(412) 471-4300 435 Sixth Avenue                .g Pittsburgh, Pennsylvania
(412) 471-4300 435 Sixth Avenue                .g Pittsburgh, Pennsylvania February 8, 1979 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention: A. Schwencer, Chief Operating Reactors, Branch No. 1 Division of Operating Reactors Washington, D. C. 20555
            ' '# "
February 8, 1979 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention: A. Schwencer, Chief Operating Reactors, Branch No. 1 Division of Operating Reactors Washington, D. C. 20555


==Reference:==
==Reference:==
Line 29: Line 26:
It was verified that sufficient physical features were provided to facilitate administrative controls, or that indication was provided to the operator at the controls to enable the rapid detection of an abnormal operating condition.
It was verified that sufficient physical features were provided to facilitate administrative controls, or that indication was provided to the operator at the controls to enable the rapid detection of an abnormal operating condition.
Procedures controlling the use of bypasses, blocks, jumpers, and manual overrides are in effect. Manual overrides are not automatically annunciated at the system level, but adequate indication as described in the facility Final Safety Analysis Report in response to Question 7.9 is availabic.
Procedures controlling the use of bypasses, blocks, jumpers, and manual overrides are in effect. Manual overrides are not automatically annunciated at the system level, but adequate indication as described in the facility Final Safety Analysis Report in response to Question 7.9 is availabic.
                                                                                                    @
7902140 6\                                      og
7902140 6\                                      og
                                                                                                     *e
                                                                                                     *e


,A  +
,A  +
  ,
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Response to November 28, 1978 Letter Concerning Containment Purging During Normal Operation Page            The administratively controlled Engineered Saferv Features Status Panel does provide indication of the availability of this equipment on a system level.
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Response to November 28, 1978 Letter Concerning Containment Purging During Normal Operation Page            The administratively controlled Engineered Saferv Features Status Panel does provide indication of the availability of this equipment on a system level.
Very truly yours, 1f ( ( t m , m.
Very truly yours, 1f ( ( t m , m.
C. N. Dunn Vice President, Operations}}
C. N. Dunn Vice President, Operations}}

Latest revision as of 22:03, 1 February 2020

Responds to NRC 781128 Ltr Re Containment Purging During Normal Operation.Reviewed Design of Safety Actuation Signals to Ensure That Overriding of One Signal Does Not Inhibit Other Signals.Maintains Subatmospheric Conditions
ML19261B176
Person / Time
Site: Beaver Valley
Issue date: 02/08/1979
From: Dunn C
DUQUESNE LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-44830, NUDOCS 7902140131
Download: ML19261B176 (2)


Text

k e ._

(412) 471-4300 435 Sixth Avenue .g Pittsburgh, Pennsylvania February 8, 1979 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention: A. Schwencer, Chief Operating Reactors, Branch No. 1 Division of Operating Reactors Washington, D. C. 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Response to November 28, 1978 Letter Concerning Containment Purging During Normal Operation Gentlemen:

The Beaver Valley Power Station is required, by a Limiting Condition of Operation described in Appendix A, Technical Specification 3.6.1.4, to maintain subatmospheric conditions within the containment at all times when the average reactor coolant system temperature is equal to or greater than 200*F. This Limiting Condition for Operation precludes the purging of the Beaver Valley Containment during normal operation.

In accordance with the last paragraph of this letter which was otherwise inapplicable to Beaver Valley, we have conducted a review of the design of all safety actuation signals, which incorporate a manual override feature, to ensure that overriding of one safety actuation signal does not bypass or inhibit another safety actuation signal.

It was verified that sufficient physical features were provided to facilitate administrative controls, or that indication was provided to the operator at the controls to enable the rapid detection of an abnormal operating condition.

Procedures controlling the use of bypasses, blocks, jumpers, and manual overrides are in effect. Manual overrides are not automatically annunciated at the system level, but adequate indication as described in the facility Final Safety Analysis Report in response to Question 7.9 is availabic.

7902140 6\ og

  • e

,A +

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Response to November 28, 1978 Letter Concerning Containment Purging During Normal Operation Page The administratively controlled Engineered Saferv Features Status Panel does provide indication of the availability of this equipment on a system level.

Very truly yours, 1f ( ( t m , m.

C. N. Dunn Vice President, Operations