Letter Sequence Approval |
---|
TAC:ME2139, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Approved, Closed) TAC:ME2419, (Approved, Closed) TAC:ME2420, (Approved, Closed) TAC:ME2421, (Approved, Closed) TAC:ME3122, (Approved, Closed) TAC:ME3460, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME3544, (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML093130368, ML102210288, ML102371088, ML102371098, ML102371109, ML102371140, ML102371178, ML102371203, ML102371205, ML102371210, ML102371257, ML102371260, ML102371266, ML102371269, ML102371282, ML102371283, ML102371290, ML102371292, ML102371294, ML102371297, ML102580704, ML102580706, ML102580709, ML102580710, ML102670754, ML102730398, ML102730399, ML103370691, ML110260316
|
MONTHYEARML1027303992009-10-14014 October 2009 Calculation C10818, Revision 0 Kewaunee Unit 1 Pressurizer Pressure Protection Channel Statistical Allowance (Csa) Calculation. Project stage: Other ML0931303682009-11-0909 November 2009 Informs That the 8/24/09 Application to Convert Technical Specifications to the ISTS Format Acceptable for Review Project stage: Other ML0931408052009-11-24024 November 2009 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1001312782010-01-13013 January 2010 Draft RAI on Proposed Amendment to Convert TS to ITS Format Project stage: Draft RAI ML1007003002010-03-11011 March 2010 Draft RAI Re. Use of TSTF-490-A in Kewaunee'S ITS Conversion Project stage: Draft RAI ML1018901762010-07-0101 July 2010 License Amendment Request 249: Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 3, 4, 5, 6, 9, 11, and 15 and Proposed License Conditions Project stage: Supplement ML1018902142010-07-0101 July 2010 Attachment 1, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Kewaunee ITS Submittal, Volumes 3, 4, 5, 6, 9, 11, and 15, Revision 1, Cover Page Project stage: Request ML1018902242010-07-0101 July 2010 Attachment 2, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Proposed New License Conditions Project stage: Request ML1018902262010-07-0101 July 2010 Attachment 3, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplemental Information for the Enclosure Project stage: Supplement ML1018902312010-07-0101 July 2010 Enclosure, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Associated NRC Staff Requests for Additional Information and Dominion Energy Kewaunee'S Responses Project stage: Request ML1023703862010-07-16016 July 2010 Enclosure, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 16, Associated NRC Staff Requests for Additional Information & Kewaunee Project stage: Supplement ML1023703852010-07-16016 July 2010 Attachment 2, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 196 Project stage: Supplement ML1023703792010-07-16016 July 2010 Attachment 1, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 16 Project stage: Supplement ML1023703692010-07-16016 July 2010 License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 16 Project stage: Supplement ML1022102882010-07-30030 July 2010 Email: ME2139 - Kewaunee TS Conversion - SE for Fact Check Review Project stage: Other ML1023712602010-08-18018 August 2010 Enclosure (5 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712572010-08-18018 August 2010 Enclosure (4 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712102010-08-18018 August 2010 Enclosure (3 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712052010-08-18018 August 2010 Enclosure (2 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712032010-08-18018 August 2010 Enclosure (1 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712002010-08-18018 August 2010 Enclosure, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Associated NRC Staff Requests for Additional Information and Dominion Energy Kewaunee'S Responses Project stage: Supplement ML1023711912010-08-18018 August 2010 Attachment 3, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Supplemental Information for the Enclosure Project stage: Supplement ML1023711852010-08-18018 August 2010 Attachment 2, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Proposed New License Conditions Project stage: Supplement ML1023711782010-08-18018 August 2010 Attachment 1, Volume 14, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations, Revision 1 Project stage: Other ML1023711402010-08-18018 August 2010 Attachment 1, Volume 13, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.8 Electrical Power Systems, Revision 1 Project stage: Other ML1023711092010-08-18018 August 2010 Attachment 1, Volume 8, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 1 Project stage: Other ML1023710982010-08-18018 August 2010 Attachment 1, Volume 2, Kewaunee Power Station Improved Technical Specifications Conversion, Generic Determination of No Significant Hazards Consideration and Environmental Assessment, Revision 1 Project stage: Other ML1023710882010-08-18018 August 2010 Attachment 1, Volume 1, Kewaunee Power Station Improved Technical Specifications Conversion, Application of Selection Criteria to Kewaunee Power Station Technical Specifications, Revision 1 Project stage: Other ML1023710782010-08-18018 August 2010 Attachment 1, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications Submittal, Volumes 1, 2, 8, 13, and 14, Revision 1, Cover Project stage: Request ML1023711972010-08-18018 August 2010 Attachment 4, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Commitment List Project stage: Supplement ML1023712692010-08-18018 August 2010 Enclosure (7 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712822010-08-18018 August 2010 Enclosure (8 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712832010-08-18018 August 2010 Enclosure (1 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712902010-08-18018 August 2010 Enclosure (2 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712922010-08-18018 August 2010 Enclosure (3 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712942010-08-18018 August 2010 Enclosure (4 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712972010-08-18018 August 2010 Enclosure, Q&A to Attachment 1, Volume 14 (Section 3.9) Project stage: Other ML1023712662010-08-18018 August 2010 Enclosure (6 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023710232010-08-18018 August 2010 License Amendment Request 249: Conversion to Improved Technical Specifications Supplement to Volumes 1, 2, 8, 13, and 14 Project stage: Supplement ML1024405642010-08-27027 August 2010 ME3460 Request for Additional Information to Support Safety Evaluation for Kewaunee ITS Conversion and TSTF-493 Submittal Project stage: Approval ML1027303812010-09-0707 September 2010 License Amendment Request 249: Kewaunee. Power Station Conversion to Improved Technical Specifications (TAC No. ME2139)- Submittal of Information Requested by NRC Staff Project stage: Request ML1027303982010-09-0707 September 2010 Calculation C11116, Revision 0, Kewaunee Unit 1 Steam Generator Narrow Range Level Protection Channel Statistical Allowance (Csa) Calculation. Project stage: Other ML1025807062010-09-0808 September 2010 Attachment 1, Volume 16, Improved Technical Specifications Conversion (Chapter 5.0), Administrative Controls, Rev. 2, Summary of Changes Project stage: Other ML1025806952010-09-0808 September 2010 Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16 Project stage: Supplement ML1025807042010-09-0808 September 2010 Attachment 1, Volume 08, Improved Technical Specifications Conversion, (Section 3.3), Instrumentation, Rev. 2, Summary of Changes Project stage: Other ML1025807102010-09-0808 September 2010 Enclosure, Q&A to Attachment 1, Volume 16 (Chapter 5.0) Rev 2, ITS NRC Questions Project stage: Other ML1025807092010-09-0808 September 2010 Enclosure, Q&A to Attachment 1, Volume 8 (Section 3.3) Rev 2, ITA NRC Questions Project stage: Other ML1025807082010-09-0808 September 2010 Enclosure, Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16, Associated NRC Staff Requests for Additional Information and Kewaunee'S Responses Project stage: Supplement ML1025807052010-09-0808 September 2010 Attachment 1, License Amendment Request 249: Conversion Improved Technical Specifications, Supplement to Volumes 8 and 16 Project stage: Supplement ML1025807072010-09-0808 September 2010 Attachment 2, Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16 Project stage: Supplement 2010-07-01
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) – Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commission’S Analysis of Dominion Energy Kewaunee‘S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML24061A0182022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Pla11, Training and Qualification Plan and Safeguards Contingency Plan Revision 5 ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc 2024-09-18
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML17123A0282017-06-0707 June 2017 Enclosure 1 - KPS Amendment 220 Regarding Permanent Removal of Spent Fuel for the Spent Fuel Pool - LAR260 ML17052A5912017-05-0909 May 2017 KPS Amendment 219 - Removal of Cyber Security Requirements for Operating License ML16341C7912017-03-0202 March 2017 Enclosure 1 - Amendment to Facility Operating License ML16320A0442016-11-30030 November 2016 Amendment No. 217 ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML14237A0452015-02-13013 February 2015 Issuance of Amendment No. 215, Revise Operating License and Technical Specifications to the Permanently Defueled Technical Specifications Consistent with Permanent Cessation of Reactor Operation ML14008A2972014-06-23023 June 2014 Issuance of Amendment No. 213 - Deletion of License Conditions Associated with Extended Operations ML14111A2342014-06-0909 June 2014 Issuance of Amendment No. 212 Revise Operating License and Technical Specifications to the Permanently Defueled Technical Specifications Consistent with Permanent Cessation of Reactor Operation ML11192A2492011-08-31031 August 2011 Issuance of Amendment Regarding Cyber Security to Dominion Plants ML11102A0272011-07-29029 July 2011 Issuance of Amendment License Amendment Request to Change the Current Licensing Basis for Automatic Operation of Transformer Load Tap Changers ML1110105232011-04-29029 April 2011 Issuance of Amendment 208 Regarding Technical Specification Change Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection for 52.1 Effective Full Power Years ML0530403522011-02-24024 February 2011 Current Facility Operating License DPR-43, Tech Specs, Revised 10/07/2015 ML1101006002011-02-24024 February 2011 Renewed License ML1101005752011-02-24024 February 2011 Issuance of Renewed Facility Operating License No. DPR-043 for Kewaunee Power Station ML1033706912011-02-0202 February 2011 Part 080 ME2139 List of Acronyms and Abbreviations ML1020206622011-02-0202 February 2011 Issuance of Amendment for Conversion to Improved Technical Specifications with Beyond Scope Issues ML1002110292009-08-0303 August 2009 2009 Kewaunee Power Station Retake Examination Proposed Exam Files ML0912710592009-06-0101 June 2009 License Amendment No. 206, Containment Purge and Vent Isolation Valves Surveillance Requirement ML0905707102009-04-30030 April 2009 Issuance of Amendment No. 205 Seismic Analysis Methodology for the Auxiliary Building Crane ML0905708922009-04-27027 April 2009 Issuance of Amendment No. 204 Re. One-time Extension of the 15-Year Containment Integrated Leak Rate Test Interval ML0902805812009-02-0606 February 2009 Issuance of Amendment No. 203 Regarding Diesel Generator Fuel Storage Tank Capacity Requirement ML0833607832009-01-0909 January 2009 Issuance of Amendment Steam Line Isolation Function Applicability (Tac No. MD8544) ML0832906532008-12-30030 December 2008 License Amendment, Issuance of Amendment No. 201 Shield Building and Auxiliary Building Special Ventilation Train Filter Heater Requirements ML0829710792008-11-20020 November 2008 Issuance of Amendment to Relocate Spent Fuel Pool Crane Requirements from the Technical Specifications to the Technical Requirements Manual ML0829405472008-11-0606 November 2008 License Amendment, Increased the Minimum Required Safety Injection Accumulator Boron Concentration from 1900 parts-per-million (Ppm) to 2400 Ppm ML0816201402008-07-0202 July 2008 Issuance of Amendment Deletion of License Condition on Fuel Burnup ML0804603632008-03-28028 March 2008 Issuance of Amendment Regarding Nuclear Instrumentation System Permissive Setpoints ML0807701792008-03-28028 March 2008 Issuance of Amendments Licensing Basis Design Criteria Associated with Internal Flooding ML0728802892007-10-31031 October 2007 License Amendment Regarding Relocation of Technical Specifications Requirements ML0721300932007-08-0202 August 2007 Revised Pages of Facility Operating License No. DPR-43 ML0711100062007-05-18018 May 2007 Issuance of Amendment Refueling Water Storage Tank Boron Concentration ML0712001862007-05-0101 May 2007 Issuance of License Amendment 191 Regarding Emergency Diesel Generator Rated Load Testing ML0704300202007-03-0808 March 2007 Radiological Accident Analysis ML0631800362006-12-14014 December 2006 License Amendment 189 Regarding Referencing the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Operation and Maintenance of Nuclear Power Plants ML0617002082006-07-17017 July 2006 Issuance of Amendment Steam Generator Tube Integrity ML0616402862006-07-12012 July 2006 Issuance of Amendment Surveillance Interval Extension ML0532100822005-11-18018 November 2005 Correction to Amendment 186 ML0521504282005-10-0404 October 2005 Issuance of License Amendment 186 Regarding Technical Specification Changes for Radioactive Effluents Control Program and Off-Site Dose Calculation Manual ML0518801062005-07-0505 July 2005 Issuance of Conforming Amendment Re Transfer of Facility Operating License from Nuclear Management Company, Wisconsin Public Service Corp and Wisconsin Power and Light Company to Dominion Energy Kewaunee, Inc ML0517100302005-06-21021 June 2005 Emergency License Amendment, Revises the TSs to Remove the Requirement to Have a Containment Spray Pump Suction Flow Path from the Containment Sump ML0516000912005-06-20020 June 2005 Issuance of Amendment Auxiliary Feedwater System ML0503902742005-04-0606 April 2005 Issuance of License Amendment 182 Relocation of Surveillance Requirements ML0505407072005-03-24024 March 2005 License Amendment, Revised Technical Specification Rod Position Indication ML0435001062005-02-15015 February 2005 Issuance of License Amendment 180 Administrative Changes to Technical Specifications ML0433800022004-12-22022 December 2004 Issuance of Amendment Deletion of Requirements for Submittal of Occupational Radiation Exposure Reports, Reports of Challenges to and Failures of the Pressurizer Power Operated Relief Valves and Safety Valves ML0431200302004-10-29029 October 2004 Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat... ML0514402972004-10-26026 October 2004 Revision to Emergency Action Levels, Facility Operating License as Amended Through October 21, 2004 Document ML0426400982004-10-0505 October 2004 License Amendment, Revises TS 3.3.a.2.B, by Extending Completion Time from 1 Hour to 24 Hours for an Accumulator That Is Inoperable for Any Reason Other than Failure to Meet Minimum Boron Concentration Requirements ML0416100952004-09-24024 September 2004 Issuance of Amendment No. 177 Re. Revision of TS 3.3.e, Service Water System ML0422300682004-09-22022 September 2004 License Amendment No. 176, Revise TS 3.10.f.2 to Add an Allowed Outage Time for the Individual Rod Position Indication (Irpi) System of 24 Hours with More than One Irpi Group Inoperable & Adds the Definition of Immediately to TS Section 1.0 2017-06-07
[Table view] Category:Safety Evaluation
MONTHYEARML23339A1362024-01-26026 January 2024 Safety Evaluation Re NRC Issuance of Exemption for Site Restoration ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML18225A0202018-08-29029 August 2018 ISFSI; North Anna 1 & 2 Isfsls, and Unit 3; Surry Power 1 & 2, and Isfsls); Dominion Energy Kewaunee, Inc. (Kewaunee Power Station and Isfsi): Request for Threshold Determination Under 10 CFR 50.80 ML17332A0782017-12-12012 December 2017 ISFSI; Millstone and ISFSI; North Anna and ISFSI; Surry and ISFSI - Request for Approval of Revision 24 of the Nuclear Facility Quality Assurance Program Description Topical Report, DOM-QA-1 (CAC Nos. MF9732-MF9739; EPID L-2017-LLQ-0001) ML17123A0292017-06-0707 June 2017 Enclosure 2 - Safety Evaluation Report Related to the Unloaded Spent Fuel Pool at KPS - LAR260 ML17046A3162017-04-0606 April 2017 Connecticut, Virginia, Millstone, North Anna, Surry, Submission of Revision 21 of the Quality Assurance Topical Report for NRC Approval and Submission Revision 22 for Information Only (CAC Nos. MF8128 - MF8234) ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML14237A0452015-02-13013 February 2015 Issuance of Amendment No. 215, Revise Operating License and Technical Specifications to the Permanently Defueled Technical Specifications Consistent with Permanent Cessation of Reactor Operation ML14279A4822014-10-31031 October 2014 Issuance of Amendment, No. 214 Revise Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML14261A2232014-10-27027 October 2014 Letter and Safety Evaluation, Exemptions from Emergency Planning Requirements of 10 CFR 50.47 and 10 CFR 50 Appendix E ML14008A2972014-06-23023 June 2014 Issuance of Amendment No. 213 - Deletion of License Conditions Associated with Extended Operations ML14111A2342014-06-0909 June 2014 Issuance of Amendment No. 212 Revise Operating License and Technical Specifications to the Permanently Defueled Technical Specifications Consistent with Permanent Cessation of Reactor Operation ML14104A0462014-05-12012 May 2014 Approval of Certified Fuel Handler Training Program ML12271A3662012-10-0404 October 2012 Relief Request Number RR-2-4 Regarding Fourth 10-Year Interval Inservice Inspection Program ML12249A4412012-09-20020 September 2012 Evaluation of Relief Request Number RR-G-5 Regarding Fourth 10-Year Interval Inservice Inspection Program ML1200505532012-02-17017 February 2012 Millstone Power Station Units 2 and 3, North Anna Power Station, Units 1 and 2, Surry Power Station Units 1 and 2 - Review of Dominion Fleet Quality Assurance Topical Report, Revision 11 ML11271A1782011-10-0303 October 2011 Review of Topical Report, Revision 11 for Kewaunee Power Station and ISFSI, Millstone Power Station, Units 1, 2, & 3 and ISFSI, North Anna Power Station, Units 1 & 2 and ISFSI, Surry Power Station, Units 1 & 2 and ISFSI (Tac ME6649, ME6650, ML11192A2492011-08-31031 August 2011 Issuance of Amendment Regarding Cyber Security to Dominion Plants ML11102A0272011-07-29029 July 2011 Issuance of Amendment License Amendment Request to Change the Current Licensing Basis for Automatic Operation of Transformer Load Tap Changers ML1110105232011-04-29029 April 2011 Issuance of Amendment 208 Regarding Technical Specification Change Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection for 52.1 Effective Full Power Years ML1033605042011-02-0202 February 2011 Part 002 ME2139 Safety Evaluation and Safety Evaluation Attachments ML1020206622011-02-0202 February 2011 Issuance of Amendment for Conversion to Improved Technical Specifications with Beyond Scope Issues ML1019701932010-08-22022 August 2010 Approval of Revision to Previously Approved IST Relief Request VRR-5 ML1016200342010-06-21021 June 2010 Approval to Remove Mixing Vane Grid Restriction in Appendix B of Dominion Fleet Topical Report DOM-NAF-2-A ML0934106522009-12-22022 December 2009 Authorization of Proposed Alternative RR-1-11 Regarding Visual Examinations for Reactor Pressure Vessel Bottom-Mounted Instrument Penetrations ML0923210792009-09-28028 September 2009 Irradiated Fuel Management Program and Preliminary Decommissioning Cost Estimate ML0905707102009-04-30030 April 2009 Issuance of Amendment No. 205 Seismic Analysis Methodology for the Auxiliary Building Crane ML0905708922009-04-27027 April 2009 Issuance of Amendment No. 204 Re. One-time Extension of the 15-Year Containment Integrated Leak Rate Test Interval ML0902805812009-02-0606 February 2009 Issuance of Amendment No. 203 Regarding Diesel Generator Fuel Storage Tank Capacity Requirement ML0833607832009-01-0909 January 2009 Issuance of Amendment Steam Line Isolation Function Applicability (Tac No. MD8544) ML0829710792008-11-20020 November 2008 Issuance of Amendment to Relocate Spent Fuel Pool Crane Requirements from the Technical Specifications to the Technical Requirements Manual ML0829405472008-11-0606 November 2008 License Amendment, Increased the Minimum Required Safety Injection Accumulator Boron Concentration from 1900 parts-per-million (Ppm) to 2400 Ppm ML0816201402008-07-0202 July 2008 Issuance of Amendment Deletion of License Condition on Fuel Burnup ML0814902822008-05-20020 May 2008 Submittal of Approved Topical Report DOM-NAF-5, Revision 0.0-A, Application of Dominion Nuclear Core Design and Safety Analysis Methods to the Kewaunee Power Station (KPS) ML0807701792008-03-28028 March 2008 Issuance of Amendments Licensing Basis Design Criteria Associated with Internal Flooding ML0804603632008-03-28028 March 2008 Issuance of Amendment Regarding Nuclear Instrumentation System Permissive Setpoints ML0806305402008-03-28028 March 2008 Issuance of License Amendment 196 Nuclear Core Design and Safety Analysis Methods ML0801604122008-02-0707 February 2008 Issuance of Amendment Regarding Emergency Diesel Generator Testing ML0728802892007-10-31031 October 2007 License Amendment Regarding Relocation of Technical Specifications Requirements ML0722903732007-08-30030 August 2007 Safety Evaluation for Topical Report DOM-NAF-5 ML0721102772007-08-14014 August 2007 Reactor Vessel Surveillance Capsule Test Results for Capsule T ML0721200032007-08-0202 August 2007 Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 Tac No. MD4543) ML0711100062007-05-18018 May 2007 Issuance of Amendment Refueling Water Storage Tank Boron Concentration ML0712001862007-05-0101 May 2007 Issuance of License Amendment 191 Regarding Emergency Diesel Generator Rated Load Testing ML0704300202007-03-0808 March 2007 Radiological Accident Analysis ML0631800362006-12-14014 December 2006 License Amendment 189 Regarding Referencing the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Operation and Maintenance of Nuclear Power Plants ML0624205112006-08-30030 August 2006 Approval of Topical Report DOM-NAF-3 ML0617002082006-07-17017 July 2006 Issuance of Amendment Steam Generator Tube Integrity ML0616402862006-07-12012 July 2006 Issuance of Amendment Surveillance Interval Extension 2024-01-26
[Table view] Category:Technical Specifications
MONTHYEARML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML14237A0452015-02-13013 February 2015 Issuance of Amendment No. 215, Revise Operating License and Technical Specifications to the Permanently Defueled Technical Specifications Consistent with Permanent Cessation of Reactor Operation ML14111A2342014-06-0909 June 2014 Issuance of Amendment No. 212 Revise Operating License and Technical Specifications to the Permanently Defueled Technical Specifications Consistent with Permanent Cessation of Reactor Operation ML13156A0372013-05-29029 May 2013 License Amendment Request 256, Permanently Defueled License and Technical Specifications ML12219A2222012-08-0303 August 2012 Response to Request for Additional Information: License Amendment Request 244, Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications ML12219A0702012-07-30030 July 2012 License Amendment Request 254: Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML1110105232011-04-29029 April 2011 Issuance of Amendment 208 Regarding Technical Specification Change Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection for 52.1 Effective Full Power Years ML0530403522011-02-24024 February 2011 Current Facility Operating License DPR-43, Tech Specs, Revised 10/07/2015 ML1020206622011-02-0202 February 2011 Issuance of Amendment for Conversion to Improved Technical Specifications with Beyond Scope Issues ML1020206642011-02-0202 February 2011 Part 090 ME2139 KPS (Kewaunee) Improved Technical Specifications 2010-10-21 ML1023712602010-08-18018 August 2010 Enclosure (5 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) ML1023712002010-08-18018 August 2010 Enclosure, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Associated NRC Staff Requests for Additional Information and Dominion Energy Kewaunee'S Responses ML1023712572010-08-18018 August 2010 Enclosure (4 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) ML1023712102010-08-18018 August 2010 Enclosure (3 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) ML1023712052010-08-18018 August 2010 Enclosure (2 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) ML1023712032010-08-18018 August 2010 Enclosure (1 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) ML1023711912010-08-18018 August 2010 Attachment 3, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Supplemental Information for the Enclosure ML1023711852010-08-18018 August 2010 Attachment 2, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Proposed New License Conditions ML1023711782010-08-18018 August 2010 Attachment 1, Volume 14, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations, Revision 1 ML1023711402010-08-18018 August 2010 Attachment 1, Volume 13, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.8 Electrical Power Systems, Revision 1 ML1023711092010-08-18018 August 2010 Attachment 1, Volume 8, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 1 ML1023710982010-08-18018 August 2010 Attachment 1, Volume 2, Kewaunee Power Station Improved Technical Specifications Conversion, Generic Determination of No Significant Hazards Consideration and Environmental Assessment, Revision 1 ML1023710882010-08-18018 August 2010 Attachment 1, Volume 1, Kewaunee Power Station Improved Technical Specifications Conversion, Application of Selection Criteria to Kewaunee Power Station Technical Specifications, Revision 1 ML1023712692010-08-18018 August 2010 Enclosure (7 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) ML1023712822010-08-18018 August 2010 Enclosure (8 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) ML1023712832010-08-18018 August 2010 Enclosure (1 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) ML1023712902010-08-18018 August 2010 Enclosure (2 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) ML1023712922010-08-18018 August 2010 Enclosure (3 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) ML1023712942010-08-18018 August 2010 Enclosure (4 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) ML1023712972010-08-18018 August 2010 Enclosure, Q&A to Attachment 1, Volume 14 (Section 3.9) ML1023712662010-08-18018 August 2010 Enclosure (6 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) ML1023711972010-08-18018 August 2010 Attachment 4, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Commitment List ML1022904202010-08-0909 August 2010 License Amendment Request 244: Proposed Revision to Radiological Accident Analysis and Control Room Envelope Habitability Technical Specifications ML1023703802010-07-16016 July 2010 Attachment 1 Vol 7, Kewaunee Power Station Improved Technical Specifications Conversion Section 3.2, Power Distribution Limits, Rev. 1 ML1023703812010-07-16016 July 2010 Attachment 1 Vol 10, Kewaunee Power Station Improved Technical Specifications Conversion Section 3.5, Emergency Core Cooling System (Eccs), Rev. 1 ML1023703822010-07-16016 July 2010 Attachment 1 Vol 12, Kewaunee Power Station Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Rev. 1 ML1023703832010-07-16016 July 2010 Attachment 1 Vol 16, Kewaunee Power Station Improved Technical Specifications Conversion, Chapter 5.0, Design Features, Rev. 1 ML1018902112010-07-0101 July 2010 Attachment 1, Volume 5, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability ML1018902122010-07-0101 July 2010 Attachment 1, Volume 6, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.1 Reactivity Control Systems ML1018902222010-07-0101 July 2010 Attachment 1, Volume 15, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Chapter 4.0 Design Features ML1018902202010-07-0101 July 2010 Attachment 1, Volume 11, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.6 Containment Systems ML1018902182010-07-0101 July 2010 Attachment 1, Volume 9, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.4 Reactor Coolant System (RCS) ML1018902172010-07-0101 July 2010 Attachment 1, Volume 4, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Chapter 2.0 Safety Limits (Sls) ML1018902152010-07-0101 July 2010 Attachment 1, Volume 3, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Chapter 1.0 Use and Application ML1013803992010-05-12012 May 2010 License Amendment Request 249: Conversion to Improved Technical Specifications (TAC No. ME02467) - Request to Change Proposed Service Water and Main Steam Isolation Valve Specifications ML1011101232010-04-13013 April 2010 License Amendment Request 246: Revision to Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection Limitations ML0924404162009-08-24024 August 2009 Attachment 1 - Volume 6, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.1, Reactivity Control Systems, Revision 0 ML0924404262009-08-24024 August 2009 Attachment 1 - Volume 10, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling System (ECCS) Revision 0 ML0924404312009-08-24024 August 2009 Attachment 1 - Volume 15, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 4.0, Design Features, Revision 0 ML0924404302009-08-24024 August 2009 Attachment 1 - Volume 14, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.9, Refueling Operations, Revision 0 2015-02-13
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 2, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
KEWAUNEE POWER STATION (KPS) -ISSUANCE OF AMENDMENT FOR THE CONVERSION TO THE IMPROVED TECHNICAL SPECIFICATIONS WITH BEYOND SCOPE ISSUES (TAC NOS. ME2139, ME2419, ME2420, ME2421, ME3122, ME3460, AND ME3544)
Dear Mr. Heacock:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 207 to Facility Operating License No. DPR-43 for Kewaunee Power Station (KPS). The amendment consists of changes to the technical specifications (TS) and the license conditions for KPS in response to your application dated August 24, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092440398), as supplemented by letters dated:
D. Heacock -2 The amendment converts the current TS (CTS) to the improved TS (ITS) and relocates certain requirements to other licensee-controlled documents. The ITS are based on:
Revision 3.0;
- "NRC Final Policy Statement on Technical Specification Improvements for Nuclear Power Reactors," dated July 22, 1993 (58 FR 39132); and
Technical Specification Task Force changes were also incorporated. The purpose of the conversion is to provide clearer and more readily understandable requirements in the TS for KPS to ensure safe operation. In addition, the amendment includes a number of issues that were considered beyond the scope of NUREG -1431.
Included in the amendments are the following three conditions for the KPS operating license:
- the requirement to relocate certain CTS requirements into licensee-controlled documents during the implementation of the ITS;
- the schedule for the first performance of new and revised surveillance requirements for the ITS; and
- deferral of certain TS requirements.
These license conditions, which are discussed in the enclosed safety evaluation (SE), are part of the implementation of the ITS and constitute regulatory commitments that the NRC staff is relying upon in approving the amendment.
The ITS will become the governing TS for KPS upon the date of implementation. This means that until the implementation of the ITS is complete, the CTS shall remain in effect. Upon complete implementation of the ITS, please submit a letter stating as such within 14 days of the date of completion.
A copy of the related SE and its Attachments are enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
D. Heacock - 3 If you have any questions concerning this letter and the SE, contact me at 301-415-3049 or email KarI.Feintuch@nrc.gov.
Sincerely, Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosures:
- 1. Amendment No. 207 to DPR-43
- 2. Safety Evaluation Safety Evaluation Attachments
- 1. Safety Evaluation Attachment 1 (from Balance of Plant Branch - SBPB)
- 2. Safety Evaluation Attachment 2 (from Technical Specifications Branch -ITSB)
- 3. Safety Evaluation Attachment 3 (from Instrumentation and Control Branch - EICB)
- 4. Safety Evaluation Attachment 4 (from Electrical Engineering Branch - EEEB)
- 5. Safety Evaluation Attachment 5 (from Accident Dose Branch - AADB)
- 6. Safety Evaluation Attachment 6 (from Component Performance and Testing Branch - CPTB)
- 3. List of Regulatory Commitments
- 4. Tables of Technical Specification Changes:
- 1. Table A - Administrative Changes
- 2. Table L - Less Restrictive Changes
- 3. Table LA - Removed Details
- 4. Table M - More Restrictive Changes
- 5. Table R - Relocated Specifications
- 5. List of Acronyms and Abbreviations
- 6. Improved Technical Specifications cc w/encls: Distribution via listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DOMINION ENERGY KEWAUNEE, INC.
DOCKET NO. 50-305 KEWAUNEE POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 207 License No. DPR-43
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Dominion Energy Kewaunee, Inc. dated August 24, 2009 as supplemented by letters dated October 22, 2009, April 13, 2010, May 12, 2010, July 1, 2010, July 16, 2010, August 18, 2010, September 7, 2010, September 8,2010, October 15,2010, and December 2,2010, complies with the standards and requirements of the Atomic Energy Act of 1954 as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-43 is hereby amended to read as follows:
-2 (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 207, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This amendment authorizes the relocation of certain Technical Specification requirements to other licensee-controlled documents. Implementation of this amendment shall include the relocation of these requirements to the other documents, as described in (1) Sections D and E of the NRC staff's Safety Evaluation, and (2) Table LA of Removed Details and Table R of Relocated Specifications attached to the NRC staff's Safety Evaluation, which is enclosed with this amendment.
- 4. License condition, 2.C.(8), is deleted.
- 5. License condition, 2.C.(9), is deleted.
- 6. New license conditions are added to Section C of this license to address performance of new and revised Surveillance Requirements (SRs):
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval, which begins on the date of implementation of this amendment.
For SRs that existed prior to this amendment whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject to the modified acceptance criteria is due at the end of the first Surveillance interval that began on the date the Surveillance was last performed prior to the implementation of this amendment.
For SRs that existed prior to this amendment whose intervals of performance are being extended the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
- 7. New license condition is added to address a currently non-functional RCS Hot Leg A Temperature Indication, as follows:
- 3 Following implementation of License Amendment No. 207, the requirement for the RCS Hot Leg A Temperature Indication to be OPERABLE as required by TS 3.3.3 and TS 3.3.4 may be deferred until startup after the first outage of sufficient duration to repair the RCS Hot Leg A Temperature Indication.
Specifically, TS Table 3.3.3-1, Function 3 will only require 1 channel to be OPERABLE, and TS Table B 3.3.4-1, Function 4.a will not be applicable.
Following the startup after the first outage of sufficient duration to repair the RCS Hot Leg A Temperature Indication, TS Table 3.3.3-1 Function 3 and TS Table B 3.3.4-1, Function 4.a requirements will be applicable.
- 8. As part of the implementation of this amendment, the NRC expects that the actions identified in the "List of Regulatory Commitments" enclosed with this amendment will be carried out in accordance with their indicated due dates or events, including any interim actions necessary to make the commitments active as planned. The NRC accepts and relies upon the definition for the word "active" as applied in the previous sentence and as intended by Dominion Energy Kewaunee, Inc. Namely, when used in the context of USAR revisions, an "active" USAR change/revision is one that has been through all of the requisite reviews and approvals, and is, from the time deSignated as "active" forward, considered as part of the then current USAR in effect. Further, within the electronic document management system, "active" is used to indicate that the changed or revised document is the current document of record.
- 9. This license amendment is effective as of its date of issuance and shall be implemented on or before February 23, 2011.
FOR THE NUCLEAR REGULATORY COMMISSION Robert Pascarelli, Chief Plant Licensing Branch 111-1 DiviSion of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance: February 2, 2011
ATTACHMENT TO LICENSE AMENDMENT NO. 207 FACILITY OPERATING LICENSE NO. DPR-43 DOCKET NO. 50-305 Replace the following pages of the Facility Operating License No. DPR*43 with the revised pages attached. The changed area is identified by a marginal line.
REMOVE INSERT Page 3 Page 3 Page 4 Page 4 Page 5 Page 5 Page 5a Page 6 Replace the following pages of Appendix A, Technical Specifications, with the revised pages attached. The revised pages are identified by amendment number. A marginal line to indicate the area of change is not used since all pages are new.
REMOVE INSERT All pages All pages
C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR, Chapter 1: (1) Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70, (2) is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and (3) is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady-state reactor core power levels not in excess of 1772 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 207, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Fire Protection The licensee shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the licensee's Fire Plan, and as referenced in the Updated Safety Analysis Report, and as approved in the Safety Evaluation Reports, dated November 25, 1977, and December 12, 1978 (and supplement dated February 13, 1981) subject to the following provision:
The licensee may make changes to the approved Fire Protection Program without prior approval of the Commission, only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(4) Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Nuclear Management Company Kewaunee Nuclear Power Plant Physical Security Plan (Revision 0)" submitted by letter dated October 18, as supplemented by letter dated October 21, 2004, July 26, 2005, and May 15, 2006.
(5) Deleted Amendment No. 207 3
(6) Steam Generator Upper Lateral Supports The design of the steam generator upper lateral supports may be modified by reducing the number of snubbers from four (4) to one (1) per steam generator.
(7) Deleted (8) Deleted (9) Deleted (10) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders Amendment No. 207 4
(11) Seismic Analysis Methodology for Auxiliary Building Crane The licensee shall use the seismic analysis methodology submitted by letter dated July 7,2008, supplemented on September 19,2008, and March 17, 2009, and approved by the NRC staff in Amendment No. 205, for analysis of the Auxiliary Building crane. The licensee shall update the USAR to reflect this approval and in accordance with the schedule specified by 10 CFR 50.71 (e).
(12) Implementation of New and Revised Surveillance Requirements (a) For SRs that are new in Amendment No. 207, the first performance is due at the end of the first surveillance interval, which begins on the date of implementation of this amendment.
(b) For SRs that existed prior to Amendment No. 207, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.
(c) For SRs that existed prior to Amendment No. 207, that have modified acceptance criteria, the first performance subject to the modified acceptance criteria is due at the end of the surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.
(d) For SRs that existed prior to Amendment No. 207, whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to the implementation of this amendment.
(13) Removed Details and Requirements Relocated to Other Controlled Documents License Amendment No. 207 authorizes the relocation of certain technical specifications and operating license conditions, if applicable, to other licensee-controlled documents. Implementation of this amendment shall include relocation of these requirements to the specified documents.
(14) Deferral of Certain Technical Specification Requirements Following implementation of License Amendment No. 207, the requirement for the RCS Hot Leg A Temperature Indication to be OPERABLE as required by TS 3.3.3 and TS 3.3.4 may be deferred until startup after the first outage of sufficient duration to repair the RCS Hot Leg A Temperature Indication.
Amendment No. 207 5
Specifically, TS Table 3.3.3-1, Function 3 will only require 1 channel to be OPERABLE, and TS Table B 3.3.4-1, Function 4.a will not be applicable.
Following the startup after the first outage of sufficient duration to repair the RCS Hot Leg A Temperature Indication, TS Table 3.3.3-1 Function 3 and TS Table B 3.3.4-1, Function 4.a requirements will be applicable.
D. The licensee shall comply with applicable effluent limitations and other limitations and monitoring requirements, if any, specified pursuant to Section 401 (d) of the Federal Water Pollution Control Act Amendments of 1972.
E. This license is effective as of the date of issuance, and shall expire at midnight on December 21, 2013.
FOR THE ATOMIC ENERGY COMMISSION Original Signed by A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing
Attachment:
Appendices A and B - Technical Specifications Date of Issuance: December 21, 1973 Amendment No. 207 6
D. Heacock - 3 If you have any questions concerning this letter and the SE, contact me at 301-415-3049 or email KarI.Feintuch@nrc.gov.
Sincerely, IRAJ Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosures:
- 1. Amendment No. 207 to DPR-43
- 2. Safety Evaluation Safety Evaluation Attachments
- 1. Safety Evaluation Attachment 1 (from Balance of Plant Branch - SBPB)
- 2. Safety Evaluation Attachment 2 (from Technical Specifications Branch - ITSB)
- 3. Safety Evaluation Attachment 3 (from Instrumentation and Control Branch - EICB)
- 4. Safety Evaluation Attachment 4 (from Electrical Engineering Branch - EEEB)
- 5. Safety Evaluation Attachment 5 (from Accident Dose Branch - AADB)
- 6. Safety Evaluation Attachment 6 (from Component Performance and Testing Branch - CPTB)
- 3. List of Regulatory Commitments
- 4. Tables of Technical Specification Changes:
- 1. Table A - Administrative Changes
- 2. Table L - Less Restrictive Changes
- 3. Table LA - Removed Details
- 4. Table M - More Restrictive Changes
- 5. Table R - Relocated Specifications
- 5. List of Acronyms and Abbreviations
- 6. Improved Technical Specifications cc w/encls: Distribution via listserv DISTRIBUTION:
PUBLIC LPL3-1 R/F VCusumano,NRR MMcConnell, NRR RidsNrrDirsltsb Resource KBucholtz, NRR BMarcus, NRR RidsOgcRp Resource GWaig, NRR DRahn, NRR RidsRgn3MailCenter Resource MHamm, NRR WBlumberg. NRR RidsNrrLABTully Resource RGrover, NRR LBenton. NRR RidsNrrPMKewaunee Resource AKlett, NRR RWolfgang. NRR RidsNrrDorlDpr Resource SGardocki RidsAcrsAcnw_MailCTR Resource GMatheru, NRR RidsNrrDorlLpl3-1 Resource KScales, NRR Package Accession Number: ML103350500 Amendment Accession Number: ML102020662 Safety Evaluation and Safety Evaluation Attachments Accession Number: ML103360504 List of Regulatory Commitments Accession Number: ML110260316 Tables A, L, LA, M. and R Accession Number: ML103480093 List of Acronyms and Abbreviations Accession Number: ML103370691 Technical Specification pages Accession Number: ML102020664 Nota: Safety evaluation input on beyond-scope issues has been provided by the respective technical branches. The memos transmittlng t he SEs may ba found'In ADAMS under tha TAC N os. rISted'In the t'tl I a above.
OFFICE LPL3-1/PM LPL3-1/LA Tech Branch DE/EEEB OIRS/ITSB OGC NLO LPL3-1/BC NAME KFeintuch BTuily See Note RMathew RElliott LSubin RPascarelli DATE 1/10/11 1/10/11 Various 1/31/11 1/11/11 1/25/11 2/02/11 OFFICIAL RECORD COpy