(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 11/24/2009 | | | issue date = 11/24/2009 |
| | title = Request for Withholding Information from Public Disclosure | | | title = Request for Withholding Information from Public Disclosure |
| | author name = Tam P S | | | author name = Tam P |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = Heacock D A | | | addressee name = Heacock D |
| | addressee affiliation = Dominion Energy Kewaunee, Inc | | | addressee affiliation = Dominion Energy Kewaunee, Inc |
| | docket = 05000305 | | | docket = 05000305 |
| | license number = DPR-043 | | | license number = DPR-043 |
| | contact person = Tam P S | | | contact person = Tam P |
| | case reference number = TAC ME2139 | | | case reference number = TAC ME2139 |
| | document type = Letter, Proprietary Information Review | | | document type = Letter, Proprietary Information Review |
| | page count = 3 | | | page count = 3 |
| | project = TAC:ME2139 | | | project = TAC:ME2139 |
| | stage = Other | | | stage = Withholding Request Acceptance |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 November 24 2009 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 KEWAUNEE POWER STATION -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME2139) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 24 2009 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc. |
| | Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 |
| | |
| | ==SUBJECT:== |
| | KEWAUNEE POWER STATION - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME2139) |
|
| |
|
| ==Dear Mr. Heacock:== | | ==Dear Mr. Heacock:== |
| By letter dated August 24, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. N1L092440398), Mr. Leslie N. Hartz submitted an application for amendment, proposing to convert the current custom Technical Specifications to the Improved Standard Technical Specifications format. The subject application included an affidavit executed by Mr. J. A. Gresham on July 21,2009, requesting that Attachment 3, "License Amendment 249, Kewaunee Power Station Conversion to Improved Technical Specifications, Applicability of WCAP-14333 and WCAP 15376 to Kewaunee Power Station" be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390. The affidavit stated that the revised pages of Attachment 3 should be considered exempt from mandatory public disclosure because these pages contain: a. The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. | | |
| : c. Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar prodUCt. We have reviewed Mr. Gresham's affidavit in accordance with the requirements of 10 CFR 2.390, and on the basis of its statements, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | By letter dated August 24, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. N1L092440398), Mr. Leslie N. Hartz submitted an application for amendment, proposing to convert the current custom Technical Specifications to the Improved Standard Technical Specifications format. The subject application included an affidavit executed by Mr. J. A. Gresham on July 21,2009, requesting that Attachment 3, "License Amendment 249, Kewaunee Power Station Conversion to Improved Technical Specifications, Applicability of WCAP-14333 and WCAP 15376 to Kewaunee Power Station" be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390. |
| Therefore, Attachment 3, which is marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. We have released to the public the non-proprietary version of the subject document, identified as Attachment 4 of the August 24,2009, application (ADAMS Accession No. N1L092440434). | | The affidavit stated that the revised pages of Attachment 3 should be considered exempt from mandatory public disclosure because these pages contain: |
| D. A. -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | | : a. The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies. |
| If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | | : c. Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar prodUCt. |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the !\IRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | | We have reviewed Mr. Gresham's affidavit in accordance with the requirements of 10 CFR 2.390, and on the basis of its statements, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, Attachment 3, which is marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | | We have released to the public the non-proprietary version of the subject document, identified as Attachment 4 of the August 24,2009, application (ADAMS Accession No. N1L092440434). |
| | |
| | D. A. Heacock -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the !\IRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| If you have any questions regarding this matter, I may be reached at 301-415-1451. | | If you have any questions regarding this matter, I may be reached at 301-415-1451. |
| v Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc w/encl: Distribution via ListServ Mr. J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company Nuclear Services P.O. Box Pittsburgh, Pennsylvania, D. A. -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | | C?~t:: |
| If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | | v Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc w/encl: Distribution via ListServ cc: Mr. J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania, 15230-0355 |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | | |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | | D. A. Heacock -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| If you have any questions regarding this matter, I may be reached at 301-415-1451. | | If you have any questions regarding this matter, I may be reached at 301-415-1451. |
| Sincerely, IRA! Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc w/encl: Distribution via ListServ Mr. J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania, 15230-0355 DISTRIBUTION PUBLIC RidsNrrDorlLpl3-1 Resource RidsNrrPMPTamResource RidsNrrLA THarrisResource RidsOgcMailCenterResource RidsAcrsAcnw_MailCTRResource RidsNrrDirsltsb RidsRgn3MailCenterResource RidsNrrDorlDprResource LPL 3-1 R/F Accession No'.. ML093140805 OFFICE LPL3-1/PM LPL3-1/LA ITSB/BC LPL3-1/BC NAME PTam THarris REIliot (CSchulten for) RPascarelli DATE 11/20/09 11/17/09 11/23/09 11/24/09 OFFICIAL RECORD}} | | Sincerely, IRA! |
| | Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc w/encl: Distribution via ListServ cc: Mr. J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania, 15230-0355 DISTRIBUTION PUBLIC RidsNrrDorlLpl3-1 Resource RidsNrrPMPTamResource RidsNrrLATHarrisResource RidsOgcMailCenterResource RidsAcrsAcnw_MailCTRResource RidsNrrDirsltsb RidsRgn3MailCenterResource RidsNrrDorlDprResource LPL 3-1 R/F Accession No'.. ML093140805 OFFICE LPL3-1/PM LPL3-1/LA ITSB/BC LPL3-1/BC REIliot NAME PTam THarris RPascarelli (CSchulten for) |
| | DATE 11/20/09 11/17/09 11/23/09 11/24/09 OFFICIAL RECORD COPY}} |
Letter Sequence Withholding Request Acceptance |
---|
TAC:ME2139, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML093130368, ML102210288, ML102371088, ML102371098, ML102371109, ML102371140, ML102371178, ML102371203, ML102371205, ML102371210, ML102371257, ML102371260, ML102371266, ML102371269, ML102371282, ML102371283, ML102371290, ML102371292, ML102371294, ML102371297, ML102580704, ML102580706, ML102580709, ML102580710, ML102670754, ML102730398, ML102730399, ML103370691, ML110260316
|
MONTHYEARML1027303992009-10-14014 October 2009 Calculation C10818, Revision 0 Kewaunee Unit 1 Pressurizer Pressure Protection Channel Statistical Allowance (Csa) Calculation. Project stage: Other ML0931303682009-11-0909 November 2009 Informs That the 8/24/09 Application to Convert Technical Specifications to the ISTS Format Acceptable for Review Project stage: Other ML0931408052009-11-24024 November 2009 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1001312782010-01-13013 January 2010 Draft RAI on Proposed Amendment to Convert TS to ITS Format Project stage: Draft RAI ML1007003002010-03-11011 March 2010 Draft RAI Re. Use of TSTF-490-A in Kewaunee'S ITS Conversion Project stage: Draft RAI ML1018901762010-07-0101 July 2010 License Amendment Request 249: Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 3, 4, 5, 6, 9, 11, and 15 and Proposed License Conditions Project stage: Supplement ML1018902142010-07-0101 July 2010 Attachment 1, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Kewaunee ITS Submittal, Volumes 3, 4, 5, 6, 9, 11, and 15, Revision 1, Cover Page Project stage: Request ML1018902242010-07-0101 July 2010 Attachment 2, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Proposed New License Conditions Project stage: Request ML1018902262010-07-0101 July 2010 Attachment 3, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplemental Information for the Enclosure Project stage: Supplement ML1018902312010-07-0101 July 2010 Enclosure, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Associated NRC Staff Requests for Additional Information and Dominion Energy Kewaunee'S Responses Project stage: Request ML1023703862010-07-16016 July 2010 Enclosure, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 16, Associated NRC Staff Requests for Additional Information & Kewaunee Project stage: Supplement ML1023703852010-07-16016 July 2010 Attachment 2, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 196 Project stage: Supplement ML1023703792010-07-16016 July 2010 Attachment 1, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 16 Project stage: Supplement ML1023703692010-07-16016 July 2010 License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 16 Project stage: Supplement ML1022102882010-07-30030 July 2010 Email: ME2139 - Kewaunee TS Conversion - SE for Fact Check Review Project stage: Other ML1023712602010-08-18018 August 2010 Enclosure (5 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712572010-08-18018 August 2010 Enclosure (4 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712102010-08-18018 August 2010 Enclosure (3 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712052010-08-18018 August 2010 Enclosure (2 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712032010-08-18018 August 2010 Enclosure (1 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712002010-08-18018 August 2010 Enclosure, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Associated NRC Staff Requests for Additional Information and Dominion Energy Kewaunee'S Responses Project stage: Supplement ML1023711912010-08-18018 August 2010 Attachment 3, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Supplemental Information for the Enclosure Project stage: Supplement ML1023711852010-08-18018 August 2010 Attachment 2, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Proposed New License Conditions Project stage: Supplement ML1023711782010-08-18018 August 2010 Attachment 1, Volume 14, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations, Revision 1 Project stage: Other ML1023711402010-08-18018 August 2010 Attachment 1, Volume 13, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.8 Electrical Power Systems, Revision 1 Project stage: Other ML1023711092010-08-18018 August 2010 Attachment 1, Volume 8, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 1 Project stage: Other ML1023710982010-08-18018 August 2010 Attachment 1, Volume 2, Kewaunee Power Station Improved Technical Specifications Conversion, Generic Determination of No Significant Hazards Consideration and Environmental Assessment, Revision 1 Project stage: Other ML1023710882010-08-18018 August 2010 Attachment 1, Volume 1, Kewaunee Power Station Improved Technical Specifications Conversion, Application of Selection Criteria to Kewaunee Power Station Technical Specifications, Revision 1 Project stage: Other ML1023710782010-08-18018 August 2010 Attachment 1, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications Submittal, Volumes 1, 2, 8, 13, and 14, Revision 1, Cover Project stage: Request ML1023712692010-08-18018 August 2010 Enclosure (7 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023711972010-08-18018 August 2010 Attachment 4, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Commitment List Project stage: Supplement ML1023712822010-08-18018 August 2010 Enclosure (8 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712832010-08-18018 August 2010 Enclosure (1 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712902010-08-18018 August 2010 Enclosure (2 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712922010-08-18018 August 2010 Enclosure (3 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712942010-08-18018 August 2010 Enclosure (4 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712972010-08-18018 August 2010 Enclosure, Q&A to Attachment 1, Volume 14 (Section 3.9) Project stage: Other ML1023710232010-08-18018 August 2010 License Amendment Request 249: Conversion to Improved Technical Specifications Supplement to Volumes 1, 2, 8, 13, and 14 Project stage: Supplement ML1023712662010-08-18018 August 2010 Enclosure (6 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1027303812010-09-0707 September 2010 License Amendment Request 249: Kewaunee. Power Station Conversion to Improved Technical Specifications (TAC No. ME2139)- Submittal of Information Requested by NRC Staff Project stage: Request ML1027303982010-09-0707 September 2010 Calculation C11116, Revision 0, Kewaunee Unit 1 Steam Generator Narrow Range Level Protection Channel Statistical Allowance (Csa) Calculation. Project stage: Other ML1025807092010-09-0808 September 2010 Enclosure, Q&A to Attachment 1, Volume 8 (Section 3.3) Rev 2, ITA NRC Questions Project stage: Other ML1025807102010-09-0808 September 2010 Enclosure, Q&A to Attachment 1, Volume 16 (Chapter 5.0) Rev 2, ITS NRC Questions Project stage: Other ML1025807082010-09-0808 September 2010 Enclosure, Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16, Associated NRC Staff Requests for Additional Information and Kewaunee'S Responses Project stage: Supplement ML1025807072010-09-0808 September 2010 Attachment 2, Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16 Project stage: Supplement ML1025807062010-09-0808 September 2010 Attachment 1, Volume 16, Improved Technical Specifications Conversion (Chapter 5.0), Administrative Controls, Rev. 2, Summary of Changes Project stage: Other ML1025807052010-09-0808 September 2010 Attachment 1, License Amendment Request 249: Conversion Improved Technical Specifications, Supplement to Volumes 8 and 16 Project stage: Supplement ML1025807042010-09-0808 September 2010 Attachment 1, Volume 08, Improved Technical Specifications Conversion, (Section 3.3), Instrumentation, Rev. 2, Summary of Changes Project stage: Other ML1025806952010-09-0808 September 2010 Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16 Project stage: Supplement ML1026707542010-09-23023 September 2010 ME2139 - Kewaunee - ITS Conversion - State Consultation e-mail Project stage: Other 2010-07-01
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 and Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report ML24073A2312024-03-13013 March 2024 and Three Mile Island Nuclear Station, Unit 2 - Management Change ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commissions Analysis of Dominion Energy Kewaunees Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 ML24061A0182022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Pla11, Training and Qualification Plan and Safeguards Contingency Plan Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc ML22089A2432022-03-30030 March 2022 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation 2024-09-18
[Table view] Category:Proprietary Information Review
MONTHYEARML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests ML1025601852010-09-28028 September 2010 ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary ML0931408052009-11-24024 November 2009 Request for Withholding Information from Public Disclosure ML0919002102009-07-24024 July 2009 Request for Withholding Information from Public Disclosure ML0732400982007-11-29029 November 2007 Request for Withholding Information from Public for Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, and Millstone Power Station and Kewaunee Power Station (TAC Nos. MD6144, MD6145, MD6146, MD6147, MD6148, MD6149 ML0621903542006-08-0707 August 2006 Withholding Information from Public Disclosure. ML0618004712006-07-18018 July 2006 Units 2 & 3, Withholding from Public Disclosure, CD-ROM Containing Electronic Gothic Input & Output Files from Benchmark Cases in Sections 4.3, 4.4, 4.5, & 4.6 of TR DOM-NAF-3, Gothic Methodology for Analyzing. ML0416904002004-07-12012 July 2004 Request for Withholding Information from Public Disclosure ML0413101222004-04-30030 April 2004 Request for Closed Meeting with USNRC to Discuss NMC Refueling Plans ML0400201032004-01-0808 January 2004 Withholding from Public Disclosure, Exhibit H of Projected Income Statement, and Exhibit I of Projected Consolidated Opening Balance Sheet, MB1595 ML0334503782004-01-0707 January 2004 Request for Withholding Information from Public Disclosure, WCAP-15821-P, MB9031 ML0319400062003-07-11011 July 2003 Withholding from Public Disclosure, WCAP-16040-P ML0314801782003-05-27027 May 2003 Request for Withholding Information from Public Disclosure, TAC No. MB7225 ML0314700022003-05-23023 May 2003 RAI, Request for Withholding Information from Public Disclosure ML0307306922003-03-28028 March 2003 Withholding from Public Disclosure, WCAP-15591, Revision 1, MB7225 ML0303701282003-02-0606 February 2003 Withholding from Public Disclosure, Proprietary Document Entitled, Kewaunee Power Uprate Engineering Report Sections 5.7 & 5.8, MB7225 ML0222803682002-09-0505 September 2002 Withholding from Public Disclosure, WCAP-15591, MB5718 2013-03-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 24 2009 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
KEWAUNEE POWER STATION - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME2139)
Dear Mr. Heacock:
By letter dated August 24, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. N1L092440398), Mr. Leslie N. Hartz submitted an application for amendment, proposing to convert the current custom Technical Specifications to the Improved Standard Technical Specifications format. The subject application included an affidavit executed by Mr. J. A. Gresham on July 21,2009, requesting that Attachment 3, "License Amendment 249, Kewaunee Power Station Conversion to Improved Technical Specifications, Applicability of WCAP-14333 and WCAP 15376 to Kewaunee Power Station" be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390.
The affidavit stated that the revised pages of Attachment 3 should be considered exempt from mandatory public disclosure because these pages contain:
- a. The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
- c. Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar prodUCt.
We have reviewed Mr. Gresham's affidavit in accordance with the requirements of 10 CFR 2.390, and on the basis of its statements, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, Attachment 3, which is marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
We have released to the public the non-proprietary version of the subject document, identified as Attachment 4 of the August 24,2009, application (ADAMS Accession No. N1L092440434).
D. A. Heacock -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the !\IRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1451.
C?~t::
v Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc w/encl: Distribution via ListServ cc: Mr. J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania, 15230-0355
D. A. Heacock -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1451.
Sincerely, IRA!
Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc w/encl: Distribution via ListServ cc: Mr. J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania, 15230-0355 DISTRIBUTION PUBLIC RidsNrrDorlLpl3-1 Resource RidsNrrPMPTamResource RidsNrrLATHarrisResource RidsOgcMailCenterResource RidsAcrsAcnw_MailCTRResource RidsNrrDirsltsb RidsRgn3MailCenterResource RidsNrrDorlDprResource LPL 3-1 R/F Accession No'.. ML093140805 OFFICE LPL3-1/PM LPL3-1/LA ITSB/BC LPL3-1/BC REIliot NAME PTam THarris RPascarelli (CSchulten for)
DATE 11/20/09 11/17/09 11/23/09 11/24/09 OFFICIAL RECORD COPY