type PN cables in 10 CFR 50.49 circuits will be replaced under the Environmental Qualification program.

Discussion: The action plan to disposition concern's related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, the only cables found damaged on Unit 2 as a result of pulling the cables over a conduit end with a missing bushing E1-26

lg, ll

Status: Complete. .TVA has performed confirmatory walkdowns ~o address this issue for Unit There was nS sidewall pressure (SWP) in uc damage observe. However, cables with grea er than 360 degree<~ of total bend between pu points were evalu ted and one cable with excessive sidewall pressure was found. This cable has been replace The results of the walkd wn also indicated that there was no damage obser ~d as a result o degree pullbys, cable jamming, or cbulls around mid-run 90 condulets. In addition, ther~ were no flex conduits observed during th ~ walkdgyi.

t.o these observations, no further ac%on concerning this issue is required.

Ref erence's:=~1. TVA letter to NRC, dated May 10, 1991, Action

= 'i~~ Plan to Disposition Concerns Related to Units 1 (i

1 and 3 Cable Installation Issues Including Cable Separations 2 ~ TVA letter to NRC, dated March 6, 1992, Additional Information on TVA's Action Plan for Units 1 and 3 Cable Installation Issues Including Cable Separations 3 ~ NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues Cable Installation Issue Number 7 - Use of Condulets as Pull Points Commitment: The 600V safety-related cables that are susceptible to damage from the use of condulets as pull points will be resolved in accordance with the Unit 2 precedent.

Discussion: The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, TVA's evaluation of this issue for Unit 2 determined that the type of conduit configurations susceptible to this problem was limited to several cases of 600 volt cables in three inch conduits. Therefore, TVA's program to identify and correct other susceptible Unit 3 conduits was satisfactory.

Complete. TVA performed an evaluation of 600 volt safety-related cables, installed in conduit, E1-28

~~

1 I

0

for damage resulting from the use of condulet fittings as pullpoints. There were six cases of jacket damage and two cases of insulation damage identified. These cables have been replaced.

References:

1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2 ~ NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues Cable Installation Issue Number 8 - Medium Voltage Vertical Cable Supports Commitment: The medium voltage vertical cable supports issue will be resolved by evaluating cables not meeting the vertical cable support criteria for static sidewall bearing pressure (SSBP). Cables with unacceptable SSBP will be Hi-Pot tested. Cables passing the Hi-Pot test will be supported in accordance with G-38. Cables failing the Hi-Pot test will be replaced.

Discussion: The action plan to disposition concerns related to cable installation issues, including cable separation, was provided in Reference 1. The Safety Evaluation on this program was provided by Reference 2. In summary, since no Unit 2 cables with acceptable sidewall bearing pressure failed Hi-Pot testing, the walkdowns and evaluation of Class 1E medium voltage cables is adequate to satisfactorily resolve the vertical support issue.

Status: Complete. TVA has analyzed safety-related medium voltage cables that were installed in vertical raceways. *Cables in three conduits exceeded the specified cable support spacing and the sidewall pressure limit. Additional supports were added and conduits/cables were replaced as required.

References:

1. TVA letter to NRC, dated May 10, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Installation Issues Including Cable Separations 2 ~ NRC letter to TVA, dated April 8, 1992, Safety Evaluation of TVA Plans to Resolve Electrical Cable Installation and Separation Issues El-29

0 4

Cable Tray Supports [TAC M80684]

TVA intends to utilize the Seismic Qualification Utility Group (SQUG) Generic Implementation Procedure (GIP) for seismic qualification of cable trays.

Discussion: The original action plan to disposition concerns related to Unit 3 cable tray supports was provided in Reference 1. However, due to the issuance of Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46, BFN submitted a revised program in order to take advantage of the NRC approved process for resolving USI A-46 (Reference 2). NRC requested additional information regarding the schedule for implementing the revised program in Reference 3.

In Reference 4, TVA committed to implement the long-term qualification of cable trays and supports prior to Unit 3 restart. In Reference 5, NRC determined that it was acceptable for TVA to complete the portion of its USI A-46 program that pertain to cable trays, including their supports, prior to Unit 3 restart.

Status: Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.

References:

1. TVA letter to NRC, dated March 27, 1991, Action Plan to Disposition Concerns Related to Units 1 and 3 Cable Tray Supports 2 ~ TVA letter to NRC, dated September 21, 1992, Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities 3 ~ NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant 4 ~ TVA letter to NRC, dated January 19, 1993, Generic Letter (GL) 87-02, Supplement 1, 120-Day Response, Request for Additional Information El-30

i ~ a

5. NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement 1 Response Browns Ferry Nuclear Plant Component and Piece Part Qualification [TAC M83828]

Commitment: TVA will implement a component and piece part qualification program.

Discussion: In Reference 1, TVA provided a change in methodology in performing the component and piece part qualification for safety-related components in 10 CFR 50.49 applications. TVA proposed to use statistical sampling techniques to achieve a 95/95 confidence level of qualification adequacy as opposed to the 100 percent verification performed for Unit 2. Additional information was requested by the NRC Staff in Reference 2, which was provided by TVA in Reference 3. In Reference 4, NRC responded that this issue would be addressed by inspection rather than a revision to the Safety Evaluation. Since this correspondence, TVA has decided to perform a 100 percent verification as performed on Unit 2.

Status: Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.

References:

1. TVA letter to NRC, dated June 12'; 1992, Request for Revision to Safety Evaluation Issued by NRC on January 10,1990, Related to Component and Piece Part Qualification Plan 2 ~ NRC letter to TVA, dated October 29, 1992, Request for Additional Information Regarding Browns Ferry Nuclear Plant Units 1 and 3 Component and Piece Parts Qualification Program 3 ~ TVA letter to NRC, dated December 17, 1992, Request for Additional Information (RAI)

Regarding BFN Units 1 and 3 Component and Piece Parts Qualification Plan 4 ~ NRC letter to TVA, dated December 7, 1993, Browns Ferry Nuclear Plant Units 1 and 3 Component and Piece Parts Qualification Program El-3 1

0

\ 4 J

Conduit Supports [TAC M80690 and R00024]

Commitment: TVA intends to utilize the Seismic Qualification Utility Group (SQUG) Generic Implementation Procedure (GIP) for seismic qualification of conduit supports.

Discussion: The original action plan to disposition concerns related to Unit 3 conduits and conduit supports was provided in References 1 through 3 and approved in Reference 4. However, due to the issuance of Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46, BFN submitted a revised program in order to take advantage of the NRC approved process for resolving USI A-46 (Reference 5). NRC requested additional information regarding the schedule for implementing the revised program in Reference 6.

In Reference 7, TVA committed to implement the long-term qualification of conduits and conduit supports prior to Unit 3 restart. In Reference 8, NRC determined that it was acceptable for TVA to complete the portion of its USI A-46 program that pertain to conduits and conduit supports, prior to Unit 3 restart in lieu of its prior restart commitments.

Status: Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.

References:

1. TVA letter to NRC, dated May 6, 1991, Program for Resolving Conduit. and Conduit Supports Issue Prior to the Restart of Units 1 and 3 2 ~ TVA letter to NRC, dated December 12, 1991, Small Bore Piping Program, Tubing, and Conduit Support Plans for Units 1 and 3 Additional Information 3 ~ TVA letter to NRC, dated January 29, 1992, Action Plan to Disposition Concerns Related to Units 1 and 3 Conduit and Conduit Support Additional Information 4 ~ NRC letter to TVA, dated March 20, 1992, Safety Evaluation of Action Plan to Resolve Conduit and Conduit Supports Issues for the Browns Ferry Nuclear Plant Units 1 and 3 El-32

8 s ~

5. TVA letter to NRC, dated September 21, 1992, Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities
6. NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant 7 ~ TVA letter to NRC, dated January 19, 1993, Generic Letter (GL) 87-02, Supplement 1, 120-Day Response, Request for Additional Information
8. NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement 1 Response Browns Ferry Nuclear Plant Configuration Management/Design Baseline fTAC M80688]

Commitment: The Unit 3 Design Baseline Verification Program (DBVP) will consolidate the two-phase (pre- and post-restart) approach performed on Unit 2.

Discussion: The objective of the DBVP was to re-establish the design basis and evaluate the plant configuration to ensure that it satisfies the design basis.

The DBVP, including a discussion of lessons learned from the Unit 2 precedent, was provided in Reference 1. In Reference 2, NRC determined that this commitment was more comprehensive than that accepted by the staff for Unit 2, and was therefore acceptable.

Status: Open. TVA will complete this item prior to restart.

References:

l. TVA letter to NRC, dated June 13, 1991, Design Baseline Verification Program (DBVP).

2 ~ NRC letter to TVA, dated November 21, 1991, Assessment of Browns Ferry Nuclear Plant, Units 1 and 3 Design Baseline Verification Program Containment Coatings The containment coating program will be implemented in accordance with the Unit 2 precedent.

E1-33

Discussion: TVA performed walkdown inspections of unqualified coating on components installed inside primary containment on Unit 2 to baseline the uncontrolled coating log. An analysis was performed to determine the maximum allowable quantity of coating debris which could be transported to the suction strainers without affecting the ability of the ECCS pumps to perform their post-Loss of Coolant Accident (LOCA) function. Corrective actions were taken to ensure that the amount of unqualified coating is maintained below the maximum allowable quantity.

On June 23, 1994, NRC issued a Notice of Violation for the misapplication of protective coatings on BFN Unit 2 suppression chamber T-quenchers (Reference 1). As part of the July 17, 1994, reply to the Notice of Violation (Reference 2), TVA committed to remove the misapplied coating from the Unit 3 T-quenchers, sample other stainless steel components within the Unit 3 primary containment, and'ake appropriate action to ensure that other similar unanalyzed coating conditions do not exist. As discussed in Reference 3, TVA identified other instances of coated stainless steel. The coating exhibited a high degree of resiliency to several removal methods. Therefore, TVA is pursuing the qualification of this coating for stainless steel applications.

Status: Complete. The containment coating program has been implemented for Unit 3.

References:

1. NRC letter to TVA, dated June 23, 1994, Notice of Violation (NRC Inspection Report 50-260/94-09) 2 ~ TVA letter to NRC, dated July 17, 1994, Reply to Notice of Violation (NOV) Regarding Inappropriate T-Quencher Coating (NRC Inspection Report 50-260/94-09) 3 ~ TVA letter to. NRC, dated November 10, 1994/

Evaluation of Epoxy Coating on Stainless Steel Components Inside the Unit 2 Suppression Chamber Control Rod Drive (CRD) Insert and lifithdrawal Piping Commitment: The seismic qualification of the CRD insert and withdrawal piping will be implemented in accordance with the Unit 2 precedent.

E1-34

Discussion: TVA's program for the seismic qualification of the 185 CRD insert and withdrawal lines on Unit 2 was provided in Reference 1 and approved by NRC in Reference 2.

Status: Complete. The Unit 3 CRD insert and withdrawal piping supports have been modified as determined by stress analyses performed on the installed piping configurations. The modifications for Unit 3 consisted of the installation of new pipe support frames rather than the modification of the original framing as was performed for the Unit 2 piping.

NRC has conducted a walkdown inspection of the Unit 3 CRD pipe support frames. The inspector concluded that the modifications were implemented in accordance with design requirements and this issue is resolved for Unit 3 restart. This is documented in Reference 3.

References:

1. TVA letter to NRC, dated December 11, 1989, Revised Program Plan Seismic Qualification of the Control Rod Drive Hydraulic (CRDH) Piping System
2. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2 Browns Ferry, Unit 2, Section 2.2.3.2 (Page 2-9) 3 ~ NRC letter to TVA, dated October 12, 1995,, NRC Inspection Report 95-52 [Section 3.4, page 5]

Design Calculations Review Commitment: The design calculations review will be implemented in accordance with the Unit 2 precedent.

Discussion: The reconciliation of the plants configuration to engineering design documents, including essential calculations, is included as part of the Design Baseline Verification Program.

Status: Refer to the section entitled Configuration Management/Design Baseline

References:

None.

E1-35

4 v ~~

Environmental Qualification [TAC M42483]

Commitment: TVA will complete the qualification of Class IE safety-related equipment.

Discussion: The qualification of Class IE safety-related equipment will be accomplished when BFN certifies compliance with 10 CFR 50.49, Environmental qualification of electric equipment important to safety for nuclear power plants.

Status: Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.

References:

None.

Fire Protection/10 CFR 50, Appendix R [TAC M48136 and M85254]

Commitment: TVA will implement a Fire Protection/10 CFR 50, Appendix R program.

Discussion: The overall action plan and schedule for the BFN Appendix R program was submitted in Reference 1.

The Appendix R Safe Shutdown Program was provided in Reference 2. Required Technical Specification changes were requested in Reference 3.

Status: Open. TVA will Implement a Fire Protection/10 CFR 50, Appendix R program prior to restart.

References:

1. TVA letter to NRC, dated July 11, 1991, Overall Action Plan and Schedule for the Appendix R Program for Unit 3 2 ~ TVA letter to NRC, dated December 15, 1992, Unit 3 Appendix R 'Program Submittal
3. TVA letter to NRC, dated September 30, 1993, TVA BFN Technical Specification (TS) No. 337, Appendix R License Amendment Flexible Conduits Commitment: Actions necessary to disposition flexible conduit concerns for the 10 CFR 50.49.equipment will be completed prior to restart. Flexible conduits E1-36

E S

attached to safety-related electrical equipment not. covered by 10 CFR 50.49 and within the scope of USI A-46 will be evaluated for seismic adequacy using the BFN A-46 program.

Discussion: The program and schedule for the resolution of flexible conduit issues for Unit 3 has been provided to the NRC as part of the resolution of Generic Letter 87-02. In Reference 1, TVA provided a schedule for flexible conduits associated with the resolution of USI A-46. NRC requested additional information regarding the schedule'in Reference 2.. In Reference 3, TVA provided the schedule for completing flexible conduit concerns in two phases. Flexible conduits attached to electrical equipment covered by 10 CFR 50.49 would be resolved prior to restart of Unit 3. Seismic qualification of flexible conduit other than those connected to electrical equipment covered by 10 CFR 50.49 (i.e., important to safety, but in a mild environment) and within the scope of USI A-46 would be included as part of the resolution of USI A-46.

In Reference 4, NRC found this program acceptable; however, additional information was requested regarding two separate issues regarding flexible conduit. TVA provided the requested information in Reference 5. Additional information was provided by TVA in Reference 6.

NRC subsequently provided a supplemental safety evaluation in Reference 7.

Status: Open. The restart portions of this issue have been completed by resolving those actions necessary for flexible conduits attached to electrical equipment covered by 10 CFR 50.49.

These flexible conduits were analyzed per the requirements of TVA General Engineering Specification G-40. Any necessary modifications were identified and have been completed.

Flexible conduits attached to safety-related electrical equipment. not covered by 10 CFR 50.49 and within the scope of USI A-46 will be evaluated as part of the resolution of USI A-46.

References:

1. TVA letter to NRC, dated September 21, 1992, Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual E1-37

Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities 2 ~ NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant 3 0 TVA letter to NRC, dated January 19, 1993, Generic Letter (GL) 87-02, Supplement 1, 120-Day Response, Request for Additional Information 4 ~ NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement 1 Response Browns Ferry Nuclear Plant

5. TVA letter to NRC, dated October 15, 1993, Generic Letter (GL) 87-02, Supplement 1, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 Response to Request for Additional Information Regarding the Evaluation of the Seismic Adequacy of Flexible Conduit
6. TVA letter to NRC, dated September 28, 1995, Browns Ferry Nuclear Plant (BFN)- Units 1, 2, and 3 Seismic Adequacy of Flexible Conduits
7. NRC letter to TVA, dated October 3, 1995, Supplemental Safety Evaluation of Flexible Conduit Seismic Design and Installation Criteria Fuses Commitment: The fuse issue will be resolved in accordance with the Unit 2 precedent.

Discussion: NRC approval of TVA's fuse program is documented in NUREG-1232 (Reference 1). The completion plan for the fuse program'was provided by Reference 2.

TVA committed to remove the reference to amperage from drawings and replace them with the appropriate unique identifier for Class 1E fuses and install permanent fuse labeling.

Status: Complete. The inspection of this issue by the NRC is documented in References 3 and 4.

References:

1. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2 Browns Ferry, Unit 2, Section 3.11.2 (Page 3-9)
2. TVA letter to NRC, dated January 29, 1992, Completion Plan for the Fuse Program El-38

t ~)'

3 ~ NRC letter to TVA, dated February 21, 1995, NRC Inspection Report 95-02 [Section 2, page 1]

4. NRC letter to TVA, dated September 29, 1995, NRC Inspection:Report 95-45 [Section 2, page 1]

Generic Letter 82 Instrumentation to Follow the Course of an Accident - Regulatory Guide 1.97 [TAC M51075]

Commitment: TVA will complete Generic Letter 82-33 Instrumentation to Follow the Course of an Accident Regulatory Guide 1.97.

Discussion: Supplement 1 to NUREG-0737, which included the request to review Regulatory Guide 1.97, was sent to TVA in Reference 1. TVA originally responded to Generic Letter 82-33 in Reference 2.

TVA was ordered to submit a report to NRC describing how the requirements of Supplement 1 to NUREG-0737 have been or will be met and an implementation schedule (Reference 3).

NRC requested additional information and/or justification in Reference 4. TVA responded to this request in Reference 5. TVA provided updated information regarding Reactor Coolant System pressure indication in Reference 6.

