IR 05000277/2008008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams|number = ML081970338}}
{{Adams
| number = ML081970338
| issue date = 07/15/2008
| title = IR 05000277-08-008 and 05000278-08-008; on 06/02/2008 - 06/06/2008; Peach Bottom Atomic Power Station; Confirmatory Action Letter Status Report
| author name = Krohn P
| author affiliation = NRC/RGN-I/DRP/PB4
| addressee name = Pardee C
| addressee affiliation = AmerGen Energy Co, LLC, Exelon Generation Co, LLC
| docket = 05000277, 05000278
| license number = DPR-044, DPR-056
| contact person = BOWER, FL
| case reference number = CAL 1-07-005
| document report number = IR-08-008
| document type = Inspection Report, Letter
| page count = 10
}}


{{IR-Nav| site = 05000277 | year = 2008 | report number = 008 }}
{{IR-Nav| site = 05000277 | year = 2008 | report number = 008 }}


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES uly 15, 2008
[[Issue date::July 15, 2008]]


CAL 1-07-005 Mr. Charles Chief Nuclear Officer (CNO) and Senior Vice President Exelon Generation Company, LLC Chief Nuclear Officer (CNO) AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348
==SUBJECT:==
 
PEACH BOTTOM ATOMIC POWER STATION CONFIRMATORY ACTION LETTER STATUS INSPECTION REPORT NOS. 05000277/2008008 and 05000278/2008008
SUBJECT: PEACH BOTTOM ATOMIC POWER STATION CONFIRMATORY ACTION LETTER STATUS INSPECTION REPORT NOS. 05000277/2008008 and 05000278/2008008


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
On June 6, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection, at your Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, to determine your progress in meeting the commitments documented in the Confirmatory Action Letter (CAL) dated October 19, 2007. The CAL had been issued to formalize Exelon's agreement to complete certain actions in response to the inattentive security officers and safety conscious work environment (SCWE) issues at PBAPS. The enclosed inspection report documents the inspection results, which were discussed on June 6, 2008, with Mr. J. Grimes, Site Vice President, and other members of your staff. Since the completion of the Augmented Inspection Teams (September 21 through 28, 2007 and November 5 through 9, 2007) were conducted and the PBAPS CAL was issued, the NRC has devoted extensive efforts to monitor your actions in response to the inattentive security officers and safety conscious work environment (SCWE) issues at PBAPS. Specific activities conducted included: inspection of the transition from contract security force to in-house security force (February 11-15, 2008); review of your root cause evaluation effectiveness (March 3-7, 2008); and an inspection of activities directly related to safety conscious work environment (March 24 - 28, 2008). These prior inspection activities also verified Exelon's actions taken to address various CAL commitments. The CAL status inspection team focused on actions taken by Exelon as specified in the CAL to determine whether such actions were timely, complete and effective. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified and the enclosed inspection report closes all but two CAL items. One CAL item related to Exelon's commitment to perform security organization SCWE surveys across the Exelon fleet remains open. As noted in the CAL, the NRC will schedule a meeting with Exelon upon the completion of your review for this action to discuss the safety conscious work environment (SCWE) survey results as they apply to other Exelon sites. The second CAL item related to Exelon submitting written confirmation that all CAL items have been completed, remains open. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
On June 6, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection, at your Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, to determine your progress in meeting the commitments documented in the Confirmatory Action Letter (CAL) dated October 19, 2007. The CAL had been issued to formalize Exelons agreement to complete certain actions in response to the inattentive security officers and safety conscious work environment (SCWE) issues at PBAPS. The enclosed inspection report documents the inspection results, which were discussed on June 6, 2008, with Mr. J. Grimes, Site Vice President, and other members of your staff.
 
Sincerely,/RA by Fred L Bower Acting For/ Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56


===Enclosure:===
Since the completion of the Augmented Inspection Teams (September 21 through 28, 2007 and November 5 through 9, 2007) were conducted and the PBAPS CAL was issued, the NRC has devoted extensive efforts to monitor your actions in response to the inattentive security officers and safety conscious work environment (SCWE) issues at PBAPS. Specific activities conducted included: inspection of the transition from contract security force to in-house security force (February 11-15, 2008); review of your root cause evaluation effectiveness (March 3-7, 2008); and an inspection of activities directly related to safety conscious work environment (March 24 - 28, 2008). These prior inspection activities also verified Exelons actions taken to address various CAL commitments.
Inspection Report Nos. 05000277/2008008, 05000278/2008008 w/Attachments


===Attachments:===
The CAL status inspection team focused on actions taken by Exelon as specified in the CAL to determine whether such actions were timely, complete and effective. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
(A) Supplemental Information (B) Peach Bottom Cal Commitment Table


cc w/encl: C. Crane, Executive Vice President, Exelon, Chief Operating Officer, Exelon Generation M. Pacilio, Chief Operating Officer, Exelon W. Maguire, Site Vice President, Peach Bottom R. DeGregorio, Senior Vice President, Mid-Atlantic R. Hovey, Senior Vice President, Nuclear Oversight G. Stathes, Acting Plant Manager, Peach Bottom J. Armstrong, Regulatory Assurance Manager, Peach Bottom J. Bardurski, Manager, Financial Control & Co-Owner Affairs B. Franssen, Acting Director, Operations P. Cowan, Director, Licensing K. Jury, Vice President, Licensing and Regulatory Affairs J. Bradley Fewell, Associate General Counsel, Exelon T. Wasong, Director, Training Correspondence Control Desk D. Allard, Bureau of Radiation Protection, PA Department of Environmental Protection S. Gray, Power Plant and Environmental Review Division (MD) S. Pattison, Secretary, MD Department of the Environment A. Lauland, Director, Homeland Security Advisor M. Griffen, MD Department of Environment Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. O'Connor, Council Administrator of Harford County Council R. Ayers, Deputy Mgr, Harford County Div of Emergency Operations E. Crist, Harford County Div of Emergency Operations S. Ayers, Emergency Planner, Harford County Div of Emergency Operations R. Brooks, Cecil County Dept of Emergency Services Mr & Mrs Dennis Hiebert, Peach Bottom Alliance E. Epstein, TMI - Alert J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams R. Fletcher, Dir, MD Environmental Program Manager, Radiological Health Program J. Powers, Director, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency D. Lockbaum, Union of Concerned Scientists
Based on the results of this inspection, no findings of significance were identified and the enclosed inspection report closes all but two CAL items. One CAL item related to Exelons commitment to perform security organization SCWE surveys across the Exelon fleet remains


open. As noted in the CAL, the NRC will schedule a meeting with Exelon upon the completion of your review for this action to discuss the safety conscious work environment (SCWE) survey results as they apply to other Exelon sites. The second CAL item related to Exelon submitting written confirmation that all CAL items have been completed, remains open. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
open. As noted in the CAL, the NRC will schedule a meeting with Exelon upon the completion of your review for this action to discuss the safety conscious work environment (SCWE) survey results as they apply to other Exelon sites. The second CAL item related to Exelon submitting written confirmation that all CAL items have been completed, remains open.


Sincerely,/RA by Fred L Bower Acting For/ Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56  
Sincerely,
/RA by Fred L Bower Acting For/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56


===Enclosure:===
===Enclosure:===
Inspection Report Nos. 05000277/2008008, 05000278/2008008 w/Attachments  
Inspection Report Nos. 05000277/2008008, 05000278/2008008 w/Attachments Attachments:
(A) Supplemental Information (B) Peach Bottom Cal Commitment Table


===Attachments:===
REGION I==
(A) Supplemental Information (B) Peach Bottom Cal Commitment Table Distribution w/encl: (via E-mail) S. Collins, RA P. Krohn, DRP M. Dapas, DRA R. Fuhrmeister, DRP D. Lew, DRP F. Bower, DRP, Sr Resident Inspector J. Clifford, DRP M. Brown, DRP, Resident Inspector S. Williams, RI OEDO S. Schmitt, Resident OA H. Chernoff, NRR ROPreportsResource@nrc.gov J. Lubinski, NRR Region I Docket Room (with concurrences) J. Hughey, PM NRR P. Bamford, Backup NRR
Docket Nos: 50-277, 50-278 License Nos: DPR-44, DPR-56 Report Nos: 05000277/2008008, 05000278/2008008 Licensee: Exelon Generation Company, LLC Facility: Peach Bottom Atomic Power Station Location: Delta, Pennsylvania Dates: June 2 - June 6, 2008 Team Leader: Anthony Dimitriadis, Senior Physical Security Inspector (Region I)
 
Inspectors: George E. Smith, Physical Security Inspector (Region I)
SUNSI Review Complete: FLB (Reviewer=s Initials) DOCUMENT NAME: G:\DRP\BRANCH4\PEACH BOTTOM\PEACH BOTTOM INATTENTIVE OFFICER 9_07\CAL STATUS INSPECTION WEEK OF 6_2_08\PB CAL STATUS REPORT REV10.DOC    ML081970338 After declaring this document AAn Official Agency Record@ it will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy  OFFICE RI/DRS RI/DRP N RI/DRS RI/DRP NAME ADimitriadis/FLB for TSetzer/TCS JTrapp/FLB for PKrohn/FLB for DATE 07/ 10/08 via phone 07/10/08 07/10 /08 via phone 07/ 14/08 OFFICIAL RECORD COPY 1 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket Nos: 50-277, 50-278 License Nos: DPR-44, DPR-56 Report Nos: 05000277/2008008, 05000278/2008008 Licensee: Exelon Generation Company, LLC Facility: Peach Bottom Atomic Power Station Location: Delta, Pennsylvania Dates: June 2 - June 6, 2008 Team Leader: Anthony Dimitriadis, Senior Physical Security Inspector (Region I) Inspectors: George E. Smith, Physical Security Inspector (Region I) Thomas Setzer, Reactor Inspector (Region I)
Thomas Setzer, Reactor Inspector (Region I)
Mark Martin, Physical Security Inspector, (Region III) Approved by: Paul Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects 2 Enclosure  
Mark Martin, Physical Security Inspector, (Region III)
Approved by: Paul Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Enclosure


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR 05000277/2008008 and 05000278/2008008; 06/02/2008 - 06/06/2008; Peach Bottom  
IR 05000277/2008008 and 05000278/2008008; 06/02/2008 - 06/06/2008; Peach Bottom


Atomic Power Station; Confirmatory Action Letter Status Report Identification of Resolution of Problems - Confirmatory Action Letter Status Inspection               This report covers an announced team inspection by two Region I security inspectors, one Region I reactor inspector, and one Region III security inspector. No findings of significance were identified. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, December 2006.
Atomic Power Station; Confirmatory Action Letter Status Report Identification of Resolution of Problems - Confirmatory Action Letter Status Inspection This report covers an announced team inspection by two Region I security inspectors, one Region I reactor inspector, and one Region III security inspector. No findings of significance were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, December 2006.


===A. NRC Identified===
===NRC Identified===
and Self Revealing Finding             None               B. Licensee Identified Findings                   None
and Self Revealing Finding None B.       Licensee Identified Findings None


=REPORT DETAILS=
=REPORT DETAILS=
Line 51: Line 64:
==OTHER ACTIVITIES (OA)==
==OTHER ACTIVITIES (OA)==
{{a|4OA2}}
{{a|4OA2}}
==4OA2 Problem Identification and Resolution - Confirmatory Action Letter and SCWE (IP 92702)==
==4OA2 Problem Identification and Resolution - Confirmatory Action Letter and==
Background  On September 10, 2007, representatives of WCBS-TV (New York City) contacted the NRC stating that they possessed videotapes of inattentive security officers at the Peach Bottom Atomic Power Station (PBAPS). Based upon this information, the NRC enhanced inspection oversight of security activities at Peach Bottom and verbally informed Exelon management who commenced an internal investigation. On September 19, 2007, the NRC viewed the video of inattentive security officers and immediately initiated an Augmented Inspection Team (AIT) to investigate this issue. The AIT concluded that Exelon's prompt compensatory measures and corrective actions in response to the inattentive security officers were adequate and ensured the station's ability to meet Security Plan requirements. On October 4, 2007, Exelon documented their prompt compensatory measures and planned corrective actions in a letter to the NRC (NRC ADAMS Accession Number ML072850708).


In Exelon's October 4, 2007, letter to the NRC Region I Regional Administrator, Exelon described completed compensatory actions and 16 planned actions to address the inattentive security officer issue. The planned actions included, in part:  (1) terminating the security contract with their contractor and transitioning to a proprietary security force; (2) completing a root cause analysis of the security officer inattentiveness; (3) identifying corrective actions; and (4) performing safety conscious work environment (SCWE)surveys of the Peach Bottom Security organization. On October 19, 2007, the NRC issued a Confirmatory Action Letter (CAL) (ML072920283) to document Exelon's commitments. The CAL included the commitments documented in Exelon's letter and added several additional Exelon commitments that were verbally made to the NRC. The commitments are listed in Attachment B of this report.
SCWE (IP 92702)
Background On September 10, 2007, representatives of WCBS-TV (New York City) contacted the NRC stating that they possessed videotapes of inattentive security officers at the Peach Bottom Atomic Power Station (PBAPS). Based upon this information, the NRC enhanced inspection oversight of security activities at Peach Bottom and verbally informed Exelon management who commenced an internal investigation. On September 19, 2007, the NRC viewed the video of inattentive security officers and immediately initiated an Augmented Inspection Team (AIT) to investigate this issue. The AIT concluded that Exelons prompt compensatory measures and corrective actions in response to the inattentive security officers were adequate and ensured the stations ability to meet Security Plan requirements. On October 4, 2007, Exelon documented their prompt compensatory measures and planned corrective actions in a letter to the NRC (NRC ADAMS Accession Number ML072850708).


On June 2 - 6, 2008, the NRC conducted a team inspection to verify whether the actions taken by Exelon adequately addressed the commitments documented in the CAL.
In Exelons October 4, 2007, letter to the NRC Region I Regional Administrator, Exelon described completed compensatory actions and 16 planned actions to address the inattentive security officer issue. The planned actions included, in part:
: (1) terminating the security contract with their contractor and transitioning to a proprietary security force;
: (2) completing a root cause analysis of the security officer inattentiveness;
: (3) identifying corrective actions; and
: (4) performing safety conscious work environment (SCWE)surveys of the Peach Bottom Security organization. On October 19, 2007, the NRC issued a Confirmatory Action Letter (CAL) (ML072920283) to document Exelons commitments. The CAL included the commitments documented in Exelons letter and added several additional Exelon commitments that were verbally made to the NRC. The commitments are listed in Attachment B of this report.


This inspection was conducted in accordance with a deviation from the Reactor Oversight Program as authorized by the NRC Executive Director of Operations (ML073320344).
On June 2 - 6, 2008, the NRC conducted a team inspection to verify whether the actions taken by Exelon adequately addressed the commitments documented in the CAL. This inspection was conducted in accordance with a deviation from the Reactor Oversight Program as authorized by the NRC Executive Director of Operations (ML073320344).


