| | issue date = 06/23/2011 | | | issue date = 06/23/2011 |
| | title = IR 05000244/2011404; 03/21/2011 - 05/17/2011; R. E. Ginna Nuclear Power Plant; Supplemental Information - Inspection Procedure (IP) 95001. (Letter Only) | | | title = IR 05000244/2011404; 03/21/2011 - 05/17/2011; R. E. Ginna Nuclear Power Plant; Supplemental Information - Inspection Procedure (IP) 95001. (Letter Only) |
| | author name = Trapp J M | | | author name = Trapp J |
| | author affiliation = NRC/RGN-I/DRS/PSB1 | | | author affiliation = NRC/RGN-I/DRS/PSB1 |
| | addressee name = Carlin J | | | addressee name = Carlin J |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:OFFIEIAT USE ENtY SEEURIry_REIATED INFORMATIONJune 23,2011Mr. John CarlinVice PresidentR. E. Ginna Nuclear Power Plant, LLC1503 Lake RoadOntario, NY 14519 | | {{#Wiki_filter:==SUBJECT:== |
| | R. E. GINNA NUCLEAR POWER PLANT - NRC INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT NO. O5OOO244I2O1 1 404 |
|
| |
|
| SUBJECT: R. E. GINNA NUCLEAR POWER PLANT - NRC INSPECTION PROCEDURE95001 SUPPLEMENTAL INSPECTION REPORT NO. O5OOO244I2O1 1 404
| | ==Dear Mr. Carlin:== |
| | On May 17,2011, the U.S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection pursuant to Inspection Procedure 95001 at your Ginna Nuclear Power Plant to follow up on previous security inspection findings. The enclosed inspection report documents the inspection results, which were discussed at the exit meeting on May 17,2011, with you and other members of your staff. The NRC was informed of your readiness for the inspection on February 23,2011. |
|
| |
|
| ==Dear Mr. Carlin:==
| | The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. |
| On May 17,2011, the U.S. Nuclear Regulatory Commission (NRC) completed a supplementalinspection pursuant to Inspection Procedure 95001 at your Ginna Nuclear Power Plant to followup on previous security inspection findings. The enclosed inspection report documents theinspection results, which were discussed at the exit meeting on May 17,2011, with you andother members of your staff. The NRC was informed of your readiness for the inspection onFebruary 23,2011.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.The inspector reviewed selected procedures and records, observed activities, and interviewedpersonnel.This report documents one NRO-identified finding (FlN) of very low security significance (i.e.,Green as determined by the Baseline Security Significance Determination Process). Thedeficiency was promptly corrected or compensated for, and the plant was in compliance withapplicable physical protection and security requirements within the scope of this inspectionbefore the inspector left the site. This FIN did not involve a violation of NRC requirements.The FIN had a cross-cutting aspect in the area of Human Performance (Work Practicescomponent) because Constellation did not ensure supervisory and management oversight ofwork activities associated with implementing corrective actions tH.4(c)1. lf you disagree with thecross-cutting aspect assigned to the finding in this report, you should provide a response within30 days of the date of this inspection report, with the basis for your disagreement, to theRegional Administrator, Region l; and the NRC Resident lnspector at the Ginna Nuclear PowerPlant.Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated fromenclosure, this transmittal document is decontrolled.OFFICIAT USE ONIY SECURIW-REIATED INFORMATION OFFIEIAT USE ENtY SEEURIW_REtATED INFORMATION In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from thePublicly Available Records System (PARS) component of NRC's document system,Agencywide Documents Access and Management System (ADAMS). ADAMS is accessiblefrom the NRC Website at http:/iwww.nrc.gov/reading-rm/adams.html (the Public ElectronicReading Room). However, because of the security-related information contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection.In accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC'sdocument system, ADAMS. lf Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.22. Otherwise, markyour entire response "security-Related Information - Withhold Under 10 CFR 2.390" and followthe instructions forwithholding in 10 CFR 2.390(bX1).
| | |
| | The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. |
| | |
| | This report documents one NRO-identified finding (FlN) of very low security significance (i.e., |
| | Green as determined by the Baseline Security Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. This FIN did not involve a violation of NRC requirements. |
| | |
| | The FIN had a cross-cutting aspect in the area of Human Performance (Work Practices component) because Constellation did not ensure supervisory and management oversight of work activities associated with implementing corrective actions tH.4(c)1. lf you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region l; and the NRC Resident lnspector at the Ginna Nuclear Power Plant. |
| | |
| | Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. |
| | |
| | OFFICIAT USE ONIY SECURIW-REIATED INFORMATION |
| | |
| | OFFIEIAT USE ENtY SEEURIW_REtATED INFORMATION In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http:/iwww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. |
| | |
| | In accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. lf Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response "security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions forwithholding in 10 CFR 2.390(bX1). |
|
| |
|
| Sincerely,lRA by Peter R. Wilson for/James M. Trapp, ChiefPlant Support Branch 1Division of Reactor SafetyDocket No. 50-244License No. DPR-18 | | Sincerely, lRA by Peter R. Wilson for/ |
| | James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-244 License No. DPR-18 Enclosure: |
| | NRC lnspection Report No. 0500024412011404 MAttachment: Supplemental Information (coNTAtNS OFFIClAL USE ONLY - SECURTTY- RELATED TNFORMATION (OUO-SRl)) |
| | cc w/encl: w/OUO-SRI: |
| | G. Palmer, Director of Security, Ginna Nuclear Power Plant R. Frazier, Assistant Director, NY State Dept of Homeland Security F. Murray, President and CEO New York State Energy Research and Development Authority cc w/o encl: w/o OUO-SRI: Distribution via ListServ OFFICIAT USE ONIY SECURIW_REIATED INFORMATION |
|
| |
|
| ===Enclosure:===
| | OFFIElAT USE ENtY SECURIW_REIATED INFORMATION ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, Agencyruide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. |
| NRC lnspection Report No. 0500024412011404M
| |
|
| |
|
| ===Attachment:===
| | ln accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. lf Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(bX1). |
| Supplemental Information(coNTAtNS OFFIClAL USE ONLY - SECURTTY- RELATED TNFORMATION (OUO-SRl))cc w/encl: w/OUO-SRI:G. Palmer, Director of Security, Ginna Nuclear Power PlantR. Frazier, Assistant Director, NY State Dept of Homeland SecurityF. Murray, President and CEO New York State Energy Research and Development Authoritycc w/o encl: w/o OUO-SRI: Distribution via ListServOFFICIAT USE ONIY SECURIW_REIATED INFORMATION J. CarlinOFFIElAT USE ENtY SECURIW_REIATED INFORMATION2ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from thePublicly Available Records System (PARS) component of NRC's document system,Agencyruide Documents Access and Management System (ADAMS). ADAMS is accessiblefrom the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public ElectronicReading Room). However, because of the security-related information contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection.ln accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC'sdocument system, ADAMS. lf Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.22. Otherwise, markyour entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and followthe instructions for withholding in 10 CFR 2.390(bX1).
| |
|
| |
|
| Sincerely,/RA by Peter R. Wilson for/James M. Trapp, ChiefPlant Support Branch 1Division of Reactor SafetyDocket No. 50-244License No. DPR-18 | | Sincerely, |
| | /RA by Peter R. Wilson for/ |
| | James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-244 License No. DPR-18 Enclosure: |
| | NRC Inspection Report No. 0500024412011404 w/Attachment: Supplemental lnformation (coNTAtNS OFFlClAL USE ONLy - SECURTTY- RELATED TNFORMATION (OUO-SR!)) |
| | cc w/encl: w/OUO-SRl: |
| | G. Palmer, Director of Security, Ginna Nuclear Power Plant R. Frazier, Assistant Director, NY State Dept of Homeland Security F. Murray, President and CEO New York State Energy Research and Development Authority cc Mo encl: Mo OUO-SRI: Distribution via ListServ Distribution: See next page SUNSI Review Complete: GES (Reviewer's Initials) |
| | Non-Public Designation Category: MD 3.4 Non-Public A.3 ADAMS ACC #ML111750181 DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Security\2011 Draft OUO Reports\Ginna\95001\Ginna 95001 Rev 3.docx After declaring this document "An Official Agency Record" letter will not be released to the Public. |
|
| |
|
| ===Enclosure:===
| | To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" = Copy with attachmenUenclosure "N" = No DATE 06t21t11 |
| NRC Inspection Report No. 0500024412011404
| | *see previous concurrence OFFICIAL RECORD OFFICIAT USE ENtY SECURIW-REIATED INFERMATION |
|
| |
|
| ===w/Attachment:===
| | OFFIClAT USE ONtY SECURITY_REIATED Ii.lFORMATION Distribution w/o encl:wio OUO-SRI: (via e-mail) |
| Supplemental lnformation(coNTAtNS OFFlClAL USE ONLy - SECURTTY- RELATED TNFORMATION (OUO-SR!))cc w/encl: w/OUO-SRl:G. Palmer, Director of Security, Ginna Nuclear Power PlantR. Frazier, Assistant Director, NY State Dept of Homeland SecurityF. Murray, President and CEO New York State Energy Research and Development Authoritycc Mo encl: Mo OUO-SRI: Distribution via ListServDistribution: See next pageSUNSI Review Complete: GES (Reviewer's Initials)Non-Public Designation Category: MD 3.4 Non-Public A.3 ADAMS ACC #ML111750181DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Security\2011 Draft OUO Reports\Ginna\95001\Ginna 95001 Rev 3.docxAfter declaring this document "An Official Agency Record" letter will not be released to the Public.To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" = Copy withattachmenUenclosure "N" = NoOFFICIAL RECORDDATE 06t21t11*see previous concurrenceOFFICIAT USE ENtY SECURIW-REIATED INFERMATION J. CarlinOFFIClAT USE ONtY SECURITY_REIATED Ii.lFORMATION3Distribution w/o encl:wio OUO-SRI: (via e-mail)W. Dean, RAD. Lew, DRAD. Roberts, DRPJ. Clifford, DRPC. Miller, DRSP. Wilson, DRSS. Bush-Goddard, Rl OEDOG. Dentel, DRPN. Perry, DRPJ. Hawkins, DRPK. Cronk, DRPN. Floyd, DRPL. Casey, DRP, RlM. Rose, DRP, OAD. Bearde, DRSRidsNrrPMREGinna ResourceRidsNrrDorlLpll -1 ResourceROPreports Resou rce@nrc. govDistribution w/encl: w/OUO-SRl: (via e-mail)G. Smith, DRSJ. Trapp, DRSG. Hunegs, SRIS. Coker, NSIRC. Johnson, NSIRM. Ernstes, DRS, RllR. Skokowski, DRS, RlllE. Byre, DRS, RIVRI ORAMAIL RESOURCE)RI ORAMAIL RESOURCE)RI ORAMAIL RESOURCE)RI DRPMAlL RESOURCE)RI DRSMAlL RESOURCE)RI DRSMAlL RESOURCE)OFFIClALUSE EN tY - SEE U RITY-REIATED IN FORMATION
| | W. Dean, RA RI ORAMAIL RESOURCE) |
| | D. Lew, DRA RI ORAMAIL RESOURCE) |
| | D. Roberts, DRP RI ORAMAIL RESOURCE) |
| | J. Clifford, DRP RI DRPMAlL RESOURCE) |
| | C. Miller, DRS RI DRSMAlL RESOURCE) |
| | P. Wilson, DRS RI DRSMAlL RESOURCE) |
| | S. Bush-Goddard, Rl OEDO G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP K. Cronk, DRP N. Floyd, DRP L. Casey, DRP, Rl M. Rose, DRP, OA D. Bearde, DRS RidsNrrPMREGinna Resource RidsNrrDorlLpll -1 Resource ROPreports Resou rce@nrc. gov Distribution w/encl: w/OUO-SRl: (via e-mail) |
| | G. Smith, DRS J. Trapp, DRS G. Hunegs, SRI S. Coker, NSIR C. Johnson, NSIR M. Ernstes, DRS, Rll R. Skokowski, DRS, Rlll E. Byre, DRS, RIV OFFIClALUSE EN tY - SEE U RITY-REIATED IN FORMATION |
| }} | | }} |
Similar Documents at Ginna |
---|
Category:Inspection Report
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) IR 05000244/20220042023-01-31031 January 2023 LLC - Integrated Inspection Report 05000244/2022004 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 IR 05000244/20224202022-11-22022 November 2022 Security Baseline Inspection Report 05000244-2022420 Cover Letter IR 05000244/20220032022-11-0303 November 2022 LLC - Integrated Inspection Report 05000244/2022003 IR 05000244/20225012022-09-21021 September 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000244/2022501 IR 05000244/20220102022-09-13013 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000244/2022010 IR 05000244/20220052022-08-31031 August 2022 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2022005) IR 05000244/20224022022-08-0303 August 2022 Security Baseline Inspection Report 05000244/2022402 IR 05000244/20220022022-08-0303 August 2022 LLC - Integrated Inspection Report 05000244/2022002 ML22160A3962022-06-0909 June 2022 R. E. Ginna Nuclear Power Plant, LLC - Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2022010 IR 05000244/20224032022-05-24024 May 2022 R. E. Ginna Nuclear Power Plant, LLC - Cyber Security Inspection Report 05000244/2022403 (Cover Letter Only) IR 05000244/20220012022-05-0303 May 2022 R. E. Ginna Nuclear Power Plant, LLC - Integrated Inspection Report 05000244/2022001 IR 05000244/20224012022-03-0404 March 2022 LLC - Security Baseline Inspection Report 05000244/2022401 IR 05000244/20210062022-03-0202 March 2022 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2021006) IR 05000244/20210042022-01-20020 January 2022 R. E. Ginna Nuclear Power Plant, LLC - Integrated Inspection Report 05000244/2021004 IR 05000244/20220112021-12-16016 December 2021 R. E. Ginna Nuclear Power Plant, LLC - Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000244/2022011 IR 05000244/20210032021-11-0404 November 2021 Integrated Inspection Report 05000244/2021003 IR 05000244/20215012021-09-29029 September 2021 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2021501 IR 05000244/20210052021-09-0101 September 2021 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, Llc (Report 05000244/2021005 IR 05000244/20210022021-08-0303 August 2021 LLC: Integrated Inspection Report 05000244/2021002 IR 05000244/20214012021-07-0202 July 2021 R. E. Ginna Nuclear Power Plant: Security Baseline Inspection Report 05000244/2021401 IR 05000244/20210102021-06-0707 June 2021 LLC: NRC Inspection Report 05000244/2021010 IR 05000244/20210012021-05-0505 May 2021 LLC: Integrated Inspection Report 05000244/2021001 IR 05000244/20210112021-04-27027 April 2021 LLC: Temporary Instruction 2515/194 Inspection Report 05000244/2021011 IR 05000244/20200032021-04-15015 April 2021 R. E. Ginna Nuclear Power Plant, LLC: Reissued Integrated Inspection Report 05000244/2020003 IR 05000244/20200062021-03-0303 March 2021 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020006) IR 05000244/20200132021-02-17017 February 2021 R. E. Ginna Nuclear Power Plant, LLC: Design Basis Assurance Inspection (Programs) Inspection Report 05000244/2020013 IR 05000244/20200042021-02-0808 February 2021 R. E. Ginna Nuclear Power Plant, LLC: Integrated Inspection Report 05000244/2020004 IR 07200067/20200022021-01-21021 January 2021 Independent Spent Fuel Storage Installation (ISFSI) NRC Inspection Report No. 07200067/2020002 IR 05000244/20203012020-12-0101 December 2020 R. E. Ginna Nuclear Power Plant, Initial Operator Licensing Examination Report 05000244/2020301 ML20315A3682020-11-10010 November 2020 R. E. Ginna Nuclear Power Plant, LLC - Integrated Inspection Report 05000244/2020003 2024-09-24
[Table view] Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report 2024-09-25
[Table view] |
Text
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - NRC INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT NO. O5OOO244I2O1 1 404
Dear Mr. Carlin:
On May 17,2011, the U.S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection pursuant to Inspection Procedure 95001 at your Ginna Nuclear Power Plant to follow up on previous security inspection findings. The enclosed inspection report documents the inspection results, which were discussed at the exit meeting on May 17,2011, with you and other members of your staff. The NRC was informed of your readiness for the inspection on February 23,2011.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
This report documents one NRO-identified finding (FlN) of very low security significance (i.e.,
Green as determined by the Baseline Security Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. This FIN did not involve a violation of NRC requirements.
The FIN had a cross-cutting aspect in the area of Human Performance (Work Practices component) because Constellation did not ensure supervisory and management oversight of work activities associated with implementing corrective actions tH.4(c)1. lf you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region l; and the NRC Resident lnspector at the Ginna Nuclear Power Plant.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled.
OFFICIAT USE ONIY SECURIW-REIATED INFORMATION
OFFIEIAT USE ENtY SEEURIW_REtATED INFORMATION In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http:/iwww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. lf Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response "security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions forwithholding in 10 CFR 2.390(bX1).
Sincerely, lRA by Peter R. Wilson for/
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-244 License No. DPR-18 Enclosure:
NRC lnspection Report No. 0500024412011404 MAttachment: Supplemental Information (coNTAtNS OFFIClAL USE ONLY - SECURTTY- RELATED TNFORMATION (OUO-SRl))
cc w/encl: w/OUO-SRI:
G. Palmer, Director of Security, Ginna Nuclear Power Plant R. Frazier, Assistant Director, NY State Dept of Homeland Security F. Murray, President and CEO New York State Energy Research and Development Authority cc w/o encl: w/o OUO-SRI: Distribution via ListServ OFFICIAT USE ONIY SECURIW_REIATED INFORMATION
OFFIElAT USE ENtY SECURIW_REIATED INFORMATION ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system, Agencyruide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
ln accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. lf Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(bX1).
Sincerely,
/RA by Peter R. Wilson for/
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-244 License No. DPR-18 Enclosure:
NRC Inspection Report No. 0500024412011404 w/Attachment: Supplemental lnformation (coNTAtNS OFFlClAL USE ONLy - SECURTTY- RELATED TNFORMATION (OUO-SR!))
cc w/encl: w/OUO-SRl:
G. Palmer, Director of Security, Ginna Nuclear Power Plant R. Frazier, Assistant Director, NY State Dept of Homeland Security F. Murray, President and CEO New York State Energy Research and Development Authority cc Mo encl: Mo OUO-SRI: Distribution via ListServ Distribution: See next page SUNSI Review Complete: GES (Reviewer's Initials)
Non-Public Designation Category: MD 3.4 Non-Public A.3 ADAMS ACC #ML111750181 DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Security\2011 Draft OUO Reports\Ginna\95001\Ginna 95001 Rev 3.docx After declaring this document "An Official Agency Record" letter will not be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" = Copy with attachmenUenclosure "N" = No DATE 06t21t11
- see previous concurrence OFFICIAL RECORD OFFICIAT USE ENtY SECURIW-REIATED INFERMATION
OFFIClAT USE ONtY SECURITY_REIATED Ii.lFORMATION Distribution w/o encl:wio OUO-SRI: (via e-mail)
W. Dean, RA RI ORAMAIL RESOURCE)
D. Lew, DRA RI ORAMAIL RESOURCE)
D. Roberts, DRP RI ORAMAIL RESOURCE)
J. Clifford, DRP RI DRPMAlL RESOURCE)
C. Miller, DRS RI DRSMAlL RESOURCE)
P. Wilson, DRS RI DRSMAlL RESOURCE)
S. Bush-Goddard, Rl OEDO G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP K. Cronk, DRP N. Floyd, DRP L. Casey, DRP, Rl M. Rose, DRP, OA D. Bearde, DRS RidsNrrPMREGinna Resource RidsNrrDorlLpll -1 Resource ROPreports Resou rce@nrc. gov Distribution w/encl: w/OUO-SRl: (via e-mail)
G. Smith, DRS J. Trapp, DRS G. Hunegs, SRI S. Coker, NSIR C. Johnson, NSIR M. Ernstes, DRS, Rll R. Skokowski, DRS, Rlll E. Byre, DRS, RIV OFFIClALUSE EN tY - SEE U RITY-REIATED IN FORMATION