A Safety Evaluation Report (SER) was issued by NRC in Reference 7. As part of this SER, TVA was directed to qualify the instrumentation that measures seven variables in accordance with 10 CFR 50.49. TVA either provided additional justification or committed to upgrade the instrumentation discussed in the SER in Reference 8. A revised SER was issued as part of the NRC's February 8, 1990 letter (Reference 9).

This revised SER also directed TVA to install a qualified neutron monitoring system. In Reference 10, TVA requested further BFN specific actions regarding the neutron flux monitoring instrumentation be deferred pending the resolution of the BUR Owners'roup appeal.

In Reference 11, TVA identified previously submitted deviation to Regulatory Guide 1.97 for which NRC review was still required, addressed discrepancies between TVA letters and NRC SERs, and identified new deviations for NRC review.

Additional information regarding emergency damper position indication was provided by TVA in Reference 12. The deviations addressed above were addressed in the NRC's May 10, 1991 SER

(Reference 13). In addition, implementation of qualified neutron flux monitoring capability was deferred pending review of an appeal by the BWR Owners Group.

A revised SER regarding neutron flux monitoring instrumentation was issued in Reference 14.

TVA's review of the BFN neutron flux monitoring instrumentation against the criteria referenced by the SER was provided in References 15 and 16.

NRC acceptance of the deviation requested by TVA was documented in the May 3, 1994 SER (Reference 17) .

Status: Complete. NRC has reviewed drawings, calculations, design criteria, and the Unit 3 Regulatory Guide 1.97 Compliance Report. In addition, walkd'owns of selected instrumentation was performed. Based on the results, NRC concluded that the Unit 3 Regulatory Guide 1.97 program.was being adequately implemented. This is documented in Reference 18.

References:

1. NRC letter to All Licensees of Operating Reactors, Applicants for Operating Licenses, and Holders of Construction Permits, dated December 17, 1982, Supplement 1 to NUREG-0737 Requirements for Emergency Response Capability (Generic Letter 82-33) 2 ~ TVA letter to NRC, dated April 30, 1984, in regards to Generic Letter 82-33
3. NRC letter to TVA, dated June 12, 1984, Issuance of Orders Confirming Licensee Commitments on Emergency Response Capability 4 ~ NRC letter to TVA, dated January 23, 1985, Emergency Response Capability Conformance to R.G. 1.97, Rev. 2
5. TVA letter to NRC, dated May 7, 1985, in regards to conformance with Regulatory Guide 1.97
6. TVA letter to NRC, dated November 20, 1985, in regards to conformance with Regulatory Guide 1.97 7 ~ NRC letter to TVA, date June 23, 1988, Generic Letter 82-33, Request for Compliance with the Guidelines of Regulatory Guide (R.G.) 1.97 as Applied to Emergency Response Facilities
8. TVA letter to NRC, dated August 23, 1988, Response to NRC's Safety Evaluation Report on E1-40

r

~ I

Regulatory Guide'1.97 as Applied to Emergency Response Facilities Dated June 23, 1988

9. NRC letter to TVA, dated February 8, 1990, Emergency Response Capability Conformance to Regulatory Guide 1.97. Revision 3
10. TVA letter to NRC, dated September 14, 1990, Response to NRC's February 8, 1990 Safety Evaluation Report Regarding Conformance to Regulatory Guide 1.97, Revision 3 Neutron Flux Monitoring Instrumentation TVA letter to NRC, dated October 15, 1990, Response to NRC Supplemental Safety Evaluation Report (SER) on Regulatory Guide (RG) 1.97 Compliance dated February 8, 1990.
12. TVA letter to NRC, dated December 21, 1990, Regulatory Guide (RG) 1.97 Emergency Ventilation Dampers Position Indication
13. NRC letter to TVA, dated May 10, 1991, Safety Evaluation of Emergency Response Capability Conformance to Regulatory Guide 1.97, Revision 3
14. NRC letter to TVA, dated May 27, 1993, Regulatory Guide 1.97 Boiling Water Reactor Neutron Flux Monitoring
15. TVA letter to NRC, dated July 30, 1993, Regulatory Guide 1.97 Boiling Water Reactor Neutron Flux Monitoring
16. TVA letter to NRC, dated March 10, 1994, Regulatory Guide 1.97 Boiling Water Reactor Neutron Flux Monitoring
17. NRC letter to TVA, dated May 3, 1994, Boiling Water Reactor Neutron Flux Monitoring for the Browns Ferry Nuclear Plant
18. NRC letter to TVA, dated August 25, 1995, NRC Inspection Report 95-39 [Summary Results, Enclosure page 1]

Generic Letter 83-28 << Salem ATWS, Item 1.2, Post Trip Review (Data and Information Capability) [TAC M53573]

Commitment: TVA will complete Generic Letter 83-28 Salem ATWS, Item 1.2.

i

~ " I

.(

Discussion: In response to Generic Letter 83-28, Item 1.2, TVA committed in Reference 1 to the installation of an upgraded process computer and an enhanced sequence of events recording capability. TVA's response was found to be acceptable in the NRC's Safety Evaluation provided by Reference 2. As discussed in Reference 3, the discussed equipment has been replaced with more modern and sophisticated hardware, since the time of the original TVA submittal. The previously described upgrade to a Digital VAX 11/750 process computer system was accomplished using a Digital VAX 6000 system. The functions previously performed by the sequence of events and time history recorder are now accomplished using the process computer system. However, the guidance contained in the Generic Letter and the requirements of the Safety Evaluation continue to be met.

Status: Complete. TVA has installed an upgraded process computer system which provides an enhanced sequence of evens recording capability.

References:

1. TVA letter to NRC, dated November 7, 1983, in regards to Generic Letter 83-28 2 ~ NRC letter to TVA, dated June 12, 1985, Safety Evaluation for Generic Letter 83-28, Item 1.2, Post Trip Review (Data and Information Capability)
3. TVA letter to NRC, dated November 9, 1993, Completion of Unit 2 Commitment for Generic Letter 83-28, Item 1.2 Post-Trip Review Data and Information Capability (GSI 75 / MPA B-085)

Generic Letter 83-28 - Salem ATWS, Item 4.5.2, Periodic On-Line Testing [TAC M53966]

Commitment: TVA will complete Generic Letter 83-28 Salem ATWS, Item 4.5.2.

Discussion: The NRC's position on this item was that plants not currently designed to permit periodic on-line testing shall justify not making modifications to permit such testing. Alternatives to on-line testing proposed by licensees will be considered where special circumstances exist and where the objective of high reliability can be met in another way. TVA's initial response to this item (Reference 1), stated that online testing was being evaluated. A description of the Reactor Protection System (RPS) functional testing and

'I 0

reliability was provided by TVA in Reference 2.

The NRC Safety Evaluation states the on-line testing capability of the BFN RPS meets the intent of this item and is therefore acceptable (Reference 3).

Status: Complete.

References:

1. TVA letter to NRC, dated November 7, 1983, in regards to Generic Letter 83-28 2 ~ TVA letter to NRC, dated March 15, 1984, in regards to Generic Letter 83-28 3 ~ NRC letter to TVA, dated September 2, 1986, Reactor Trip System Reliability, On-Line Testing, Generic Letter 83-28, Item 4.5.2 Generic Letter 83 Salem ATWS, Item 4.5.3, Intervals for On-Line Testing fTAC M53966]

Commitment: TVA will complete Generic Letter 83-28 Salem ATWS, Item 4.5.3.

Discussion: The NRC Staff has reviewed the General Electric Topical Reports NEDC-30844, BWR (BWROG) Response to NRC Generic Owners'roup Letter 83-28, Item 4.5.3, and NEDC-30851Pg Technical Specifications Improvement Analysis for BWR Reactor Protection System, and issued a favorable Safety Evaluation Report (Reference 1).

In Reference 2, TVA endorsed the BWROG position and stated the analysis presented in NEDC-30851P were applicable to BFN. No Technical Specification instrument calibration frequency extensions were requested based on these reports.

Differences between the parts of the BFN Reactor Protection System (RPS) that perform the trip functions and those of the base case plant were analyzed using the procedures of Appendix K of NEDC-30851P to demonstrate no appreciable change in RPS availability or public risk. The Safety Evaluation that closed this item was provided by Reference 3.

Status: Complete. TVA evaluated the BFN RPS and determined it was in conformance with the requirements contained in NEDC 30844A.

References:

1. NRC letter to BWR Owners Group, dated July 15, 1987, General Electric Company (GE)

Topical Reports NEDC-30844, "BWR Owners'1-43

Group Response to NRC Generic Letter 83-28," and NEDC 30851PI Technical Specifications Improvement Analysis for BWR RPS"

2. TVA letter to NRC, dated July 5, 1990, Generic Letter 83-28, Required Actions Based on Generic Implications of Salem ATWS Events, Item 4.5.3, Reactor Trip System Reliability
3. NRC letter to TVA, dated-August 17, 1990, Safety Evaluation of Generic Letter 83-28, Item 4.5.3, Reactor Trip Reliability On-Line Functional Testing of the Reactor Trip System Generic Letter 83-36 - NUREG-0737 Technical Specifications Commitment: TVA will complete Generic Letter 83-36.

Discussion: Generic Letter 83-36 (Reference 1), dated November 1, 1983, requested Licensees implement Technical Specification changes resulting from the reviews of the Three Mile Island incident.

The status of each item is referenced below:

~ Reactor Coolant System Vents (II.B.1)

The Generic Letter states that there are no changes required in Technical Specification requirements for BWRs that do not have isolation condensers. BFN does not have isolation condensers. Thus the item is considered closed.

~ Post-accident Sampling System (II.B.3)

The changes for the Post-Accident Sampling System were proposed by TVA letter, dated April 1, 1992 (Technical Specification No. 302). These changes were approved as Amendment 180 on June 21, 1994. Thus the item is considered closed.

~ Noble Gas Effluent Monitors (II.F.1.1)

Technical Specification No. 313 proposed the changes associated with the Noble Gas Effluent Monitor on October 7, 1993. These changes were approved in Amendment 187, dated December 21, 1994. Thus the item is considered closed.

~

Sampling and Analysis of Plant Effluents (II.F.1.2)

E1-44

0

~ r

Amendment No. 171, which was approved by NRC on August 22, 1989, removed the monitoring of iodides and particulates from the Unit 2 Technical Specifications. Iodines and particulates are now measured by onsite laboratory analysis of particulate and carbon filters installed in the continuous flow effluent sample line. This amendment found these provisions to be in compliance with the requirements of Item ZI.F.2 and Regulatory Guide 1.97. Thus the item is considered closed.

~ Containment High-Radiation Monitor (II'.1.3)

Technical Specification No. 313, dated October 7, 1993 proposed the addition of two drywell radiation monitors changes. These changes were approved in Amendment 187, dated December 21, 1994. Thus the item is considered closed.

~ Containment Pressure Monitor (II.F.1.4)

Amendment No. 78, which was approved by NRC on August 27, 1984, referenced this TMI Action Item and stated that the operability and surveillance requirements on the new Unit 3 monitoring system are acceptable.

Thus the item is considered closed.

~ Containment Water Level Monitor (II.F.1.5)

Amendment No. 78, which was approved by NRC on August 27, 1984, referenced this TMI Action Item and stated that the operability and surveillance requirements on the new monitoring system are acceptable for Unit 3.

Thus the item is considered closed.

~ Containment Hydrogen Monitor (II.F.1.6)

TVA letter, dated March 7, 1984, stated that Browns Ferry Units 1, 2, and 3 had adequate technical specifications on the containment hydrogen monitors. Thus the item is considered closed.

~ Control Room Habitability Requirements (III.D.3.4)"

TVA letter, dated March 7, 1984, stated that Table 3.2.G of the Technical Specifications listed the control room isolation E1-45

instrumentationg therefore, no revisions were required. Thus the item is considered closed.

Status: Complete. As discussed above for each specific item, TVA has completed the NUREG-0737 Technical Specifications changes associated with Generic Letter 83-36.

References:

1. NRC letter to All Boiling Water Reactor Licensees, dated November 1, 1983, NUREG-0737 Technical Specifications (Generic Letter No. 83-36)

Generic Letter 88-01 - NRC Position on ZGSCC in BWR Austenitic Stainless Steel Piping fTAC M85296]

Commitment: TVA will complete Generic Letter 88-01 NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.

Discussion: TVA's program to address Generic Letter 88-01 was provided by Reference 1. The Safety Evaluation documenting the acceptability of the program was included in Reference 2.

Status: Complete. In order to reduce the potential for Intergranular Stress Corrosion Cracking (IGSCC),

TVA has performed Nondestructive Examination (NDE), repair, stress improvement, and pipe replacement on Unit 3.

NRC has reviewed TVA's actions regarding Generic Letter 88-01. Based on this review, no IGSCC issues were found that would negatively impact Unit 3 restart. This is documented in Reference 4.

References:

1. TVA letter to NRC, dated December 28, 1992, Supplemental Response to Generic Letter (GL) 88-01, NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping NRC letter to TVA, dated December 3, 1993, Safety Evaluation of Supplemental Response to Generic Letter 88-01 3 TVA letter to NRC, dated November 25, 1992, Browns Ferry Nuclear Plant (BFN) - Request for

~

NRC Approval of Alternate Methods for the Reactor Water Cleanup (RWCU) and Residual Heat Removal E1-46

(RHR) Inservice Inspections Required by Generic Letter 88-01

4. NRC letter to TVA, dated August 30, 1995, NRC Inspection Report 95-44 [Section 3.b., page 6]

Generic Letter 88 Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations fTAC M71469]

Commitment: TVA will complete Generic Letter 88-11 Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations.

Discussion: TVA responded to Generic Letter 88-11 in Reference 1. TVA concluded that the current pressure-temperature curves in each plant's Technical Specifications were valid through the next two fuel cycles when compared to the Regulatory Guide 1.99, Revision 2, methodology.

Supplemental information was provided for BFN in References 2 and 3.

In Reference 4, TVA proposed Technical Specification changes to incorporate pressure-temperature curves calculated using Regulatory Guide 1.99, Revision 2, methodology.

NRC requested additional information in Reference 5, which was provided by TVA in Reference 6. The proposed Technical Specifications were issued by Reference 7.

Status: Complete.

References:

l. TVA letter to NRC, dated November 30, 1988, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN) Response to Generic Letter 88-11 NRC Position on Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations 2 ~ TVA letter to NRC, dated February 28, 1991, TVA Supplemental Response to Generic Letter 88-11, NRC Position of Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations 3 ~ TVA letter to NRC, dated April 30, 1991, TVA Supplemental Response to Generic Letter 88-11, NRC Position of, Radiation Embrittlement of Reactor Vessel Materials and its Impact on Plant Operations El-47

0 k,l

4 ~ TVA letter to NRC, dated July 19, 1991, TVA BFN Technical Specification (TS) No. 293-

5. NRC letter to TVA, dated August 28, 1991, Pressure-Temperature Limits Pursuant to Generic Letter 88-11 as Reflected in Proposed Amendment to Technical Specification (TS 293)
6. TVA letter to NRC, dated October 24, 1991, TVA BFN Technical Specification (TS) No. 293 Radiation Embrittlement of Reactor Vessel Material and its Impact on Plant Operations Response to Request for Additional Information 7 ~ NRC letter to TVA, dated January 8, 1993, Issuance of Amendments for the Browns Ferry Nuclear Plant (TS 293)

Generic Letter 88-14 - Instrument Air Supply System Problems Affecting Safety-Related Equipment [TAC M71633]

Commitment: TVA will complete Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment.

Discussion:

~ ~

The original response to Generic Letter 88-14 was included as part of Reference 1. Additional information regarding the dew point of air being supplied to certain components was provided in Reference 2.

Status: Open. TVA will complete this item prior to restart.

References:

1. TVA letter to NRC, dated February 23, 1989, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN) Response to Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment 2 ~ TVA letter to NRC, dated July 30, 1993, Supplemental Response to Generic Letter (GL) 88-14, Instrument Air Supply System Problems Affecting Safety-Related Equipment Generic Letter 88>>20 - Initiation of the Individual Plant Examination for Severe Accident Vulnerahilities [TAC M74385]

Commitment: TVA committed to complete a Level 1 Probabilistic Risk Assessment (PRA) and containment analysis, E1-48

in accordance with the requirements of Generic Letter 88-20, and submit the results by September 1, 1992.

Discussion: In Reference 1, the NRC staff requested all licensees perform an Individual Plant Examination (IPE) for severe accident vulnerabilities. TVA responded to this request in Reference 2. The IPE for BFN was forwarded to NRC on September 1, 1992 (Reference 3), as requested by Generic Letter 88-20. NRC requests for additional information were issued in References 4 and 6. TVA's responses were provided by References 5 and 7. The NRC Safety Evaluation for the BFN IPE was issued by Reference 8. Responses to the open items were provided in Reference 9.

Status: Complete.

References:

1. NRC letter to All Licensees, dated November 23, 1988, Individual Plant Examination for Severe Accident Vulnerabilities 10 CFR 50.54(f) 2 ~ TVA letter to NRC, dated October 30, 1989, Proposed Program in Response to Generic Letter 88-20 Individual Plant Examination (IPE) for Severe Accident Vulnerabilities 3 ~ TVA letter to NRC, dated September 1, 1992, Response to Generic Letter 88-20, Individual Plant Examination for Severe Accident Vulnerabilities 4 ~ NRC letter to TVA, dated August 4, 1993, Request for Additional Information Regarding the Browns Ferry Unit 2 Individual Plant Examination
5. TVA letter to NRC, dated September 21, 1993, Response to Request for Additional Information Regarding the Individual Plant Examination (IPE)
6. NRC letter to TVA, dated November 19, 1993, Request for Additional Information Regarding the Browns Ferry Unit 2 Individual Plant Examination 7 ~ TVA letter to NRC, dated December 23, 1993, Response to Request for Additional Information Regarding the Individual Plant Examination (IPE)
8. NRC letter to TVA, dated September 28, 1994, Individual Plant Examination Submittal for Internal Events E1-49

L;g

9. TVA letter to NRC, dated April 14, 1995, Multi-Unit Probabilistic Risk Assessment (PRA)

Generic Letter 88-20, Supplement 4 - Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities

[TAC M835977 Commitment: TVA will complete an Individual Plant Examination of External Events (IPEEE)

Discussion: In Reference 1, TVA described the BFN program and schedule for completing the internal fires, high winds, external floods, and transportation and nearby facility accidents portions of the IPEEE.