The results of this inspection are documented in this report.
The results of this inspection are documented in this report.


===.1 Random Observations of Various Aspects of the Security Program (Attachment B, Item 1) (IP 92702)===
===.1 Random Observations of Various Aspects of the Security Program (Attachment B,===
Inspection Scope Exelon committed to conducting five observations in a 24 hour period, seven days per week, by Exelon Corporate Security and security management personnel from other sites. Random observations included verifying attentiveness at security ready rooms and other posts. The inspectors reviewed PBAPS records of Exelon Corporate daily random security program observations performed until November 18, 2007, to determine whether observations were conducted and whether any adverse trends were identified or documented. The inspectors performed interviews of security department management to better understand Exelon's programs and processes for identifying issues related to inattentiveness, behavior observation, and SCWE. Additionally, the inspectors conducted 63 interviews with security officers to determine their understanding of making proper notifications to station management upon discovery of an inattentive officer, aberrant behavior, and recognition of behaviors adverse to the safe operation and security of the facility.
 
Item 1) (IP 92702)
Inspection Scope Exelon committed to conducting five observations in a 24 hour period, seven days per week, by Exelon Corporate Security and security management personnel from other sites. Random observations included verifying attentiveness at security ready rooms and other posts. The inspectors reviewed PBAPS records of Exelon Corporate daily random security program observations performed until November 18, 2007, to determine whether observations were conducted and whether any adverse trends were identified or documented. The inspectors performed interviews of security department management to better understand Exelons programs and processes for identifying issues related to inattentiveness, behavior observation, and SCWE. Additionally, the inspectors conducted 63 interviews with security officers to determine their understanding of making proper notifications to station management upon discovery of an inattentive officer, aberrant behavior, and recognition of behaviors adverse to the safe operation and security of the facility.
 
Findings and Observations No findings of significance were identified. This CAL item is closed.
 
The inspectors reviewed Exelons letter (ML073040516) to the NRC dated October 25, 2007 and the NRCs response to this letter (ML073370024) dated November 30, 2007.


Findings and Observations  No findings of significance were identified. This CAL item is closed.
The letters were regarding a missed observation on October 20, 2007. The inspectors concluded that this one missed observation by corporate security management was of minor significance and did not impact the overall implementation of this commitment.


The inspectors reviewed Exelon's letter (ML073040516) to the NRC dated October 25, 2007 and the NRC's response to this letter (ML073370024) dated November 30, 2007. The letters were regarding a missed observation on October 20, 2007. The inspectors concluded that this one missed observation by corporate security management was of minor significance and did not impact the overall implementation of this commitment.
With the exception of the item noted above, the inspectors determined that the daily random security program observations were all completed in accordance with the CAL.


With the exception of the item noted above, the inspectors determined that the daily random security program observations were all completed in accordance with the CAL. Interviews with security operations staff identified an effective level of understanding and ownership of the importance of attentiveness. Inspector-led interviews conducted with selected officers and staff confirmed that security personnel were knowledgeable of behaviors adverse to attentiveness. Observations of post assignment areas revealed that security posts, ready rooms, and alarm stations were orderly, properly lit, well ventilated, and fully functional. Furthermore, the security officers conveyed a fundamental understanding of the importance of prompt communication with management regarding behavior observation.
Interviews with security operations staff identified an effective level of understanding and ownership of the importance of attentiveness. Inspector-led interviews conducted with selected officers and staff confirmed that security personnel were knowledgeable of behaviors adverse to attentiveness. Observations of post assignment areas revealed that security posts, ready rooms, and alarm stations were orderly, properly lit, well ventilated, and fully functional. Furthermore, the security officers conveyed a fundamental understanding of the importance of prompt communication with management regarding behavior observation.


===.2 Daily Observations of Various Security Posts (Attachment B, Item 2)===
===.2 Daily Observations of Various Security Posts (Attachment B, Item 2)===
Inspection Scope Exelon committed to conduct and document daily management observations of various security posts chosen at random. Additionally, site management committed to visit the ready room at least once per day, 7 days per week, including at least one backshift visit per week until November 20, 2007. The inspectors performed numerous walk-downs of all security posts, ready rooms and alarm stations. The inspectors examined records of daily observations of various security posts from October 18, 2007, through November 20, 2007. The inspectors performed observations, interviewed individuals, and verified records to ensure that the observations were effectively conducted and documented.
Inspection Scope Exelon committed to conduct and document daily management observations of various security posts chosen at random. Additionally, site management committed to visit the ready room at least once per day, 7 days per week, including at least one backshift visit per week until November 20, 2007. The inspectors performed numerous walk-downs of all security posts, ready rooms and alarm stations. The inspectors examined records of daily observations of various security posts from October 18, 2007, through November 20, 2007. The inspectors performed observations, interviewed individuals, and verified records to ensure that the observations were effectively conducted and documented.


Findings and Observations No findings of significance were identified. This CAL item is closed. The inspectors verified that Exelon site management had performed all actions detailed in the CAL.
Findings and Observations No findings of significance were identified. This CAL item is closed.
 
The inspectors verified that Exelon site management had performed all actions detailed in the CAL.


===.3 Alarm Station and Shift Turnover Observations (Attachment B, Item 3)===
===.3 Alarm Station and Shift Turnover Observations (Attachment B, Item 3)===
Exelon committed to conducting observations of the Central Alarm Station (CAS) and the Secondary Alarm Station (SAS), as well as one security shift turnover per month by the Peach Bottom Site Vice President and the Plant Manager until March 2008. The inspectors reviewed records from October 19, 2007, through May 29, 2008, and performed interviews with the Plant Manager and Site Vice President to determine if the observations of the CAS, SAS, and shift turnovers were effective. The inspectors performed walk-downs of the CAS and SAS, interviewed seven alarm station operators, and several security officers to determine if the observations made by the Site Vice President and/or Plant Manager provided reinforcement of expectations related to attentiveness.
Exelon committed to conducting observations of the Central Alarm Station (CAS) and the Secondary Alarm Station (SAS), as well as one security shift turnover per month by the Peach Bottom Site Vice President and the Plant Manager until March 2008. The inspectors reviewed records from October 19, 2007, through May 29, 2008, and performed interviews with the Plant Manager and Site Vice President to determine if the observations of the CAS, SAS, and shift turnovers were effective. The inspectors performed walk-downs of the CAS and SAS, interviewed seven alarm station operators, and several security officers to determine if the observations made by the Site Vice President and/or Plant Manager provided reinforcement of expectations related to attentiveness.


Findings and Observations No findings of significance were identified. This CAL item is closed. The inspectors verified that Site Vice President and Plant Manager had performed all actions detailed in the CAL. The results of interviews with CAS and SAS operators indicated a strong understanding of management's expectations of attentiveness and proper timely reporting of such issues to management.
Findings and Observations No findings of significance were identified. This CAL item is closed.
 
The inspectors verified that Site Vice President and Plant Manager had performed all actions detailed in the CAL. The results of interviews with CAS and SAS operators indicated a strong understanding of managements expectations of attentiveness and proper timely reporting of such issues to management.


===.4 Wackenhut Corporate Security Management Oversight and Observations===
===.4 Wackenhut Corporate Security Management Oversight and Observations===
Inspection Scope (Attachment B, Item 4)    The inspectors verified through a review of plant records that: (a) Wackenhut corporate security management had provided 24 hour supervisory coverage of security activities at the plant through the transition to an Exelon proprietary security force; (b) Wackenhut provided site security management oversight above normal staffing to the day and night shifts; (c) Wackenhut supervisors had performed continuous observation in the ready room; and (d) Wackenhut security personnel conducted random radio checks.


Findings and Observations No findings of significance were identified. This CAL item is closed. The inspectors verified that Wackenhut had performed all actions detailed in the CAL.
Inspection Scope (Attachment B, Item 4)
The inspectors verified through a review of plant records that:
: (a) Wackenhut corporate security management had provided 24 hour supervisory coverage of security activities at the plant through the transition to an Exelon proprietary security force;
: (b) Wackenhut provided site security management oversight above normal staffing to the day and night shifts;
: (c) Wackenhut supervisors had performed continuous observation in the ready room; and
: (d) Wackenhut security personnel conducted random radio checks.


===.5 Exelon to Provide the NRC information Regarding the Management Transition of the Exelon Security Program (Attachment B, Item 5)===
Findings and Observations No findings of significance were identified. This CAL item is closed.
Inspection Scope  The inspectors reviewed Exelon's project plan and related actions for transitioning to an Exelon managed security force. The inspectors reviewed records detailing weekly telephone call updates to Region I management on the status and changes to the security force transition plan.


Findings and Observations No findings of significance were identified. This CAL item is closed.
The inspectors verified that Wackenhut had performed all actions detailed in the CAL.
 
===.5 Exelon to Provide the NRC information Regarding the Management Transition of the===
 
Exelon Security Program (Attachment B, Item 5)
Inspection Scope The inspectors reviewed Exelons project plan and related actions for transitioning to an Exelon managed security force. The inspectors reviewed records detailing weekly telephone call updates to Region I management on the status and changes to the security force transition plan.
 
Findings and Observations No findings of significance were identified. This CAL item is closed.


The inspectors confirmed that Region I management participated in numerous weekly telephone calls and discussed the status and relevant details of the transition to an Exelon managed security organization.
The inspectors confirmed that Region I management participated in numerous weekly telephone calls and discussed the status and relevant details of the transition to an Exelon managed security organization.


===.6 Sixteen Commitments in an Exelon Letter Dated October 4, 2007 (Attachment B, Items 6a through 6p)===
===.6 Sixteen Commitments in an Exelon Letter Dated October 4, 2007 (Attachment B, Items===
Inspection Scope    The inspectors verified that Exelon had completed a root cause evaluation (IR 673505)and identified corrective actions to address the inattentive security officer issue (Attachment B, Item 6a). The inspectors reviewed post inspection forms, vital area patrol records and post activity logs for all assigned posts and locations from October 4, 2007, through June 2, 2008, to verify that security officers were not assigned to a single post for an entire shift (Item 6b). The inspectors reviewed fleet corrective actions to ensure post rotations had been reviewed at the remaining Exelon Nuclear operating reactor sites (Item 6d). The inspectors conducted interviews with officers at security posts to assess the effectiveness of attentiveness stimuli (Item 6c). Additionally, the inspectors verified that attentiveness stimuli projects had been fully implemented or were scheduled to be implemented (Item 6g). The inspectors reviewed the common Exelon procedures to verify that authorized attentiveness aids were described and that their use at each post (Ready Room, Over-watch, etc.) was clearly stated and authorized. The inspectors confirmed that Exelon has established a new division to manage security organization at Peach Bottom (Item 6h). The inspectors also reviewed condition reports that described incidents which warranted reporting to security management. Specifically, the inspectors focused on incidents where inappropriate behavior was witnessed by security officers on shift and reported to management. The inspectors reviewed documentation of communications to the balance of the Peach Bottom Station staff regarding expectations for reporting issues (Item 6i).


The inspectors conducted interviews and reviewed records to understand Exelon's methods to return security officers to duty following the inattentiveness issue (Item 6e). Corrective action records were reviewed to ensure indoctrination sessions for understanding Behavioral Observation Program (BOP) and SCWE were conducted with all security force members (Item 6f). The inspectors visited posts to verify that structural improvements, lighting enhancements, and temperature controls were conducive to maintaining security officer attentiveness (Item 6j). The inspectors reviewed training records to verify that refresher training for the Peach Bottom security organization and for the remainder of Exelon Nuclear reactor sites had been implemented (Item 6k). The inspectors verified that lesson plans stressed expectations regarding the BOP, SCWE, and maintaining attentiveness while on duty.
6a through 6p)
Inspection Scope The inspectors verified that Exelon had completed a root cause evaluation (IR 673505)and identified corrective actions to address the inattentive security officer issue (Attachment B, Item 6a). The inspectors reviewed post inspection forms, vital area patrol records and post activity logs for all assigned posts and locations from October 4, 2007, through June 2, 2008, to verify that security officers were not assigned to a single post for an entire shift (Item 6b). The inspectors reviewed fleet corrective actions to ensure post rotations had been reviewed at the remaining Exelon Nuclear operating reactor sites (Item 6d).


The inspectors verified that face-to-face interviews were conducted with security force supervisors to reinforce expectations related to attentiveness and actions to take if someone is found in an inattentive state, and to solicit feedback on challenges to maintaining attentiveness and raising issues (Item 6l). The inspectors also verified that supervisory training was conducted for security force supervisors regarding their responsibilities for maintaining a SCWE (Item 6m). The inspectors verified that a SCWE survey of the Peach Bottom security organization by an external vendor had been conducted (Item 6n). The inspectors verified that the results of the SCWE survey were evaluated by Exelon and were the basis of a focused self assessment (Item 6o).
The inspectors conducted interviews with officers at security posts to assess the effectiveness of attentiveness stimuli (Item 6c). Additionally, the inspectors verified that attentiveness stimuli projects had been fully implemented or were scheduled to be implemented (Item 6g). The inspectors reviewed the common Exelon procedures to verify that authorized attentiveness aids were described and that their use at each post (Ready Room, Over-watch, etc.) was clearly stated and authorized.


The inspectors also reviewed Exelon's plans for conducting SCWE surveys of the security organizations at other Exelon sites (Item 6p). As noted in the CAL, the NRC will schedule a meeting with Exelon upon the completion of their review for this action to discuss the safety conscious work environment (SCWE) survey results as they apply to other Exelon sites.
The inspectors confirmed that Exelon has established a new division to manage security organization at Peach Bottom (Item 6h). The inspectors also reviewed condition reports that described incidents which warranted reporting to security management.


Findings and Observations  No findings of significance were identified. The CAL Items 6a through 6o are closed. The CAL item 6p, for conducting SCWE surveys of the security organizations at other Exelon sites, remains open. Exelon has corrective actions assigned to track completion of these surveys. All surveys are expected to be completed by October 2008.
Specifically, the inspectors focused on incidents where inappropriate behavior was witnessed by security officers on shift and reported to management. The inspectors reviewed documentation of communications to the balance of the Peach Bottom Station staff regarding expectations for reporting issues (Item 6i).


Exelon created an in-house proprietary security division to manage the security organization at Peach Bottom. The inspectors reviewed procedures and records to ensure no security officer had been assigned to a single post for an entire shift. Steps had been taken in the post assignments to ensure that the officers' duties provide for a change in location, variety of responsibilities, and appropriate breaks to prevent inattentiveness.
The inspectors conducted interviews and reviewed records to understand Exelons methods to return security officers to duty following the inattentiveness issue (Item 6e).


Exelon conducted face to face interviews with security force supervisors to reinforce expectations related to inattentiveness; actions to be taken if someone was found to be inattentive; and, the mechanism to solicit feedback on challenges to maintaining attentiveness. Exelon included topics such as behavioral observation training, security officer attentiveness, aberrant behavior identification, and notification expectations and requirements in these interviews. The inspectors determined that communications to reinforce expectations of reporting issues for the balance of the Peach Bottom staff were complete. The inspectors concluded that the security staff had a sound understanding of Exelon management's expectations of reporting unusual behavior or actions that could indirectly pose a risk to public health and safety. Specifically, the inspectors noted that the security staff was willing to report operational and safety issues at a low threshold. The officers were fully cognizant of communicating early and clearly with management regarding BOP, SCWE, and inattentiveness.
Corrective action records were reviewed to ensure indoctrination sessions for understanding Behavioral Observation Program (BOP) and SCWE were conducted with all security force members (Item 6f). The inspectors visited posts to verify that structural improvements, lighting enhancements, and temperature controls were conducive to maintaining security officer attentiveness (Item 6j).


===.7 Exelon Will Provide Written Confirmation to the NRC When These Actions Are Completed (Attachment B, Item 7)===
The inspectors reviewed training records to verify that refresher training for the Peach Bottom security organization and for the remainder of Exelon Nuclear reactor sites had been implemented (Item 6k). The inspectors verified that lesson plans stressed expectations regarding the BOP, SCWE, and maintaining attentiveness while on duty.
 
The inspectors verified that face-to-face interviews were conducted with security force supervisors to reinforce expectations related to attentiveness and actions to take if someone is found in an inattentive state, and to solicit feedback on challenges to maintaining attentiveness and raising issues (Item 6l). The inspectors also verified that supervisory training was conducted for security force supervisors regarding their responsibilities for maintaining a SCWE (Item 6m).
 
The inspectors verified that a SCWE survey of the Peach Bottom security organization by an external vendor had been conducted (Item 6n). The inspectors verified that the results of the SCWE survey were evaluated by Exelon and were the basis of a focused self assessment (Item 6o). The inspectors also reviewed Exelons plans for conducting SCWE surveys of the security organizations at other Exelon sites (Item 6p). As noted in the CAL, the NRC will schedule a meeting with Exelon upon the completion of their review for this action to discuss the safety conscious work environment (SCWE) survey results as they apply to other Exelon sites.
 
Findings and Observations No findings of significance were identified. The CAL Items 6a through 6o are closed.
 
The CAL item 6p, for conducting SCWE surveys of the security organizations at other Exelon sites, remains open. Exelon has corrective actions assigned to track completion of these surveys. All surveys are expected to be completed by October 2008.
 
Exelon created an in-house proprietary security division to manage the security organization at Peach Bottom. The inspectors reviewed procedures and records to ensure no security officer had been assigned to a single post for an entire shift. Steps had been taken in the post assignments to ensure that the officers duties provide for a change in location, variety of responsibilities, and appropriate breaks to prevent inattentiveness.
 
Exelon conducted face to face interviews with security force supervisors to reinforce expectations related to inattentiveness; actions to be taken if someone was found to be inattentive; and, the mechanism to solicit feedback on challenges to maintaining attentiveness. Exelon included topics such as behavioral observation training, security officer attentiveness, aberrant behavior identification, and notification expectations and requirements in these interviews. The inspectors determined that communications to reinforce expectations of reporting issues for the balance of the Peach Bottom staff were complete.
 
The inspectors concluded that the security staff had a sound understanding of Exelon managements expectations of reporting unusual behavior or actions that could indirectly pose a risk to public health and safety. Specifically, the inspectors noted that the security staff was willing to report operational and safety issues at a low threshold. The officers were fully cognizant of communicating early and clearly with management regarding BOP, SCWE, and inattentiveness.
 
===.7 Exelon Will Provide Written Confirmation to the NRC When These Actions Are===
 
Completed (Attachment B, Item 7)
The inspectors verified through interviews that Exelon will provide written confirmation of all CAL items when the remaining SCWE surveys at all Exelon sites have been completed.
The inspectors verified through interviews that Exelon will provide written confirmation of all CAL items when the remaining SCWE surveys at all Exelon sites have been completed.


Findings and Observations No findings of significance were identified.
Findings and Observations No findings of significance were identified.


This CAL item remains open.
This CAL item remains open.
Line 117: Line 174:
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings, Including Exit==
==4OA6 Meetings, Including Exit==
On June 6, 2008, the inspectors presented the inspection results to Mr. Joseph Grimes, Site Vice President, and other members of his staff.
On June 6, 2008, the inspectors presented the inspection results to Mr. Joseph Grimes, Site Vice President, and other members of his staff.


ATTACHMENT A:
ATTACHMENT A:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
Personnel Contacted:
 
: [[contact::J. Grimes]], Site Vice President  
Personnel Contacted:
: [[contact::M. Massaro]], Plant Manager  
: [[contact::J. Grimes]], Site Vice President
: [[contact::J. Armstrong]], Manager, Regulatory Assurance  
: [[contact::M. Massaro]], Plant Manager
: [[contact::R. Smith]], Regulatory Assurance Specialist  
: [[contact::J. Armstrong]], Manager, Regulatory Assurance
: [[contact::J. Kovalchick]], Manager Site Security  
: [[contact::R. Smith]], Regulatory Assurance Specialist
: [[contact::S. Craig]], Manager, Site Security Operations  
: [[contact::J. Kovalchick]], Manager Site Security
: [[contact::J. Glunt]], NOS Manager  
: [[contact::S. Craig]], Manager, Site Security Operations
: [[contact::K. Young]], Security Operations Supervisor  
: [[contact::J. Glunt]], NOS Manager
: [[contact::D. Torres]], Security Training Coordinator  
: [[contact::K. Young]], Security Operations Supervisor
: [[contact::R. White]], Lead Supervisor - Security  
: [[contact::D. Torres]], Security Training Coordinator
: [[contact::S. Berry]], Lead Supervisor - Security  
: [[contact::R. White]], Lead Supervisor - Security
: [[contact::T. Girken]], Lead Supervisor - Security  
: [[contact::S. Berry]], Lead Supervisor - Security
: [[contact::K. Bristol]], Lead Supervisor - Security
: [[contact::T. Girken]], Lead Supervisor - Security
: [[contact::K. Bristol]], Lead Supervisor - Security


==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
None
 
None
 
==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
Procedures:
: SY-AA-101-126-1001, Revision 2, Nuclear Security Team Turnover and Briefing
: SY-AA-1016, Revision 5, Watch-Standing Practices
: SY-AA-1016, Revision 6, Watch-Standing Practices and Communications
: SY-AA-1020, Revision 4, Supervisor Post Checks and Post Orders
: SY-AA-1024, Revision 0, Security Performance Monitoring, Oversight, and Indicators
: SY-AA-101-135, Revision 3, Exelon Nuclear Security Work Hour Controls
: SY-PB-101-124-1001, Revision 4, Security Control Center Operations
: SY-AA-101-126-1001, Revision 2, Nuclear Security Team Turnover and Briefing
: SY-AA-101-126-1002, Revision 1, Security Team Management Review Meeting (MRM)
: SY-AA-500-126-1001, Revision 0, Security Improvement Focus Team
: LS-AA-125, Revision 11, Corrective Action Program (CAP) Procedure
: HU-PB-2000, Revision 2, Attentiveness Guidelines
: SY-AA-500-126, Revision 3, Duties and Responsibilities of the Exelon Nuclear Security Organization
: DD-13, Revision 2, Security Department Description
: NO-AA-101-1005, Revision 1, Qualification of Employee Concerns Personnel
: EI-AA-101-1001, Revision 7, Employee Concerns Program Process
: OP-PB-101-111, Revision 8, Peach Bottom Operations Department
: LS-AA-112, Revision 3, Responding to Allegations Referred by NRC and to NRC Investigations
: LS-AA-126-1006, Revision 2, Benchmarking Program Attachment
: WC-AA-106, Revision 7, Work Screening and Processing
: Miscellaneous:
: CAL No. 1-07-005, Letter to Christopher Crane, President and Chief Nuclear Officer, Exelon Nuclear, "Confirmatory Action Letter (1-07-005)," October 19, 2007,
: ML072920283. Letter to Samuel Collins, Regional Administrator, NRC, "Exelon Letters Regarding Alleged Security Officer Inattentiveness at Peach Bottom Atomic Power Station," October 9, 2007, ML072900343. Station Security Observation Forms, September 19, 2007, through November 18, 2007.
: N-AN-SY-SUPVECPSCWE, "Employee Concerns Program and Safety Conscious Work Environment for Supervisors [training lesson plan]."
: Issue Reports:
: IR 673505, Security Inattentiveness Allegation
: IR 674907, NER
: NC-07-034 Red - Inattentive Security Officer Actions
: IR 682545, Track Action from Letter to NRC dated October 4, 2007
: IR 688313, Track Actions from Confirmatory Action Letter 1-07-005
: IR 707182, Security Post Rotation Differences
: IR 707952, NER
: NC-07-034, Revision 3, Inattentive Security Officer Actions
: IR 720465, Track Actions from PBAPS Letter to NRC dated November 2, 2007
: IR 739665, NER
: NC-07-034, Revision 4, Actions for Inattentive Security Officer
: IR 762432, Trend Issue - Inadvertent Discharge of OC Spray
: IR 782379*, Security Root Cause ACIT Improperly Closed
: IR 782387, Inappropriate Behavior by Security Officer
: IR 782747*, Scaffold Poles Creating Glare/Blockage
: IR 783038*, REC:
: Evaluate Security Turnover Process (Uninterrupted)  * Written as a result of NRC inspection Attachment
==LIST OF ACRONYMS==
: [[ADAMS]] [[Agency-wide Documents Access and Management System]]
: [[AIT]] [[Augmented Inspection Team]]
: [[AR]] [[Activity Report]]
: [[BOP]] [[Behavior Observation Program]]
: [[CAL]] [[Confirmatory Action Letter]]
: [[CAP]] [[Corrective Action Program]]
: [[CARB]] [[Corrective Action Review Board]]
: [[CAS]] [[Central Alarm Station  CFR  Code of Federal Regulations]]
: [[CNO]] [[Chief Nuclear Officer]]
: [[CR]] [[Condition Report]]
: [[DRP]] [[Division of Reactor Projects]]
: [[ECP]] [[Employee Concerns Program  EDO  Executive Director for Operations]]
: [[NRC]] [[Nuclear Regulatory Commission]]
: [[PARS]] [[Publicly Available Records]]
: [[PBAPS]] [[Peach Bottom Atomic Power Station]]
: [[SAS]] [[Secondary Alarm Station]]
: [[SC]] [[]]
: [[WE]] [[Safety Conscious Work Environment]]
: [[SDP]] [[Significance Determination Process]]
ROP  Reactor Oversight Process     


Attachment
: [[ATTACH]] [[]]
: [[MENT]] [[B]]
: [[PEACH]] [[]]
: [[BOTTOM]] [[]]
: [[CAL]] [[]]
: [[COMMIT]] [[MENT]]
: [[TABLE]] [[]]
: [[ITEM]] [[]]
: [[NO.]] [[]]
ISSUE 1 Exelon Corporate security management personnel will conduct and document daily random observations of the implementation of various aspects of the security program
until November 18, 2007. 2 Exelon site management will conduct and document daily observations of various security posts chosen at random until November 20, 2007. 3 The Peach Bottom Site Vice President and the Plant Manager will observe the Central Alarm Station and Secondary Alarm Station, as well as one security shift turnover per month until March 2008. 4 Until the transition to an Exelon security force is implemented on or about November 1, 2007, Wackenhut management oversight actions of security operations at Peach Bottom. 5 Exelon will provide the NRC information regarding the transition to an Exelon security program and implementing procedures that supersede the above actions, as well as updates on the security force transition plan, via weekly telephone calls until a permanent management observation system is installed. 6 Exelon will complete or maintain all other actions committed to in its October 4, 2007 letter on the schedule listed therein (6a-6p, below). 6a Complete root cause evaluation and identify subsequent corrective actions. 6b Revise post assignments for Peach Bottom security so no one is assigned to a single post for entire shift. 6c Enhance attentiveness stimuli. 6d Review security post rotation at remaining Exelon plants. 6e Determine which security force members impacted by the inattentiveness issue will be returned to duty. 6f Conduct indoctrination sessions with those returning security force members to reinforce expectations regarding behavioral
observation program and a healthy safety conscious work environment. 6g Improvements in attentiveness stimuli have been identified and scheduled for implementation. 6h Establish new Exelon division or company to manage security organization at Peach Bottom. 6i Develop appropriate communications for the balance of the Peach Bottom staff to reinforce expectations regarding reporting of issues.
Attachment  6j Improve the environmental conditions of the staging areas at Peach Bottom. 6k Provide refresher training to the security organizations at the remainder of the Exelon Nuclear reactor sites to reinforce expectations regarding the behavioral observation program and a healthy
: [[SC]] [[]]
WE 6l Conduct face-to-face interviews with security force supervisors to reinforce expectations related to inattentiveness and
actions to take if someone is found in an inattentive state, and solicit feedback on challenges to maintaining attentiveness and raising issues. 6m Conduct supervisory training for security force supervisors regarding their responsibilities for maintaining a
: [[SCWE.]] [[6n Conduct a]]
: [[SCWE]] [[survey of the Peach Bottom security organization with the assistance of resources external to Exelon. 6o Perform a self-assessment of the Peach Bottom security organization, with the assistance of resources external to Exelon, focusing on the]]
: [[SCWE]] [[in the security organization. 6p Conduct a]]
: [[SCWE]] [[survey of the security organizations at the remaining Exelon Nuclear operating reactor sites to identify any required corrective actions  (Not Complete). 7 Exelon will provide written confirmation to NRC when these actions are completed  (Not Complete ).]]
}}
}}

Latest revision as of 15:57, 14 November 2019

IR 05000277-08-008 and 05000278-08-008; on 06/02/2008 - 06/06/2008; Peach Bottom Atomic Power Station; Confirmatory Action Letter Status Report
ML081970338
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/15/2008
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Pardee C
AmerGen Energy Co, Exelon Generation Co
BOWER, FL
References
CAL 1-07-005 IR-08-008
Download: ML081970338 (10)


Text

UNITED STATES uly 15, 2008

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION CONFIRMATORY ACTION LETTER STATUS INSPECTION REPORT NOS. 05000277/2008008 and 05000278/2008008

Dear Mr. Pardee:

On June 6, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection, at your Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, to determine your progress in meeting the commitments documented in the Confirmatory Action Letter (CAL) dated October 19, 2007. The CAL had been issued to formalize Exelons agreement to complete certain actions in response to the inattentive security officers and safety conscious work environment (SCWE) issues at PBAPS. The enclosed inspection report documents the inspection results, which were discussed on June 6, 2008, with Mr. J. Grimes, Site Vice President, and other members of your staff.

Since the completion of the Augmented Inspection Teams (September 21 through 28, 2007 and November 5 through 9, 2007) were conducted and the PBAPS CAL was issued, the NRC has devoted extensive efforts to monitor your actions in response to the inattentive security officers and safety conscious work environment (SCWE) issues at PBAPS. Specific activities conducted included: inspection of the transition from contract security force to in-house security force (February 11-15, 2008); review of your root cause evaluation effectiveness (March 3-7, 2008); and an inspection of activities directly related to safety conscious work environment (March 24 - 28, 2008). These prior inspection activities also verified Exelons actions taken to address various CAL commitments.

The CAL status inspection team focused on actions taken by Exelon as specified in the CAL to determine whether such actions were timely, complete and effective. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified and the enclosed inspection report closes all but two CAL items. One CAL item related to Exelons commitment to perform security organization SCWE surveys across the Exelon fleet remains

open. As noted in the CAL, the NRC will schedule a meeting with Exelon upon the completion of your review for this action to discuss the safety conscious work environment (SCWE) survey results as they apply to other Exelon sites. The second CAL item related to Exelon submitting written confirmation that all CAL items have been completed, remains open.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by Fred L Bower Acting For/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56

Enclosure:

Inspection Report Nos. 05000277/2008008, 05000278/2008008 w/Attachments Attachments:

(A) Supplemental Information (B) Peach Bottom Cal Commitment Table

REGION I==

Docket Nos: 50-277, 50-278 License Nos: DPR-44, DPR-56 Report Nos: 05000277/2008008, 05000278/2008008 Licensee: Exelon Generation Company, LLC Facility: Peach Bottom Atomic Power Station Location: Delta, Pennsylvania Dates: June 2 - June 6, 2008 Team Leader: Anthony Dimitriadis, Senior Physical Security Inspector (Region I)

Inspectors: George E. Smith, Physical Security Inspector (Region I)

Thomas Setzer, Reactor Inspector (Region I)

Mark Martin, Physical Security Inspector, (Region III)

Approved by: Paul Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Enclosure

SUMMARY OF FINDINGS

IR 05000277/2008008 and 05000278/2008008; 06/02/2008 - 06/06/2008; Peach Bottom

Atomic Power Station; Confirmatory Action Letter Status Report Identification of Resolution of Problems - Confirmatory Action Letter Status Inspection This report covers an announced team inspection by two Region I security inspectors, one Region I reactor inspector, and one Region III security inspector. No findings of significance were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, December 2006.

NRC Identified

and Self Revealing Finding None B. Licensee Identified Findings None

REPORT DETAILS

OTHER ACTIVITIES (OA)

4OA2 Problem Identification and Resolution - Confirmatory Action Letter and

SCWE (IP 92702)

Background On September 10, 2007, representatives of WCBS-TV (New York City) contacted the NRC stating that they possessed videotapes of inattentive security officers at the Peach Bottom Atomic Power Station (PBAPS). Based upon this information, the NRC enhanced inspection oversight of security activities at Peach Bottom and verbally informed Exelon management who commenced an internal investigation. On September 19, 2007, the NRC viewed the video of inattentive security officers and immediately initiated an Augmented Inspection Team (AIT) to investigate this issue. The AIT concluded that Exelons prompt compensatory measures and corrective actions in response to the inattentive security officers were adequate and ensured the stations ability to meet Security Plan requirements. On October 4, 2007, Exelon documented their prompt compensatory measures and planned corrective actions in a letter to the NRC (NRC ADAMS Accession Number ML072850708).

In Exelons October 4, 2007, letter to the NRC Region I Regional Administrator, Exelon described completed compensatory actions and 16 planned actions to address the inattentive security officer issue. The planned actions included, in part:

(1) terminating the security contract with their contractor and transitioning to a proprietary security force;
(2) completing a root cause analysis of the security officer inattentiveness;
(3) identifying corrective actions; and
(4) performing safety conscious work environment (SCWE)surveys of the Peach Bottom Security organization. On October 19, 2007, the NRC issued a Confirmatory Action Letter (CAL) (ML072920283) to document Exelons commitments. The CAL included the commitments documented in Exelons letter and added several additional Exelon commitments that were verbally made to the NRC. The commitments are listed in Attachment B of this report.

On June 2 - 6, 2008, the NRC conducted a team inspection to verify whether the actions taken by Exelon adequately addressed the commitments documented in the CAL. This inspection was conducted in accordance with a deviation from the Reactor Oversight Program as authorized by the NRC Executive Director of Operations (ML073320344).

The results of this inspection are documented in this report.

.1 Random Observations of Various Aspects of the Security Program (Attachment B,

Item 1) (IP 92702)

Inspection Scope Exelon committed to conducting five observations in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, seven days per week, by Exelon Corporate Security and security management personnel from other sites. Random observations included verifying attentiveness at security ready rooms and other posts. The inspectors reviewed PBAPS records of Exelon Corporate daily random security program observations performed until November 18, 2007, to determine whether observations were conducted and whether any adverse trends were identified or documented. The inspectors performed interviews of security department management to better understand Exelons programs and processes for identifying issues related to inattentiveness, behavior observation, and SCWE. Additionally, the inspectors conducted 63 interviews with security officers to determine their understanding of making proper notifications to station management upon discovery of an inattentive officer, aberrant behavior, and recognition of behaviors adverse to the safe operation and security of the facility.

Findings and Observations No findings of significance were identified. This CAL item is closed.

The inspectors reviewed Exelons letter (ML073040516) to the NRC dated October 25, 2007 and the NRCs response to this letter (ML073370024) dated November 30, 2007.

The letters were regarding a missed observation on October 20, 2007. The inspectors concluded that this one missed observation by corporate security management was of minor significance and did not impact the overall implementation of this commitment.

With the exception of the item noted above, the inspectors determined that the daily random security program observations were all completed in accordance with the CAL.

Interviews with security operations staff identified an effective level of understanding and ownership of the importance of attentiveness. Inspector-led interviews conducted with selected officers and staff confirmed that security personnel were knowledgeable of behaviors adverse to attentiveness. Observations of post assignment areas revealed that security posts, ready rooms, and alarm stations were orderly, properly lit, well ventilated, and fully functional. Furthermore, the security officers conveyed a fundamental understanding of the importance of prompt communication with management regarding behavior observation.

.2 Daily Observations of Various Security Posts (Attachment B, Item 2)

Inspection Scope Exelon committed to conduct and document daily management observations of various security posts chosen at random. Additionally, site management committed to visit the ready room at least once per day, 7 days per week, including at least one backshift visit per week until November 20, 2007. The inspectors performed numerous walk-downs of all security posts, ready rooms and alarm stations. The inspectors examined records of daily observations of various security posts from October 18, 2007, through November 20, 2007. The inspectors performed observations, interviewed individuals, and verified records to ensure that the observations were effectively conducted and documented.

Findings and Observations No findings of significance were identified. This CAL item is closed.

The inspectors verified that Exelon site management had performed all actions detailed in the CAL.

.3 Alarm Station and Shift Turnover Observations (Attachment B, Item 3)

Exelon committed to conducting observations of the Central Alarm Station (CAS) and the Secondary Alarm Station (SAS), as well as one security shift turnover per month by the Peach Bottom Site Vice President and the Plant Manager until March 2008. The inspectors reviewed records from October 19, 2007, through May 29, 2008, and performed interviews with the Plant Manager and Site Vice President to determine if the observations of the CAS, SAS, and shift turnovers were effective. The inspectors performed walk-downs of the CAS and SAS, interviewed seven alarm station operators, and several security officers to determine if the observations made by the Site Vice President and/or Plant Manager provided reinforcement of expectations related to attentiveness.

Findings and Observations No findings of significance were identified. This CAL item is closed.

The inspectors verified that Site Vice President and Plant Manager had performed all actions detailed in the CAL. The results of interviews with CAS and SAS operators indicated a strong understanding of managements expectations of attentiveness and proper timely reporting of such issues to management.

.4 Wackenhut Corporate Security Management Oversight and Observations

Inspection Scope (Attachment B, Item 4)

The inspectors verified through a review of plant records that:

(a) Wackenhut corporate security management had provided 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> supervisory coverage of security activities at the plant through the transition to an Exelon proprietary security force;
(b) Wackenhut provided site security management oversight above normal staffing to the day and night shifts;
(c) Wackenhut supervisors had performed continuous observation in the ready room; and
(d) Wackenhut security personnel conducted random radio checks.

Findings and Observations No findings of significance were identified. This CAL item is closed.

The inspectors verified that Wackenhut had performed all actions detailed in the CAL.

.5 Exelon to Provide the NRC information Regarding the Management Transition of the

Exelon Security Program (Attachment B, Item 5)

Inspection Scope The inspectors reviewed Exelons project plan and related actions for transitioning to an Exelon managed security force. The inspectors reviewed records detailing weekly telephone call updates to Region I management on the status and changes to the security force transition plan.

Findings and Observations No findings of significance were identified. This CAL item is closed.

The inspectors confirmed that Region I management participated in numerous weekly telephone calls and discussed the status and relevant details of the transition to an Exelon managed security organization.

.6 Sixteen Commitments in an Exelon Letter Dated October 4, 2007 (Attachment B, Items

6a through 6p)

Inspection Scope The inspectors verified that Exelon had completed a root cause evaluation (IR 673505)and identified corrective actions to address the inattentive security officer issue (Attachment B, Item 6a). The inspectors reviewed post inspection forms, vital area patrol records and post activity logs for all assigned posts and locations from October 4, 2007, through June 2, 2008, to verify that security officers were not assigned to a single post for an entire shift (Item 6b). The inspectors reviewed fleet corrective actions to ensure post rotations had been reviewed at the remaining Exelon Nuclear operating reactor sites (Item 6d).

The inspectors conducted interviews with officers at security posts to assess the effectiveness of attentiveness stimuli (Item 6c). Additionally, the inspectors verified that attentiveness stimuli projects had been fully implemented or were scheduled to be implemented (Item 6g). The inspectors reviewed the common Exelon procedures to verify that authorized attentiveness aids were described and that their use at each post (Ready Room, Over-watch, etc.) was clearly stated and authorized.

The inspectors confirmed that Exelon has established a new division to manage security organization at Peach Bottom (Item 6h). The inspectors also reviewed condition reports that described incidents which warranted reporting to security management.

Specifically, the inspectors focused on incidents where inappropriate behavior was witnessed by security officers on shift and reported to management. The inspectors reviewed documentation of communications to the balance of the Peach Bottom Station staff regarding expectations for reporting issues (Item 6i).

The inspectors conducted interviews and reviewed records to understand Exelons methods to return security officers to duty following the inattentiveness issue (Item 6e).

Corrective action records were reviewed to ensure indoctrination sessions for understanding Behavioral Observation Program (BOP) and SCWE were conducted with all security force members (Item 6f). The inspectors visited posts to verify that structural improvements, lighting enhancements, and temperature controls were conducive to maintaining security officer attentiveness (Item 6j).

The inspectors reviewed training records to verify that refresher training for the Peach Bottom security organization and for the remainder of Exelon Nuclear reactor sites had been implemented (Item 6k). The inspectors verified that lesson plans stressed expectations regarding the BOP, SCWE, and maintaining attentiveness while on duty.

The inspectors verified that face-to-face interviews were conducted with security force supervisors to reinforce expectations related to attentiveness and actions to take if someone is found in an inattentive state, and to solicit feedback on challenges to maintaining attentiveness and raising issues (Item 6l). The inspectors also verified that supervisory training was conducted for security force supervisors regarding their responsibilities for maintaining a SCWE (Item 6m).

The inspectors verified that a SCWE survey of the Peach Bottom security organization by an external vendor had been conducted (Item 6n). The inspectors verified that the results of the SCWE survey were evaluated by Exelon and were the basis of a focused self assessment (Item 6o). The inspectors also reviewed Exelons plans for conducting SCWE surveys of the security organizations at other Exelon sites (Item 6p). As noted in the CAL, the NRC will schedule a meeting with Exelon upon the completion of their review for this action to discuss the safety conscious work environment (SCWE) survey results as they apply to other Exelon sites.

Findings and Observations No findings of significance were identified. The CAL Items 6a through 6o are closed.

The CAL item 6p, for conducting SCWE surveys of the security organizations at other Exelon sites, remains open. Exelon has corrective actions assigned to track completion of these surveys. All surveys are expected to be completed by October 2008.

Exelon created an in-house proprietary security division to manage the security organization at Peach Bottom. The inspectors reviewed procedures and records to ensure no security officer had been assigned to a single post for an entire shift. Steps had been taken in the post assignments to ensure that the officers duties provide for a change in location, variety of responsibilities, and appropriate breaks to prevent inattentiveness.

Exelon conducted face to face interviews with security force supervisors to reinforce expectations related to inattentiveness; actions to be taken if someone was found to be inattentive; and, the mechanism to solicit feedback on challenges to maintaining attentiveness. Exelon included topics such as behavioral observation training, security officer attentiveness, aberrant behavior identification, and notification expectations and requirements in these interviews. The inspectors determined that communications to reinforce expectations of reporting issues for the balance of the Peach Bottom staff were complete.

The inspectors concluded that the security staff had a sound understanding of Exelon managements expectations of reporting unusual behavior or actions that could indirectly pose a risk to public health and safety. Specifically, the inspectors noted that the security staff was willing to report operational and safety issues at a low threshold. The officers were fully cognizant of communicating early and clearly with management regarding BOP, SCWE, and inattentiveness.

.7 Exelon Will Provide Written Confirmation to the NRC When These Actions Are

Completed (Attachment B, Item 7)

The inspectors verified through interviews that Exelon will provide written confirmation of all CAL items when the remaining SCWE surveys at all Exelon sites have been completed.

Findings and Observations No findings of significance were identified.

This CAL item remains open.

4OA6 Meetings, Including Exit

On June 6, 2008, the inspectors presented the inspection results to Mr. Joseph Grimes, Site Vice President, and other members of his staff.

ATTACHMENT A:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Personnel Contacted:

J. Grimes, Site Vice President
M. Massaro, Plant Manager
J. Armstrong, Manager, Regulatory Assurance
R. Smith, Regulatory Assurance Specialist
J. Kovalchick, Manager Site Security
S. Craig, Manager, Site Security Operations
J. Glunt, NOS Manager
K. Young, Security Operations Supervisor
D. Torres, Security Training Coordinator
R. White, Lead Supervisor - Security
S. Berry, Lead Supervisor - Security
T. Girken, Lead Supervisor - Security
K. Bristol, Lead Supervisor - Security

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

None

LIST OF DOCUMENTS REVIEWED