8/31/06 Dresden - Mid-Cycle Performance Review and Inspection Plan
ML062430333
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/31/2006
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
Download: ML062430333 (7)


Text

August 31, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DRESDEN NUCLEAR POWER STATION

Dear Mr. Crane:

On August 7, 2006, the NRC staff completed its performance review of the Dresden Nuclear Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.

Plant performance for the most recent quarter at Dresden Units 2 and 3 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on performing inspection procedure 71004, Power Uprate, to inspect activities related to the steam dryer replacement on Unit 3 during the fall 2006 refueling outage and plan to perform the same inspection procedure during the proposed Unit 2 refueling outage in the fall 2007.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

In addition, the resident inspectors plan to perform Temporary Instruction 2515/169, Mitigating Systems Performance Index Verification, prior to the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan DISTRIBUTION:

See next page

C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\dresden\Dresden MOC Letter 2006.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME MRing:sls DATE 08/16/2006 OFFICIAL RECORD COPY

C. Crane cc w/encl: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Will County Executive Will County Sheriff Director, Will County Emergency Management Agency Mayor of Joliet City Manager of Joliet Kendall County Board Chairman Kendall County Sheriff Grundy County Board Chairman Grundy County Sheriff Grundy County Emergency Management Agency Mayor of Morris Minooka Village President Mayor of Coal City Mayor of Carbon Hill Mayor of Diamond Mayor of Braidwood Mayor of Wilmington Channahon Village President Channahon Village Administrator Mayor of Shorewood Shorewood Village Administrator Mayor of Elwood INPO

C. Crane ADAMS Distribution:

DXC1 TEB MXB RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Dresden DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

Page 1 of 2 Dresden 08/30/2006 12:57:48 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71004 - POWER UPRATE 2 2, 3 IP 71004 Power Uprate 04/01/2006 12/31/2006 Other Routine MOD5059 - MODIFICATION/50.59 INSPECTION 2 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/18/2006 10/06/2006 Baseline Inspections 2, 3 IP 7111117B Permanent Plant Modifications 09/18/2006 10/06/2006 Baseline Inspections TI - 2515/169 MSPI VERIFICATION 2 2, 3 IP 2515/169 Mitigating Systems Performance Index Verification 10/01/2006 12/31/2006 Safety Issues ISI - ISI BASELINE INSPECTION 1 2, 3 IP 7111108G Inservice Inspection Activities - BWR 11/13/2006 11/17/2006 Baseline Inspections 7112102 - ALARA OUTAGE INSP 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 11/13/2006 11/17/2006 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 11/13/2006 11/17/2006 Baseline Inspections ISFSI - ISFSI INSPECTION 1 2, 3 IP 60854 Preoperational Testing Of An ISFSI 11/15/2006 12/15/2006 Other Routine 2, 3 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 11/15/2006 12/15/2006 Other Routine ISFSI - ISFSI INSPECTION 4 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/01/2007 03/31/2007 Other Routine 71122.02 - TRANSPORTATION AND RADWASTE 1 2, 3 IP 7112202 Radioactive Material Processing and Transportation 01/08/2007 01/12/2007 Baseline Inspections MAINT EF - MAINTENANCE EFFECTIVENESS 1 2, 3 IP 7111112B Maintenance Effectiveness 02/26/2007 03/02/2007 Baseline Inspections 71122.01 - RADIOLOGICAL EFFLUENTS 1 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/05/2007 03/09/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 03/05/2007 03/09/2007 Baseline Inspections 7111401 - EP EXERCISE & PI INSP 1 2, 3 IP 7111401 Exercise Evaluation 03/19/2007 03/23/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections FY 2007 - DRESDEN INIT PREP 04/2007 3 2 W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 04/02/2007 04/06/2007 Not Applicable CDBI - COMPONENT DESIGN BASES INSPECTION 5 2, 3 IP 7111121 Component Design Bases Inspection 04/16/2007 05/25/2007 Baseline Inspections FY 2007 - DRESDEN INIT EXAM 04&05/2007 3 2 W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 04/23/2007 05/04/2007 Not Applicable 71121.01 - RADIOLOGICAL ACCESS CONTROL 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 06/25/2007 06/29/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Dresden 08/30/2006 12:57:48 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121.01 - RADIOLOGICAL ACCESS CONTROL 1 2, 3 IP 71151 Performance Indicator Verification 06/25/2007 06/29/2007 Baseline Inspections 71121.02 - ALARA PROGRAM 1 2, 3 IP 7112102 ALARA Planning and Controls 10/29/2007 11/02/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 10/29/2007 11/02/2007 Baseline Inspections ISI - ISI BASELINE INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 11/05/2007 11/09/2007 Baseline Inspections 71121.03 - INSTRUMENTATION & SCBA 1 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/11/2008 02/15/2008 Baseline Inspections FPI - TRIENNIAL FIRE PROTECTION INSPECTION 3 2, 3 IP 7111105T Fire Protection [Triennial] 03/03/2008 03/21/2008 Baseline Inspections HEATSINK - HEAT SINK INSPECTION 1 2, 3 IP 7111107B Heat Sink Performance 03/24/2008 03/28/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.