TVA committed to:

1. Complete the internal fires IPEEE and provide a summary report to NRC within one hundred twenty days after the restart of Unit 3 from its first refueling outage following restart.
2. Complete the high winds, external floods, and transportation and nearby facility accidents IPEEE for all three units and provide a summary report to NRC within one hundred twenty days after the restart of Unit 2 from the Cycle 7 refueling outage.

NRC acceptance of the methods and schedules for the addressed portions of the IPEEE was documented in Reference 2. Due', in part, to a request from NRC to expand the scope of the multi-unit Probabilistic Risk Assessment submittal, TVA rescheduled the portions of the IPEEE discussed in Item 2, above, to June 26, 1995 (Reference. 6). This revised date was discussed with the NRC's Project Manager.

TVA provided its initial program and schedule for responding to the seismic portion of the IPEEE in Reference 3. NRC requested additional information on this subject in Reference 4, which TVA provided. in Reference 5.

The summary report for the high winds, external floods, and transportation and nearby facility accidents IPEEE was provided by TVA in Reference 7.

Status: Open. The seismic portion of the IPEEE will be submitted by March 19, 1996. TVA will complete the internal fires IPEEE and provide a summary El-50

report to NRC within one hundred twenty days from its first refueling outage following restart.

References:

1. TVA letter to NRC, dated December 20, 1991, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities (Generic Letter 88-20, Supplement 4) 2 ~ NRC letter to TVA, dated July 2, 1992, Review of Response to Generic Letter 88-20, Supplement No. 4 Individual Plant Examinations for External Events
3. TVA letter to NRC, dated September 21, 1992, Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities 4 ~ NRC letter to TVA, dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response
5. TVA letter to NRC, dated January 19, 1993, Generic Letter (GL) 87-02, Supplement 1, 120-Day Response, Request for Additional Information
6. TVA letter to NRC, dated January 19, 1995, Schedule for Submittal of the Expanded (Multi-Unit) Probabilistic Risk Assessment (PRA) and Portions of the Individual Plant Examination of External Events (IPEEE) 7 ~ TVA letter to NRC, dated July 24, 1995, Browns Ferry Nuclear Plant Generic Letter 88-20, Supplement 4, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities Partial Submittal of Report Generic Letter 89-06 - Safety Parameter Display System

[TAC M51225 and M73636]

Commitment: TVA will install and make operational a Safety Parameter Display System (SPDS) and certify that the SPDS fully meets the requirements of NUREG-0737, Supplement 1, taking into account the information provided in NUREG-1342.

Discussion:

~ ~

Certification that the BFN SPDS fully meets the requirements of NUREG-0737, Supplement 1, taking

0 into account the information provided in NUREG-1342, was requested by Generic Letter 89-06 (Reference 1). TVA's commitment to implement an SPDS on Unit 2 before restart is contained in Reference 2. The final design description for the SPDS was provided by TVA in References 3 and 4. The initial Safety Evaluation Report (SER) of the SPDS design description was documented in Reference 5. TVA responded to the SER open items in Reference 6.

NRC concluded in a Supplemental SER that TVA's SPDS design description fully met the requirements of NUREG-0737, Supplement 1 (Reference 7) .

Status: Open. The SPDS is fully functional. In accordance with Generic Letter 89-06, TVA will certify its compliance with the requirements of NUREG-0737, Supplement 1, within two months after the SPDS is declared fully operational.

TVA will evaluate the performance of the SPDS and the new process computer during the power ascension test program and for a few weeks during normal operation. Pending the successful demonstration of the SPDS and process computer, TVA intends to declare the SPDS fully operational. This includes evaluating and certifying its compliance with the requirements of NUREG-0737, Supplement 1. TVA is committed to provide this certification within two months after the SPDS is declared fully operational.

The certification includes completion of the Generic Letter 89-06 SPDS Certification Checklist, control room overview and workstation photographs, and color screen prints of the SPDS display screens.

References:

1. NRC letter to All Licensees of Operating Plants, Applicants for Operating Licenses and Holders of Construction Permits, dated April 12, 1989, Task Action Plan Item I.D.2 Safety Parameter Display System 10 CFR $ 50.54(f) (Generic Letter No. 89-06) 2 ~ TVA letter to NRC, dated April 7, 1987, Safety Parameter Display System (SPDS) Schedule for Response to Request for Additional Information 3 ~ TVA letter to NRC, dated October 22, 1990, Notification of Implementation of NUREG-0737 (TMI Action Plan), Item I.D.2.1, Safety Parameter Display System (SPDS), Phase I Installation and Final Design Description E1-52

4 ~ TVA letter'to NRC, dated December 11, 1990, Notification of Implementation of NUREG-0737 (TMI Action Plan), Item I.D.2.1, Safety Parameter Display System (SPDS), Final Design Description

5. NRC letter to TVA, dated March 6, 1991, Interim and Final Design of the Safety Parameter Display System at the Browns Ferry Nuclear Plant
6. TVA letter to NRC, dated December 17, 1991, Safety Parameter Display System (SPDS), Response.

to NRC Safety Evaluation Report (SER) Open Items 7 ~ NRC letter to TVA, dated February 5, 1992, Safety Parameter Display System Browns Ferry Nuclear Plant, Units 1, 2, and 3)

Generic Letter 89-08 - Erosion/Corrosion-Induced Pipe Wall Thinning [TAC M734597 Commitment: TVA will complete Generic Letter 89-08 Erosion/Corrosion-Induced Pipe Wall Thinning Discussion: TVA responded to Generic Letter 89-08 in Reference 1 and committed to implement a long-term monitoring program (single and dual phase piping).

Status: Complete. Plant instructions for Unit 3 have been prepared and implemented for the dual phase and single phase flow monitoring requirements for Unit 3. These instructions require pipe wall thickness measurements each outage at established monitoring locations. They also provide direction on trending of data as well as engineering review for any necessary corrective action. The monitoring points were selected using the EPRI CHECWORKS program: The inspections in accordance with the instructions have been completed for Unit 3. Inspected components were either acceptable or maintenance was completed.

NRC has reviewed documentation to evaluate the Flow Accelerated Corrosion (FAC) program. Based on this review, NRC concluded that the erosion/corrosion program is acceptable for restart of Unit 3. This is documented in Reference 2.

References:

1. TVA letter to NRC, dated July 19, 1989, Response to Generic Letter 89-08 Erosion/Corrosion-Induced Pipe Wall Thinning E1-53
2. NRC letter to TVA, dated September 8, 1995, NRC Inspection Report 95-41 [Section 3, page 5]

Generic Letter 89-10 Safety-Related Motor-Operated Valve Testing and Surveillance [TAC M75637]

Commitment: TVA will complete Generic Letter 89-10 Safety-Related Motor-Operated Valve Testing and Surveillance.

Discussion: TVA responded to Generic Letter 89-10 in Reference 1 and committed to implement a comprehensive motor operated valve program within the requested 5-year implementation schedule.

Additional schedule information was provided by NRC in Reference 2. TVA provided the 30-day response to Generic Letter 89-10, Supplement 3 by Reference 3 and informed the Staff that the plant specific safety assessment was available for review. TVA also responded to Reference 2 and informed the Staff in Reference 4 that the program description for implementing Generic Letter 89-10 was also available for review.

The 120-day response requested in Supplement 3 to the Generic Letter was provided by TVA in Reference 5. It states that no deficiencies were identified in the motor-operated valves for primary containment isolation for the High Pressure Coolant Injection and Reactor Core Isolation Cooling steam supply lines or the Reactor Water Cleanup water supply line.

In Reference 6, TVA clarified the implementation schedule for Unit 3. Based on test requirements and system configurations, it would be necessary to perform differential pressure testing on some motor operated valves during the power ascension test program. Consequently, TVA committed to complete the required testing within 30 days following the completion of the power ascension test program. This implementation schedule was acknowledged by the NRC Staff in Reference 7.

Status: Open. The majority of the motor operated valves have been successfully tested. Two HPCI valves remain to be tested during the power ascension testing.

TVA letter to NRC, dated December 21, 1989, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN) Response to Generic Letter 89-10

t r Safety-Related Motor-Operated Valve (MOV) Testing and Surveillance 2 ~ NRC letter to TVA, dated September 14, 1990, Response to Generic Letter 89-10. "Safety-Related Motor-Operated Valve Testing and Surveillance" for the Browns Ferry, Sequoyah, Watts Bar and Bellefonte Nuclear Plants (MPA B-110) 3 ~ TVA letter to NRC, dated December 10, 1990, Response to Generic Letter (GL) 89-10, Supplement 3 "Consideration of the Results of NRC-Sponsored Tests of Motor-Operated Valves" (MOV) 4 ~ TVA letter to NRC, dated December 21, 1990, Response to Generic Letter 89-10. "Safety-Related Motor-Operated Valve Testing and Surveillance"

5. TVA letter to NRC, dated March 31, 1991, Response to Generic Letter (GL) 89-10, Supplement 3 "Consideration of the Results of NRC-Sponsored Tests of Motor-Operated Valves" (MOV)
6. TVA letter to NRC, dated April 14, 1992, Generic Letter (GL) 89-10, "Safety-Related Motor-Operated Valve Testing and Surveillance" Implementation Schedule 7 ~ NRC letter to TVA, dated June 30, 1992, Implementation Schedule for Generic Letter 89-10 Generic Letter 89-13 - Servi.ce Water Systems Problems Affecting Safety-Related Equipment [TAC M73972]

Commitment: TVA will complete Generic Letter 89-13 Service Water Systems Problems Affecting Safety-Related Equipment.

Discussion: TVA responded to Generic Letter 89-13 in Reference 1. Three of the near-term commitments were rescheduled in Reference 2. NRC was notified of the completion of the majority of the commitments made in response to Generic Letter 89-13 in Reference 3. The remaining commitment on Unit 3 was to verify that portions of the Residual Heat Removal Service Water (RHRSW) and Emergency Equipment Cooling Water (EECW) systems satisfied their design criteria.

Status: Complete. The RHRSW and EECW systems have been verified to meet their design criteria.

Engineering has verified that both systems can E1-55

~ h h ~

s h ~

perform their intended function as stated in the Updated Final Safety Analysis Report.

References:

l. TVA letter to NRC, dated March 16, 1990, Response to Generic Letter (GL) 89-13 Service Water System Problems Affecting Safety-Related Equipment 2 ~ TVA letter to NRC, dated December 31, 1990, Generic Letter (GL) 89-13, Service Water System Problems Affecting Safety-Related Equipment 3 ~ TVA letter to NRC, dated August 17, 1995, Browns Ferry Nuclear Plant (BFN) Response to Generic Letter (GL) 89-13 Service Water System (SWS)

Problems Affecting Safety-Related Equipment Generic Letter 89-16 Installation of a Hardened Wetwell Vent

[TAC M74860]

Commitment: TVA will complete Generic Letter 89-16 Installation of a Hardened Wetwell Vent.

Discussion: In Reference 1, NRC requested Licensees with Mark I containments voluntarily install a hardened vent. In response, TVA committed to install a hardened vent prior to restart in Reference 2.

Status: Complete. TVA has installed the Hardened Wetwell Vent in Unit 3 as recommended by Generic Letter 89-16.

References:

1. NRC letter to All Operating Licensees with Mark I Containments, dated September 1, 1989, Installation of a Hardened Wetwell Vent (Generic Letter 89-16) 2 ~ TVA letter to NRC, dated October 30, 1989, Response to Generic Letter 89-16 "Installation of Hardened Wetwell Vent" Generic Letter 89 Request for Action Related to Resolution of Unresolved Safety Issue A-47, "Safety Implication of Control Systems in LWR Nuclear Power Plants" [TAC M74917]

Commitment: TVA will complete Generic Letter 89-19 Request for Action Related to Resolution of Unresolved Safety Issue A-47, "Safety Implication of Control Systems in LWR Nuclear Power Plants".

E1-56

a' Discussion: TVA responded to Generic Letter 89-19 in Reference 1. A revised response was provided in Reference 2 and TVA committed to finalize the engineering calculations that forms the basis for the high vessel feedwater level switches setpoint. A request for additional information regarding TVA's conformance to the generic BWR Owners'roup response was issued by NRC in Reference 3. In Reference 4, TVA stated that BFN was bounded by the BWR Owners'roup response and requested Generic Letter 89-19 be closed.

Status: Complete. The engineering calculation for the high vessel feedwater level switches setpoint has been completed and BFN is bounded by the BWR Owners'roup response.

NRC has reviewed TVA's August 29, 1994 reply and agrees that the inclusion of the reactor vessel overfill protection system is not required for BFN Units 1, 2, and 3. This is documented in Reference 5.

References:

1. TVA letter to NRC, dated May 4, 1990, Response to Generic Letter 89-19 Request for Action Related to Resolution of Unresolved Safety Issue A-47, "Safety Implication of Control Systems in LWR Nuclear Power Plants" 2 ~ TVA letter to NRC, dated August 17, 1990, Revised Response to Generic Letter (GL) 89-19 Request for Action Related to Resolution of Unresolved Safety Issue A-47 "Safety Implication of Control Systems in LWR Nuclear Power Plants" and Notification of Commitment Completion 3 ~ NRC letter to TVA, dated June 28, 1994, Request for Additional Information Regarding Generic Letter 89-19, "Safety Implication of Control Systems in LWR Nuclear Power Plants" 4 ~ TVA letter to NRC, dated August 29, 1994, Reply to NRC Request for Additional Information Regarding Generic Letter (GL) 89-19
5. NRC letter to TVA, dated September 21, 1994, Response to Generic Letter 89-19 Safety Implications of Control Systems Browns Ferry Nuclear Plant Units 1, 2, and 3 E1-57

l Generic Letter 91-06 - Resolution of Generic Issue A-30, "Adequacy of Safety-Related DC Power Supplies" Commitment: TVA will add procedures to provide for reading the bus (250V DC unit and shutdown board batteries, and 125V DC diesel generator batteries) voltmeters and battery ammeters daily.

In addition( TVA will provide response procedures for the associated alarms and indications.

Discussion: TVA responded to Generic Letter 91-06 in Reference 1.

Status: Complete. TVA clarified its commitments and notified NRC that the commitments were completed in Reference 2.

References:

1. TVA letter to NRC, dated October 28, 1991, Response to Generic Letter 91-06, Resolution of Generic Issue (GI) A-30, Adequacy of Safety-Related DC Power Supplies 2 ~ TVA letter to NRC, dated May 27, 1992, Supplemental Response to Generic Letter (GL) 91-06, Resolution of Generic I Issue (GI) A-30, Adequacy of Safety-Related DC Power. Supplies Generic Letter 91 Resolution of Generic Issues 48, "LCOs for Class 1E Vital Instrument Buses," and 49, "Interlocks and LCOs for Class 1E Tie Breakers" Commitment: None.

Discussion: TVA responded to Generic Letter 91-11 in Reference 1.

Status: Complete. TVA concluded that the existing controls for Class 1E tie-breakers are sufficient to resolve the identified concerns.

References:

1. TVA letter to NRC, dated April 30, 1992, Generic Letter (GL) 91-11, Resolution of Generic Issues (GIs) 48, "LCOs for Class 1E Vital Instrument Buses," and 49, "Interlocks and LCOs for Class 1E Tie Breakers" E1-58

0 G eneric Letter 92 Reactor Vessel Structural Integrity, Revision 1, ance Revision 1 Supplement 1 [TAC M83440 and H92651]

Commitment: TVA will submit a summary evaluation of the time and accumulated fluence during intervals of BFN operation below 525'F and its effect on the reference temperature and on the Charpy upper shelf energy.

Discussion: TVA provided an initial response to Generic Letter 92-01 in Reference 1 and made the commitment reiterated above. The summary evaluation of the time and accumulated fluence during intervals of BFN operation below 5254F was provided by TVA in Reference 2. Additional information was requested by the NRC Staff in Reference 3, which was provided by TVA in Reference 4.

In Reference 5, NRC requested TVA verify the data entered into the Reactor Vessel Integrity Database. TVA responded to this request in References 6 and 7. Updated material and fluence data was provided by TVA in Reference 8.

Status: Complete. In Reference 9, NRC requested Licensees verify the completeness of the information previously submitted by November 15, 1995. TVA's response was provided in Reference 10.

