Attachment 4, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Commitment List
ML102371197
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 08/18/2010
From:
Dominion Energy Kewaunee
To:
Office of Nuclear Reactor Regulation
References
10-457, TAC ME2139
Download: ML102371197 (0)


Text

Serial No.10-457 ATTACHMENT 4 LICENSE AMENDMENT REQUEST 249: KEWAUNEE POWER STATION CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS (TAC NO. ME 2139)

SUPPLEMENT TO VOLUMES 1, 2, 8, 13, AND 14 COMMITMENT LIST KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

Serial No.10-457 Docket No. 50-305 Attachment 4 Page 1 of 4 COMMITMENT LIST The following list identifies those actions committed to by Dominion Energy Kewaunee (DEK) for the Kewaunee Power Station (Kewaunee) in this document. Any other actions discussed in the submittal represent intended or planned actions and are described only for information and are not regulatory commitments.

This following list supersedes the list provided in Reference 1 of the cover letter in its entirety. Information within parentheses provides reference to the specific DEK response to NRC RAIs where the commitment was made. These NRC RAIs and DEK responses are contained in the Enclosure to this letter. Please contact Mr. Gerald O.

Riste - ITS Conversion, Licensing, at (920) 388-8424 with any questions regarding this document or any associated regulatory commitments.

No. Commitment Due Date/Event DEK will have written procedures available describing the compensatory measures when LCO 3.7.10, Control Room Post-Accident Recirculation 1 Upon implementation (CRPAR) System, ACTION B, Two CRPAR trains inoperable due to inoperable control room boundary in MODE 1, 2, 3, or 4, is entered.

DEK will establish the Technical Specification Bases 2 for LCO 3.0.8, as adopted, with the applicable Upon implementation license amendment.

DEK will ensure that when LCO 3.0.8a is used, appropriate plant procedures and administrative controls are revised to implement the following Tier 2 Restriction:

3 Upon implementation

  • At least one AFW train (including a minimum set of supporting equipment required for its successful operation) not associated with the inoperable snubber(s) must be available.

Serial No.10-457 Docket No. 50-305 Attachment 4 Page 2 of 4 COMMITMENT LIST No. Commitment Due Date/Event DEK will ensure that when LCO 3.0.8b is used, appropriate plant procedures and administrative controls are revised to implement the following Tier 2 Restriction:

  • At least one AFW train (including a minimum set 4 of supporting equipment required for its Upon implementation successful operation) not associated with the inoperable snubber(s), or some alternative means of core cooling (e.g., F&B, firewater system or aggressive secondary cooldown using the steam generators) must be available.

DEK will ensure that when LCO 3.0.8 is used appropriate plant procedures and administrative controls are revised to implement the following Tier 2 Restriction:

  • Each time the provisions of LCO 3.0.8 are used DEK will confirm that at least one train (or subsystem) of systems supported by the inoperable snubbers would remain capable of 5 performing their required safety or support Upon implementation functions for postulated design loads other than seismic loads. LCO 3.0.8 does not apply to non-seismic snubbers. In addition, a record of the design function of the inoperable snubber (i.e.,

seismic vs. non-seismic), implementation of any applicable Tier 2 restrictions, and the associated plant configuration shall be available on a recoverable basis.

DEK will revise the USAR or TS Bases to describe In accordance with 6

the restrictions in commitments 3 and 4. 10 CFR 50.71(e)

DEK will have written procedures available describing compensatory measures to be taken in the event of an intentional or unintentional entry into 7 Upon implementation LCO 3.7.12, Auxiliary Building Special Ventilation (ASV) System, Condition B, Two ASV trains inoperable due to inoperable ASV boundary.

8 Withdrawn, refer to Enclosure Volume 8 (KAB-077) N/A

Serial No.10-457 Docket No. 50-305 Attachment 4 Page 3 of 4 COMMITMENT LIST No. Commitment Due Date/Event DEK will implement administrative controls to include the following restrictions.

9 Upon implementation

  • Activities that could degrade other components of the RPS, including master relays or slave relays and activities that cause analog channels to be unavailable should not be scheduled when a logic cabinet is unavailable.
  • Activities on electrical systems that support the systems or functions listed in the first two bullets should not be scheduled when a RTB is unavailable.

DEK commits to include in the USAR a requirement to maintain a 5% design margin for the batteries describing how this design margin is required to In accordance with 10 allow the use of a 2 amp float current value that is an 10 CFR 50.71(e) indication that the battery is 95 percent charged.

(GMW-007) (Duplicated in Commitment 12 but included here for completeness.)

DEK commits to incorporating the expected/qualified In accordance with 11 life of the safety related batteries in the battery 10 CFR 50.71(e) monitoring program in the USAR. (GMW-009)

Serial No.10-457 Docket No. 50-305 Attachment 4 Page 4 of 4 COMMITMENT LIST No. Commitment Due Date/Event DEK commits to change or verify the Kewaunee USAR describes:

1. The requirement to maintain a 5% design margin for the batteries describing how this design margin is required to allow the use of a 2 amp float current value as an indication that the battery is at least 95 percent charged.
2. The minimum established design limit for battery terminal float voltage. In accordance with 12 10 CFR 50.71(e)
3. The minimum established design limit for electrolyte level.
4. The minimum established design limit for electrolyte temperature.
5. The minimum requirements for the alternate means (i.e., spare battery charger) that is used to obtain an extended battery charger completion time (CT). (GMW-014)

DEK commits to change (or verify) procedure(s) to include the measuring and test equipment 13 manufacturers recommended practice for instrument Upon implementation stabilization when measuring float current to confirm battery state of charge. (GMW-014)

DEK commits to including vital switchgear and In accordance with 14 battery room temperature limits in the USAR.

10 CFR 50.71(e)

(MEH-009)

DEK has committed in the GL 2008-01 letter to Following NRC approval of monitor the status of the industry/NRC Technical the TSTF, on a schedule Specification Task Force (TSTF) Traveler to be 15 consistent with the developed as a follow-up to GL 2008-01. Following commitment made in the NRC approval of this TSTF, DEK will adopt response to GL 2008-01.