November 10, 2020

Mr. Bryan C. Hanson

Senior Vice President

Exelon Generation Company, LLC

President and Chief Nuclear Officer

Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT, LLC - INTEGRATED INSPECTION

REPORT 05000244/2020003

Dear Mr. Hanson:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at R. E. Ginna Nuclear Power Plant, LLC. On October 16, 2020, the NRC inspectors

discussed the results of this inspection with Mr. Paul Swift, Site Vice President and other

members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

X /RA/

Signed by: Erin E. Carfang

Erin E. Carfang, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Docket No. 05000244

License No. DPR-18

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

ML20315A368

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE R1/DRP

R1/DRP

R1/DRP

NAME

Jschussler/via email

CLally/via email

ECarfang/via email

DATE

11/09/2020

11/09/2020

11/10/2020

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000244

License Number:

DPR-18

Report Number:

05000244/2020003

Enterprise Identifier: I-2020-003-0041

Licensee:

Exelon Generation Company, LLC

Facility:

R. E. Ginna Nuclear Power Plant, LLC

Location:

Ontario, New York

Inspection Dates:

July 1, 2020 to September 30, 2020

Inspectors:

J. Schussler, Senior Resident Inspector

S. Monarque, Resident Inspector

J. DeBoer, Reactor Inspector

S. Elkhiamy, Operations Engineer

J. Rady, Emergency Preparedness Inspector

J. Schoppy, Senior Reactor Inspector

S. Shaffer, Senior Health Physicist

Approved By:

Erin E. Carfang, Chief

Reactor Projects Branch 1

Division of Reactor Projects

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at R. E. Ginna Nuclear Power Plant, LLC,

in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the

NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer

to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

3

PLANT STATUS

Ginna began the inspection period at 100 percent power. The unit remained at, or near, 100

percent power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess licensee performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President

of the United States on the public health risks of the coronavirus (COVID-19), resident and

regional inspectors were directed to begin telework and to remotely access licensee information

using available technology. During this time the resident inspectors performed periodic site

visits each week, increasing the amount of time on site as local COVID-19 conditions

permitted. As part of their onsite activities, resident inspectors conducted plant status activities

as described in IMC 2515, Appendix D; observed risk significant activities; and completed on

site portions of IPs. In addition, resident and regional baseline inspections were evaluated to

determine if all or portion of the objectives and requirements stated in the IP could be performed

remotely. If the inspections could be performed remotely, they were conducted per the

applicable IP. In some cases, portions of an IP were completed remotely and on site. The

inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1)

'B' service water system alignment following scheduled surveillance testing

September 29, 2020

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a

walkdown and performing a review to verify program compliance, equipment functionality,

material condition, and operational readiness of the following fire areas:

(1)

Turbine building main feedwater pump room on July 23, 2020

(2)

Control room air handling room on August 6, 2020

4

(3)

Walkdown of fire piping systems S13, S24, S12, S24, and S38 on September 24,

2020

(4)

Technical support center on September 25, 2020

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections of:

(1)

Door gaskets to 'B' battery and 'B' emergency diesel generator rooms on July 22,

2020

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1)

Residual heat recovery 'B' heat exchanger on August 21, 2020

71111.07T - Heat Sink Performance

Triennial Review (IP Section 03.02) (4 Samples)

The inspectors evaluated heat exchanger/sink performance on the following on August 21,

2020:

(1)

'B' emergency diesel generator lube oil cooler heat exchanger, cooled by service

water

(2)

'B' emergency diesel generator jacket water heat exchanger, cooled by service water

(3)

'B' spent fuel pool heat exchanger, cooled by service water

(4)

'B' containment recirculating fan cooler heat exchanger, cooled by service water

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

(1)

The inspectors observed and evaluated licensed operator performance and

procedure use and adherence in the main control room following an eight inch fire

water pipe fitting failure that caused water to partly fill the condenser pit on

September 3, 2020 and observed reactor power reduction for a planned turbine

driven auxiliary feedwater surveillance and test performance on September 22, 2020

5

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1)

The inspectors observed and evaluated licensed operator performance in the

simulator during licensed operator re-qualification training on September 3, 2020. The

training involved a scenario that contained, but was not limited to, a chemical volume

control system leak in the reactor coolant letdown line, a loss of one offsite circuit, a

steam generator tube leak, and safety injection pump failures.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (3 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following

structures, systems, and components remain capable of performing their intended function:

(1)

'D' standby auxiliary feedwater system on August 7, 2020

(2)

Alternating current and direct current distribution system, breaker 52/MMC1G1 failure

to transfer bus 18 480v loads to safety related equipment, maintenance rule action

plan on August 14, 2020

(3)

Service air compressor system 11/12, maintenance rule action plan on

September 28, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (8 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the

following planned and emergent work activities to ensure configuration changes and

appropriate work controls were addressed:

(1)

Elevated risk, (yellow), during planned maintenance of 'B' emergency diesel

generator air roll and replacement of 'B' battery room door gasket on July 1, 2020

(2)

Elevated risk, (yellow), during planned maintenance of service air compressor, dryer,

and relief valves on July 6, 2020

(3)

Elevated risk, (yellow), during planned maintenance of 'C' standby auxiliary feedwater

pump system on August 11, 2020

(4)

Elevated risk, (yellow), during planned quarterly testing of 'A' residual heat removal

pump on September 1, 2020

(5)

Elevated risk, (green), during unplanned maintenance of 'B' motor driven auxiliary

feedwater lube oil cooler service water system flush on September 14, 2020

(6)

Elevated risk, (green), during unplanned maintenance of turbine driven auxiliary

feedwater steam admission line visual inspection for pipe integrity on September 25,

2020

(7)

Elevated risk, (green), during unplanned maintenance of fire system S04 pipe failure

and associated replacement on September 25, 2020

(8)

Elevated risk, (action green), during planned maintenance of the 'B' control room

emergency air treatment system cooling system on September 28, 2020

6

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the

following operability determinations and functionality assessments:

(1)

OPEVAL-20-004 microprocessor rod position indication subsystem 1 DC power

supply failure PS2 on August 20, 2020

(2)

'A' steam generator level transmitter 461 instrument deviation on August 24, 2020

(3)

Service water hanger SWU-164 loose turnbuckle on September 22, 2020

71111.17T - Evaluations of Changes, Tests, and Experiments

Sample Selection (IP Section 02.01) (28 Samples)

The inspectors reviewed the following evaluations, screenings, and/or applicability

determinations for 10 CFR 50.59 from September 14 through September 18, 2020.

(1)

A-2018-007, P-15.54, Diesel air compressor procedure to start, stop, ensure correct

configuration control and monitor the compressors, dated February 1, 2018

(2)

A-2018-049, Increase the residual heat removal pump motor bearing oil temperature

operating temperature range, dated September 12, 2018

(3)

A-2018-051, Raise spent fuel pool pump/motor temperature limits, dated

September 19, 2018

(4)

A-2018-069, Revise acceptance criteria of alternate reactor coolant system injection

system flow test, dated December 14, 2018

(5)

A-2019-048, Low screenhouse water level, dated July 29, 2019

(6)

A-2019-064, Technical specification basis change to clarify allowed duration of

emergency diesel generator operation while parallel to the grid, dated October 22,

2019

(7)

A-2020-074, Allow reactor coolant system loop fill with refueling water purification

pump, dated April 17, 2020

(8)

B-2017-049, NFPA 805 Modification to reduce likelihood of spurious actuation of

standby auxiliary feedwater valves, dated March 23, 2018

(9)

B-2018-002, Auxiliary building high energy line break requirements, dated

January 23, 2018

(10)

B-2018-005, Tornado missile protection structural barriers, dated February 14, 2018

(11)

B-2018-020, Guidance for withdrawal rates after prolonged 'D' bank insertion in R.E.

Ginna Cycle 40, dated April 20, 2018

(12)

B-2018-052, Equivalent change to allow use of either element of dual element RTD

TE-410A for reactor coolant loop 'B' leg temperature, dated October 17, 2018

(13)

B-2018-053, Manipulator crane overload/underload setpoints increase to +/- 200lbs,

dated October 22, 2018

(14)

B-2018-055, Permanent scaffolds inside containment for temporary lead shielding,

dated October 24, 2018

(15)

B-2019-007, TSB change to revise B 3.8.9 and B 3.8.10 for minimum DC system

voltage to be 129 VDC, dated February 26, 2019

(16)

B-2019-009, MSSV setpoint tolerance change, dated March 11, 2020

(17)

B-2019-014, Turbine driven auxiliary feedwater instrumentation upgrade, dated

June 26, 2019

7

(18)

B-2019-015, Newly identified SSCs in scope of license renewal, section 18.1.3

update, dated April 3, 2019

(19)

B-2019-040, Permanently maintain the open phase in an alarm only configuration in

accordance with Revision 3 of the NEI Voluntary Industry Initiative, dated

December 12, 2019

(20)

B-2020-007, Design change to resolve resonant condition on turbine driven auxiliary

feedwater pump turbine, dated May 11, 2020

(21)

B-2020-013, Disconnect pressurizer heater 28, dated May 10, 2020

(22)

B-2020-0014, Swap F12 and H13 CET trains, dated May 10, 2020

(23)

B-2020-0015, PCTCC to defeat the zirconium guide tube trip function in PT-34.0,

dated May 8, 2020

(24)

C-2017-004, Change valve 9080 from normal closed to normal open, dated

December 1, 2017

(25)

C-2018-001, Retire AVT area radiation monitors R-23, R-24, R-25, R27 and R-28,

dated May 17, 2018

(26)

C-2018-002, Remove all remaining intake heaters from the intake structure, dated

June 21, 2018

(27)

C-2018-004, AMSAC Actuation Logic (STP-O-R-21 Test interval Extension -

Technical Requirements Manual change: TSR 3.4.3.6 change required frequency

from 18 months to 36 months, dated October 19, 2018

(28)

C-2019-001, Compensatory measure to tagout 738A switch and allow local operation

only, dated March 18, 2019

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post maintenance test activities to verify system

operability and functionality:

(1)

Inservice test for residual heat removal suction valves, motor operated valve 851,

following planned maintenance on July 7, 2020

(2)

Operational testing of the service air compressor, dryer, and relief valves, following

planned maintenance on July 16, 2020

(3)

'C' standby auxiliary feedwater pump, comprehensive test, valve and modification,

following planned maintenance on July 16, 2020

(4)

NFPA 805 diesel generator operational test, following planned maintenance on

August 26, 2020

(5)

Standby auxiliary feed water pump diesel generator operational test, following

planned maintenance on August 27, 2020

(6)

Operational testing of the instrument air compressor and relief valve, following

planned maintenance on September 8, 2020

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01) (4 Samples)

(1)

STP-O-36Q-D, 'D' standby auxiliary feedwater pump quarterly test on July 28, 2020

(2)

STP-O-12.2, 'B' emergency diesel generator monthly test on August 28, 2020

8

(3)

STP-O-R-20, 'B' emergency diesel generator auto start undervoltage logic test on

September 30, 2020

(4)

STP-O-16QT, auxiliary feedwater turbine driven pump quarterly test on

September 30, 2020

Inservice Testing (IP Section 03.01) (1 Sample)

(1)

STP-O-3-COMP-B, 'B' containment spray pump comprehensive test on

September 15, 2020

FLEX Testing (IP Section 03.02) (1 Sample)

(1)

STP-O-40.1C, beyond design basis flex pump PBD01C periodic test on

September 10, 2020

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1)

The inspectors evaluated Exelon's maintenance and testing of the Ginna alert and

notification system on July 27-30, 2020, for the period of July 2018 through June

2020

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1)

The inspectors evaluated the readiness of Exelon's Emergency Preparedness

Organization on July 27-30, 2020

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1)

The inspectors evaluated the following submitted Emergency Action Level and

Emergency Plan changes onsite on July 27-30, 2020. The NRC notes that this

evaluation does not constitute NRC approval.

Evaluation No.: 19-65, EP-AA-1000, Exelon Nuclear Standardized

Radiological Emergency Plan, Revision 32

Evaluation No.: 19-84, EP-AA-1000, Exelon Nuclear Standardized

Radiological Emergency Plan, Revision 33

Evaluation No.: 19-89, EP-AA-1012, Exelon Nuclear Radiological Emergency

Plan Annex for Ginna Station, Revision 8

Evaluation No.: 19-90, EP-AA-1012, Addendum 1, Rev 1, R. E. Ginna Nuclear

Power Plant On-Shift Staffing Technical Basis, Revision 1

9

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1)

The inspectors evaluated the maintenance of the emergency preparedness program

on July 27-30, 2020, for the period of July 2018 through June 2020

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)

(1 Sample)

(1)

The inspectors evaluated an emergency drill in the simulator control room and

emergency offsite facility involving an Alert, Site Area Emergency, and General

Emergency declaration due to a scenario which contained, but was not limited to, a

loss of reactor vessel inventory affecting fuel clad with containment challenged on

July 14, 2020

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated a simulator drill involving an Unusual Event, Alert, Site Area

Emergency, and General Emergency declaration due to a scenario which contained,

but as not limited to, a loss of coolant accident and a loss of reactor coolant system

barrier with a potential containment barrier on August 25, 2020

RADIATION SAFETY

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Radioactive Material Storage (IP Section 03.01) (2 Samples)

(1)

Inspectors evaluated the licensees performance in controlling, labeling and securing

radioactive materials in the radioactive waste yard east

(2)

Inspectors evaluated the licensees performance in controlling, labelling and securing

radioactive materials in the steam generator mausoleum

Radioactive Waste System Walkdown (IP Section 03.02 (2 Samples)

(1)

Inspectors walked down accessible portions of the solid radioactive waste handling

system and evaluated system configuration and functionality

(2)

Inspectors walked down accessible portions of the liquid radioactive waste systems

and evaluated system configuration and functionality

Waste Characterization and Classification (IP Section 03.03) (2 Samples)

(1)

The inspectors evaluated the licensees characterization and classification of

radioactive waste in spent resin sample identification number 2019-227SA analyzed

on October 15, 2019

10

(2)

The inspectors evaluated the licensees characterization and classification of

radioactive waste in dry active waste sample identification number 2018-189SA

analyzed on December 11, 2018

Shipment Preparation (IP Section 03.04) (1 Sample)

(1)

The inspectors reviewed the records for shipment packaging, surveying, labeling,

placarding, vehicle surveys, emergency instructions, manifests, and shipping papers

provided to the driver

Shipping Records (IP Section 03.05) (4 Samples)

The inspectors evaluated the following non-excepted radioactive material shipments through

a record review:

(1)

The inspectors reviewed the shipping records for shipment 2018-054 shipped on

August 23, 2018

(2)

The inspectors reviewed the shipping records for shipment 2018-092 shipped on

November 9, 2018

(3)

The inspectors reviewed the shipping records for shipment 2019-020 shipped on

March 25, 2019

(4)

The inspectors reviewed the shipping records for shipment 2019-049 shipped on

July 31, 2019

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12) (1 Sample)

(1)

Submitted data from April 1, 2019 - March 31, 2020

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1)

Submitted data from April 1, 2019 - March 31, 2020

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1)

Submitted data from April 1, 2019 - March 31, 2020

MS06: Emergency AC Power Systems (IP Section 02.05) (1 Sample)

(1)

Submitted data from July 1, 2019 - June 30, 2020

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1)

Submitted data from July 1, 2019 - June 30, 2020

11

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1)

Submitted data from July 1, 2019 - June 30, 2020

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1)

Submitted data from July 1, 2019 - June 30, 2020

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1)

Submitted data from July 1, 2019 - June 30, 2020

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1)

The inspectors reviewed licensee submittals for the occupational radiological

occurrences PI for the fourth quarter 2019 through the third quarter of 2020

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual

Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample

(IP Section 02.16) (1 Sample)

(1)

The inspectors reviewed licensee submittals for the radiological effluent TS/ODCM

radiological effluent occurrence PI for the fourth quarter 2019 through the third

quarter of 2020

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issues:

(1)

Control room emergency air treatment system, IR 04351801, on September 10, 2020

INSPECTION RESULTS

Observation: 'B' Control room emergency air treatment system filter failure

71152

The inspectors reviewed Exelons corrective action program evaluation, work orders, extent

of condition reviews, and corrective actions associated with the B train of the control room

emergency air treatment system charcoal filter efficiency failure. Exelon entered this issue

into their corrective action program as IR 04351801, specifically the charcoal filter efficiency

results for the B train of the control room emergency air treatment system were below the

Technical Specification 3.7.9 surveillance requirements, detailed in section 5.5.10. The

inspectors assessed Exelons problem identification threshold, causal analysis, prioritization,

and timeliness of corrective actions to determine whether Exelon had taken timely and

appropriate corrective actions.

The inspectors observed that Exelon performed a thorough review of the issue and

determined the cause of the sample efficiency failure to meet the acceptance criteria was due

to contamination of the sample. Exelons immediate corrective actions were to declare the

system inoperable and enter the applicable technical specification action statement. Exelon

12

completed evacuation of the existing charcoal and replaced the charcoal particulate with new

material. Additional corrective actions are long term and appear to be appropriate and

commensurate with the significance which include increased sample quantity and a review of

the efficiency acceptance criteria.

Exelon also performed additional testing of the removed charcoal to aid in determining the

failure cause. These samples were determined to meet acceptance criteria. Through the

corrective action program evaluation document, Exelon concluded the removed charcoal

would have met the efficiency requirements and the error was either contamination during

testing or sample retrieval. Furthermore, Exelon notes specific conclusion of cause is unlikely

because the samples are destroyed during the testing process.

The inspectors independently reviewed the testing data, requirements, and methodology. At

the time of Exelons immediate correction actions, the inspectors observed the in-field

activities to replace the charcoal particulate. During this time, the inspectors also observed

how Exelon accomplished the sample retrieval process. Additionally, the inspectors reviewed

work orders and efficiency trends dating back to 2007 to identify adverse trends. Lastly, the

inspectors independently reviewed Exelons conclusion and technical basis that the efficiency

of the removed charcoal would have met performance requirements outlined in the plants

technical specification. The inspectors determined that Exelons actions in identifying and

resolving the issue was appropriate and timely and commensurate with the safety

significance. The inspectors independently evaluated the deficiencies noted above for

significance in accordance with the guidance in IMC 0612, Appendix B, Issue Screening,

and Appendix E, Examples of Minor Issues. The inspectors determined that none of the

conditions were deficiencies of greater than minor significance and, therefore, are not subject

to enforcement action in accordance with the NRCs Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 30, 2020, the inspectors presented the Emergency Preparedness Program

inspection results to Mr. Paul Swift, Site Vice President and other members of the

licensee staff.

On August 21, 2020, the inspectors presented the Triennial Heat Sink inspection results

to Mr. Paul Swift, Site Vice President and other members of the licensee staff.

On September 18, 2020, the inspectors presented the Triennial 50.59 Team inspection

results to Mr. Paul Swift, Site Vice President and other members of the licensee staff.

On October 16, 2020, the inspectors presented the integrated inspection results to

Mr. Paul Swift, Site Vice President and other members of the licensee staff.

13

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Procedures

STP-O-30.8

Service Water System Valve Position Verification

Revision 002

71111.05

Corrective Action

Documents

Resulting from

Inspection

AR 04372590

Corrosion at Threaded Fitting downstream of Diesel Generator

Preaction System S13 Isolation Valve V-5230

09/28/2020

AR 04372603

Corrosion at Threaded Fitting Upstream of 5216K

09/28/2020

71111.06

Work Orders

C93709104

Perform Visual Inspection/Replacement - Door Neoprene

Gaskets (B Train)

06/29/2020

71111.07A Work Orders

C93690133

EAC02B Clean, Inspect, and Eddy Current Tube Side of Heat

Exchanger

03/25/2020

71111.07T Miscellaneous

ER-AA-340-1002

EDG "B" Jacket Water Heat Exchanger Inspection Report

11/26/2018

71111.12

Corrective Action

Documents

AR 04341255

AOV4270 and AOV 4272 did not close during testing

05/05/2020

AR 04344709

SAC trip on Motor Overload

05/20/2020

71111.15

Corrective Action

Documents

AR 04358711

A Steam Generator level Transmitter LT-461 deviation

07/24/2020

Work Orders

C93451228

Contingency Repair/Replace Steam Generator Level

Transmitter

07/24/2020

71111.17T Corrective Action

Documents

AR 04034735

50.59 Self Assessment Screen not Performed within 90 days

07/24/2017

AR 04056448

AD-AA-101-F-01 not filled correctly

09/27/2017

AR 04057261

Follow up actions from 50.59 inspection

09/29/2017

AR 04092244

'A' Auxiliary feed water pump motor high temp during test

01/10/2018

AR 04214360

Entered ER-SC.3 due to screenhouse level lowering 6 inches

01/27/2019

AR 04226929

NRC identified 50.59 screen/eval not performed for 738A OP

03/06/2019

AR 04347695

Pipe blockage upstream of 4516

06/03/2020

Corrective Action

Documents

Resulting from

Inspection

AR 04370151

NRC 50.59 Inspection non-conformance not entered into CAP

09/17/2020

IR 04370150

NRC 50.59 Inspection lack design control for CETS

09/17/20

Procedures

LS-AA-104-1000

Exelon 50.59 Resource Manual

Revision 14

71111.19

Corrective Action

Documents

Resulting from

Inspection

AR 0435999

WO C93690133 field copy data not transferred to Master

07/30/2020

AR 04364457

NRC Identified - Fuel Oil Weepage found on KDG08

08/20/2020

14

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procedures

STP-O-2.3.3

Inservice Test of RHR Suction Valves

Revision

00001

STP-O-36-

COMP-C

Standby Auxiliary Feedwater Pump C - Comprehensive Test

Revision 021

STP-O-40.4

SAFW Diesel Generator (KDG08) Run Test

Revision 012

STP-O-40.5

NFPA Diesel Generator (KDG09) Run Test

Revision 011

Work Orders

699555

Replace service air filter to demineralizer mixed bed resin

vessels (FSA02)

07/06/2020

C93665383

Stroke the following Valves 7001D, 7001I, 7001J, 7001P,

7001T, 7000D, 7000E, 7000F, 7000G

07/06/2020

C93686385

Replace Motor for 851B RHR Pump Suction Valve from

Containment Sump B

04/08/2020

C93708985

Perform Instrument Air Compressor CIA02C Maintenance

07/23/2020

C93710361

Service Air Compressor Receiver Relief Valves

7/6/2020

C93711063

Annual Preventive Maintenance for Service Air Compressor

Dryer (TSA01A and TSA01B)

07/06/2020

C93711915

Perform Service Air Dryer Annual or 4 Year Preventive

Maintenance

07/06/2020

C93714754

Annual Maintenance on Diesel Generator KDG09 650 Kw

Load Run

8/18/2020

C93714763

Annual Maintenance on SAFW DG KDG08 and 650 kw Load

Run

08/17/2020

C93747333

Perform Corrective Maintenance on SMB-00 Motor Operator

for OP/851B Pump Suction

4/8/2020

C93749868

Perform Repairs o OP/851B RHR Pump Suction Valve

Actuator and Control Circuitry

5/3/2020

C93750631

RV-8302 Swap Out with Pre-Tested Spare and Test Removed

Valve

07/24/2020

71111.22

Procedures

STP-O-36Q-D

Standby Auxiliary Feedwater Pump D - Quarterly

Revision 020

STP-O-R-20

Diesel Generator B - Auto Start Undervoltage Logic Test

Revision 007

71114.02

Corrective Action

Documents

AR 04180998

Siren 82 indicated a communication issue on evening poll

10/07/2018

AR 04317551

Siren 18 indicated a no response during evening poll

02/13/2020

Miscellaneous

Design Report

R. E. Ginna Nuclear Power Station Site-Specific Offsite

February 26,

15

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Radiological Emergency Preparedness Alert and Notification

System Quality Assurance

1986

71114.03

Miscellaneous

EP-AA-1000

Exelon Nuclear Standardized Radiological Emergency Plan

Revision 33

EP-AA-1012

Exelon Nuclear Radiological Emergency Plan Annex for Ginna

Station

Revision 8

EP-AA-1012

Addendum 1

R. E. Ginna Nuclear Power Plant On-Shift Staffing Technical

Basis

Revision 1

71114.04

Miscellaneous

EP-AA-120-1001

10 CFR 50.54(q) Change Evaluation

Revision 10

71114.05

Corrective Action

Documents

AR 04214466

150 foot wind direction weather vane damaged

01/28/2019

AR 04248782

OCCRP computer sign on = 12 minutes impact

05/14/2019

Corrective Action

Documents

Resulting from

Inspection

AR 04359748

NRC EP program inspection - EP equipment removed from

either procedure

07/29/2020

Miscellaneous

EP-AA-121-F-12

Ginna Equipment Matrix

Revision 1