{{#Wiki_filter:August 31, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer
{{#Wiki_filter:August 31, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
 
Exelon Nuclear
 
Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DRESDEN NUCLEAR POWER STATION  
DRESDEN NUCLEAR POWER STATION


==Dear Mr. Crane:==
==Dear Mr. Crane:==


On August 7, 2006, the NRC staff completed its performance review of the Dresden Nuclear Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff
On August 7, 2006, the NRC staff completed its performance review of the Dresden Nuclear Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.
reviewed performance indicators (PIs) for the most recent quarter and inspection results over
Plant performance for the most recent quarter at Dresden Units 2 and 3 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on performing inspection procedure 71004, Power Uprate, to inspect activities related to the steam dryer replacement on Unit 3 during the fall 2006 refueling outage and plan to perform the same inspection procedure during the proposed Unit 2 refueling outage in the fall 2007.
 
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
the previous 12 months. The purpose of this lette r is to inform you of our assessment of yoursafety performance during this period and our plans for future inspections at your facility.
In addition, the resident inspectors plan to perform Temporary Instruction 2515/169, Mitigating Systems Performance Index Verification, prior to the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in
 
Accordance with 10 CFR 2.390" will include the physical protection review and a resultant
 
inspection plan.
Plant performance for the most recent quarter at Dresden Units 2 and 3 was within the Licensee Response Column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on performing inspection
 
procedure 71004, "Power Uprate," to inspect activities related to the steam dryer replacement
 
on Unit 3 during the fall 2006 refueling outage and plan to perform the same inspection
 
procedure during the proposed Unit 2 refueling outage in the fall 2007.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution
 
of any scheduling conflicts and personnel availabilit y issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.  
 
In addition, the resident inspectors plan to perform Temporary Instruction 2515/169, "Mitigating
 
Systems Performance Index Verification," pr ior to the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public
 
Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at
 
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If circumstances arise which cause us to c hange the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any
 
questions you may have regarding this letter or the inspection plan.
Sincerely,/RA/Mark A. Ring, Chief Reactor Projects Branch 1


Division of Reactor Projects Docket Nos. 50-237; 50-249; 72-037 License Nos. DPR-19; DPR-25
C. Crane                                      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
                                              /RA/
Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249; 72-037 License Nos. DPR-19; DPR-25


==Enclosure:==
==Enclosure:==


Dresden Inspection/Activity Plan DISTRIBUTION:
Dresden Inspection/Activity Plan DISTRIBUTION:
See next page C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public
See next page


Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at
C. Crane                                                                  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If circumstances arise which cause us to c hange the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any
Sincerely,
 
                                                                          /RA/
questions you may have regarding this letter or the inspection plan.
Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249; 72-037 License Nos. DPR-19; DPR-25
Sincerely,/RA/Mark A. Ring, Chief Reactor Projects Branch 1
 
Division of Reactor Projects Docket Nos. 50-237; 50-249; 72-037 License Nos. DPR-19; DPR-25


==Enclosure:==
==Enclosure:==


Dresden Inspection/Activity Plan DISTRIBUTION:
Dresden Inspection/Activity Plan DISTRIBUTION:
See next pageDOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\dresden\Dresden MOC Letter 2006.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIERIIIRIIIRIIINAMEMRing:slsDATE08/16/2006 OFFICIAL RECORD COPY C. Crane-3-cc w/encl:Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager
See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\dresden\Dresden MOC Letter 2006.wpd X Publicly Available                       G Non-Publicly Available                 G Sensitive              X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE            RIII                            E RIII                              RIII                              RIII NAME              MRing:sls DATE              08/16/2006 OFFICIAL RECORD COPY


Regulatory Assurance Manager - Dresden
C. Crane                                cc w/encl: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Will County Executive Will County Sheriff Director, Will County Emergency Management Agency Mayor of Joliet City Manager of Joliet Kendall County Board Chairman Kendall County Sheriff Grundy County Board Chairman Grundy County Sheriff Grundy County Emergency Management Agency Mayor of Morris Minooka Village President Mayor of Coal City Mayor of Carbon Hill Mayor of Diamond Mayor of Braidwood Mayor of Wilmington Channahon Village President Channahon Village Administrator Mayor of Shorewood Shorewood Village Administrator Mayor of Elwood INPO