References:

1 ~ TVA letter to NRC, dated July 7, 1992, Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar Nuclear Plant (WBN)

Response to generic Letter 92-01 (Reactor Vessel Structural Integrity) 2 ~ TVA letter to NRC, dated December 1, 1992, Completion of Commitment Made in Response to Generic Letter 92-01, "Reactor Vessel Structural Integrity" 3 ~ NRC letter to TVA, dated May 27, 1993, Request for Additional Information Regarding TVA Response to Generic Letter 92-01, Revision 1, "Reactor Vessel Structural Integrity"

4. TVA letter to NRC, dated August 2, 1993, Response to Request for Additional Information, Generic Letter 92-01, Revision 1
5. NRC letter to TVA, dated April 19, 1994, Generic Letter 92-01, Revision 1, "Reactor Vessel Structural Integrity" E1-59

0 t

~ a

6. TVA letter to NRC, dated May 23, 1994, TVA's Response to NRC's Letter Dated April 19, 1994, Generic Letter 92-01, Revision 1, "Reactor Vessel Structural Integrity" 7 ~ TVA letter to NRC, dated July 28, 1994, Supplemental Response to TVA letter Dated May 23, 1994, Generic Letter 92-01, Revision 1, "Reactor Vessel Structural Integrity"
8. TVA letter to NRC, dated March 27, 1995, Generic Letter 92-01, Reactor Vessel Structural Integrity, Update to the Initial Reference Nil-Ductility Temperature (RTN ~), Chemical Composition and Fluence Values
9. NRC letter to TVA, dated May 19, 1995, Reactor Vessel Structural Integrity
10. TVA letter to NRC, dated November 7, 1995/

Response to NRC Generic Letter (GL) 92-01, Revision 1; Supplement 1i Reactor Vessel Structural Integrity Browns Ferry (BFN), Watts Bar (WBN), and Sequoyah (SQN) Nuclear Plants (TAC Nos ~ M92649g M92650i M92651g M92730i M92731i M83525, and M83526)

Generic Letter 92 Resolution of the Issues Related to Reactor Vessel Mater Level Instrumentation in BMRs [TAC M84271]

Commitment: TVA will continue to support the BWR (BWROG) program of analysis, testing, and Owners'roup development of possible hardware changes which is being conducted by the BWROG.

TVA will review the results of the BWROG program for potential training requirements for operators.

Discussion: TVA responded to Generic Letter 92-04 by Reference 1. Resolution of the water level instrumentation issue was addressed as part of the previous item entitled Bulletin 93-03 Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs. NRC approval of TVA's program for the resolution of Generic Letter 92-04 is documented in Reference 2.

Status: Refer to the previous item entitled Bulletin 93-03 Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs E1-60

0 0

I 6 Z

References:

1. TVA letter to NRC, dated September 28, 1992, Response to Generic Letter (GL) 92-04 Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in BWRs 2 ~ NRC letter to TVA, dated March 25, 1993, Response to Generic Letter 92-04, Resolution of the Issues Related to Reactor Vessel Water Level Instrumentation in Boiling Water Reactors Generic Letter 92-08 - Thermo-Lag 330-1 Fire Barriers

[TAC M85525]

Commitment: TVA committed to:

1. Install isolation fuses in the 4KV Shutdown Board AC power circuit, and
2. Replace the Thermo-Lag material currently installed in the Intake Pumping Station.

Discussion: TVA responded to Generic Letter 92-08 in Reference 1. TVA requested an exemption from 10 CFR 50, Appendix R requirements for Residual Heat Removal Service Water (RHRSW) system power cables in the Intake Pumping Station and notified NRC of its intent to perform modifications that would allow BFN to comply with Section III.G of Appendix R without the use of Thermo-Lag 330-1 fire barrier systems. NRC denied TVA's request for an exemption to Appendix R. TVA performed the modifications to comply with Section III.G of Appendix R without the use of Thermo-Lag in all areas except the Intake Pumping Station prior to Unit 2 Cycle 7 operation. In-Reference 2, TVA notified NRC of a Thermo-Lag related problem affecting the availability of a required 4kV Shutdown Board. TVA committed to install isolation fuses in the AC power circuit and maintain a fire watch in the affected area until the modification was implemented. TVA implemented this modification prior to Unit 2 Cycle 8 operation.

In a separate letter (Reference 3) the Staff also requested additional information regarding long-term compliance with Appendix R and identified concerns regarding test results and criteria. TVA responded in Reference 4 and committed to complete the modifications necessary to bring the RHRSW system power cables into compliance with Appendix R by July 26, 1995.

0 An indictment of Thermal Science Incorporated and deficiencies in Thermo-Lag barriers installed at Comanche Peak resulted in an NRC request, for additional information regarding Thermo-Lag materials and fire barriers at BFN (Reference 5).

TVA responded in Reference 6, and committed to remove the Thermo-Lag material currently installed in the Intake Pumping Station and replace this material with new material obtained from the Watts Bar Nuclear Plant. TVA intends to complete this modification prior to performing reactor pressure vessel hydrostatic testing on Unit 3. This commitment supersedes the previous commitment to complete modifications necessary to bring the RHRSW system power cables into compliance with Appendix R (Reference 4).

Status: Complete. TVA has installed isolation fuses in the 4KV Shutdown Board AC power circuit and the Thermo-Lag material in the Intake Pumping Station has been replaced.

References:

1. TVA letter to NRC, dated May 10, 1993, Generic Letter (GL) 92-08 Thermo-Lag 330-1 Fire Barriers, Revision 1 2 ~ TVA letter to NRC, dated July 1, 1993, Generic Letter (GL) 92-08 Thermo-Lag 330-1 Fire Barriers, Revision 1 (Supplement) 3 ~ NRC letter to TVA, dated January 18, 1994, Denial of Exemption from Section III.G of Appendix R to 10 CFR Part 50 and Request for Additional Information 4 ~ TVA letter to NRC, dated March 10, 1994, Response to Nuclear Regulatory Commission (NRC) Request for Additional Information Regarding Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers"
5. NRC letter to TVA, dated December 22, 1994, Request for Additional Information Regarding Generic Letter 92-08, Issued Pursuant to 10 CFR 50.54(f)
6. TVA letter to NRC, dated March 22, 1995, Request for Additional (RAI) Information Regarding Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers" E1-62

t Generic Letter 94 Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors Commitment: 1. TVA will modify BFN to operating procedures and training programs make them consistent or more conservative than the interim BWR (BWROG) guidelines.

Owners'roup 2 ~ TVA will implement the BWROG Option methodology for the stability long-term solution.

III This is a post Unit 3 restart commitment.

Discussion: TVA responded to Generic Letter 94-02 in Reference 1. In Reference 2, TVA notified NRC that the Unit 3 procedure revisions would be completed prior to restart. TVA intends to have the power range neutron monitoring (PRNM) upgrade with the Option III trip in the "indicate only>>

mode installed during the Unit 3 Cycle 7 refueling outage. Following one cycle of operation for testing, TVA intends to enable the stability trip function prior to startup from the Cycle 8 refueling outage. TVA's confirmation of the installation schedule was provided in Reference 3.

Open. The restart portion of this commitment is complete. TVA has implemented the interim BWROG guidelines into plant procedures. TVA intends to have the neutron monitoring (PRNM) upgrade with the Option III trip in the "indicate only" mode installed during the Unit 3 Cycle 7 refueling outage. Following one cycle of operation for testing, TVA intends to enable the stability trip function prior to startup from the Cycle 8 outage.

References:

1. TVA letter to NRC, dated September 8, 1994, Response to NRC Generic Letter (GL) 94-02 Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors 2 ~ TVA letter to NRC, dated December 22, 1994, NRC Generic Letter (GL) 94-02, Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors Completion of Requested Action 1, Interim Corrective Actions 3 ~ TVA letter to NRC, dated October 4, 1995, Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 TVA Confirmation of the Installation Schedule for E1-63

0, the Stability Long-Term Solution for NRC Generic Letter (GL) 94-02 Generic Letter 94-03 - Zntergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors fTAC M90083]

Commitment: None.

Discussion: TVA performed core shroud inspections in Unit 3 during June and July 1994. The results of the Unit 3 inspections indicated that severe core shroud cracking is not occurring at BFN. TVA analyzed the Unit 3 inspection results and determined that Unit 3 can safely be returned to service and operated for at least one cycle of operation without repairs. The results of the Unit 3 inspection were provided as part of TVA's response to Generic Letter 94-03 (Reference 1).

The NRC's Safety Evaluation is contained in Reference 2.

Status: Complete. NRC has reviewed TVA's actions regarding Generic Letter 94-03. TVA's actions for long-term mitigation of Intergranular Stress Corrosion Cracking (IGSCC) of Unit 3 reactor

.vessel internals were found to be aggressive and satisfactory. Based on this review, no IGSCC issues were found that would negatively impact Unit 3 restart. This is documented in Reference 3.

References:

1. TVA letter to NRC, dated August 23, 1994, Response to NRC Generic Letter (GL) 94-03 Intergranular Stress Corrosion Cracking (IGSCC) of Shrouds in Boiling Water Reactors
2. NRC letter to TVA, dated January 13, 1995, Browns Ferry Nuclear Plant Units 1, 2, and 3 Safety Evaluation of Response to Generic Letter 94-03 (IGSCC of Core Shroud in BWRs) 3 ~ NRC letter to TVA, dated August 30, 1995, NRC Inspection Report 95-44 [Section 3.b., page 6]

Generic Safety Issue 40 (MPA B-065) - Safety Concerns Associated with Pipe Breaks in the BWR Scram System [TAC M43736]

Commitment: TVA will complete Generic Safety Issue (GSI) 40 (MPA B-065) Safety Concerns Associated with Pipe Breaks in the BWR Scram System.

0 0

P S~

Discussion: NRC closure of this GSI was documented in Generic Letter 86-01, Safety Concerns Associated with Pipe Breaks in the BWR Scram System. During the preparation of BFN's response to Generic Letter 90-04, Request for Information on the Status of Licensee Implementation of Generic Safety Issues Resolved with Impositions of- Requirements or Corrective Actions, TVA identified a discrepancy between TVA's programs and the NRC assumptions which were the basis for the closure of GSI 40.

Specifically, NRC cited leak testing recommended by the Boiling Water Reactor Owners Group (BWROG) in BWROG-8420. In order to resolve this issue, TVA revised the Abnormal Operating Instruction (AOI) for Reactor Scram to require the scram discharge volume be visually inspected for leaks within 30 minutes of the first reactor scram, following a refueling outage, from rated temperature and pressure (Reference 1).

Status: Complete. TVA has revised this commitment to allow leak inspection of the scram discharge volume piping during refueling outages in lieu of the post-scram walkdown. This requirement has been implemented in plant procedures.

References:

1. TVA letter to NRC, dated October 1, 1990, Browns Ferry Nuclear Plant (BFN) Safety Concerns Associated with Pipe Breaks in the Boiling Water Reactor (BWR) Scram System (GSI 40 and Generic Letter 86-01)

Generic Safety Issue 41 (MPA B-058) - BHR Scram Discharge Volume System [TAC M51014]

Commitment: TVA will complete Generic Safety Issue (GSI) 41 (MPA B-058) BWR Scram Discharge Volume System.

Discussion: The NRC Staff's Generic Safety Evaluation regarding the BWR Scram Discharge System was issued by Reference 1. TVA provided a description of the long term scram discharge volume modifications in Reference 2. NRC issued an Order to TVA on June 24, 1983 (Reference 3),

to require the installation of the long term modifications.

TVA's previous analysis of the Unit 2 scram discharge system indicated that a successful scram would be achieved without the scram pilot air header low pressure switches, provided that the Control Rod Drive (CRD) stall flow rate and the scram discharge volume water level

instrumentation response characteristics remain within acceptable limits. TVA has noted higher CRD stall flow rates during the first part of the operating cycle following a refueling outage, which preclude conformance with these acceptance limits.

Therefore, a revision to the long term modifications was provided by Reference 4. TVA determined that a design change notice would be implemented on Unit 3 to install a qualified scram pilot air header low pressure switch scram function prior to restart. However, TVA continues to pursue the overall reactor protection system .design issue and the long-term need for the scram pilot air header low pressure trip function. In addition, TVA would also submit a proposed Unit 3 Technical Specification amendment that adds the scram pilot air header low pressure switch scram function. The associated Technical Specification changes were requested by Reference 5 and supplemented by Reference 6. NRC approval of the proposed Technical Specification was provided in Reference 7.

Status: Complete. TVA has performed the required modifications.

References:

1. NRC letter to All BWR Licensees, dated December 9, 1980, BWR Scram Discharge System 2 ~ TVA letter to NRC, dated October 6, 1982, in regards to the Scram Discharge System Long Term Modifications 3 ~ NRC letter to TVA, dated June 24, 1983, in regards to Confirmatory Order for the Scram Discharge System Long Term Modifications 4 ~ TVA letter to NRC, dated April 28, 1995, Description of BWR Scram Discharge Volume Long-Term Modifications and Withdrawal of Technical Specification (TS) No. 312
5. TVA letter to NRC, dated May 11, 1995, Technical Specification (TS) No. 359 Scram Pilot Air Header Low Pressure Trip
6. TVA letter to NRC, dated June 30, 1995, Supplemental Information for Proposed Technical Specification (TS) No. 359 Scram Pilot Air Header Low Pressure Trip El-66

~ 'k 4

7 ~ NRC letter to TVA, dated August 29, 1995, Issuance of Technical Specification Amendments for the Browns Ferry Nuclear Plant Units 1, 2, and 3 (TAC Nos. M92315, 92316, and 92317)

(TS) 359.

Generic Safety Issue 43 (MPA B-107) >> Reliabili.ty of Air Systems

[TAC M71633]

Commitment: TVA will complete Generic Safety Issue (GSI) 43 (MPA B-107) Reliability of Air Systems.

Discussion: The resolution of GSI 43 was addressed as part of Generic Letter 88-14. Refer to the previous topic entitled Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment for the additional discussion of this item.

Status: Refer to the previous topic entitled Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment.

References:

None.

Generic Safety Issue 51 (MPA L-913) - Improving the Reliability of Open-Cycle Service Water Systems [TAC M73972]

Commitment: 'TVA will complete Generic Safety Issue (GSI) 51 (MPA L-913) Improving the Reliability of Open-Cycle Service Water Systems.

Discussion: The resolution of GSI 51 was addressed as part of Generic Letter 89-13. Refer to the previous topic entitled Generic Letter 89-13 Service Water Systems Problems Affecting Safety-Related Equipment.

Status: Refer to the previous topic entitled Generic Letter 89-13 Service Water Systems Problems Affecting Safety-Relate'd Equipment.

References:

None.

HVAC Duct Supports [TAC M82127 and R00300]

Commitment: The HVAC Duct Supports program will be implemented in accordance with the Unit 2 precedent.

E1-67

o Discussion: The approval of the program for the seismic qualification of HVAC duct supports is contained in NUREG-1232 (Reference 1). The design criteria for the seismic qualification of the HVAC and supports was submitted in Reference 2. The NRC staff's Safety Evaluation Report (SER) on the criteria was included in Reference 3.

Status: Complete. For Unit 3, a review was performed to identify the areas of Class I HVAC ductwork that were not previously qualified for Unit 2 operation. The only areas specific to Unit 3 thus identified were the ductwork associated with the pump motor coolers for the Unit 3 Residual Heat, Removal system and Core Spray system. Based upon the seismic qualification calculations, modifications were completed as necessary to ensure that this ductwork was qualified to the long term requirements of the design criteria.

NRC has reviewed design change notices and performed walkdown inspections of the HVAC duct supports that were modified on Unit 3. Based on the results of this review, the inspector concluded that this issue is resolved for Unit 3 restart. This is documented in Reference 4.

References:

l. NRC letter to TVAi dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2 Browns Ferry, Unit 2,'Section 2.2.2.4 (Page 2-5) 2 ~ TVA letter to NRC, dated November 15, 1991, Heating, Ventilation and Air Conditioning (HVAC)

Seismic Design Criteria 3 ~ NRC letter to TVA, dated July 16, 1992, Evaluation of Seismic Design Criteria for Heating Ventilation and Air Conditioning 4 ~ NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52 [Section 3.3, page 4]

Instrument Sensing Lines [TAC M80017]

Commitments: 1. The H)0) analyzers will be modified in accordance with the Unit 2 precedent.

2. Where satisfactory operation can not be justified, the sensing lines will be reworked.

3 ~ The 10 CFR 50, Appendix R, FSAR Appendix M, and Generic Evaluation of Internally Generated E1-68

~ '~',f Missiles programs will require evaluations to maintain the integrity of instrument sense line

'eparation.

Discussion: The action plan for dispositioning instrument sensing line issues, including a discussion of lessons learned from the Unit 2 precedent, was provided in Reference 1. Additional information regarding the similarity of the routing of instrument sensing lines between Unit 2 and Unit 3 was provided in Reference 2. In Reference 3, NRC concluded that the program to address concerns related to instrument sensing lines was adequate.

Status: Complete. The sample lines to the H20~ analyzers have been modified to assure that there are no moisture traps in the sample lines which would block the air sample flow from the drywell/torus to the analyzers. Safety-related sense lines have been evaluated in order to maintain the integrity of instrument sense line separation as required by the 10 CFR 50, Appendix R, FSAR Appendix M, and Generic Evaluation of Internally Generated Missiles programs. Sense lines were either justified for use-as-is, or modified as required.

References:

1. TVA letter to NRC, dated February 13, 1991, Action Plan to Disposition Concerns Related to Instrument Sensing Lines for Units 1 and 3 2 ~ TVA letter to NRC, dated November 8, 1991, Physical Separation of Instrument Sensing Lines in Units 1 and 3 3 ~ NRC letter to TVA, dated December 10, 1991, Safety Evaluation TVA Action Plan to Resolve Concerns Related to Instrument Sensing Lines for the Browns Ferry Nuclear Plant, Units 1 and 3 Instrument Tubing fTAC M80036]

Commitment: Safety-related instrument tubing will be seismically qualified to meet the final design criteria.

