| issue date = 12/13/2007 | | issue date = 12/13/2007 | ||
| title = ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant | | title = ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant | ||
| author name = Dentel G | | author name = Dentel G | ||
| author affiliation = NRC/RGN-I/DRP/PB1 | | author affiliation = NRC/RGN-I/DRP/PB1 | ||
| addressee name = Spina J | | addressee name = Spina J | ||
| addressee affiliation = Calvert Cliffs Nuclear Power Plant, Inc | | addressee affiliation = Calvert Cliffs Nuclear Power Plant, Inc | ||
| docket = 05000317, 05000318 | | docket = 05000317, 05000318 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc. | ||
1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702 | |||
1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702 | |||
==SUBJECT:== | ==SUBJECT:== | ||
CHANGE TO THE INSPECTION PLAN FOR THE CALVERT CLIFFS NUCLEAR POWER PLANT | CHANGE TO THE INSPECTION PLAN FOR THE CALVERT CLIFFS NUCLEAR POWER PLANT | ||
==Dear Mr. Spina:== | ==Dear Mr. Spina:== | ||
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas. | As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas. | ||
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). | |||
J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
/RA/ | |||
Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69 | |||
J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69 | |||
==Enclosures:== | ==Enclosures:== | ||
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans | Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans cc w/encl: | ||
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Patterson, SLO (2) | |||
cc w/encl: | |||
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer | |||
President, Calvert County Board of Commissioners | |||
J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
/RA/ | |||
J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan. | Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69 | ||
Sincerely, | |||
Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69 | |||
==Enclosures:== | ==Enclosures:== | ||
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans | Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans cc w/encl: | ||
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Patterson, SLO (2) | |||
Distribution: see next page SUNSI Review Complete: BAB4 (Reviewer=s Initials) | |||
DOCUMENT NAME: T:\DRP\BRANCH1\ROP 8 Letters\Rop8 Letter - CC.doc After declaring this document AAn Official Agency Record@ it will be released to the Public. | |||
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett/BAB4 GDentel/GTD DATE 12/06/07 12/06/07 OFFICIAL RECORD COPY | |||
J. Spina 3 Distribution w/encl: J. Trapp, DRS S. Collins, RA J. Rogge, DRS M. Dapas, DRA M. Sykes, DRS G. West, RI OEDO (Acting) J. White, DRS J. Lubinski, NRR L. Doerflein, DRS D. Pickett, PM, NRR R. Conte, DRS M. David, PM, NRR L. Scholl, DRS G. Dentel, DRP P. Frechette, DRS B. Bickett, DRP D. Silk, DRS S. Kennedy, DRP, SRI D. Screnci, PAO M. Davis, DRP, RI N. Sheehan, PAO C. Newgent, DRP, Resident OA R. Barkley, ORA Region I Docket Room (with concurrences) D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov) | |||
M. J. | |||
Page 1 of 2 Calvert Cliffs 12/11/2007 14:25:40 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 5/19 EXM - INITIAL OPERATOR LICENSING EXAMS 4 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 05/19/2008 05/23/2008 Not Applicable 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 06/16/2008 06/20/2008 Not Applicable 7111108P - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 02/18/2008 02/22/2008 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 02/25/2008 02/29/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/25/2008 02/29/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/25/2008 02/29/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/25/2008 02/29/2008 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATION INSPECTION 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 03/03/2008 03/09/2008 Safety Issues 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/17/2008 03/21/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/17/2008 03/21/2008 Baseline Inspections ISFSI - ISFSI - ANNUAL SAMPLE 1 1 IP 60855 Operation Of An ISFSI 04/01/2008 06/30/2008 Other Routine 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/19/2008 05/23/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/19/2008 05/23/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 05/19/2008 05/23/2008 Baseline Inspections 7111121 - CDBI 10 1, 2 IP 7111121 Component Design Bases Inspection 06/02/2008 06/06/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/23/2008 06/27/2008 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/16/2008 06/20/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/25/2008 08/29/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/03/2008 11/07/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 Calvert Cliffs 12/11/2007 14:25:40 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 7112102 ALARA Planning and Controls 11/03/2008 11/07/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/03/2008 11/07/2008 Baseline Inspections EP - EP PROGRAM INSP 2 1, 2 IP 7111402 Alert and Notification System Testing 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 71151-EP01 Drill/Exercise Performance 11/17/2008 11/21/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 11/17/2008 11/21/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 11/17/2008 11/21/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. | |||
Calvert Cliffs Inspection / Activity Plan 01/01/2008 | |||
-12/31/2008 | |||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} |
Latest revision as of 23:55, 22 November 2019
ML073470724 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 12/13/2007 |
From: | Glenn Dentel Reactor Projects Branch 1 |
To: | Spina J Calvert Cliffs |
Dentel, G RGN-I/DRP/BR1/610-337-5233 | |
References | |
Download: ML073470724 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
SUBJECT:
CHANGE TO THE INSPECTION PLAN FOR THE CALVERT CLIFFS NUCLEAR POWER PLANT
Dear Mr. Spina:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69
Enclosures:
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Patterson, SLO (2)
J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69
Enclosures:
Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center S. Patterson, SLO (2)
Distribution: see next page SUNSI Review Complete: BAB4 (Reviewer=s Initials)
DOCUMENT NAME: T:\DRP\BRANCH1\ROP 8 Letters\Rop8 Letter - CC.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett/BAB4 GDentel/GTD DATE 12/06/07 12/06/07 OFFICIAL RECORD COPY
J. Spina 3 Distribution w/encl: J. Trapp, DRS S. Collins, RA J. Rogge, DRS M. Dapas, DRA M. Sykes, DRS G. West, RI OEDO (Acting) J. White, DRS J. Lubinski, NRR L. Doerflein, DRS D. Pickett, PM, NRR R. Conte, DRS M. David, PM, NRR L. Scholl, DRS G. Dentel, DRP P. Frechette, DRS B. Bickett, DRP D. Silk, DRS S. Kennedy, DRP, SRI D. Screnci, PAO M. Davis, DRP, RI N. Sheehan, PAO C. Newgent, DRP, Resident OA R. Barkley, ORA Region I Docket Room (with concurrences) D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)
Page 1 of 2 Calvert Cliffs 12/11/2007 14:25:40 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 5/19 EXM - INITIAL OPERATOR LICENSING EXAMS 4 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 05/19/2008 05/23/2008 Not Applicable 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 06/16/2008 06/20/2008 Not Applicable 7111108P - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 02/18/2008 02/22/2008 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 02/25/2008 02/29/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/25/2008 02/29/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/25/2008 02/29/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/25/2008 02/29/2008 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATION INSPECTION 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 03/03/2008 03/09/2008 Safety Issues 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/17/2008 03/21/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/17/2008 03/21/2008 Baseline Inspections ISFSI - ISFSI - ANNUAL SAMPLE 1 1 IP 60855 Operation Of An ISFSI 04/01/2008 06/30/2008 Other Routine 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/19/2008 05/23/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/19/2008 05/23/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 05/19/2008 05/23/2008 Baseline Inspections 7111121 - CDBI 10 1, 2 IP 7111121 Component Design Bases Inspection 06/02/2008 06/06/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/23/2008 06/27/2008 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/16/2008 06/20/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/16/2008 06/20/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/25/2008 08/29/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/03/2008 11/07/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Calvert Cliffs 12/11/2007 14:25:40 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 7112102 ALARA Planning and Controls 11/03/2008 11/07/2008 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/03/2008 11/07/2008 Baseline Inspections EP - EP PROGRAM INSP 2 1, 2 IP 7111402 Alert and Notification System Testing 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/17/2008 11/21/2008 EP Baseline Inspectio 1, 2 IP 71151-EP01 Drill/Exercise Performance 11/17/2008 11/21/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 11/17/2008 11/21/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 11/17/2008 11/21/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.