Line 3: Line 3:
| issue date = 12/13/2007
| issue date = 12/13/2007
| title = ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant
| title = ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant
| author name = Dentel G T
| author name = Dentel G
| author affiliation = NRC/RGN-I/DRP/PB1
| author affiliation = NRC/RGN-I/DRP/PB1
| addressee name = Spina J A
| addressee name = Spina J
| addressee affiliation = Calvert Cliffs Nuclear Power Plant, Inc
| addressee affiliation = Calvert Cliffs Nuclear Power Plant, Inc
| docket = 05000317, 05000318
| docket = 05000317, 05000318
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION                                                         REGION I                                               475 ALLENDALE ROAD                                         KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
 
1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702  


==SUBJECT:==
==SUBJECT:==
CHANGE TO THE INSPECTION PLAN FOR THE CALVERT CLIFFS NUCLEAR POWER PLANT  
CHANGE TO THE INSPECTION PLAN FOR THE CALVERT CLIFFS NUCLEAR POWER PLANT


==Dear Mr. Spina:==
==Dear Mr. Spina:==


As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.  
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).


The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature. 
J. Spina                                       2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,
In accordance with 10 CFR 2.390 of the NRC's "Rules and Practices" a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
                                            /RA/
 
Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69
J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
      /RA/       Mr. Glenn T. Dentel, Chief       Projects Branch 1 Division of Reactor Projects  
 
Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69  


==Enclosures:==
==Enclosures:==
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans cc w/encl:
 
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Patterson, SLO (2)
cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer  
 
President, Calvert County Board of Commissioners  


C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center
J. Spina                                             2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,
S. Patterson, SLO (2)
                                                  /RA/
J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69
Sincerely,  
/RA/         Mr. Glenn T. Dentel, Chief       Projects Branch 1       Division of Reactor Projects, Region I  
 
Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69  


==Enclosures:==
==Enclosures:==
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Patterson, SLO (2)
Distribution: see next page SUNSI Review Complete:        BAB4    (Reviewer=s Initials)
DOCUMENT NAME: T:\DRP\BRANCH1\ROP 8 Letters\Rop8 Letter - CC.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE      RI/DRP                      RI/DRP NAME        BBickett/BAB4              GDentel/GTD DATE        12/06/07                    12/06/07 OFFICIAL RECORD COPY


cc w/encl:
J. Spina                                3 Distribution w/encl:                       J. Trapp, DRS S. Collins, RA                            J. Rogge, DRS M. Dapas, DRA                              M. Sykes, DRS G. West, RI OEDO (Acting)                  J. White, DRS J. Lubinski, NRR                          L. Doerflein, DRS D. Pickett, PM, NRR                        R. Conte, DRS M. David, PM, NRR                          L. Scholl, DRS G. Dentel, DRP                            P. Frechette, DRS B. Bickett, DRP                            D. Silk, DRS S. Kennedy, DRP, SRI                      D. Screnci, PAO M. Davis, DRP, RI                          N. Sheehan, PAO C. Newgent, DRP, Resident OA              R. Barkley, ORA Region I Docket Room (with concurrences)  D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer


President, Calvert County Board of Commissioners
Page 1 of 2                                                                                  Calvert Cliffs 12/11/2007      14:25:40                                                              Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit                                                                                                                  No. of Staff    Planned Dates          Inspection Number        Inspection Activity                                                  Title                                on Site        Start    End              Type 5/19 EXM        - INITIAL OPERATOR LICENSING EXAMS                                                                4 1                  U01633              CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)                                                05/19/2008 05/23/2008 Not Applicable 1                  U01633              CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)                                                06/16/2008 06/20/2008 Not Applicable 7111108P        - U1 INSERVICE INSPECTION                                                                          1 1              IP 7111108P            Inservice Inspection Activities - PWR                                                        02/18/2008 02/22/2008 Baseline Inspections 1              IP 7111108P            Inservice Inspection Activities - PWR                                                        02/25/2008 02/29/2008 Baseline Inspections 71121          - OCC RAD SAFETY                                                                                  1 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                            02/25/2008 02/29/2008 Baseline Inspections 1, 2            IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                02/25/2008 02/29/2008 Baseline Inspections 1, 2            IP 71151                Performance Indicator Verification                                                            02/25/2008 02/29/2008 Baseline Inspections TI-166          - CONTAINMENT SUMP MODIFICATION INSPECTION                                                        1 1              IP 2515/166            Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]              03/03/2008 03/09/2008 Safety Issues 7112103        - OCC RAD SAFETY - INSTRUMENTS                                                                    1 1, 2            IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                03/17/2008 03/21/2008 Baseline Inspections 1, 2            IP 71151                Performance Indicator Verification                                                            03/17/2008 03/21/2008 Baseline Inspections ISFSI          - ISFSI - ANNUAL SAMPLE                                                                            1 1              IP 60855                Operation Of An ISFSI                                                                        04/01/2008 06/30/2008 Other Routine 71121          - OCC RAD SAFETY                                                                                  1 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                            05/19/2008 05/23/2008 Baseline Inspections 1, 2            IP 7112102              ALARA Planning and Controls                                                                  05/19/2008 05/23/2008 Baseline Inspections 1, 2            IP 71151                Performance Indicator Verification                                                            05/19/2008 05/23/2008 Baseline Inspections 7111121        - CDBI                                                                                            10 1, 2            IP 7111121              Component Design Bases Inspection                                                            06/02/2008 06/06/2008 Baseline Inspections 1, 2            IP 7111121              Component Design Bases Inspection                                                            06/16/2008 06/20/2008 Baseline Inspections 1, 2            IP 7111121              Component Design Bases Inspection                                                            06/23/2008 06/27/2008 Baseline Inspections 7112201        - PUB RAD SAFETY - RETS                                                                            1 1, 2            IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                      06/16/2008 06/20/2008 Baseline Inspections 1, 2           IP 71151                Performance Indicator Verification                                                            06/16/2008 06/20/2008 Baseline Inspections 71121          - OCC RAD SAFETY                                                                                  1 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                            08/25/2008 08/29/2008 Baseline Inspections 1, 2            IP 7112102              ALARA Planning and Controls                                                                  08/25/2008 08/29/2008 Baseline Inspections 1, 2            IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                08/25/2008 08/29/2008 Baseline Inspections 1, 2           IP 71151                Performance Indicator Verification                                                            08/25/2008 08/29/2008 Baseline Inspections 71121          - OCC RAD SAFETY                                                                                  1 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                            11/03/2008 11/07/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing
 
Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center
 
S. Patterson, SLO (2)
 
Distribution:  see next page
 
SUNSI Review Complete:    BAB4    (Reviewer
=s Initials)
DOCUMENT NAME:  T:\DRP\BRANCH1\ROP 8 Letters\Rop8 Letter - CC.doc After declaring this document AAn Official Agency Record
@ it will be released to the Public. To receive a copy of this document, indicate in the box: 
" C" = Copy without attachment/enclosure  " E" = Copy with attachment/enclosure  " N" = No copy OFFICE  RI/DRP      RI/DRP           NAME  BBickett/BAB4 GDentel/GTD
 
DATE  12/06/07  12/06/07     OFFICIAL RECORD COPY J. Spina 3 Distribution w/encl: S. Collins, RA M. Dapas, DRA 
 
G. West, RI OEDO (Acting)
J. Lubinski, NRR 


D. Pickett, PM, NRR M. David, PM, NRR G. Dentel, DRP B. Bickett, DRP S. Kennedy, DRP, SRI M. Davis, DRP, RI C. Newgent, DRP, Resident OA Region I Docket Room (with concurrences)
Page 2 of 2                                                                              Calvert Cliffs 12/11/2007      14:25:40                                                          Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit                                                                                                    No. of Staff   Planned Dates        Inspection Number        Inspection Activity                                              Title                        on Site       Start     End            Type 71121           - OCC RAD SAFETY                                                                     1 1, 2           IP 7112102             ALARA Planning and Controls                                                     11/03/2008 11/07/2008 Baseline Inspections 1, 2           IP 71151               Performance Indicator Verification                                               11/03/2008 11/07/2008 Baseline Inspections EP             - EP PROGRAM INSP                                                                     2 1, 2           IP 7111402             Alert and Notification System Testing                                           11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2           IP 7111403             Emergency Response Organization Augmentation Testing                             11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2           IP 7111404             Emergency Action Level and Emergency Plan Changes                               11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2           IP 7111405             Correction of Emergency Preparedness Weaknesses and Deficiencies                 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2           IP 71151-EP01           Drill/Exercise Performance                                                       11/17/2008 11/21/2008 Baseline Inspections 1, 2           IP 71151-EP02           ERO Drill Participation                                                         11/17/2008 11/21/2008 Baseline Inspections 1, 2           IP 71151-EP03           Alert & Notification System                                                     11/17/2008 11/21/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS
 
R. Conte, DRS L. Scholl, DRS P. Frechette, DRS  D. Silk, DRS D. Screnci, PAO
 
N. Sheehan, PAO
 
R. Barkley, ORA  D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)
Calvert Cliffs Inspection / Activity Plan 01/01/2008
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:25:40 Report 22 4 5/19 EXM-INITIAL OPERATOR LICENSING EXAMS Not Applicable 05/19/2008 05/23/2008 1     U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)
Not Applicable 06/16/2008 06/20/2008 1    U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 1 7111108P-U1 INSERVICE INSPECTION Baseline Inspections 02/18/2008 02/22/2008 1    7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 02/25/2008 02/29/2008 1    7111108P IP Inservice Inspection Activities - PWR 1 71121-OCC RAD SAFETY Baseline Inspections 02/25/2008 02/29/2008 1, 2  7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 02/25/2008 02/29/2008 1, 2  7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 02/25/2008 02/29/2008 1, 2  71151 IP Performance Indicator Verification 1 TI-166-CONTAINMENT SUMP MODIFICATION INSPECTION Safety Issues 03/03/2008 03/09/2008 1    2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02
]1 7112103-OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 03/17/2008 03/21/2008 1, 2  7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 03/17/2008 03/21/2008 1, 2  71151 IP Performance Indicator Verification 1 ISFSI-ISFSI - ANNUAL SAMPLE Other Routine 04/01/2008 06/30/2008 1    60855 IP Operation Of An ISFSI 1 71121-OCC RAD SAFETY Baseline Inspections 05/19/2008 05/23/2008 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 05/19/2008 05/23/2008 1, 2  7112102 IP A LARA Planning and Controls Baseline Inspections 05/19/2008 05/23/2008 1, 2  71151 IP Performance Indicator Verification 10 7111121-CDBI Baseline Inspections 06/02/2008 06/06/2008 1, 2  7111121 IP Component Design Bases Inspection Baseline Inspections 06/16/2008 06/20/2008 1, 2  7111121 IP Component Design Bases Inspection Baseline Inspections 06/23/2008 06/27/2008 1, 2   7111121 IP Component Design Bases Inspection 1 7112201-PUB RAD SAFETY - RETS Baseline Inspections 06/16/2008 06/20/2008 1, 2  7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 06/16/2008 06/20/2008 1, 2  71151 IP Performance Indicator Verification 1 71121-OCC RAD SAFETY Baseline Inspections 08/25/2008 08/29/2008 1, 2  7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 08/25/2008 08/29/2008 1, 2  7112102 IP A LARA Planning and Controls Baseline Inspections 08/25/2008 08/29/2008 1, 2  7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/25/2008 08/29/2008 1, 2  71151 IP Performance Indicator Verification 1 71121-OCC RAD SAFETY Baseline Inspections 11/03/2008 11/07/2008 1, 2  7112101 IP A ccess Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Calvert Cliffs Inspection / Activity Plan 01/01/2008
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:25:40 Report 22 1 71121-OCC RAD SAFETY Baseline Inspections 11/03/2008 11/07/2008 1, 2  7112102 IP A LARA Planning and Controls Baseline Inspections 11/03/2008 11/07/2008 1, 2  71151 IP Performance Indicator Verification 2 EP-EP PROGRAM INSP EP Baseline Inspecti o 11/17/2008 11/21/2008 1, 2   7111402 IP A lert and Notification System Testing EP Baseline Inspecti o 11/17/2008 11/21/2008 1, 2   7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspecti o 11/17/2008 11/21/2008 1, 2   7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspecti o 11/17/2008 11/21/2008 1, 2   7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 11/17/2008 11/21/2008 1, 2   71151-EP01 IP Drill/Exercise Performance Baseline Inspections 11/17/2008 11/21/2008 1, 2   71151-EP02 IP ERO Drill Participation Baseline Inspections 11/17/2008 11/21/2008 1, 2   71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 23:55, 22 November 2019

ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant
ML073470724
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/13/2007
From: Glenn Dentel
Reactor Projects Branch 1
To: Spina J
Calvert Cliffs
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
Download: ML073470724 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.

1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR THE CALVERT CLIFFS NUCLEAR POWER PLANT

Dear Mr. Spina:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69

Enclosures:

Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans cc w/encl:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Patterson, SLO (2)

J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69

Enclosures:

Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans cc w/encl:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Patterson, SLO (2)

Distribution: see next page SUNSI Review Complete: BAB4 (Reviewer=s Initials)

DOCUMENT NAME: T:\DRP\BRANCH1\ROP 8 Letters\Rop8 Letter - CC.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett/BAB4 GDentel/GTD DATE 12/06/07 12/06/07 OFFICIAL RECORD COPY

J. Spina 3 Distribution w/encl: J. Trapp, DRS S. Collins, RA J. Rogge, DRS M. Dapas, DRA M. Sykes, DRS G. West, RI OEDO (Acting) J. White, DRS J. Lubinski, NRR L. Doerflein, DRS D. Pickett, PM, NRR R. Conte, DRS M. David, PM, NRR L. Scholl, DRS G. Dentel, DRP P. Frechette, DRS B. Bickett, DRP D. Silk, DRS S. Kennedy, DRP, SRI D. Screnci, PAO M. Davis, DRP, RI N. Sheehan, PAO C. Newgent, DRP, Resident OA R. Barkley, ORA Region I Docket Room (with concurrences) D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)

Page 1 of 2 Calvert Cliffs 12/11/2007 14:25:40 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 5/19 EXM - INITIAL OPERATOR LICENSING EXAMS 4 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 05/19/2008 05/23/2008 Not Applicable 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 06/16/2008 06/20/2008 Not Applicable 7111108P - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 02/18/2008 02/22/2008 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 02/25/2008 02/29/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/25/2008 02/29/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/25/2008 02/29/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/25/2008 02/29/2008 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATION INSPECTION 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 03/03/2008 03/09/2008 Safety Issues 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/17/2008 03/21/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/17/2008 03/21/2008 Baseline Inspections ISFSI - ISFSI - ANNUAL SAMPLE 1 1 IP 60855 Operation Of An ISFSI 04/01/2008 06/30/2008 Other Routine 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/19/2008 05/23/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/19/2008 05/23/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 05/19/2008 05/23/2008 Baseline Inspections 7111121 - CDBI 10 1, 2 IP 7111121 Component Design Bases Inspection 06/02/2008 06/06/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/23/2008 06/27/2008 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/16/2008 06/20/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/25/2008 08/29/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/03/2008 11/07/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Calvert Cliffs 12/11/2007 14:25:40 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 7112102 ALARA Planning and Controls 11/03/2008 11/07/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/03/2008 11/07/2008 Baseline Inspections EP - EP PROGRAM INSP 2 1, 2 IP 7111402 Alert and Notification System Testing 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 71151-EP01 Drill/Exercise Performance 11/17/2008 11/21/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 11/17/2008 11/21/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 11/17/2008 11/21/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.