Discussion: The action plan for dispositioning concerns regarding the seismic qualification of instrument tubing, including a discussion of lessons learned from the Unit 2 precedent, was provided in Reference 1. Additional information regarding E1-69

inspection attributes and sampling sizes was provided in Reference 2. In Reference 3, NRC concluded that the program was an acceptable basis for restart of Unit 3 provided that the licensee also evaluates the instrument tubing populations in all units for any new attributes which may,be identified during the implementation of the revised program.

Status: Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.

References:

1. TVA letter to NRC, dated February 27'991/

Action Plan to Disposition Concerns Regarding the Seismic Qualification of Units 1 and 3 Instrument Tubing 2 ~ TVA letter to NRC, dated December 12, 1991, Small Bore Piping Program, Tubing, and Conduit Support Plans for Units 1 and 3 Additional Information.

3 ~ NRC letter to TVA, dated February 4, 1992, Safety Evaluation of Small Bore Piping and Seismic Qualification of Instrument Tubing Programs for Browns Ferry Nuclear Plant, Units 1 and 3 Zntergranular Stress Corrosion Cracking (IGSCC)

Commitment: The Intergranular Stress Corrosion Cracking (IGSCC) program will be implemented in accordance with the Unit 2 precedent.

Discussion: Refer to previous topic entitled Generic Letter 88-01 NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.

Status: Refer to previous topic entitled Generic Letter 88-01 NRC Position on IGSCC in BWR

~

Austenitic Stainless Steel Piping.

References:

None.

Long Term Torus Integrity Program [TAC M07391 and M80686]

TVA committed to:

1. The resolution of torus attached piping support discrepancies will be implemented, in E1-70

accordance with the Unit 2 criteria and will use the configurational attributes from the Unit 2 implementation precedent.

2. The inspection of safety-related torus and torus related structures will exclude the four attributes which did not result in modifications on Unit 2. With the exception of these four attributes, the resolution of discrepancies on the safety-related torus and torus related structures will be implemented, in accordance with the Unit 2 criteria and implementation precedent.
3. The inspection of the nonsafety-related catwalk will be limited to welds and bolted connections associated with maintaining the integrity of the safety-related structures.

The resolution of catwalk discrepancies will be in accordance with the Unit 2 criteria.

Discussion: The action plan for dispos'itioning the long-term torus integrity issue was provided in Reference 1 and approved by NRC in Reference 2.

Status: Complete. TVA has performed modifications to resolve torus attached piping support discrepancies, safety-related torus and torus related structure discrepancies, and nonsafety-related catwalk discrepancies in accordance with the Unit 2 precedent.

NRC has reviewed design criteria, design calculations and completed modifications for torus attached piping and pipe supports. Based on this review, the inspector concluded that this issue is resolved for Unit 3 restart. This is documented in Reference 3.

References:

1. TVA letter to NRC, dated April 29, 1991, Program for Resolving Long-Term Torus Integrity Issue Prior to the Restart of Units 1 and 3
2. NRC letter to TVA, dated February 10, 1992, Evaluation of Long-Term Torus Integrity Program for Browns Ferry Nuclear Plant, Units 1 and 3
3. NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52 [Section 3.6, page 6]

E1-71

I sa

t Lower Drywell Platforms and Miscellaneous Steel fTAC M80620, R00297 and R00303]

Commitment: The lower drywell steel platforms and miscellaneous steel will be evaluated and modified, if required, to meet the design criteria.

Discussion: The action plan for dispositioning the Lower Drywell Platforms and Miscellaneous Steel issue was provided in Reference 1. Additional information requested by the Staff was provided in Reference 2. Additional information was requested by the Staff in Reference 3 and provided by TVA in Reference 4.

An NRC position regarding the design criteria was

. issued by Reference 5 and a subsequent Safety Evaluation and request for additional information was issued as Reference 6. This additional information was provided by TVA in Reference 7.

A supplemental Safety Evaluation was issued by NRC in Reference 8. Additional information was provided by TVA in References 9 and 10. The final Safety Evaluation was issued in Reference 11 and the issue closed after an audit of the design criteria implementation as documented in Reference 12.

Status: Complete.

References:

1. TVA letter to NRC, dated June 12, 1991, Corrective Action Plan and Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 2 ~ TVA letter to NRC, dated November 8, 1991, Seismic Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 3 ~ NRC letter to TVA, dated December 12, 1991, Request for Additional Information Regarding Browns Ferry Drywell and Miscellaneous Steel Design Criteria 4 ~ TVA letter to NRC, dated February 6, 1992, Lower Drywell-Platforms and Miscellaneous Steel Seismic Criteria
5. NRC letter to TVA, dated March 19, 1992, NRC Staff Position on Proposed Ductility Ratio Design Criteria El-72

0

6. NRC letter to TVA, dated July 13, 1992, Safety Evaluation and Request for Additional Information Regarding Browns Ferry Nuclear Plant Units 1, 2, and 3 Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel 7 ~ TVA letter to NRC, dated July 31, 1992, Response to Request for Additional Information Regarding Design Criteria for Lower Drywell Steel Platforms and Miscellaneous Steel
8. NRC letter to TVA, dated October 29, 1992, Supplemental Safety Evaluation of Steel Design Criteria for the Browns Ferry Nuclear Power Plant
9. TVA letter to NRC, dated September 30, 1992, Resolution of the Thermal Growth Issue Outside Containment
10. TVA letter to NRC, dated June 29, 1993, Resolution of the Thermal Growth Issue NRC letter to TVA, dated December 7, 1993, Supplemental Safety Evaluation of Structural Steel Thermal Growth Design Criteria
12. NRC letter to TVA, dated April 20, 1994, Audit of Structural Steel Design Criteria Implementation Miscellaneous Steel Frames Commitment: The lower drywell steel platforms and miscellaneous steel will be evaluated and modified, criteria.,

if required, to meet the design Discussion: Refer to the item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel Status: Refer to the item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel

References:

None.

Moderate Energy Line Break (MELB)

Commitment: The Moderate Energy Line Break (MELB) program will be implemented in accordance with the Unit 2 precedent.

f r f i E

Discussion: As part of the restart effort on Unit 2, TVA committed to review the effects of flooding due to breaks in moderate energy lines outside primary containment.

Status: Complete. The critical plant features that. are required to mitigate or limit the consequences of moderate energy piping failures exist in the current BFN design. The results of the evaluation concluded that Browns Ferry Unit 3 conforms to the original licensing basis for MELB flooding and that the existing flooding studies and protective measures are adequate to justify continued operations.

NRC has reviewed assumptions for MELB analysis, design methodology, design input data and design analysis. Based on this review, the inspector concluded that the MELB program is acceptable for Unit 3 restart. This is documented in Reference 1~

References:

1. NRC letter to TVA, dated October 12, 1995, NRC Inspection Report 95-52 [Section 3.2, page 3]

Multi-Plant Action Item A 10 CFR 50.55A(G) - Inservice Inspection Commitment: TVA will complete Multi-Plant Action Item A-01 10 CFR 50.55A(G) Inservice Inspection.

Discussion: 10 CFR 50.55a(g) requires that American Society of Mechanical Engineers (ASME) Code components meet the requirements of ASME Section XI, Rules for Inservice Inspection (ISI). A subsection of this regulation requires the ISI program be updated every 10 years to meet the requirements of the latest approved applicable edition and addenda of Section XI in effect 12 months before the start of the next 120-month inspection interval. The code also provides for an extension of the interval for extended periods of facility downtime.

As discussed in Reference 1, TVA proposed the extension of the first ten-year interval until one year after restart. BFN will complete the first ten-year interval ISI examinations and from the current pressure tests before startup outage. The year following startup allows time for adoption of a new code, program preparation, preparation of implementing instructions, program submittal to NRC, and NRC review and approval.

El-74

~ \ J The NRC Staff found this proposal to be acceptable in Reference 2.

Status: Complete. The ISI Program is in place.

References:

1. TVA letter to NRC, dated March 1, 1988, Extension of Ten-Year Inservice Inspection Interval 2 ~ NRC letter to TVA, dated October 20, 1993, Second 10-Year Interval Znservice Inspection Program Plan and Associated Requests for Relief Multi-Plant Action Item A-04 10 CFR 50, Appendix J-Containment Leak Testing [TAC M08717]

Commitment: TVA will complete Multi-Plant Action Item A-04 10 CFR 50, Appendix J Containment Leak Testing.

Discussion: In Reference 1, NRC requested additional information regarding Units 1 and 3 conformance with NUREG-0737, Item II.E.4.2 and 10 CFR 50, Appendix J. In order to minimize the number and scope of updates that would have to be provided to NRC on this issue, TVA replied in Reference 2 using the anticipated configuration at the time of the restart of Unit 3. NRC approval of the Unit 3 containment isolation design is provided in Reference 3. Changes to the preliminary information, including corrections to information previously provided on Unit 2, was provided by TVA in Reference 4. NRC requested additional information in Reference 5, which was provided by TVA 1n Reference 6 and approved by NRC in Reference 7.

Status: Complete.

References:

1. NRC letter to TVA, dated May 5, 1992, Request for Additional Information to Review Browns Ferry Nuclear Plant Units 1 and 3 Compliance with NUREG-0737 Item II.E.4.2 and 10 CFR 50, Appendix J 2 ~ TVA letter to NRC, dated September 1, 1992, Response to NRC Request for Additional Information Regarding Units 1 and 3 Conformance with NUREG-0737, Item ZI.E.4.2 and 10 CFR 50, Appendix J 3 ~ NRC letter to TVA, dated January 6, 1995, Browns Ferry Nuclear Plant Units 1 and 3 NUREG-0737, Item II.E.4.2, Containment Isolation Dependability E1-75

L

4 ~ TVA letter to NRC, dated August 3, 1995, Supplemental Information for Conformance With NUREG-0737, Item II.E.4.2 And 10 CFR 50, Appendix J (TAC NOS. M74615 And M74616).

5. NRC letter to TVA, dated October 3, 1995, Browns Ferry Nuclear Plant Units 2 and 3 Request for Additional Information: Conformance with NUREG-0737 Item II.E.4.2 and 10 CFR 50, Appendix J (TAC NOS. M74615 and M74616)
6. TVA letter to NRC, dated October 4, 1995, Browns Ferry Nuclear Plant (BFN) Units 2 and 3 Supplemental Information for Conformance with NUREG-0737, Item II.E.4.2 and 10 CFR 50, Appendix J (TAC NOS. M74615 and M74616)
7. NRC letter to TVA, dated October 18, 1995, Browns Ferry Nuclear Plant Units 2 and 3 Supplemental Information: Conformance with NUREG-0737 Item II.E.4.2 and 10 CFR'50, Appendix J (TAC NOS.

M74615 and 74616)

Multi-Plant Action Item B 10 CFR 50, Appendix R - Fire Protection [TAC M48136]

TVA will complete Multi-Plant Action Item B-41 10 CFR 50, Appendix R Fire Protection.

Discussion: Refer to the previous topic entitled Fire Protection/10 CFR 50, Appendix R.

Status: Refer to the previous topic entitled Fire Protection/10 CFR 50, Appendix R.

References:

None.

Multi-Plant Action Item C-10 - Control of Heavy Loads Phase I (NUREG-0612) [TAC M08438]

Commitment: TVA will complete Multi-Plant Action Item C-10.

Discussion: In December 1980 (Reference 1), NRC issued a Generic Letter which disseminated NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, and requested utilities provide additional information. TVA's responses to this request included References 2 and 3. NRC's closure of Control of Heavy Loads (Phase I) was contained in Reference 4. The generic closure of Phase II of

'1-76

Q Control of Heavy Loads was issued by NRC in Reference 5.

Complete. TVA has performed the required modifications.

NRC has reviewed the program for handling critical loads and considers this issue closed for Unit 3. The results are documented in Reference 6.

References:

1. NRC letter to All Licensees of Operating Plants ad Applicants for Operating Licenses and Holders of Construction Permits, dated December 22, 1980, Control of Heavy Loads 2 ~ TVA letter to NRC, dated January 6, 1984, in regards to NUREG-0612 3 ~ TVA letter to NRC, dated April 4, 1984, in regards to NUREG-0612
4. NRC letter to TVA, dated June 6, 1984, Control of Heavy Loads (Phase I)
5. NRC letter to All Licensees for Operating Reactors, dated June 26, 1985, Completion of Phase II of "Control of Heavy Loads at Nuclear Power Plants", NUREG-0612 (Generic Letter 85-11)
6. NRC letter to TVA, dated August 7, 1995, NRC Inspection Report 95-38 [Section r

6.f., page 16]

Multi-Plant Action Item C-11 - Reactor Protection System Power Supply [TAC M08931]

Commitment: TVA will replace the General Electric (GE) molded case circuit breakers that are used on the output of the reactor protection system (RPS) motor-generator (MG) sets. The replacement breakers provide undervoltage, overvoltage and underfrequency protection by utilizing a combination of contactors and relays.

Discussion: In Reference 1, NRC informed TVA of deficiencies identified in the design of the voltage regulator system of the motor generator sets which supply power to the reactor protection system at another facility. TVA responded in Reference 2. In Reference 3, the NRC Staff recommended that TVA implement modifications similar to those performed at the Hatch facility. In response, E1-77

TVA committed to install a Class IE RPS power supply in Reference 4.

NRC requested additional information and proposed Technical Specification changes in Reference 5.

The requested information and proposed Technical Specifications for Unit 1 were provided by TVA in Reference 6. Additional information was requested by the NRC Staff in Reference 7 and provided by TVA in Reference 8. Additional information was requested by the NRC Staff in Reference 9 and provided by TVA in Reference 10.

NRC Staff acceptance of TVA's modifications was documented in Reference 11.

The associated Technical Specifications were proposed by TVA in Reference 12. NRC requested additional information in Reference 13, which TVA provided in Reference 14. The proposed Technical Specifications were approved in Reference 15.

Status: Complete. TVA installed two Class 1E detection and isolation assemblies in each of the three sources of power to the RPS. Each assembly includes a circuit breaker and a monitoring module consisting of an undervoltage, an overvoltage and an underfrequency sensing relay.

The protective assembly relays operate to disconnect the abnormal source of supply from the RPS bus.

NRC has reviewed related documentation and the Unit 3 modifications to the RPS power supply.

Based on this review, the inspector considers this issue is closed for Unit 3. This is documented in Reference 16.

References:

1. NRC letter to TVA, dated August 7, 1978, in regards to Reactor Protection System Power Supply Deficiencies 2 ~ TVA letter to NRC, dated December 13, 1978, in regards to Reactor Protection System Power Supplies 3 ~ NRC letter to TVA, dated September 24( 1980( in regards to Reactor Protection System Power Supply Deficiencies 4 ~ TVA letter to NRC, dated December 4g 1980i in regards to Reactor Protection System Power Supplies E1-78

"f IL J

II C 4 ei

NRC letter to TVA, dated October 30, 1981, Reactor Protection System (RPS) Power Monitoring System Design Modifications TVA letter to NRC, dated July 13, 1983, in regards to Unit 1 Cycle 6 Technical Specifications NRC letter to TVA, dated October 12, 1983, Reactor Protection System (RPS) Power Monitoring System Design Modifications TVA letter to NRC, dated August 9, 1984, in regards to Reactor Protection System (RPS) Power Monitoring System Design Modifications NRC letter to TVA, dated October 31, 1984, Reactor Protection System (RPS) Power Monitoring System Design Modifications TVA letter to NRC, dated March 1, 1985, in regards to Reactor Protection System (RPS) Power Monitoring System Design Modifications NRC letter to TVA, dated June 27, 1985, Reactor Protection System (RPS) Power Monitoring System Design Modifications TVA letter to NRC, dated June 4, 1990, TVA BFN Technical Specification (TS) No. 286 Reactor Protection System (RPS) Circuit Protector Trip Level Setpoint NRC letter to TVA, dated September 27, 1990, Request for Additional Information Browns Ferry Technical Specification Amendment (TS 286)

Regarding Reactor Protection System Circuit Protection Trip Level Setpoints TVA letter to NRC, dated October 24, 1990, Technical Specification (TS) No. 286 TVA'FN Reactor Protection System (RPS) Circuit Protector Trip Level Setpoint Response to Request for Additional Information NRC letter to TVA, dated January 3, 1991, Issuance of Amendments (TS 286)

NRC letter to TVA, dated October 13, 1995, NRC Inspection Report 95-51 [Section 5.4, page 30]

E1-79

Multi-Plant Action Item D Relocation of Radiologi.cal Effluent Technical Specificati.ons Commitment: TVA will complete MPA D-25 Relocation of Radiological Effluent Technical Specifications (RETS) .

Discussion: In accordance with the guidelines provided in Generic Letter 89-01, TVA submitted a proposed Technical Specification amendment for the relocation of the RETS in Reference 2.

Additional information was provided by TVA in References 3 and 4.

Status: Complete. NRC approval of the relocation of RETS is contained in Reference 5.

References:

1. NRC letter to All Power Reactor Licensees and Applicants, dated January 31, 1989, Implementation of Programmatic Controls for Radiological Effluent Technical Specifications in the Administrative Controls Section of the Technical Specifications and the Relocation of Procedural Details of RETS to the Offsite Dose Calculation Manual or to the Process Control Program (Generic Letter 89-01)
2. TVA letter to NRC, dated March 25, 1992, TVA BFN Technical Specification (TS) No. 301, Implementation of the Guidance of GL 89-01 3 ~ TVA letter to NRC, dated January 29, 1993, Technical Specification (TS) No. 301 Supplement 1, Implementation of the Guidance of Generic Letter (GL) 89-01 Units 1, 2, and 3 4 ~ TVA letter to NRC, dated August 27, 1993, Clarifications for Proposed Technical Specification No. 301
5. NRC letter to TVA, dated September 22, 1993, Issuance of Amendments (TS 301)

MJREG-0737 (TMI Acti.on Plan), Action Item I.D.1 - Control Room Design Review [TAC M45778 and M56106]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item I.D.1 Control Room Design Review.

Pursuant to NUREG-0737 (TMI Action Plan) and Supplement 1, TVA provided its Control Room Design Review (CRDR) corrective action plan and El-80

O V

I J 4 f

commitments to NRC by letter, dated December 30, 1986, and supplemented by letter, dated November 9, 1988 (References 1 and 2). In Reference 3, TVA also committed to complete all safety and non-safety significant Human Engineering Discrepancies (HEDs) prior to the restart of Units 1 and 3. The final Safety Evaluation Report (SER) for the BFN CRDR was provided in Reference 4.

As part of the BFN Operating and Maintenance Cost Reduction Program, TVA submitted a Cost Beneficial Licensing Action to discontinue the cost-benefit analysis of non-safety significant HEDs (Reference 5). NRC approval of this request was contained in Reference 6.

Status: Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent verification. These remaining items will be completed prior to restart.

NRC has evaluated the Detailed Control Room Design Review (DCRDR) program. The control board mockups were examined and eleven HEDs were selected for a results comparison between the Unit 2 and Unit 3 control rooms. Based on this review, the previous approval of the Unit 2 DCRDR, and the similarity of the Unit 2 and Unit 3 programs, the inspector considers this issue closed for Unit 3. This is documented in Reference 7.

References:

1. TVA letter to NRC, dated December 30, 1986, Detailed Control Room Design Review (DCRDR)

NUREG-0737, Item I.D.1 2 ~ TVA letter to NRC, dated November 9, 1988, Response to NRC Safety Evaluation for the BFN Detailed Control Room Design Review (DCRDR) 3 ~ TVA letter to NRC, dated August 22, 1991, Supplemental Response to NRC Safety Evaluation for the BFN Detailed Control Room Design Review (DCRDR) 4 ~ NRC letter to TVA, dated October 29, 1991, Safety Evaluation of the Browns Ferry Nuclear Plant Detailed Control Room Design Review

5. TVA letter to NRC, dated December 15, 1993, Operating & Maintenance (0&M) Cost Reduction Program Cost Beneficial Licensing Action Revision of Detailed Control Room Design

p I ~8 l ~

I

~ I

Review (DCRDR) Program to Discontinue Cost-Benefit Analysis of Non-Safety Significant Human Engineering Discrepancies (HEDs)

6. NRC letter to TVA, dated February 4, 1994, Revision of Detailed Control Room Design Review Program to Discontinue Cost-Benefit Analysis of Non-Safety Significant Human Engineering Discrepancies 7 ~ NRC letter to TVA, dated October 7, 1994, NRC Inspection Report 94-21 [Section 3.d., page 3]

NUREG-0737 (TMI Action Plan), Action Item I.D.2 - Safety Parameter Display Console [TAC M51225 and M74612]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item I.D.2 Safety Parameter Display Console.

Discussion: Refer to the previous item entitled Generic Letter 89-06 Safety Parameter Display System 10 CFR 50.54(f).

Status: Refer to the previous item entitled Generic Letter 89-06 Safety Parameter Display System 10 CFR 50.54(f) ~

References:

None.

NUREG-0737 (TMI Action Plan), Action Item II.B.3 - Post-Accident Sampling System [TAC M44425, M74613, M74614 and M74617]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item II.B.3 Post-Accident Sampling System (PASS)

Discussion: A description of the BFN PASS design was provided in References 1 and 2. The Safety Evaluation Report for this system was provided by Reference 3.

Status: Open. The PASS has been installed and is functional. Testing of the PASS during power ascension testing will confirm agreement with measurements taken at the:normal sampling points.

References:

1. TVA letter to NRC, dated December 19, 1986, NUREG-0737, Item II.B.3 Postaccident Sampling System

'E1-82

2 ~ TVA letter to NRC, dated April 1, 1987, NUREG-0737, Item II.B.3 Postaccident Sampling System 3 ~ NRC letter to TVA, dated May 27, 1987, Post Accident Sampling System NUREG-0737, (TMZ Action Plan), Action Ztem ZZ.E.4.2.1 Containment Isolation Dependability - Implement Diverse Isolation fTAC M74615]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item II.E.4.2.1-4 Containment Isolation Dependability Implement Diverse Isolation Discussion: In Reference 1, NRC requested additional information regarding Units 1 and 3 conformance with NUREG-0737, Item ZI.E.4.2 and 10 CFR 50, Appendix J. In order to minimize the number and scope of updates that would have to be provided to NRC on this issue, TVA replied in Reference 2 using the anticipated'onfiguration at the time of the restart of Unit 3. NRC approval of the Unit 3 containment isolation design is provided in Reference 3. Changes to the preliminary information was provided by TVA in Reference 4 and approved by NRC,in Reference 5.

Status: Complete. The modifications to ensure containment isolation dependability have been installed.

References:

1. NRC letter to TVA, dated May 5, 1992, Request for Additional Information to Review Browns Ferry Nuclear Plant Units 1 and 3 Compliance with NUREG-0737 Item II.E.4.2 and 10CFR50, Appendix J 2 ~ TVA letter to NRC, dated September 1, 1992, Response to NRC Request for Additional Information Regarding Units 1 and 3 Conformance with NUREG-0737, Item II.E.4.2 and 10CFR50, Appendix J 3 ~ NRC letter to TVA, dated January 6, 1995, Browns Ferry Nuclear Plant Units 1 and 3 NUREG-0737, Item II.E.4.2, Containment Isolation Dependability 4 ~ TVA letter to NRC, dated August 3, 1995, Browns Ferry Nuclear Plant Units 2 and 3 Supplemental Information For Conformance with NUREG-0737, Item II.E.4.2 and 10CFR50, Appendix J El-83

ff

5. NRC letter to TVA, dated October 18, 1995, Browns Ferry Nuclear Plant Units 2 and 3 Supplemental Information: Conformance with NUREG-0737 Item II.E.4.2 and 10 CFR 50, Appendix J (TAC NOS.

M74615 and M74616)

NUREG-0737 (TMI Action Plan), Action Item ZZ.E.4.2.6-Containment Isolation Dependability - Containment Purge Valves

[TAC M74616]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item II.E.4.2.6 Containment Isolation Dependability Containment Purge Valves Discussion: TVA addressed the issue of containment purge valve dependability in References 1 through 4.

The NRC Staffs determination that the requirements of Item II.E.4.2.6 have been met is contained in Reference 5.

Status: Complete. The containment purge isolation valves were replaced, debris screens installed on the containment purge lines, and calculations were performed that determined the Reactor Building ductwork, Secondary Containment, and Standby Gas Treatment systems would not be adversely affected by a loss of coolant accident occurring during containment purge operations.

References:

1. TVA letter to NRC, dated June 12, 1979, in regards to Primary Containment Purge System Design 2 ~ TVA letter to NRC, dated December 10, 1979, in regards to Containment Purging and Venting During Normal Operation 3 ~ TVA letter to NRC, dated June 2, 1981, in regards to Containment Purge Valve Operability and Purge Operations 4 ~ TVA letter to NRC, dated January 25, 1985, in regards to Structural Adequacy of Containment Vent and Purge Valves
5. NRC letter to TVA, dated July 1, 1985, Completion of Review of NUREG-0737, Items II.E.4.2.6 and ICE.4.2.7 El-84

U g

~ 1 E ~

~ >

II '1

NUREG-0737 (TMZ Action Plan), Action Item XX.F.1.2.A - Accident-Monitoring Noble Gas Monitor [TAC M44905] I Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item II.F.1.2.A Accident Monitoring Noble Gas Monitor Discussion: In response to NUREG-0737 (TMI Action Plan)

Action Item II.F.1.1 Noble Gas Monitor, TVA committed to provide a system to monitor the Browns Ferry stack for high-range noble gas (Reference 1). In response to an NRC request for additional information (Reference 2), TVA stated that the monitoring equipment, which is common to all three units, would be operable with local readout and have instrumentation installed in the Unit 1 control room (Reference 3).

In Reference 4, TVA was directed to:

1. Install noble gas effluent monitors with local readout capability by December 31, 1984, and
2. Install control room instrumentation prior to start-up in Cycle 7.

TVA requested an extension to the December 31, 1984 completion date in Reference Specification Amendment Number 85, 5.'echnical dated February 12, 1985 (Reference 6), revised the completion date for the March 25, 1983 Order for installation of noble gas monitors with local readout capability from December 31, 1984 to prior to startup of Unit 2 from the current refueling and modification outage. An explanation as to how this license condition was satisfied was provided in Reference 7.

Status: Complete. The Wide Range Gaseous Effluent Radiation Monitoring System (WRGERMS), installed at the stack, provides the high-range monitoring capability. This system was installed prior to the restart of Unit 2, and is common to all Units. In addition, TVA has installed an annunciator in the Unit 3 control room as well as connection to the plant integrated computer system which allows Unit 3 operators to obtain WRGERMS information.

References:

1. TVA letter to NRC, dated June 17, 1982, in regards to NUREG-0737, Action Items II.B.2, II.F.1.1 and II.F.1.2 E1-85

P 2 ~ NRC letter to TVA, dated February 1, 1983, Schedules on NUREG-0737 Items 3 ~ TVA letter to NRC, dated February 28, 1983, in regards to NUREG-0737, Items II.F.1.1 and II.F.1 '

4 ~ NRC letter to TVA, dated March 25, 1983, in regards to post-TMI Confirmatory Orders

5. TVA letter to NRC, dated December 13, 1984, in regards to NUREG-0737, Items II.F.1.1 and II.F.1.2
6. NRC letter to TVA, dated February 12, 1985, in regards to Amendment Nos. 110 and 85 for Units 2 and 3 7 ~ TVA letter to NRC, dated August 27, 1993, Completion of Unit 3 License Condition Regarding NUREG-0737 (TMI Action Plan) Action Items II.F.1.1 Noble Gas Monitor and II.F.1.2 Iodine/particulate Monitor NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.B Accident-Monitoring - Iodine/Particulate Monitor [TAG M44976]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item II.F.1.2.B Accident Monitoring Iodine/Particulate Monitor Discussion: In response to NUREG-0737 (TMI Action Plan)

Action Item II.F.1.2 Iodine/Particulate Monitor, TVA committed to provide a system to monitor the Browns Ferry stack with particulate and iodine collection on appropriate adsorption media (Reference 1). In response to an NRC request for additional information (Reference 2),

TVA stated that the monitoring equipment, which is common to all three units, would be operable with local readout and have instrumentation installed in the Unit 1 control room (Reference 3).

In Reference 4, TVA was directed to:

1. Provide capability for effluent monitoring of iodine with local readout capability by

~

December 31, 1984, and

2. Install control room instrumentation prior to start-up in Cycle 7.

E1-86

4 TVA requested an extension to the December 31, 1984 completion date in Reference 5.

Technical Specification Amendment Number 85, dated February 12, 1985 (Reference 6), revised the completion date for the March 25, 1983 Order for installation of iodine effluent monitors with local readout capability from December 31, 1984 to prior to startup of Unit 2 from the current refueling and modification outage. An explanation as to how this license condition was satisfied was provided in Reference 7.

Status: Complete. The Wide Range Gaseous Effluent Radiation Monitoring System (WRGERMS), installed at the stack, provides the high-range monitoring capability. This system was installed prior to the restart of Unit 2, and is common to all Units. In addition, TVA has installed an annunciator in the Unit 3 control room as well as connection to the plant integrated computer system which allows Unit 3 operators to obtain WRGERMS information.

t

References:

1. TVA letter to NRC, dated June 17, 1982, in regards to NUREG-0737, Action Items II.B.2, II.F.1.1 and II.F.1.2
2. NRC letter to TVA, dated February 1, 1983, Schedules on NUREG-0737 Items
3. TVA letter to NRC, dated February 28, 1983, in regards to NUREG-0737, Items II.F.1.1 and II.F.1.2 4 ~ NRC letter to TVA, dated March 25, 1983, in regards to post-TMI Confirmatory Orders
5. TVA letter to NRC, dated December 13, 1984, in regards to NUREG-0737, Items II.F.1.1 and II'.1.2
6. NRC letter to TVA, dated February 12, 1985, in regards to Amendment Nos. 110 and 85 for Units 2 and 3
7. TVA letter to NRC, dated August 27, 1993, Completion of Unit 3 License Condition Regarding NUREG-0737 (TMI Action Plan) Action Items II.F.1.1 Noble Gas Monitor and II.F.1.2 Iodine/particulate Monitor El-87

NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.C - Accident-Monitoring Containment High Range Radiation [TAC M45047]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Accident Monitoring Action Item II.F.1.,2.C Containment High Range Radiation Discussion: In Reference 1, TVA committed to install a containment high range radiation monitor.

Reference 2 issued a Confirmatory Order for the installation of the radiation monitors prior to start-up in Cycle 7.

Status: Complete. TVA has upgraded the two Unit 3 drywell radiation monitor loops to meet the requirements of NUREG-0737 for Containment High Range Radiation Monitors (CHRRM). The modifications ensure that the CHRRMs are capable of detecting and measuring the radiation levelwithin the drywell during and following an accident.

NRC has reviewed applicable calibration records, vendor's test data, environmental qualification work activities associated with each CHRRM, and performed a walkdown of the completed installation. Based on this review, the inspector considers this item closed. This is documented in Reference 3.

References:

1. TVA letter to NRC, dated December 23, 1980, in regards to post-TMI requirements 2 ~ NRC letter to TVA, dated March 25, 1983, in regards to Confirmatory Order for Post-TMI Related Items Set Forth in NUREG-0737 3 ~ NRC letter to TVA, dated October 18, 1995, NRC Inspection Report, 95-55 [Section 3, page 3]

NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.D - Accident-Monitoring - Containment Pressure [TAC M47584]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Accident Monitoring Action Item II.F.1.2.D Containment Pressure Discussion: In Reference 1, TVA committed to install a containment pressure monitor. NRC requested additional information in Reference 2, which was provided by TVA in Reference 3. Reference 4 issued a Confirmatory Order for the installation E1-88

c" <"- i:3 of the pressure monitor prior to start-up in Cycle 6. The Safety Evaluation Report that closed this item was issued in Reference 5.

Status: Complete. In order to achieve compliance with the Drywell pressure monitoring requirements stipulated by NUREG-0737, various Design Change Notices (DCNs) and Engineering Change Notices (ECNs) have been implemented to upgrade the applicable instrumentation loops.

References:

1. TVA letter to NRC, dated December 23, 1980, in regards to post-TMI requirements 2 ~ NRC letter to TVA, dated March 22~ 1982~

NUREG-0737, Items II.F.1.4, Containment Pressure Monitor; II.F.1.5, Containment Water Level Monitor, and II.F.1.6, Containment Hydrogen Monitor 3 ~ TVA letter to NRC, dated April 26, 1982, in regards to NUREG-0737, Items II.F.1.4, II.F.1.5, and II.F.1.6 4 ~ NRC letter to TVA, dated March 25, 1983, in regards to Confirmatory Order for Post-TMI Related Items Set Forth in NUREG-0737

5. NRC letter to TVA, dated June 16, 1983/

NUREG-0737, Item II.F.1.4 Containment Pressure Monitor II.F.1.5 Containment Water Level Monitor II.F.1.6 Containment Hydrogen Monitor NUREG-0737 (TMI Action Plan), Action Item II.F.1.2.E - Accident-Monitoring - Containment Water Level [TAC M47655]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Accident Monitoring Action Item ZI.F.1.2.E Containment Water Level Discussion: In Reference 1, TVA committed to install a containment water level monitor. NRC requested additional information in Reference 2, which was provided by TVA in Reference 3. Reference 4 issued a Confirmatory Order for the installation of the water level monitor prior to start-up in Cycle 6. The Safety Evaluation Report that closed this item was issued in Reference 5.

Status: Complete. TVA has replaced the existing Drywell "Narrow Range" and "Wide Range" Torus Water Level Transmitters with new equipment. In addition, El-89

(

I 'P l f

new scales were installed for Level Indicators located in the Unit 3 Control Room.

References:

1. TVA letter to NRC, dated December 23, 1980, in regards to post-TMI requirements
2. NRC letter to TVA, dated March 22, 1982, NUREG-0737, Items II.F.1.4, Containment Pressure Monitor; II.F.1.5, Containment Water Level Monitor, and II.F.1.6, Containment Hydrogen Monitor
3. TVA letter to NRC, dated April 26, 1982, in regards to NUREG-0737, Items II.F.1.4, II.F.1.5, and II.F.1.6
4. NRC letter to TVA, dated March 25, 1983, in regards to Confirmatory Order for Post-TMI Related Items Set Forth in NUREG-07371
5. NRC letter to TVA, dated June 16, 1983, NUREG-0737, Item II.F.1.4 Containment Pressure Monitor II.F.1.5 Containment Water Level Monitor II.F.1.6 Containment Hydrogen Monitor NUREG-0737 (TMI Action Plan), Action Item II.F.2.4 (Generic Letter 84-23) - Instrumentation for Detection of Inadequate Core Cooling [TAC M45118]

Commitment: TVA committed to:

1. Convert level instruments which initiate the Reactor Protection System (RPS) and Emergency Core Cooling System (ECCS) and provide class 1E level indication in the control room to analog trip units.
2. Minimize the effects of high drywell temperature on level indications by limiting the vertical drop of the reference legs inside the drywell to no more than two feet.