Chief Operating Officer
C. Crane                                  ADAMS Distribution:
DXC1 TEB MXB RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Dresden DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)


Senior Vice President - Nuclear Services
Page 1 of 2                                                                                    Dresden 08/30/2006    12:57:48                                                                Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                                                No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                                    Title                                              on Site        Start    End              Type 71004          - POWER UPRATE                                                                                                    2 2, 3        IP 71004                Power Uprate                                                                                              04/01/2006 12/31/2006 Other Routine MOD5059        - MODIFICATION/50.59 INSPECTION                                                                                  2 2, 3        IP 7111102              Evaluation of Changes, Tests, or Experiments                                                              09/18/2006 10/06/2006 Baseline Inspections 2, 3        IP 7111117B              Permanent Plant Modifications                                                                              09/18/2006 10/06/2006 Baseline Inspections TI            - 2515/169 MSPI VERIFICATION                                                                                      2 2, 3        IP 2515/169              Mitigating Systems Performance Index Verification                                                          10/01/2006 12/31/2006 Safety Issues ISI            - ISI BASELINE INSPECTION                                                                                        1 2, 3        IP 7111108G              Inservice Inspection Activities - BWR                                                                      11/13/2006 11/17/2006 Baseline Inspections 7112102        - ALARA OUTAGE INSP                                                                                              1 2, 3        IP 7112101              Access Control to Radiologically Significant Areas                                                        11/13/2006 11/17/2006 Baseline Inspections 2, 3        IP 7112102              ALARA Planning and Controls                                                                                11/13/2006 11/17/2006 Baseline Inspections ISFSI          - ISFSI INSPECTION                                                                                                1 2, 3        IP 60854                Preoperational Testing Of An ISFSI                                                                        11/15/2006 12/15/2006 Other Routine 2, 3        IP 60854.1              Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P              11/15/2006 12/15/2006 Other Routine ISFSI          - ISFSI INSPECTION                                                                                                4 2            IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants                            01/01/2007 03/31/2007 Other Routine 71122.02      - TRANSPORTATION AND RADWASTE                                                                                    1 2, 3        IP 7112202              Radioactive Material Processing and Transportation                                                        01/08/2007 01/12/2007 Baseline Inspections MAINT EF      - MAINTENANCE EFFECTIVENESS                                                                                      1 2, 3        IP 7111112B              Maintenance Effectiveness                                                                                  02/26/2007 03/02/2007 Baseline Inspections 71122.01      - RADIOLOGICAL EFFLUENTS                                                                                          1 2, 3        IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                                  03/05/2007 03/09/2007 Baseline Inspections 2, 3        IP 71151                Performance Indicator Verification                                                                        03/05/2007 03/09/2007 Baseline Inspections 7111401        - EP EXERCISE & PI INSP                                                                                          1 2, 3        IP 7111401              Exercise Evaluation                                                                                        03/19/2007 03/23/2007 Baseline Inspections 2, 3        IP 71151                Performance Indicator Verification                                                                        03/19/2007 03/23/2007 Baseline Inspections FY 2007        - DRESDEN INIT PREP 04/2007                                                                                      3 2              W90160                OL - INITIAL EXAM - DRESDEN - APR/MAY 2007                                                                04/02/2007 04/06/2007 Not Applicable CDBI          - COMPONENT DESIGN BASES INSPECTION                                                                              5 2, 3        IP 7111121              Component Design Bases Inspection                                                                          04/16/2007 05/25/2007 Baseline Inspections FY 2007        - DRESDEN INIT EXAM 04&05/2007                                                                                    3 2              W90160                OL - INITIAL EXAM - DRESDEN - APR/MAY 2007                                                                04/23/2007 05/04/2007 Not Applicable 71121.01      - RADIOLOGICAL ACCESS CONTROL                                                                                    1 2, 3        IP 7112101              Access Control to Radiologically Significant Areas                                                        06/25/2007 06/29/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
Senior Vice President - Mid-West Regional
 
