IR 05000244/2021401
| ML21183A049 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/02/2021 |
| From: | Fred Bower NRC Region 1 |
| To: | Rhoades D Exelon Generation Co, Exelon Nuclear |
| References | |
| IR 2021401 | |
| Download: ML21183A049 (9) | |
Text
July 2, 2021
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000244/2021401
Dear Mr. Rhoades:
On June 24, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R. E. Ginna Nuclear Power Plant and discussed the results of this inspection with Mr. Daren Blankenship, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Fred L. Bower, III, Chief Security, Emergency Preparedness and and Incident Response Branch Division of Radiological Safety and Security
Docket No. 05000244 License No. DPR-18
Enclosure:
As stated
Inspection Report
Docket Number:
05000244
License Number:
Report Number:
Enterprise Identifier: I-2021-401-0077
Licensee:
Exelon Generation Company, LLC
Facility:
R. E. Ginna Nuclear Power Plant
Location:
Ontario, NY
Inspection Dates:
June 21, 2021 to June 24, 2021
Inspectors:
K. Hussar, Senior Physical Security Inspector
D. Caron, Senior Physical Security Inspector
S. McCarver, Physical Security Inspector
J. Rey, Physical Security Inspector
M. Ordoyne, Physical Security Inspector (Training)
T. Eck, Physical Security Inspector (Training)
Approved By:
Fred L. Bower, III, Chief
Security, Emergency Preparedness and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at R. E. Ginna Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
In response to the COVID-19 Public Health Emergency declared on January 31, 2020, by the Secretary of the United States Department of Health and Human Services on the public health risks of the coronavirus, R. E. Ginna Nuclear Power Plant pursued an exemption to security officer training and requalification requirements (ML20330A291). In addition to these exemptions, licensees implemented additional actions or alternatives allowed in response to health concerns within existing regulatory guidance available in RG 5.75 to ensure annual Force on Force exercises were conducted as safely as possible while maintaining the requirements to simulate as closely as practicable site specific conditions and minimizing the number and effects of artificialities associated with these exercises (Part 73, Appendix B, VI.C.3)
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: 14 Requirements (02.06 a - d, 02.07 a, 02.08 a - i)
- Tier III: 1 Requirement (02.09)
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following inspection elements:
Protective Strategy Evaluation (2 Samples)
(1)
- Tier I: All Requirements
- Tier II: 18 Requirements (02.05 a, 02.06 a, d, e - n, 02.07 a-e)
- Tier III: 4 Requirements (02.08, 02.09 a, 02.10 a, 02.11 a)
- (2) The inspectors evaluated the Security Performance Evaluation Program.
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following inspection elements:
Review Security Plan Changes (IP Section 02.01) (1 Sample)
- (1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan (PSP) change in accordance with Title 10 of the Code of Federal Regulations 10 CFR 50.54(p)(2) since the last performance of this IP and PSP Revision 12 remains current.
71130.14 - Review of Power Reactor Target Sets
The inspectors evaluated the security target set program through completion of the following inspection elements:
Review of Power Reactor Target Sets (1 Sample)
- (1) 02.01, 02.02 a - e, 02.04 a, b,
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) (1 Sample)
- (1) April 1, 2020 through April 30,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 24, 2021, the inspectors presented the security baseline inspection results to Mr. Daren Blankenship, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
4358311
4382405
4386032
4387156
4392014
4401267
4411176
4417193
21897
26006
Corrective Action
Documents
Resulting from
Inspection
4430840
4430846
4431006
Procedures
Control and Classification of Safeguards Information (SGI)
and Sensitive Unclassified Non-Safeguards Information
(SUNSI)
Revision 22
Exelon Security Search Processes
Revision 37
SY-AA-101-112-
1004
Protected Area Search Processes
Revision 4
SY-AA-101-112-
1005
Owner Controlled Area Inspection Processes
Revision 2
SY-AA-101-112-
F-06
PA Entry - Vehicle Search
Revision 9
Processing and Escorting or Personnel and Vehicles
Revision 32
Control of Security Access Control Devices
Revision 9
Security Assessment and Response to Unusual Activities
Revision 34
SY-GI-101-119
Ginna OCA Warehouse Search Activities
Revision 008
SY-GI-101-119-F-
Material Search Officer Checklist
Revision 007
SY-GI-101-119-F-
Vehicle Escort Officer Checklist
Revision 002
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calculations
CALC No. 2013-
S-017
LLEA Resource Response Times and Agreements
2/05/2021
CALC No. DA-
CE-16-003
Ginna Security Composite Blast Analysis 2016
Revision 0
CALC No. DA-
CE-16-004
Ginna Security Active Vehicle Barrier Analysis 2016
Revision 0
DOC. REF. #
2014-S-007
Analysis of Underground Pathways Intersecting PA
Boundaries
01/17/2014
Corrective Action
Documents
Resulting from
Inspection
4431294
4431214
Procedures
SY-GI-101-501
Station Security Defensive Strategy Procedure
Revision 12
Corrective Action
Documents
4401267
Procedures
ER-SEC.2
Response to Intrusion by Adversary
Revision
00702.01
O-2.3.1
Draining and Operation at Reduced Inventory of the Reactor
Coolant System
Revision 092
Safety/Security Interface
Revision 007
SY-GI-101-502-
1001
Target Set Identification Process
Revision 0
71151
Miscellaneous
Monthly Performance Indicator Data