Discussion: The long-term modifications to improve the reliability and accuracy of BWR water level measurement and instrumentation were requested by Generic Letter 84-23 (Reference 1). TVA committed in Reference 2 to replace the RPS and ECCS instruments with analog trip units. TVA committed in Reference 3 to minimize the vertical drop of the reference legs inside containment by bringing the reference legs outside the drywell at higher elevations. This commitment was modified in accordance with the commitment E1-90

~ I ~

~ J',*

management process to limit the vertical drop inside the drywell to be no more than 2 feet 5 inches. The NRC was notified of this change by Reference 4.

Status: Open. In order to comply with Generic Letter 84-23, TVA has performed modifications which include converting instruments in the control room to analog trip units, removing the Yarway Temperature Equalizing Columns, and rerouting the reactor vessel sense lines inside the drywell to minimize the vertical drop of the sense lines to 2 feet 5 inches. Installation is complete and equipment operable. Some confirmatory testing is to be performed at power.

References:

1. NRC letter to All Boiling Water Reactor (BWR)

Licensees of Operating Reactors (Except LaCrosse, Big Rock Point, Humboldt Bay and Dresden-1),

dated October 26, 1984, Reactor Vessel Water Level Instrumentation in BWRs (Generic Letter 84-23) 2 ~ TVA letter to NRC, dated April 8, 1995, in regards to Generic Letter 84-23 3 ~ TVA letter to NRC, dated March 12; 1986, in regards to Generic Letter 84-23 4 ~ TVA letter to NRC, dated September 5, 1995, Browns Ferry Nuclear Plant (BFN) Units 1 and 3 Revision to Commitments Concerning The Senior Management Assessment of Readiness Team (SMART) and The Vertical Drop of Reactor Vessel Reference Legs (Generic Letter 84-23)

NUREG-0737 (TMI Action Plan), Action Item II.K.3.13 - HPCI/RCIC Initiation Levels t'TAC M45534]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action. Item II.K.3.13 HPCI/RCIC Initiation Levels Discussion: In Reference 1, TVA states that the BWR Owners'roup it recommendation concurs with that separation of the HPCI/RCIC level setpoints had no substantial benefit and committed to implement an automatic restart of RCIC. In Reference 2, NRC concurred that no significant benefit would be gained by the separation of the HPCI/RCIC initiation levels and requested TVA evaluate the acceptance criteria provided for the RCIC automatic restart. One exception to the criteria

II I

k

was identified in Reference 3 and approved by NRC in Reference 4.

TVA clarified Technical Specification Bases Section 4.2 in Reference 5. The Bases were revised to state that the automatic restart feature is tested during the performance of logic system functional tests. The issuance of these Bases changes was documented in Reference 6.

Status: Complete. TVA has implemented a Design Change Notice (DCN) which modified the RCIC logic in order to automatic restart the RCIC system on vessel low water level (without operator action) following a vessel. high water trip.

References:

1. TVA letter to NRC, dated December 23, 1980, in regards to Post-TMI Requirements 2 ~ NRC letter to TVA, dated March 16, 1983, NUREG-0737, Item II.K.3.13, "RCIC Automatic Restart" 3 ~ TVA letter to NRC, dated May 24, 1983, in regards to NUREG-0737, Item ZI.K.3.13 4 ~ NRC letter to TVA, dated September 19, 1983, NUREG-0737, Item II.K.3.13, "RCIC Automatic Restart"
5. TVA letter to NRC, dated January 14, 1992, TVA BFN Technical Specification (TS) No. 300 Reactor Core Thermal-Hydraulic Stability
6. NRC letter to'VA, dated May 31, 1994, Issuance of Technical Specification Amendments for the Browns Ferry Nuclear Plant Units 1 and 3 (TS 300)

NUREG-0737 (TMI Action Plan), Action Item II.K.3.18 << ADS Actuation Modifications [TAC M45682]*

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item II.K.3.18 ADS Actuation Modifications Discussion: In response to Item II.K.3.18, the BWR performed an evaluation of options for Owners'roup compliance. Two of these options were found to be acceptable by the NRC Staff and TVA was requested in Reference 1 to commit to one of these options. TVA chose Option 2, to modify the ADS logic to allow the ADS to initiate vessel depressurization, automatically bypassing the E1-92

C%

~.~" fbi

high drywell pressure signal 10 minutes after a sustained lo-lo-lo reactor vessel water level signal (Reference 2).

Status: Complete. The modifications to the ADS logic which allows the ADS to initiate vessel depressurization has been completed.

References:

1. NRC letter to TVA, dated June 3, 1983, NUREG-0737, Item II.K.3.18, "ADS Logic Modifications"
2. TVA letter to NRC, dated March 5, 1987, Modifications to Automatic Depressurization System (ADS) Logic NUREG-0737, Item II.K.3.18 NUREG-0737, Item II.K.3.27 - Common Reference Level for Vessel Level Instrumentation [TAC M45778]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item II.K.3.27 Common Reference Level for Vessel Level Instrumentation Discussion: In Reference 1, NRC informed TVA of an alternate approach to resolving this issue. This approach was to incorporate the requirement of this TMI Action Item into the control room design review to be performed per TMI Action Item I.D.1. The NRC stated that if TVA committed to utilize this alternate approach, it would provide sufficient bases for considering Item II.K.3.27 complete.

TVA accepted this approach in Reference 2.

Status: Closed. NRC has reviewed the design change notices (DCN), has walked down the modifications and concluded that this item is closed for Unit

3. This is documented in Reference 3.

References:

1. NRC letter to TVA, dated October 28, 1982, NUREG-0737 Action Item II.K.3.27 (Common Reference Level)
2. TVA letter to NRC, dated December 3, 1982, in regards to NUREG-0737 Action Item II.K.3.27
3. NRC letter to TVA, dated April 11, 1995, NRC Inspection Report 95-16 [Section 6.i., page 24]

E1-93

NUREG-0737 (TMI Action Plan), Action Item II.K.3.28-Qualification of ADS Accumulators [TAC M48262]

Commitment: TVA will complete NUREG-0737 (TMI Action Plan)

Action Item II.K.3.28 Qualification of ADS Accumulators Discussion: TVA responded to Item II.K.3.28 by Reference 1.

The NRC Staff requested additional information in Reference 2, which was provided by TVA in Reference 3. Additional information was requested in Reference 4 and provided in Reference 5. TVA responded to a verbal request for additional information in Reference 6. The Safety Evaluation that documents the acceptability of TVA's plan to satisfy Item II.K.3.28 was provided in Reference 7.

Status: Complete. TVA has performed modifications to upgrade the ADS accumulator system. This was accomplished by splitting the ring header into two sections, and providing an alternate nitrogen supply to the Drywell Control Air System.

References:

1. TVA letter to NRC, dated December 30, 1981, in regards to NUREG-0737, Items II.K.3.24, II.K.3.28 and II.B.4
2. NRC letter to TVA, dated May 11, 1983, Request for Additional Information NUREG-0737,

.Item II.K.3.28, Qualification of ADS Accumulators 3 ~ TVA letter to NRC, dated July 8, 1983, in regards to NUREG-0737, Item II.K.3.28 4 ~ NRC letter to TVA, dated May 29, 194, Request for Additional Information MPA F-55 (TMI II.K.3.28)

"Qualification of ADS Accumulators"

5. TVA letter to NRC, dated July 12, 1984, in regards to NUREG-0737, Item II.K.3.28
6. TVA letter to NRC, dated July 11, 1985, in regards to NUREG-0737, Item II.K.3.28 7 ~ NRC letter to TVA, dated July 24, 1985, NUREG-0737, Item II.K.3.28, Qualification of ADS Accumulators El-94

o 'k j

Operational Readiness TVA will conduct an Operational Readiness Program to provide assurance that the required systems are operable, personnel are able to conduct operations safely, and the activities, programs, and commitments required for the restart of Unit 3 are complete.

Discussion: The Operational Readiness Program was submitted by TVA in Reference 1. Additional information was incorporated and the program plan was superseded by Reference 2. NRC review of the program is documented in Reference 3. NRC was notified in Reference 4 that the Senior Management Assessment of Readiness Team (SMART) review for Unit 3 will be conducted by the Nuclear Safety Review Board (NSRB).

Status: Complete. The Operational Readiness Program is in place and the final recommendations for the restart of Unit 3 have been issued by NSRB.

References:

1. TVA letter to NRC, dated November 12, 1991, Units 1 and 3 Operational Readiness Program 2 ~ TVA letter to NRC, dated July 6, 1992, Units 1 and 3 Operational Readiness Program and Employee Concerns 3 ~ NRC letter to TVA, dated October 6, 1992, Browns Ferry Units 1 and 3 Operational Readiness Program 4 TVA letter to NRC, dated September 5, 1995, Browns Ferry Nuclear Plant (BFN) - Units 1 and 3

~

Revision to Commitments Concerning the Senior Management Assessment of Readiness Team (SMART) and the Vertical Drop of Reactor Vessel Level Reference Legs (Generic Letter 84-23)

Platform Thermal Growth Commitment: The lower drywell steel platforms and miscellaneous steel will be evaluated and modified, criteria.

if required, to meet the design Discussion: The issue of platform thermal growth was resolved as part of the overall issue regarding the seismic qualification of the lower drywell platforms and miscellaneous steel. Refer to the E1-95

'J f(

item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel.

Refer to the item discussed above, entitled Lower Drywell Platforms and Miscellaneous Steel.

References:

None.

Probabilistic Risk Assessment for Multi-Unit Operation Commitment: TVA will perform an expanded Probabilistic Risk Assessment (PRA), which addresses all three units in operation.

Discussion: In August of 1990 (Reference 1), NRC noted that the three units at BFN share many important safety systems. NRC expressed a concern with the potential safety implications of shared systems in the various operating modes of the BFN units (e.g., All three units operating, Units 1 and 2 operating with Unit 3 shutdown, etc.). NRC requested TVA provide expanded PRAs that evaluate the entire site as a whole, taking into account the risk significant combinations of unit operational status. In June 1991 (Reference 2),

NRC acknowledged that the performance of these expanded PRAs was not required to fulfil Generic Letter 88-20. However, the staff continued to encourage TVA to perform the expanded PRAs for BFN Units 1 and 3.

In February 1992 (Reference 3), TVA committed to perform an expanded'PRA. TVA stated that intended to submit a summary report to NRC prior it to the restart of Unit,3. However, TVA did not consider completion of this work to be a restart prerequisite. NRC's review of the TVA approach for addressing multi-unit dependencies was provided in July 1992 (Reference 4). The Staff agreed that this report was not a prerequisite for the restart. of Unit 3.

Status: Complete. The BFN Multi-Unit PRA was submitted for NRC review in Reference 5.

References:

1. NRC letter to TVA, dated August 13, 1990, PRA Concerns Regarding Operation of Browns Ferry, Units 1 and 3 2 ~ NRC letter to TVA, dated June 28, 1991, Individual Plant Examination for Severe Accident Vulnerabilities (Generic Letter 88-20), Browns Ferry Nuclear Plant, Units 1, 2, and 3

R I'

0

3 ~ TVA letter to NRC, dated February 7, 1992, Expanded Probabilistic Risk Assessment (PRA)

Considering Operation of Browns Ferry, Units 1 and 3 4 NRC letter to TVA, dated July 22, 1992, TVA Approach for Addressing Inter-Unit Dependencies as part of the Individual Plant Examination for the Browns Ferry Nuclear Plant

5. TVA letter to NRC, dated April 14, 1995, Multi-Unit. Probabilistic Risk Assessment (PRA)

Restart Test Program [TAC M81791]

Commitment: For those systems that support safe shutdown, administrative controls for the Restart Test Program will be implemented to insure that an assessment of the Unit 2 System Test Specifications, test procedures, and test results is performed.. Administrative controls will be used to insure that the status of the operating unit is considered during the planning and scheduling of restart tests.

The restart test program was submitted in Reference 1 and supplemented by References 2 through 5. The NRC's Safety Evaluation of the restart test program was contained in Reference 6. TVA submitted changes to the Restart Test Program in Reference 7.

Status: Complete. Site Standard Practice 8.50, Restart Test Program, and 3-STM-001, Startup Test Manual, includes the committed administrative controls.

References:

1. TVA letter to NRC, dated September 27, 1991, Restart Test Program (RTP) Description for Units 1 and 3 2 ~ TVA letter to NRC, dated February 18, 1992, Request for Additional Information Regarding the Restart Test Program for Units 1 and 3 3 ~ TVA letter to NRC, dated December 28, 1992, Update of Restart Test Program (RTP) Submittal for Units 1 and 3 4 ~ TVA letter to NRC, dated July 19, 1993, Restart Test Program (RTP) Update for Units 1 and 3 E1-97
5. TVA letter to NRC, dated February 3, 1994, Restart Test Program (RTP) Update for Units 1 and 3
6. NRC letter to TVA, dated August 30, 1994, Browns Ferry Nuclear Plant Units 1 and 3 Restart Test Program 7 ~ TVA letter to NRC, dated October 19, 1995, Browns Ferry Nuclear Plant (BFN) Unit 3 Changes to Restart Test Program and Power Ascension Program Seismic Class II Spray [TAC M80015]

Over I/Spacial Systems Interactions and Water Commitment: The Seismic Class II Over I/Spacial Systems Interactions and Water Spray program will be implemented in accordance with the Unit 2 precedent.

Discussion: TVA is utilizing a two phase program to address Class II systems. The action plan for Unit 3 was provided to the NRC in Reference 1. The first phase, to be completed before restart, involves the evaluation of potential seismic-induced water spray effects of Class II systems on Class The second phase of the program I

systems.

involves the evaluation of potential seismic-induced, spatial interaction effects of Class II systems on Class I systems. The second phase has been incorporated into the resolution of Unresolved Safety Issue (USI) A-46. The approval of the Seismic Class II Over I/Spacial Systems Interactions and Water Spray program is contained in NUREG-1232 (Reference 2).

Status: Open. The restart portion of this issue (seismic induced water spray hazards program) has been completed. Areas where Class II seismic features could possibly interact with Class I seismic features have been evaluated. The results of the evaluation required minor modifications to piping support configurations in the plant. These modifications have been completed.

The second phase, involving spatial interaction effects of Class II systems on Class I systems incorporated into USI A-46, which will has ~been be completed prior to March 19, 1996.

TVA letter to NRC dated February 27, 1991, Browns Ferry Nuclear Plant (BFN) Action Plan to

Disposition Concerns Related to Units 1 and 3 Seismic Class II Piping Over Class I Commodities

2. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2 Browns Ferry, Unit 2, Section 2.2.4.2 (Page 2-10)

Small Bore Piping t'TAC M80013 and R00306]

Commitment: The Seismic Class I small bore piping will be qualified to meet the final design criteria.

Discussion: TVA's action plan to disposition concerns related to Units 1 and 3 small bore piping was provided in Reference 1 and augmented by Reference 2. NRC approval of this program is documented in the Safety Evaluation transmitted by Reference 3.

Status: Open. The field work associated with this issue has been completed. TVA is currently in the process of paper closure and independent verification. These remaining items will be

\

completed prior to restart.

References:

1. TVA letter to NRC, dated February 27, 1991, Action Plan to Disposition concerns Related to Units 1 and 3 Small Bore Piping 2 ~ TVA letter to NRC, dated December 12, 1991, Small Bore Piping Program, Tubing, and Conduit Support Plans for Units 1 and 3 Additional Information 3 ~ NRC letter to TVA, dated February 4, 1992, Safety Evaluation of Small Bore Piping and Seismic Qualification of Instrument Tubing Programs for Browns Ferry Nuclear Plant, Units 1 and 3 Unresolveck Safety Issue A-7 (MPA D-01) - Mark I Long-Term Program

[TAC M80686 and M07931]

Commitment: TVA will complete Unresolved Safety Issue A-7 (MPA D-01) Mark I Long-Term Program.

Discussion: Refer to the previous item entitled Long Term Torus Integrity Program.

Status: Refer to the previous item entitled Long Term Torus Integrity Program.

References:

None.

E1-99

8 n ~

II eX

t Unresolved Safety Issue A Anticipated Transi.ents Wi.thout Scram (ATWS) [10 CFR 50.62] [TAC M59074]

Commitment: TVA 1.

committed Install an to:

Alternate Rod Insertion (ARI) system,

2. Modify the Standby Liquid Control (SLC) system to ensure that the system will provide the equivalent of injecting a minimum of 86 gallons per minute of 13-weight percent sodium borate solution, and
3. Install an automatic Recirculation Pump Trip (RPT) under conditions of an ATWS.

Discussion: TVA endorsed the BWR Owners'roup recommendations regarding ATWS design in Reference 1. The NRC Staff requested additional information in Reference 2, which was provided by TVA in Reference 3. The required Technical Specification changes were proposed in Reference 4 and approved in Reference 5.

NRC verification that TVA's design conformed to the ATWS rule, with the exception of the diversity issue, was provided in Reference 6.

TVA committed to implement the diversity requirements in Reference 7.

Status: Complete. TVA has performed the required modifications to comply with 10 CFR 50.62, including the diversity requirements listed in Reference 7.