Operating Group
 
Vice President - Mid-West Operations Support
 
Vice President - Licensing and Regulatory Affairs
 
Director Licensing - Mid-West Regional
 
Operating Group
 
Manager Licensing - Dresden and Quad Cities
 
Senior Counsel, Nuclear, Mid-West Regional
 
Operating Group
 
Document Control Desk - Licensing
 
Assistant Attorney General
 
Illinois Emergency Management Agency
 
State Liaison Officer
 
Chairman, Illinois Commerce Commission
 
Will County Executive
 
Will County Sheriff Director, Will County Emergency
 
Management Agency Mayor of Joliet
 
City Manager of Joliet
 
Kendall County Board Chairman
 
Kendall County Sheriff
 
Grundy County Board Chairman
 
Grundy County Sheriff
 
Grundy County Emergency Management Agency
 
Mayor of Morris Minooka Village President
 
Mayor of Coal City
 
Mayor of Carbon Hill
 
Mayor of Diamond
 
Mayor of Braidwood
 
Mayor of Wilmington
 
Channahon Village President Channahon Village Administrator
 
Mayor of Shorewood Shorewood Village Administrator


Mayor of Elwood
Page 2 of 2                                                                                     Dresden 08/30/2006     12:57:48                                                             Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                        No. of Staff    Planned Dates        Inspection Number      Inspection Activity                                                  Title                        on Site        Start    End            Type 71121.01       - RADIOLOGICAL ACCESS CONTROL                                                              1 2, 3         IP 71151                 Performance Indicator Verification                                                 06/25/2007 06/29/2007 Baseline Inspections 71121.02      - ALARA PROGRAM                                                                            1 2, 3         IP 7112102              ALARA Planning and Controls                                                        10/29/2007 11/02/2007 Baseline Inspections 2, 3         IP 71151                 Performance Indicator Verification                                                 10/29/2007 11/02/2007 Baseline Inspections ISI           - ISI BASELINE INSPECTION                                                                 1 2            IP 7111108G              Inservice Inspection Activities - BWR                                              11/05/2007 11/09/2007 Baseline Inspections 71121.03       - INSTRUMENTATION & SCBA                                                                   1 2, 3        IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                      02/11/2008 02/15/2008 Baseline Inspections FPI           - TRIENNIAL FIRE PROTECTION INSPECTION                                                     3 2, 3        IP 7111105T              Fire Protection [Triennial]                                                        03/03/2008 03/21/2008 Baseline Inspections HEATSINK       - HEAT SINK INSPECTION                                                                     1 2, 3        IP 7111107B              Heat Sink Performance                                                              03/24/2008 03/28/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
 
INPO C. Crane ADAMS Distribution:
DXC1 TEB MXB RidsNrrDirslpab
 
JLC1 GEG KGO RML2 SRI Dresden
 
DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
Dresden Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 12:57:48 Report 22 2 71004-POWER UPRATE Other Routine 04/01/2006 12/31/2006 2, 3 71004 IP Power Uprate 2 MOD5059-MODIFICATION/50.59 INSPECTION Baseline Inspections 09/18/2006 10/06/2006 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/18/2006 10/06/2006 2, 3 7111117B IP Permanent Plant Modifications 2 TI-2515/169 MSPI VERIFICATION Safety Issues 10/01/2006 12/31/2006 2, 3 2515/169 IP Mitigating Systems Performance Index Verification 1 ISI-ISI BASELINE INSPECTION Baseline Inspections 11/13/2006 11/17/2006 2, 3 7111108G IP Inservice Inspection Activities - BWR 1 7112102-ALARA OUTAGE INSP Baseline Inspections 11/13/2006 11/17/2006 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 11/13/2006 11/17/2006 2, 3 7112102 IP A LARA Planning and Controls 1 ISFSI-ISFSI INSPECTION Other Routine 11/15/2006 12/15/2006 2, 3 60854 IP Preoperational Testing Of An ISFSI Other Routine 11/15/2006 12/15/2006 2, 3 60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 4 ISFSI-ISFSI INSPECTION Other Routine 01/01/2007 03/31/2007 2  60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 71122.02-TRANSPORTATION AND RADWASTE Baseline Inspections 01/08/2007 01/12/2007 2, 3 7112202 IP Radioactive Material Processing and Transportation 1 MAINT EF-MAINTENANCE EFFECTIVENESS Baseline Inspections 02/26/2007 03/02/2007 2, 3 7111112B IP Maintenance Effectiveness 1 71122.01-RADIOLOGICAL EFFLUENTS Baseline Inspections 03/05/2007 03/09/2007 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 03/05/2007 03/09/2007 2, 3 71151 IP Performance Indicator Verification 1 7111401-EP EXERCISE & PI INSP Baseline Inspections 03/19/2007 03/23/2007 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/19/2007 03/23/2007 2, 3 71151 IP Performance Indicator Verification 3 FY 2007-DRESDEN INIT PREP 04/2007 Not Applicable 04/02/2007 04/06/2007 2  W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY  2007 5 CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/16/2007 05/25/2007 2, 3 7111121 IP Component Design Bases Inspection 3 FY 2007-DRESDEN INIT EXAM 04&05/2007 Not Applicable 04/23/2007 05/04/2007 2  W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY  2007 1 71121.01-RADIOLOGICAL ACCESS CONTROL Baseline Inspections 06/25/2007 06/29/2007 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Dresden Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 12:57:48 Report 22 1 71121.01-RADIOLOGICAL ACCESS CONTROL Baseline Inspections 06/25/2007 06/29/2007 2, 3 71151 IP Performance Indicator Verification 1 71121.02-ALARA PROGRAM Baseline Inspections 10/29/2007 11/02/2007 2, 3 7112102 IP A LARA Planning and Controls Baseline Inspections 10/29/2007 11/02/2007 2, 3 71151 IP Performance Indicator Verification 1 ISI-ISI BASELINE INSPECTION Baseline Inspections 11/05/2007 11/09/2007 2  7111108G IP Inservice Inspection Activities - BWR 1 71121.03-INSTRUMENTATION & SCBA Baseline Inspections 02/11/2008 02/15/2008 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 3 FPI-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/03/2008 03/21/2008 2, 3 7111105T IP Fire Protection [Triennial]
1 HEATSINK-HEAT SINK INSPECTION Baseline Inspections 03/24/2008 03/28/2008 2, 3 7111107B IP Heat Sink Performance This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 15:33, 23 November 2019

8/31/06 Dresden - Mid-Cycle Performance Review and Inspection Plan
ML062430333
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/31/2006
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
Download: ML062430333 (7)


Text

August 31, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DRESDEN NUCLEAR POWER STATION

Dear Mr. Crane:

On August 7, 2006, the NRC staff completed its performance review of the Dresden Nuclear Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.

Plant performance for the most recent quarter at Dresden Units 2 and 3 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on performing inspection procedure 71004, Power Uprate, to inspect activities related to the steam dryer replacement on Unit 3 during the fall 2006 refueling outage and plan to perform the same inspection procedure during the proposed Unit 2 refueling outage in the fall 2007.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

In addition, the resident inspectors plan to perform Temporary Instruction 2515/169, Mitigating Systems Performance Index Verification, prior to the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan DISTRIBUTION:

See next page

C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\dresden\Dresden MOC Letter 2006.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME MRing:sls DATE 08/16/2006 OFFICIAL RECORD COPY

C. Crane cc w/encl: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Will County Executive Will County Sheriff Director, Will County Emergency Management Agency Mayor of Joliet City Manager of Joliet Kendall County Board Chairman Kendall County Sheriff Grundy County Board Chairman Grundy County Sheriff Grundy County Emergency Management Agency Mayor of Morris Minooka Village President Mayor of Coal City Mayor of Carbon Hill Mayor of Diamond Mayor of Braidwood Mayor of Wilmington Channahon Village President Channahon Village Administrator Mayor of Shorewood Shorewood Village Administrator Mayor of Elwood INPO

C. Crane ADAMS Distribution:

DXC1 TEB MXB RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Dresden DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

Page 1 of 2 Dresden 08/30/2006 12:57:48 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71004 - POWER UPRATE 2 2, 3 IP 71004 Power Uprate 04/01/2006 12/31/2006 Other Routine MOD5059 - MODIFICATION/50.59 INSPECTION 2 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/18/2006 10/06/2006 Baseline Inspections 2, 3 IP 7111117B Permanent Plant Modifications 09/18/2006 10/06/2006 Baseline Inspections TI - 2515/169 MSPI VERIFICATION 2 2, 3 IP 2515/169 Mitigating Systems Performance Index Verification 10/01/2006 12/31/2006 Safety Issues ISI - ISI BASELINE INSPECTION 1 2, 3 IP 7111108G Inservice Inspection Activities - BWR 11/13/2006 11/17/2006 Baseline Inspections 7112102 - ALARA OUTAGE INSP 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 11/13/2006 11/17/2006 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 11/13/2006 11/17/2006 Baseline Inspections ISFSI - ISFSI INSPECTION 1 2, 3 IP 60854 Preoperational Testing Of An ISFSI 11/15/2006 12/15/2006 Other Routine 2, 3 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 11/15/2006 12/15/2006 Other Routine ISFSI - ISFSI INSPECTION 4 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/01/2007 03/31/2007 Other Routine 71122.02 - TRANSPORTATION AND RADWASTE 1 2, 3 IP 7112202 Radioactive Material Processing and Transportation 01/08/2007 01/12/2007 Baseline Inspections MAINT EF - MAINTENANCE EFFECTIVENESS 1 2, 3 IP 7111112B Maintenance Effectiveness 02/26/2007 03/02/2007 Baseline Inspections 71122.01 - RADIOLOGICAL EFFLUENTS 1 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/05/2007 03/09/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 03/05/2007 03/09/2007 Baseline Inspections 7111401 - EP EXERCISE & PI INSP 1 2, 3 IP 7111401 Exercise Evaluation 03/19/2007 03/23/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections FY 2007 - DRESDEN INIT PREP 04/2007 3 2 W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 04/02/2007 04/06/2007 Not Applicable CDBI - COMPONENT DESIGN BASES INSPECTION 5 2, 3 IP 7111121 Component Design Bases Inspection 04/16/2007 05/25/2007 Baseline Inspections FY 2007 - DRESDEN INIT EXAM 04&05/2007 3 2 W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 04/23/2007 05/04/2007 Not Applicable 71121.01 - RADIOLOGICAL ACCESS CONTROL 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 06/25/2007 06/29/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Dresden 08/30/2006 12:57:48 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121.01 - RADIOLOGICAL ACCESS CONTROL 1 2, 3 IP 71151 Performance Indicator Verification 06/25/2007 06/29/2007 Baseline Inspections 71121.02 - ALARA PROGRAM 1 2, 3 IP 7112102 ALARA Planning and Controls 10/29/2007 11/02/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 10/29/2007 11/02/2007 Baseline Inspections ISI - ISI BASELINE INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 11/05/2007 11/09/2007 Baseline Inspections 71121.03 - INSTRUMENTATION & SCBA 1 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/11/2008 02/15/2008 Baseline Inspections FPI - TRIENNIAL FIRE PROTECTION INSPECTION 3 2, 3 IP 7111105T Fire Protection [Triennial] 03/03/2008 03/21/2008 Baseline Inspections HEATSINK - HEAT SINK INSPECTION 1 2, 3 IP 7111107B Heat Sink Performance 03/24/2008 03/28/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.