ML090630393: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML090630393
| number = ML090630393
| issue date = 03/04/2009
| issue date = 03/04/2009
| title = Robinson - Report 22 - 03/01/2009 - 06/30/2010
| title = Report 22 - 03/01/2009 - 06/30/2010
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP/RPB4
| author affiliation = NRC/RGN-II/DRP/RPB4
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 03/04/2009 07:28:58 Report 22 03/01/2009
{{#Wiki_filter:Page 1 of 2                                                                               Robinson 03/04/2009     07:28:58                                                         Inspection / Activity Plan Report 22                                                                       03/01/2009 - 06/30/2010 Unit         Planned Dates                                                                                                                 No. of Staff Number        Start     End     Inspection Activity                                                             Title                         on Site OL RQ         - REQUAL INSPECTION                                                                                   2 2       03/02/2009   03/06/2009   IP 7111111B            Licensed Operator Requalification Program PSB1EP       - EMERGENCY PREPAREDNESS EXERCISE                                                                     3 2       05/18/2009  05/22/2009   IP 7111401              Exercise Evaluation 2        05/18/2009   05/22/2009  IP 7111404              Emergency Action Level and Emergency Plan Changes 2        05/18/2009   05/22/2009  IP 71151                Performance Indicator Verification EB3-HS       - HEAT SINK                                                                                           3 2       06/01/2009   06/05/2009   IP 7111107T            Heat Sink Performance OL EXAM       - INITIAL EXAM PREP                                                                                   4 2       08/17/2009   08/21/2009     V23310              ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES ISFSI         - ISFSI OPERATIONAL INSPECTION                                                                       2 2       09/01/2009  10/15/2009   IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM       - INITIAL EXAM - WEEK 1                                                                               4 2       09/07/2009   09/11/2009     V23310              ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES EB1-MODS - MODIFICATIONS-10CFR50.59                                                                                 2 2       09/14/2009  09/18/2009   IP 7111117              Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 2        09/28/2009   10/02/2009  IP 7111117              Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications OL EXAM       - INTIAL EXAM - WEEK2                                                                                 3 2       09/21/2009   09/25/2009     V23310              ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES PSB1-RP       - RP ACCESS CONTROLS                                                                                 1 2       11/16/2009   11/20/2009   IP 7112101              Access Control to Radiologically Significant Areas LI           - POST APPROVAL LR INSPECTION                                                                         5 2       01/25/2010   01/29/2010  IP 71003                Post-Approval Site Inspection for License Renewal LI            - POST APPROVAL LR INSPECTION                                                                        5 2        02/08/2010   02/12/2010   IP 71003                Post-Approval Site Inspection for License Renewal TFPI 805     - TRIENNIAL FIRE PROTECTION                                                                           1 2       03/15/2010   03/19/2010  IP 7111105T            Fire Protection [Triennial]
-06/30/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Robinson OL RQ-REQUAL INSPECTION 2 2   IP Licensed Operator Requalification Program 7111111B 03/02/2009 03/06/2009 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 2  IP Exercise Evaluation 7111401 05/18/2009 05/22/2009 2   IP Emergency Action Level and Emergency Plan Changes 7111404 05/18/2009 05/22/2009 2   IP Performance Indicator Verification 71151 05/18/2009 05/22/2009 EB3-HS-HEAT SINK 3 2   IP Heat Sink Performance 7111107T 06/01/2009 06/05/2009 OL EXAM-INITIAL EXAM PREP 4 2   ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 08/17/2009 08/21/2009 ISFSI-ISFSI OPERATIONAL INSPECTION 2 2  IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/01/2009 10/15/2009 OL EXAM-INITIAL EXAM - WEEK 1 4 2   ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 09/07/2009 09/11/2009 EB1-MODS-MODIFICATIONS-10CFR50.59 2 2  IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117 09/14/2009 09/18/2009 2   IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117 09/28/2009 10/02/2009 OL EXAM-INTIAL EXAM - WEEK2 3 2   ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 09/21/2009 09/25/2009 PSB1-RP-RP ACCESS CONTROLS 1 2   IP A ccess Control to Radiologically Significant Areas 7112101 11/16/2009 11/20/2009 LI-POST APPROVAL LR INSPECTION 5 2   IP Post-Approval Site Inspection for License Renewal 71003 01/25/2010 01/29/2010 LI-POST APPROVAL LR INSPECTION 5  2   IP Post-Approval Site Inspection for License Renewal 71003 02/08/2010 02/12/2010 TFPI 805-TRIENNIAL FIRE PROTECTION 1 2   IP Fire Protection [Triennial]
