{{#Wiki_filter:Harris NFPA 805 Pilot Observation Meetings / Reviews Proposed Schedule Rev  6/1/2007  Page 1 of 2 Pilot Plant Meeting Location Date Topic Type of Review Harris Raleigh May 29, 1-5 pm May 30, 8-5pm May 31, 8-3pm June 1, 8-12  
{{#Wiki_filter:Harris NFPA 805 Pilot Observation Meetings / Reviews Proposed Schedule Pilot       Meeting     Date               Topic                       Type of Review Plant      Location Harris     Raleigh     May 29, 1-5 pm     Fire PRA Products          Detail Review of May 30, 8-5pm     Task 7.5, Fire Induced PRA  Products / Results May 31, 8-3pm     Model June 1, 8-12       Task 7.12 Post Fire HRA Send products      SSA Products May 15th          Task 4.2 Control Room B-3 Table Task 4.4 Update T-H Analysis Task 4.5 Recovery Action Update Harris      Phone Call June Time Frame Follow-up to previous          Detail Review of as needed.        reviews                    Products / Results Oconee      Oconee      July 10-13        Agenda to be determined by  Detail Review of Duke                        Products / Results Harris &    NRC NRR August 6-9            Fire PRA Products          Meeting Oconee                                    Task 7.14 Fire Risk        Presentations (send products    Quantification Selected July 18)          Scenarios                  Include Detail FP Program                  Review of Task 8.0 Change Evaluations Products / Results Selected Items / Scenarios  when available Harris &    NEI Forum September 19, 20 TBD                            Meeting Oconee                  Note NEI Forum                                Presentations with NFPA 805 lessons learned and NEI task force added on Harris &    TBD        Nov 12-14          Combined meeting general    Meeting Oconee                                    status, methodologies, LAR  Presentations Transmittal ANS meeting        content, etc 2 weeks    that week?                                    Include Detail prior                                                      Review of Products / Results when available Rev 6/1/2007                                                          Page 1 of 2


Send products May 15 th Fire PRA Products Task 7.5, Fire Induced PRA
Harris NFPA 805 Pilot Observation Meetings / Reviews Proposed Schedule Pilot       Meeting     Date             Topic                     Type of Review Plant      Location Harris     Harris     Feb 4-8, 2008    PRA Audit                  NRC Audit Transmittal 2 weeks prior -
 
locate models materials at NEI??
Model Task 7.12 Post Fire HRA 
Rev 6/1/2007                                                      Page 2 of 2}}
 
SSA Products Task 4.2  Control Room B-3
 
Table Task 4.4 Update T-H Analysis Task 4.5 Recovery Action
 
Update  Detail Review of Products / Results 
 
Harris Phone Call  June Time Frame as needed. Follow-up to previous reviews Detail Review of Products / Results Oconee Oconee July 10-13 Agenda to be determined by Duke  Detail Review of Products / Results Harris &
Oconee NRC NRR August 6-9 
 
(send products July 18) 
 
Fire PRA Products Task 7.14 Fire Risk Quantification Selected Scenarios 
 
FP Program Task 8.0 Change Evaluations Selected Items / Scenarios Meeting Presentations 
 
Include Detail
 
Review of
 
Products / Results when available Harris & Oconee NEI Forum September 19, 20Note NEI Forum with NFPA 805
 
lessons learned and NEI task force added on TBD  Meeting Presentations Harris & Oconee TBD Transmittal
 
2 weeks prior Nov 12-14
 
ANS meeting that week? Combined meeting general status, methodologies, LAR content, etc Meeting Presentations 
 
Include Detail
 
Review of
 
Products / Results when available Harris NFPA 805 Pilot Observation Meetings / Reviews Proposed Schedule Rev  6/1/2007  Page 2 of 2 Pilot Plant Meeting Location Date Topic Type of Review Harris Harris  
 
Transmittal  
 
2 weeks prior -
locate models materials at NEI?? Feb 4-8, 2008 PRA Audit NRC Audit}}

Latest revision as of 06:01, 23 November 2019

Proposed Schedule 2007. Handout Reference for May 30-June 1, 2007, Fire Protection Transition Pilot Plant Observation Visit
ML071780459
Person / Time
Site: Oconee, Harris  Duke Energy icon.png
Issue date: 05/30/2007
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
Oudinot D, NRR/DRA, 415-3731
References
Download: ML071780459 (2)


Text

Harris NFPA 805 Pilot Observation Meetings / Reviews Proposed Schedule Pilot Meeting Date Topic Type of Review Plant Location Harris Raleigh May 29, 1-5 pm Fire PRA Products Detail Review of May 30, 8-5pm Task 7.5, Fire Induced PRA Products / Results May 31, 8-3pm Model June 1, 8-12 Task 7.12 Post Fire HRA Send products SSA Products May 15th Task 4.2 Control Room B-3 Table Task 4.4 Update T-H Analysis Task 4.5 Recovery Action Update Harris Phone Call June Time Frame Follow-up to previous Detail Review of as needed. reviews Products / Results Oconee Oconee July 10-13 Agenda to be determined by Detail Review of Duke Products / Results Harris & NRC NRR August 6-9 Fire PRA Products Meeting Oconee Task 7.14 Fire Risk Presentations (send products Quantification Selected July 18) Scenarios Include Detail FP Program Review of Task 8.0 Change Evaluations Products / Results Selected Items / Scenarios when available Harris & NEI Forum September 19, 20 TBD Meeting Oconee Note NEI Forum Presentations with NFPA 805 lessons learned and NEI task force added on Harris & TBD Nov 12-14 Combined meeting general Meeting Oconee status, methodologies, LAR Presentations Transmittal ANS meeting content, etc 2 weeks that week? Include Detail prior Review of Products / Results when available Rev 6/1/2007 Page 1 of 2

Harris NFPA 805 Pilot Observation Meetings / Reviews Proposed Schedule Pilot Meeting Date Topic Type of Review Plant Location Harris Harris Feb 4-8, 2008 PRA Audit NRC Audit Transmittal 2 weeks prior -

locate models materials at NEI??

Rev 6/1/2007 Page 2 of 2