References:

1. TVA letter to NRC, dated March 1, 1988, Anticipated Transients Without Scram (ATWS)

Rule (10 CFR 50.62) Plant Specific Design 2 ~ NRC letter to TVA, dated April 13, 1988, Anticipated Transients Without Scram (ATWS)

Rule (10 CFR 50.62) Plant Specific Submittal 3 ~ TVA letter to NRC, dated July 15, 1988, Anticipated Transients Without Scram (ATWS)

Rule (10 CFR 50.62) Detailed Plant Specific Design 4 ~ TVA letter to NRC, dated August 4, 1988,

- TVA BFN Technical Specification No. 252 Anticipated Transients Without Scram (ATWS) Recirculation Pump Trip (RPT) Section 3.2/4.2 L E1-100

V r

l>> ~ l 4kq

5. NRC letter to TVA, dated January 26, 1989, Technical Specifications on Anticipated Transients Without Scram (ATWS) Recirculation Pump Trip (RPT) (TS 252)
6. NRC letter to TVA, dated January 22, with Rule 10 CFR 50.62 Relating to 1989,'ompliance Alternate Rod Injection and Reactor Pump Trip System 7 ~ TVA letter to NRC, dated November 29, 1990, Anticipated Transients Without Scram (ATWS)

Response to NRC Followup Items Received During ATWS Inspection Unresolved Safety Issue A-24 (MPA B-60) - Qualification of Class IE Safety-Related Equipment [TAC M42483]

Commitment: TVA will complete Unresolved Safety Issue (USI)'-24 (MPA B-60) Qualification of Class IE'afety-Related Equipment.

Discussion: Refer to the previous issue entitled Environmental Qualification.

Refer to the previous issue entitled Environmental Qualification.

References:

None.

Unresolved Safety Issue A<<36 (MPA C-10) - Control of Heavy Loads Near Spent Fuel, Pool [TAC M08438]

Commitment: TVA will complete

- Unresolved Safety Issue A-36 (MPA C-10) Control of Heavy Loads Near Spent Fuel Pool.

Discussion: Refer to previous item entitled Multi-Plant Action Item C-10 Control of Heavy Loads Phase I (NUREG-0612) .

Status: Refer to previous item entitled Multi-Plant Action Item C-10 Control of Heavy Loads Phase I (NUREG-0612) .

References:

None.

E1-101

t Unresolved Safety Issue A>>42 Water Reactors [TAC M85296]

Commitment: TVA (MPA (MPA will complete B-05)

Reactors.

B-05) - Pipe Cracks in Boiling Unresolved Safety Issue A-42 Pipe Cracks in Boiling Water Discussion: Refer to previous topic entitled Generic Letter 88-01 NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.

Status: Refer to previous topic entitled Generic Letter 88-01 NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.

References:

None.

Unresolved Safety Issue A-44 - Station Blackout [10 CFR 50.63]

[TAC M68519]

Commitment: TVA committed to the following:

1. The safety-related unit batteries 2 and 3 will be replaced with batteries having a higher number of plates per cell and containing a greater ampere hour capacity,
2. The existing Unit Preferred Motor-Motor-Generator (MMG) sets will either be transferred to a nonsafety-related battery or load shed during a Station Blackout (SBO) event, and
3. The 120VAC Reactor Core Isolation Cooling (RCIC) system controls, which are currently supplied from the MMG sets, will be transferred to an appropriate source.

Discussion: 'TVA provided information regarding conformance with the Station Blackout Rule for Unit 3 in Reference l. Additional information was requested by the NRC Staff in Reference 2 and provided by TVA in Reference 3. A change in coping strategy and emergency AC group classification was proposed by TVA in Reference 4. In Reference 5, the NRC Staff issued a Safety Evaluation that documents conformance with 10 CFR 50.63 for BFN Units 1, 2, and 3. TVA provided the implementation schedules for conformance with the Station Blackout Rule in Reference 6.

El-102

41 E

I I,

Status: Complete. TVA has performed the required modifications to comply with 10 CFR 50.63.

(Note: Unit 1 preferred MMG set normal and alternate feeds have been deenergized by maintaining their feeder breakers open.)

References:

l. TVA letter to Response to NRC NRC, dated December 2, 1991, Safety Evaluation (SE) on the Conformance of BFN Plant with the Station Blackout Rule (SBO) (10 CFR 50.63) 2 ~ NRC letter to TVA, dated March 5, 1992, Request for Additional Information on Station Blackout for Browns Ferry 3 ~ TVA le'tter to NRCi dated March 27 1992 NRC g Request for Additional Information Regarding TVA's Response to NRC's Safety Evaluation (SE) on the Conformance of BFN Plant with the Station Blackout Rule (SBO) (10 CFR 50.62) 4 ~ TVA letter to NRC, dated May. 28, 1992, Proposed Change in Station Blackout, (SBO) Coping Strategy and Emergency AC (EAC) Group Classification
5. NRC letter to TVA, dated September 16, 1992, Station Blackout Browns Ferry Units 1, 2, and 3 (MPA-A022)
6. TVA letter to NRC, dated October 15, 1992, Response to NRC Supplemental Safety Evaluation on the Conformance of BFN with the Station Blackout (SBO) Rule Unresolved Safety Issue A Seismic Qualification of Equipment in Operating Plants [TAC M69432]

Commitment: The seismic qualification of mechanical and electrical equipment will use the approach developed by the Seismic Qualification Utilities Group (SQUG) .

Discussion: In Reference 1, the NRC staff stated that the issues relating to the seismic qualification of mechanical and electrical equipment would be resolved when the staff implemented its resolution of USI A-46. The status of this commitment was discussed in Reference 2.

Reference 3 transmitted the NRC staff's Supplemental Safety Evaluation Report (SER) of the SQUG's Generic Implementation Procedure for the resolution of USI A-46. As committed in E1-103

~<

U

~ % ~ 4

' c

~%

Reference 4, a Seismic Evaluation Report summarizing the results of the USI A-46 and seismic Individual Plant Examination of External Events (IPEEE) programs for BFN Units 1, 2, and 3 will be submitted to NRC prior to the restart of Unit 1. This report will document the long-term seismic qualification of mechanical and electrical equipment. In Reference 5, NRC stated that TVA's proposed completion date for Units 2 and 3 was unacceptable.

Status: Open. In Reference 6, TVA committed to complete the seismic portion of the USI A-46 program prior to March 19, 1996. The NRC found this commitment to be acceptable as documented in Reference 7.

References:

1. NRC letter to TVA, dated January 23, 1991, NUREG-1232, Volume 3, Supplement 2 Browns Ferry Unit 2 [Section 2.2.2.3, Page 2-10]
2. TVA letter to NRC, dated September 20, 1991, Status and Schedule for Completion of Unit 2 Post-Restart Issues [Section III.3.12, Page 21]

3 ~ NRC letter to All Unresolved Safety Issue (USI)

A-46 Plant Licensees who are Members of the Seismic Qualification Utility Group (SQUG), dated May 22, 1992, Supplement No. 1 to Generic Letter 87-02 that Transmits Supplemental Safety Evaluation Report No. 2 on SQUG Generic Implementation Procedure, Revision 2, as Corrected on February 14, 1992 4 ~ TVA letter to NRC, dated September 21 1992(

Supplement 1 to Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46 and Supplement 4 to Generic Letter 88-20, Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities

5. NRC letter to TVA; dated November 19, 1992, Generic Letter 87-02, Supplement 1 Response-Browns Ferry Nuclear Plant
6. TVA letter to NRC, dated January 19, 1993, Generic Letter 87-02, Supplement 1, 120-Day Response, Request for Additional Information 7 ~ NRC letter to TVA, dated March 19, 1993, Generic Letter 87-02, Supplement 1 Response Browns Ferry Nuclear Plant E1-104

t

~ 4 I.R

t Unresolved Safety Issue A-48 Commitment: TVA (USI) A-48 (MPA (MPA A-19) Hydrogen Control Measures and Effects of Hydrogen Burns [TAC M55955]

will complete Unresolved Safety Issue A-19) Hydrogen Control Measures and Effects of Hydrogen Burns.

Discussion USI A-48 is resolved by the implementation of 10 CFR 50.44, Standards for Combustible Gas Control System in Light Water-Cooled Power Reactors. Clarification of these requirements for Mark I BWR plants was provided by Generic Letter 84-09 (Reference 1). TVA's response to Generic Letter 84-09 was provided by Reference 2.

The NRC Staff requested additional information in Reference 3, which was provided by TVA in Reference 4.

The NRC issued an Evaluation of TVA's response to Generic Letter 84-09 and a request for Technical Specification changes in Reference 5. The requested Technical Specifications were proposed by Reference 6 and approved in Reference 7.

Status: Complete. TVA has performed modifications which provide an alternate supply of nitrogen to the Drywell Control Air System. This modification eliminates the need to use air as a pneumatic supply to valves for assuring primary containment integrity. The Technical Specifications changes which were approved in Reference 7 will ensure that the control air supply valve for the pneumatic control system is closed prior to reactor startup.

NRC has reviewed the correspondence related to Generic Letter 84-09 and the design change associated with the Control Air System modifications. Based on this review, the inspector considers this issue closed for Unit 3.

This is documented in Reference 8.

References:

1. NRC letter to All Licensees of Operating Reactors, dated May 8, 1994, Recombiner Capability Requirements of 10 CFR 50.44(c)(3)(ii)

(Generic Letter No. 84-09)

2. TVA letter to NRC, dated July 2, 1984, in regards to Generic Letter 84-09 3 ~ NRC letter to TVA, dated March 10, 1986, Hydrogen Recombiner Relief
4. TVA letter to NRC, dated May 13, 1986, in regards to Hydrogen Recombiner Capability
5. NRC letter to TVA, dated September 9, 1986, Hydrogen Recombiner Capability
6. TVA letter to NRC, dated June 4, 1987, TVA BFN TS 233
7. NRC letter to TVA, dated February'12, 1988, Technical Specification Change Related to Generic Letter 84-09 Hydrogen Recombiner Capability
8. NRC letter to TVA, dated October 13, 1995, NRC Inspection Report 95-51 [Section 5.6, page 31]

E1-106

ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

SUMMARY

OF REMAINING UNIT 3 RESTART ISSUES TOPIC COMMITMENT SCHEDULE PAGE Bulletin 79-02 Pipe TVA will complete Bulletin 79-02 The field work associated with El-2 Support Baseplate Designs this issue has been completed.

Using Concrete Anchor Bolts TVA is currently in the process

[TAC R00017] of paper closure and independent verification.

These remaining items will be completed prior to restart.

Bulletin 79-14 Seismic TVA will complete Bulletin 79-14 The field work associated with El-4 Analyses for As-Built this issue has been completed.

Safety-Related Piping TVA is currently in the process Systems [TAC R00017] of paper closure and independent verification.

These remaining items will be completed prior to restart.

Bulletin 93-02 >> Debris TVA will complete Bulletin 93-02 TVA has completed the walkdown El-13 Plugging of Emergency Core for permanent fibrous material.

Cooling Suction Strainers, Administrative procedures are and Supplement 1 [TAC M86537 in place which require and M89279] documentation of the removal of temporary fibrous air filters or other sources of fibrous material prior to drywell closure, This will be completed prior to restart.

TOPIC COMMITMENT SCHEDULE PAGE Bulletin 95-02 Unexpected TVA will provide a report indicating TVA will provide the report by El-15 Clogging of a Residual Heat actions taken in order to comply with November 13, 1995.

Removal (RHR) Pump Strainer the requested actions of Bulletin While Operating in 95-02.

Suppression Pool Cooling Mode Cable Tray Supports TVA intends to utilize the Seismic The field work. associated with El-30

[TAC M80684] Qualification Utility Group (SQUG) this issue has been completed.

Generic Implementation Procedure TVA is currently in the process (GIP) for seismic qualification of of paper closure and cable trays. independent verification.

These remaining items will be completed prior to restart.

Component and Piece Part TVA will implement a component and The field work associated with El-31 Qualification [TAC M83828] piece part qualification program. this .issue has been completed.

TVA is currently in the process of paper closure and independent verification.

These remaining items will be completed prior to restart.

Conduit Supports [TAC M80690 TVA intends to utilize the seismic The field work associated with El-32 and R00024] Qualification Utility Group (SQUG) this issue has been completed.

Generic Implementation Procedures TVA is currently in the process (GIP) for seismic qualification of of paper closure and conduit supports. independent verification.

These remaining items will be completed prior to restart.

Configuration The Unit 3 Design Baseline TVA will complete this item El-33 Management/Design Baseline Verification Program (DBVP) will prior to restart.

[TAC M80688] consolidate the two-phase (pre- and post-restart) approach perform on Unit 2.

E2-

TOPIC COMMITMENT SCHEDULE PAGE Environmental Qualification TVA will complete the qualification The field work associated with El-36 of Class IE safety-related equipment. this issue has been completed.

TVA is currently in the process of paper closure and independent verification.

These remaining items will be completed prior to restart.

Fire Protection/10 CFR 50, TVA will implement a Fire TVA will implement a Fire El-36 Appendix R [TAC M48136 and Protection/10 CFR 50, Appendix R Protection/10 CFR 50, M85254] Program. Appendix R Program prior to restart.

Generic Letter 88-14 TVA will complete Generic Letter TVA will complete this item El-48 Instrument Air Supply System 88 Instrument Air Supply System prior to restart.

Problems Affecting Safety- Problems Affecting Safety-Related Related Equipment Equipment

[TAC M71633]

Instrument Tubing Safety-Related Instrument Tubing will The field work associated with E1-69

[TAC M80036] be seismic qualified to meet the this issue has been completed.

final design criteria. TVA is currently in the process.

of paper closure and independent verification.

These remaining items will be completed prior to restart.

NUREG-0737 (TMI Action Plan) TVA will complete NUREG-0737 (TMI The field work associated with El-80 Action Item I.D.1 Control Action Plan) Action Item I.D.1- this issue has been completed.

Room Design Review Control Room Design Review TVA is currently in the process

[TAC M45778 and M56106] of paper closure and independent verification.

These remaining items will be completed prior to restart.

- TOPIC COMMITMENT SCHEDULE PAGE Small Bore Piping The Seismic Class I Small Bore Pi.ping The field work associated with El-99

[TAC M80013 and R00306] will be qualified to meet the final this issue has been completed.

desi.gn criteria. TVA is currently in the process of paper closure and independent verification.

These remaining items wi.ll be completed prior to restart.

ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROOMS FERRY NUCLEAR PLANT tBFN)

SUMMARY

OF REMAINING UNIT 3 POST-RESTART ISSUES TOPIC COMMITMENT SCHEDULE PACE Flexible Conduits Seismic quali.ficati.on of flexible The restart portions of this E1-36 condui.t, other than those connected i.ssue have been completed by to electri.cal equipment covered by resolving those actions 10 CFR 50.49 wi.ll be included as part: necessary for flexible conduits of the resolution of USI A-46. attached to electri.cal equipment covered by 10 CFR 50.49.

Flexible conduits'ttached to safety-related electrical .=

equipment not covered by 10 CFR 50.49 and within the scope of USI A-46 wi.ll be evaluated as part of the resolution of USI A-46, which will be completed prior to March 19, 1996.

Ceneri.c Letter 88-20, TVA will complete the internal fires The seismic portion of the El-48 Supplement 4, Individual IPEEE and provide a summary report to IPEEE will be submitted by Plant Examination of NRC. A seismic IPEEE will be March 19, 1996. TVA will External Events (IPEEE) submitted prior to March 19, 1996. complete the internal fires IPEEE and provide a summary report to NRC within one hundred twenty days from its first refueling outage following restart.

TOPIC COMMITMENT SCHEDULE PAGE Generic Letter 89 TVA will install and make operational The SPDS is fully functional. E1-51 Safety Parameter Display a SPDS. In accordance with Generic System (SPDS) Letter 89-06, TVA will certify its compliance with the requirements of NUREG-0737, Supplement 1, within two months after the SPDS is declared fully operational.

Generic Letter 89-10, TVA will complete Generic Letter The majority of the motor El-54 Safety-Related 89-10 Safety-Related Motor-Operated operated valves have been Motor-Operated Valve Testing Valve Testing and Surveillance during successfully tested. Two HPCI and Surveillance the power ascension test program. valves remain to be tested during the power ascension testing.

Generic Letter 94-02 Long- TVA will implement the BWROG Option TVA intends to have the power El-63 Term Solutions and Upgrade of Interim Operating III methodology for the stability range neutron monitoring (PRNM)

III long-term solution. upgrade with the Option Recommendations for Thermal- trip in the "indicate only" Hydraulic Instabilities in mode installed during the Unit Boiling Water Reactors. 3 Cycle 7 refueling outage.

Following one cycle of operation for testing, TVA intends to enable the stability trip function prior to startup from the Cycle 8 refueling outage.

NUREG-0737 (TMI Action Plan) TVA will install a PASS. The PASS has been installed and El-82 Action Item II.B.3 is functional. Testing of the Post-Accident Sampling PASS during power ascension System (PASS) testing will confirm agreement with measurements taken at the normal sampling points.

NUREG 0737 (TMI Action Plan) Convert level instruments to analog Installation is complete and E1-90 Action Item 2.F.2.4 (Generic trip units and limit vertical drop of equipment operable. Some Letter 84-23) reference legs inside drywell. confirmatory testing is to be Instrumentation for performed at power.

Detection of Inadequate Core Cooling E3-

TOPIC COMMITMENT SCHEDULE PAGE Seismic Class II Over I/

Spacial Systems Interactions TVA will evaluate potential The restart portion of this E1-98 seismic-induced, spatial interaction issue (seismic induced water and Water Spray effects of Class Class I II systems on spray hazards program) has been systems. completed.

The second phase, involving spatial interaction effects of Class II systems on Class I systems has been incorporated into USI A-46, which will be completed prior to March 19, 1996.

Unresolved Safety Issue A-46 Seismic Qualification of TVA will complete the seismic portion This program will be completed El-103 of the USI A-46 program. prior to March 19, 1996 Ecpxipment in Operating Plants E3-0

4 J