2        03/29/2010   04/02/2010   IP 7111105T            Fire Protection [Triennial]
7111105T 03/15/2010 03/19/2010 2   IP Fire Protection [Triennial]
LI           - POST APPROVAL LR CONT INSPECTION                                                                   2 2       04/19/2010  04/23/2010   IP 71003                Post-Approval Site Inspection for License Renewal EB3ISI       - UNIT 2 INSERVICE INSPECTION                                                                         1 2       04/26/2010   04/30/2010   IP 7111108P            Inservice Inspection Activities - PWR PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK1                                                                     2 2       04/26/2010  04/30/2010   IP 7112101              Access Control to Radiologically Significant Areas 2        04/26/2010   04/30/2010  IP 7112102-7112102R ALARA - Required This report does not include INPO and OUTAGE activities.
7111105T 03/29/2010 04/02/2010 LI-POST APPROVAL LR CONT INSPECTION 2 2  IP Post-Approval Site Inspection for License Renewal 71003 04/19/2010 04/23/2010 EB3ISI-UNIT 2 INSERVICE INSPECTION 1 2   IP Inservice Inspection Activities - PWR 7111108P 04/26/2010 04/30/2010 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 2 2  IP A ccess Control to Radiologically Significant Areas 7112101 04/26/2010 04/30/2010 2   IP A LARA - Required 7112102-7112102R 04/26/2010 04/30/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 03/04/2009 07:28:58 Report 22 03/01/2009
Enclosure
-06/30/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Robinson PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 2 2  IP Radioactive Material Processing and Transportation 7112202 04/26/2010 04/30/2010 2   IP Performance Indicator Verification 71151 04/26/2010 04/30/2010 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 2 3 2  IP A ccess Control to Radiologically Significant Areas 7112101 05/10/2010 05/14/2010 2   IP A LARA - Required 7112102-7112102R 05/10/2010 05/14/2010 2   IP Radioactive Material Processing and Transportation 7112202 05/10/2010 05/14/2010 2   IP Performance Indicator Verification 71151 05/10/2010 05/14/2010 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1  2   IP A lert and Notification System Testing 7111402 05/24/2010 05/28/2010 2   IP Emergency Response Organization Augmentation Testing 7111403 05/24/2010 05/28/2010 2   IP Emergency Action Level and Emergency Plan Changes 7111404 05/24/2010 05/28/2010 2   IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/24/2010 05/28/2010 2   IP Performance Indicator Verification 71151 05/24/2010 05/28/2010 PSB1-RP-RP GROUND WATER PROTECTION 1 2  IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/31/2010 06/04/2010 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.}}
Page 2 of 2                                                                               Robinson 03/04/2009     07:28:58                                                         Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit         Planned Dates                                                                                                                           No. of Staff Number        Start     End     Inspection Activity                                                           Title                                   on Site PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK1                                                                               2 2       04/26/2010  04/30/2010   IP 7112202              Radioactive Material Processing and Transportation 2        04/26/2010   04/30/2010  IP 71151                Performance Indicator Verification PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK 2                                                                               3 2       05/10/2010  05/14/2010   IP 7112101              Access Control to Radiologically Significant Areas 2        05/10/2010   05/14/2010  IP 7112102-7112102R ALARA - Required 2        05/10/2010   05/14/2010  IP 7112202              Radioactive Material Processing and Transportation 2        05/10/2010   05/14/2010  IP 71151                Performance Indicator Verification PSB1EP        - EMERGENCY PREPAREDNESS INSPECTION                                                                            1 2        05/24/2010   05/28/2010  IP 7111402              Alert and Notification System Testing 2        05/24/2010   05/28/2010  IP 7111403              Emergency Response Organization Augmentation Testing 2        05/24/2010   05/28/2010  IP 7111404              Emergency Action Level and Emergency Plan Changes 2        05/24/2010   05/28/2010  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 2        05/24/2010   05/28/2010  IP 71151                Performance Indicator Verification PSB1-RP       - RP GROUND WATER PROTECTION                                                                                   1 2       05/31/2010  06/04/2010   IP 2515/173            Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure}}

Latest revision as of 09:31, 14 November 2019

Report 22 - 03/01/2009 - 06/30/2010
ML090630393
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 03/04/2009
From:
NRC/RGN-II/DRP/RPB4
To:
Shared Package
ML090630383 List:
References
Download: ML090630393 (2)


Text

Page 1 of 2 Robinson 03/04/2009 07:28:58 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL RQ - REQUAL INSPECTION 2 2 03/02/2009 03/06/2009 IP 7111111B Licensed Operator Requalification Program PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 05/18/2009 05/22/2009 IP 7111401 Exercise Evaluation 2 05/18/2009 05/22/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/18/2009 05/22/2009 IP 71151 Performance Indicator Verification EB3-HS - HEAT SINK 3 2 06/01/2009 06/05/2009 IP 7111107T Heat Sink Performance OL EXAM - INITIAL EXAM PREP 4 2 08/17/2009 08/21/2009 V23310 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES ISFSI - ISFSI OPERATIONAL INSPECTION 2 2 09/01/2009 10/15/2009 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM - INITIAL EXAM - WEEK 1 4 2 09/07/2009 09/11/2009 V23310 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES EB1-MODS - MODIFICATIONS-10CFR50.59 2 2 09/14/2009 09/18/2009 IP 7111117 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 2 09/28/2009 10/02/2009 IP 7111117 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications OL EXAM - INTIAL EXAM - WEEK2 3 2 09/21/2009 09/25/2009 V23310 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES PSB1-RP - RP ACCESS CONTROLS 1 2 11/16/2009 11/20/2009 IP 7112101 Access Control to Radiologically Significant Areas LI - POST APPROVAL LR INSPECTION 5 2 01/25/2010 01/29/2010 IP 71003 Post-Approval Site Inspection for License Renewal LI - POST APPROVAL LR INSPECTION 5 2 02/08/2010 02/12/2010 IP 71003 Post-Approval Site Inspection for License Renewal TFPI 805 - TRIENNIAL FIRE PROTECTION 1 2 03/15/2010 03/19/2010 IP 7111105T Fire Protection [Triennial]

2 03/29/2010 04/02/2010 IP 7111105T Fire Protection [Triennial]

LI - POST APPROVAL LR CONT INSPECTION 2 2 04/19/2010 04/23/2010 IP 71003 Post-Approval Site Inspection for License Renewal EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 04/26/2010 04/30/2010 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 2 04/26/2010 04/30/2010 IP 7112101 Access Control to Radiologically Significant Areas 2 04/26/2010 04/30/2010 IP 7112102-7112102R ALARA - Required This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Robinson 03/04/2009 07:28:58 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 2 04/26/2010 04/30/2010 IP 7112202 Radioactive Material Processing and Transportation 2 04/26/2010 04/30/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 3 2 05/10/2010 05/14/2010 IP 7112101 Access Control to Radiologically Significant Areas 2 05/10/2010 05/14/2010 IP 7112102-7112102R ALARA - Required 2 05/10/2010 05/14/2010 IP 7112202 Radioactive Material Processing and Transportation 2 05/10/2010 05/14/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 2 05/24/2010 05/28/2010 IP 7111402 Alert and Notification System Testing 2 05/24/2010 05/28/2010 IP 7111403 Emergency Response Organization Augmentation Testing 2 05/24/2010 05/28/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/24/2010 05/28/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/24/2010 05/28/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP GROUND WATER PROTECTION 1 2 05/31/2010 06/04/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure