Page 1 of 2 Robinson 03/04/2009 07:28:58 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL RQ - REQUAL INSPECTION 2 2 03/02/2009 03/06/2009 IP 7111111B Licensed Operator Requalification Program PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 05/18/2009 05/22/2009 IP 7111401 Exercise Evaluation 2 05/18/2009 05/22/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/18/2009 05/22/2009 IP 71151 Performance Indicator Verification EB3-HS - HEAT SINK 3 2 06/01/2009 06/05/2009 IP 7111107T Heat Sink Performance OL EXAM - INITIAL EXAM PREP 4 2 08/17/2009 08/21/2009 V23310 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES ISFSI - ISFSI OPERATIONAL INSPECTION 2 2 09/01/2009 10/15/2009 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM - INITIAL EXAM - WEEK 1 4 2 09/07/2009 09/11/2009 V23310 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES EB1-MODS - MODIFICATIONS-10CFR50.59 2 2 09/14/2009 09/18/2009 IP 7111117 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 2 09/28/2009 10/02/2009 IP 7111117 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications OL EXAM - INTIAL EXAM - WEEK2 3 2 09/21/2009 09/25/2009 V23310 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES PSB1-RP - RP ACCESS CONTROLS 1 2 11/16/2009 11/20/2009 IP 7112101 Access Control to Radiologically Significant Areas LI - POST APPROVAL LR INSPECTION 5 2 01/25/2010 01/29/2010 IP 71003 Post-Approval Site Inspection for License Renewal LI - POST APPROVAL LR INSPECTION 5 2 02/08/2010 02/12/2010 IP 71003 Post-Approval Site Inspection for License Renewal TFPI 805 - TRIENNIAL FIRE PROTECTION 1 2 03/15/2010 03/19/2010 IP 7111105T Fire Protection [Triennial]

2 03/29/2010 04/02/2010 IP 7111105T Fire Protection [Triennial]

LI - POST APPROVAL LR CONT INSPECTION 2 2 04/19/2010 04/23/2010 IP 71003 Post-Approval Site Inspection for License Renewal EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 04/26/2010 04/30/2010 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 2 04/26/2010 04/30/2010 IP 7112101 Access Control to Radiologically Significant Areas 2 04/26/2010 04/30/2010 IP 7112102-7112102R ALARA - Required This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Robinson 03/04/2009 07:28:58 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 2 04/26/2010 04/30/2010 IP 7112202 Radioactive Material Processing and Transportation 2 04/26/2010 04/30/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 3 2 05/10/2010 05/14/2010 IP 7112101 Access Control to Radiologically Significant Areas 2 05/10/2010 05/14/2010 IP 7112102-7112102R ALARA - Required 2 05/10/2010 05/14/2010 IP 7112202 Radioactive Material Processing and Transportation 2 05/10/2010 05/14/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 2 05/24/2010 05/28/2010 IP 7111402 Alert and Notification System Testing 2 05/24/2010 05/28/2010 IP 7111403 Emergency Response Organization Augmentation Testing 2 05/24/2010 05/28/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/24/2010 05/28/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/24/2010 05/28/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP GROUND WATER PROTECTION 1 2 05/31/2010 06/04/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.