| title = (External_Sender) Oyster Creek FHRR Clarification Question 1.a Response
| title = NRR E-mail Capture - (External_Sender) Oyster Creek FHRR Clarification Question 1.a Response
| author name = Distel D J
| author name = Distel D
| author affiliation = Exelon Corp
| author affiliation = Exelon Corp
| addressee name = Govan T V
| addressee name = Govan T
| addressee affiliation = NRC/NRR/JLD
| addressee affiliation = NRC/NRR/JLD
| docket = 05000219
| docket = 05000219
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Distel, David J:(GenCo-Nuc) <David.Distel@exeloncorp.com>
{{#Wiki_filter:NRR-PMDAPEm Resource From:                               Distel, David J:(GenCo-Nuc) <David.Distel@exeloncorp.com>
Sent: Thursday, January 14, 2016 10:49 AM To: Govan, Tekia Cc:Joe Bellini; Samlal, Valmicky:(GenCo-Nuc)
Sent:                               Thursday, January 14, 2016 10:49 AM To:                                 Govan, Tekia Cc:                                 Joe Bellini; Samlal, Valmicky:(GenCo-Nuc)


==Subject:==
==Subject:==
[External_Sender] Oyster Creek FHRR Clarification Question 1.a ResponseTekia - The following information provides the response for NRC clarification Question 1.a, as discussed in today's follow-up conference call.  
[External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Tekia - The following information provides the response for NRC clarification Question 1.a, as discussed in todays follow-up conference call.
 
Follow-up Response to Question 1a of the Oyster Creek FHRR Audit Information Request In Question 1a of the Oyster Creek FHRR Audit Information Request, the NRC sought clarification as to whether structures at the northeast corner of the Reactor Building would permit the conveyance of LIP-generated surface water runoff along the east face of the Reactor Building. Exelon clarified that the area at the northeast corner of the Reactor Building and along the east side of the Reactor Building (between the Reactor Building and the Old Rad Waste Building) is obstructed to flow. The NRC agreed with this clarification but did not agree that the FLO-2D model (updated to replace Area Reduction Factors with raised ground elements to more conservatively account for roof runoff) represented this obstruction. Exelon reviewed the updated model and concur that, when Area Reductions Factors were removed, a gap was inadvertently created between the Reactor Building and Old Radwaste Building, which is occupied by the Drywell Processing Center. The FLO-2D model was corrected to fill this gap with a raise ground element and prevent flow from passing between the buildings, which resulted in a flooding depth of 0.87 foot above the door sill (a 0.36 foot increase) at Door 9. The increase appears to be the same as the NRCs sensitivity analysis described in the follow-up question. The flooding duration also increased by 0.58 hour. The table below presents the corrected results for each door location.
Follow-up Response to Question 1a of the Oyster Creek FHRR Audit Information Request  
Exelon is currently preparing an updated LIP calculation to incorporate the correction.
 
Flooding Max. Flooding Station                          Duration Depth Above Reference                               Grade/                          Above the Max. Water Surface                     the Station Grid                                Door Sill                         Station Door No.                                                                   Grade/Door Sill Element                                Elevation                     Grade/Door Sill Elevation No.                                                                  Elevation ft. (NAVD       ft.
In Question 1a of the Oyster Creek FHRR Audit Information Request, the NRC sought clarification as to whether structures at the northeast corner of the Reactor Building would permit the conveyance of LIP-generated surface water runoff along the east face of the Reactor Building. Exelon clarified that the area at the northeast corner of the Reactor Building and along the east side of the Reactor Building (between the Reactor Building and the Old Rad Waste Building) is obstructed to flow. The NRC agreed with this clarification but did not agree that the FLO-2D model (updated to replace Area Reduction Factors with raised ground elements to more conservatively account for roof runoff) represented this obstruction. Exelon reviewed the updated model and concur that, when Area Reductions Factors were removed, a gap was inadvertently created between the Reactor Building and Old Radwaste Building, which is occupied by the Drywell Processing Center. The FLO-2D model was corrected to fill this gap with a raise ground element and prevent flow from passing between the buildings, which resulted in a flooding depth of 0.87 foot above the door sill (a 0.36 foot increase) at Door 9. The increase appear s to be the same as the NRC's sensitivity analysis described in the follow-up question. The flooding duration also increased by 0.58 hour. The table below presents the corrected results for each door location. Exelon is currently preparing an updated LIP calculation to incorporate the correction.
Ft (MSL)           ft.             hrs.
Door No. Reference Grid Element No. Max. Water Surface Station Grade/ Door Sill Elevation Max. Flooding Depth Above the Station Grade/Door Sill Elevation Flooding Duration Above the Station Grade/Door Sill Elevation ft. (NAVD  
: 88)      (MSL)
: 88) ft. (MSL) Ft (MSL) ft. hrs. Door 1 24458 22.70 22.72 23.50 -0.78 0.00 Door 2 26887 22.75 22.77 23.50 -0.73 0.00 Door 3 23275 22.70 22.72 23.50 -0.78 0.00 Door 4 26895 23.16 23.18 23.50 -0.32 0.00 Door 5 22982 22.70 22.72 23.50 -0.78 0.00 Door 6 27829 23.02 23.04 23.50 -0.46 0.00 Door 7 30020 23.07 23.09 23.50 -0.41 0.00 Door 8 31919 23.20 23.22 23.50 -0.28 0.00 Door 9 26009 24.35 24.37 23.50 0.87 1.52 Door 10 20654 22.62 22.64 23.62 -0.98 0.00 Door 11 20647 22.82 22.84 23.61 -0.77 0.00 2Door 12 19802 23.57 23.59 23.60 -0.01 0.00 Door 13 18978 23.63 23.65 23.69 -0.04 0.00
Door 1                 24458             22.70     22.72     23.50           -0.78             0.00 Door 2                 26887             22.75     22.77     23.50           -0.73             0.00 Door 3                 23275             22.70     22.72     23.50           -0.78             0.00 Door 4                 26895             23.16     23.18     23.50           -0.32             0.00 Door 5                 22982             22.70     22.72     23.50           -0.78             0.00 Door 6                 27829             23.02     23.04     23.50           -0.46             0.00 Door 7                 30020             23.07     23.09     23.50           -0.41             0.00 Door 8                 31919             23.20     23.22     23.50           -0.28             0.00 Door 9                 26009             24.35     24.37     23.50           0.87             1.52 Door 10                 20654             22.62     22.64     23.62           -0.98             0.00 Door 11                 20647             22.82     22.84     23.61           -0.77             0.00 1
 
Please let me know if any additional information is needed.


Door 12                19802          23.57      23.59    23.60          -0.01            0.00 Door 13                18978          23.63      23.65    23.69          -0.04            0.00 Please let me know if any additional information is needed.
Thanks.
Thanks.
Dave Distel  
Dave Distel This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.
Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 2


This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Ema il to the intended recipien t(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete th is Email and any copies.
Hearing Identifier:       NRR_PMDA Email Number:             2594 Mail Envelope Properties       (4BCCAD574B0D614096E6221C12ED97D876AD974B)
Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP Hearing Identifier: NRR_PMDA Email Number: 2594   Mail Envelope Properties   (4BCCAD574B0D614096E6221C12ED97D876AD974B)


==Subject:==
==Subject:==
  [External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Sent Date:   1/14/2016 10:49:13 AM Received Date: 1/14/2016 10:49:19 AM From:   Distel, David J:(GenCo-Nuc)
[External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Sent Date:               1/14/2016 10:49:13 AM Received Date:           1/14/2016 10:49:19 AM From:                     Distel, David J:(GenCo-Nuc)
Created By:   David.Distel@exeloncorp.com Recipients:     "Joe Bellini" <joe.bellini@aterrasolutions.com>
Created By:               David.Distel@exeloncorp.com Recipients:
Tracking Status: None "Samlal, Valmicky:(GenCo-Nuc)" <Valmicky.Samlal@exeloncorp.com> Tracking Status: None "Govan, Tekia" <Tekia.Govan@nrc.gov> Tracking Status: None  
"Joe Bellini" <joe.bellini@aterrasolutions.com>
Tracking Status: None "Samlal, Valmicky:(GenCo-Nuc)" <Valmicky.Samlal@exeloncorp.com>
Tracking Status: None "Govan, Tekia" <Tekia.Govan@nrc.gov>
Tracking Status: None Post Office:              exchm-omf-24.exelonds.com Files                              Size                  Date & Time MESSAGE                            3893                  1/14/2016 10:49:19 AM Options Priority:                          Standard Return Notification:              No Reply Requested:                  No Sensitivity:                      Normal Expiration Date:
Recipients Received:


Post Office:  exchm-omf-24.exelonds.com Files    Size      Date & Time MESSAGE    3893      1/14/2016 10:49:19 AM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
NRR-PMDAPEm Resource From:                               Distel, David J:(GenCo-Nuc) <David.Distel@exeloncorp.com>
1 NRR-PMDAPEm Resource From: Distel, David J:(GenCo-Nuc) <David.Distel@exeloncorp.com>
Sent:                               Thursday, January 14, 2016 10:49 AM To:                                 Govan, Tekia Cc:                                 Joe Bellini; Samlal, Valmicky:(GenCo-Nuc)
Sent: Thursday, January 14, 2016 10:49 AM To: Govan, Tekia Cc:Joe Bellini; Samlal, Valmicky:(GenCo-Nuc)


==Subject:==
==Subject:==
[External_Sender] Oyster Creek FHRR Clarification Question 1.a ResponseTekia - The following information provides the response for NRC clarification Question 1.a, as discussed in today's follow-up conference call.  
[External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Tekia - The following information provides the response for NRC clarification Question 1.a, as discussed in todays follow-up conference call.
 
Follow-up Response to Question 1a of the Oyster Creek FHRR Audit Information Request In Question 1a of the Oyster Creek FHRR Audit Information Request, the NRC sought clarification as to whether structures at the northeast corner of the Reactor Building would permit the conveyance of LIP-generated surface water runoff along the east face of the Reactor Building. Exelon clarified that the area at the northeast corner of the Reactor Building and along the east side of the Reactor Building (between the Reactor Building and the Old Rad Waste Building) is obstructed to flow. The NRC agreed with this clarification but did not agree that the FLO-2D model (updated to replace Area Reduction Factors with raised ground elements to more conservatively account for roof runoff) represented this obstruction. Exelon reviewed the updated model and concur that, when Area Reductions Factors were removed, a gap was inadvertently created between the Reactor Building and Old Radwaste Building, which is occupied by the Drywell Processing Center. The FLO-2D model was corrected to fill this gap with a raise ground element and prevent flow from passing between the buildings, which resulted in a flooding depth of 0.87 foot above the door sill (a 0.36 foot increase) at Door 9. The increase appears to be the same as the NRCs sensitivity analysis described in the follow-up question. The flooding duration also increased by 0.58 hour. The table below presents the corrected results for each door location.
Follow-up Response to Question 1a of the Oyster Creek FHRR Audit Information Request  
Exelon is currently preparing an updated LIP calculation to incorporate the correction.
 
Flooding Max. Flooding Station                          Duration Depth Above Reference                               Grade/                          Above the Max. Water Surface                     the Station Grid                                Door Sill                         Station Door No.                                                                   Grade/Door Sill Element                                Elevation                     Grade/Door Sill Elevation No.                                                                  Elevation ft. (NAVD       ft.
In Question 1a of the Oyster Creek FHRR Audit Information Request, the NRC sought clarification as to whether structures at the northeast corner of the Reactor Building would permit the conveyance of LIP-generated surface water runoff along the east face of the Reactor Building. Exelon clarified that the area at the northeast corner of the Reactor Building and along the east side of the Reactor Building (between the Reactor Building and the Old Rad Waste Building) is obstructed to flow. The NRC agreed with this clarification but did not agree that the FLO-2D model (updated to replace Area Reduction Factors with raised ground elements to more conservatively account for roof runoff) represented this obstruction. Exelon reviewed the updated model and concur that, when Area Reductions Factors were removed, a gap was inadvertently created between the Reactor Building and Old Radwaste Building, which is occupied by the Drywell Processing Center. The FLO-2D model was corrected to fill this gap with a raise ground element and prevent flow from passing between the buildings, which resulted in a flooding depth of 0.87 foot above the door sill (a 0.36 foot increase) at Door 9. The increase appear s to be the same as the NRC's sensitivity analysis described in the follow-up question. The flooding duration also increased by 0.58 hour. The table below presents the corrected results for each door location. Exelon is currently preparing an updated LIP calculation to incorporate the correction.
Ft (MSL)           ft.             hrs.
Door No. Reference Grid Element No. Max. Water Surface Station Grade/ Door Sill Elevation Max. Flooding Depth Above the Station Grade/Door Sill Elevation Flooding Duration Above the Station Grade/Door Sill Elevation ft. (NAVD  
: 88)      (MSL)
: 88) ft. (MSL) Ft (MSL) ft. hrs. Door 1 24458 22.70 22.72 23.50 -0.78 0.00 Door 2 26887 22.75 22.77 23.50 -0.73 0.00 Door 3 23275 22.70 22.72 23.50 -0.78 0.00 Door 4 26895 23.16 23.18 23.50 -0.32 0.00 Door 5 22982 22.70 22.72 23.50 -0.78 0.00 Door 6 27829 23.02 23.04 23.50 -0.46 0.00 Door 7 30020 23.07 23.09 23.50 -0.41 0.00 Door 8 31919 23.20 23.22 23.50 -0.28 0.00 Door 9 26009 24.35 24.37 23.50 0.87 1.52 Door 10 20654 22.62 22.64 23.62 -0.98 0.00 Door 11 20647 22.82 22.84 23.61 -0.77 0.00 2Door 12 19802 23.57 23.59 23.60 -0.01 0.00 Door 13 18978 23.63 23.65 23.69 -0.04 0.00
Door 1                 24458             22.70     22.72     23.50           -0.78             0.00 Door 2                 26887             22.75     22.77     23.50           -0.73             0.00 Door 3                 23275             22.70     22.72     23.50           -0.78             0.00 Door 4                 26895             23.16     23.18     23.50           -0.32             0.00 Door 5                 22982             22.70     22.72     23.50           -0.78             0.00 Door 6                 27829             23.02     23.04     23.50           -0.46             0.00 Door 7                 30020             23.07     23.09     23.50           -0.41             0.00 Door 8                 31919             23.20     23.22     23.50           -0.28             0.00 Door 9                 26009             24.35     24.37     23.50           0.87             1.52 Door 10                 20654             22.62     22.64     23.62           -0.98             0.00 Door 11                 20647             22.82     22.84     23.61           -0.77             0.00 1
 
Please let me know if any additional information is needed.


Door 12                19802          23.57      23.59    23.60          -0.01            0.00 Door 13                18978          23.63      23.65    23.69          -0.04            0.00 Please let me know if any additional information is needed.
Thanks.
Thanks.
Dave Distel  
Dave Distel This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.
Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 2


This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Ema il to the intended recipien t(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete th is Email and any copies.
Hearing Identifier:       NRR_PMDA Email Number:             2594 Mail Envelope Properties       (4BCCAD574B0D614096E6221C12ED97D876AD974B)
Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP Hearing Identifier: NRR_PMDA Email Number: 2594   Mail Envelope Properties   (4BCCAD574B0D614096E6221C12ED97D876AD974B)


==Subject:==
==Subject:==
  [External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Sent Date:   1/14/2016 10:49:13 AM Received Date: 1/14/2016 10:49:19 AM From:   Distel, David J:(GenCo-Nuc)
[External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Sent Date:               1/14/2016 10:49:13 AM Received Date:           1/14/2016 10:49:19 AM From:                     Distel, David J:(GenCo-Nuc)
Created By:   David.Distel@exeloncorp.com Recipients:     "Joe Bellini" <joe.bellini@aterrasolutions.com>
Created By:               David.Distel@exeloncorp.com Recipients:
Tracking Status: None "Samlal, Valmicky:(GenCo-Nuc)" <Valmicky.Samlal@exeloncorp.com> Tracking Status: None "Govan, Tekia" <Tekia.Govan@nrc.gov> Tracking Status: None  
"Joe Bellini" <joe.bellini@aterrasolutions.com>
 
Tracking Status: None "Samlal, Valmicky:(GenCo-Nuc)" <Valmicky.Samlal@exeloncorp.com>
Post Office:   exchm-omf-24.exelonds.com Files     Size     Date & Time MESSAGE   3893     1/14/2016 10:49:19 AM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Govan, Tekia" <Tekia.Govan@nrc.gov>
Tracking Status: None Post Office:             exchm-omf-24.exelonds.com Files                             Size                   Date & Time MESSAGE                           3893                   1/14/2016 10:49:19 AM Options Priority:                         Standard Return Notification:               No Reply Requested:                   No Sensitivity:                       Normal Expiration Date:
Recipients Received:}}

Latest revision as of 20:00, 4 December 2019

NRR E-mail Capture - (External_Sender) Oyster Creek FHRR Clarification Question 1.a Response
ML16015A001
Person / Time
Site: Oyster Creek
Issue date: 01/14/2016
From: Distel D
Exelon Corp
To: Tekia Govan
Japan Lessons-Learned Division
References
Download: ML16015A001 (3)


Text

NRR-PMDAPEm Resource From: Distel, David J:(GenCo-Nuc) <David.Distel@exeloncorp.com>

Sent: Thursday, January 14, 2016 10:49 AM To: Govan, Tekia Cc: Joe Bellini; Samlal, Valmicky:(GenCo-Nuc)

Subject:

[External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Tekia - The following information provides the response for NRC clarification Question 1.a, as discussed in todays follow-up conference call.

Follow-up Response to Question 1a of the Oyster Creek FHRR Audit Information Request In Question 1a of the Oyster Creek FHRR Audit Information Request, the NRC sought clarification as to whether structures at the northeast corner of the Reactor Building would permit the conveyance of LIP-generated surface water runoff along the east face of the Reactor Building. Exelon clarified that the area at the northeast corner of the Reactor Building and along the east side of the Reactor Building (between the Reactor Building and the Old Rad Waste Building) is obstructed to flow. The NRC agreed with this clarification but did not agree that the FLO-2D model (updated to replace Area Reduction Factors with raised ground elements to more conservatively account for roof runoff) represented this obstruction. Exelon reviewed the updated model and concur that, when Area Reductions Factors were removed, a gap was inadvertently created between the Reactor Building and Old Radwaste Building, which is occupied by the Drywell Processing Center. The FLO-2D model was corrected to fill this gap with a raise ground element and prevent flow from passing between the buildings, which resulted in a flooding depth of 0.87 foot above the door sill (a 0.36 foot increase) at Door 9. The increase appears to be the same as the NRCs sensitivity analysis described in the follow-up question. The flooding duration also increased by 0.58 hour6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br />. The table below presents the corrected results for each door location.

Exelon is currently preparing an updated LIP calculation to incorporate the correction.

Flooding Max. Flooding Station Duration Depth Above Reference Grade/ Above the Max. Water Surface the Station Grid Door Sill Station Door No. Grade/Door Sill Element Elevation Grade/Door Sill Elevation No. Elevation ft. (NAVD ft.

Ft (MSL) ft. hrs.

88) (MSL)

Door 1 24458 22.70 22.72 23.50 -0.78 0.00 Door 2 26887 22.75 22.77 23.50 -0.73 0.00 Door 3 23275 22.70 22.72 23.50 -0.78 0.00 Door 4 26895 23.16 23.18 23.50 -0.32 0.00 Door 5 22982 22.70 22.72 23.50 -0.78 0.00 Door 6 27829 23.02 23.04 23.50 -0.46 0.00 Door 7 30020 23.07 23.09 23.50 -0.41 0.00 Door 8 31919 23.20 23.22 23.50 -0.28 0.00 Door 9 26009 24.35 24.37 23.50 0.87 1.52 Door 10 20654 22.62 22.64 23.62 -0.98 0.00 Door 11 20647 22.82 22.84 23.61 -0.77 0.00 1

Door 12 19802 23.57 23.59 23.60 -0.01 0.00 Door 13 18978 23.63 23.65 23.69 -0.04 0.00 Please let me know if any additional information is needed.

Thanks.

Dave Distel This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.

Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 2

Hearing Identifier: NRR_PMDA Email Number: 2594 Mail Envelope Properties (4BCCAD574B0D614096E6221C12ED97D876AD974B)

Subject:

[External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Sent Date: 1/14/2016 10:49:13 AM Received Date: 1/14/2016 10:49:19 AM From: Distel, David J:(GenCo-Nuc)

Created By: David.Distel@exeloncorp.com Recipients:

"Joe Bellini" <joe.bellini@aterrasolutions.com>

Tracking Status: None "Samlal, Valmicky:(GenCo-Nuc)" <Valmicky.Samlal@exeloncorp.com>

Tracking Status: None "Govan, Tekia" <Tekia.Govan@nrc.gov>

Tracking Status: None Post Office: exchm-omf-24.exelonds.com Files Size Date & Time MESSAGE 3893 1/14/2016 10:49:19 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Distel, David J:(GenCo-Nuc) <David.Distel@exeloncorp.com>

Sent: Thursday, January 14, 2016 10:49 AM To: Govan, Tekia Cc: Joe Bellini; Samlal, Valmicky:(GenCo-Nuc)

Subject:

[External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Tekia - The following information provides the response for NRC clarification Question 1.a, as discussed in todays follow-up conference call.

Follow-up Response to Question 1a of the Oyster Creek FHRR Audit Information Request In Question 1a of the Oyster Creek FHRR Audit Information Request, the NRC sought clarification as to whether structures at the northeast corner of the Reactor Building would permit the conveyance of LIP-generated surface water runoff along the east face of the Reactor Building. Exelon clarified that the area at the northeast corner of the Reactor Building and along the east side of the Reactor Building (between the Reactor Building and the Old Rad Waste Building) is obstructed to flow. The NRC agreed with this clarification but did not agree that the FLO-2D model (updated to replace Area Reduction Factors with raised ground elements to more conservatively account for roof runoff) represented this obstruction. Exelon reviewed the updated model and concur that, when Area Reductions Factors were removed, a gap was inadvertently created between the Reactor Building and Old Radwaste Building, which is occupied by the Drywell Processing Center. The FLO-2D model was corrected to fill this gap with a raise ground element and prevent flow from passing between the buildings, which resulted in a flooding depth of 0.87 foot above the door sill (a 0.36 foot increase) at Door 9. The increase appears to be the same as the NRCs sensitivity analysis described in the follow-up question. The flooding duration also increased by 0.58 hour6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br />. The table below presents the corrected results for each door location.

Exelon is currently preparing an updated LIP calculation to incorporate the correction.

Flooding Max. Flooding Station Duration Depth Above Reference Grade/ Above the Max. Water Surface the Station Grid Door Sill Station Door No. Grade/Door Sill Element Elevation Grade/Door Sill Elevation No. Elevation ft. (NAVD ft.

Ft (MSL) ft. hrs.

88) (MSL)

Door 1 24458 22.70 22.72 23.50 -0.78 0.00 Door 2 26887 22.75 22.77 23.50 -0.73 0.00 Door 3 23275 22.70 22.72 23.50 -0.78 0.00 Door 4 26895 23.16 23.18 23.50 -0.32 0.00 Door 5 22982 22.70 22.72 23.50 -0.78 0.00 Door 6 27829 23.02 23.04 23.50 -0.46 0.00 Door 7 30020 23.07 23.09 23.50 -0.41 0.00 Door 8 31919 23.20 23.22 23.50 -0.28 0.00 Door 9 26009 24.35 24.37 23.50 0.87 1.52 Door 10 20654 22.62 22.64 23.62 -0.98 0.00 Door 11 20647 22.82 22.84 23.61 -0.77 0.00 1

Door 12 19802 23.57 23.59 23.60 -0.01 0.00 Door 13 18978 23.63 23.65 23.69 -0.04 0.00 Please let me know if any additional information is needed.

Thanks.

Dave Distel This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.

Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 2

Hearing Identifier: NRR_PMDA Email Number: 2594 Mail Envelope Properties (4BCCAD574B0D614096E6221C12ED97D876AD974B)

Subject:

[External_Sender] Oyster Creek FHRR Clarification Question 1.a Response Sent Date: 1/14/2016 10:49:13 AM Received Date: 1/14/2016 10:49:19 AM From: Distel, David J:(GenCo-Nuc)

Created By: David.Distel@exeloncorp.com Recipients:

"Joe Bellini" <joe.bellini@aterrasolutions.com>

Tracking Status: None "Samlal, Valmicky:(GenCo-Nuc)" <Valmicky.Samlal@exeloncorp.com>

Tracking Status: None "Govan, Tekia" <Tekia.Govan@nrc.gov>

Tracking Status: None Post Office: exchm-omf-24.exelonds.com Files Size Date & Time MESSAGE 3893 1/14/2016 10:49:19 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: