R. E. Ginna Nuclear Power Plant: Security Baseline Inspection Report 05000244/2021401
ML21183A049
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/02/2021
From: Fred Bower
NRC Region 1
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
IR 2021401
Download: ML21183A049 (9)


Text

July 2, 2021

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000244/2021401

Dear Mr. Rhoades:

On June 24, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R. E. Ginna Nuclear Power Plant and discussed the results of this inspection with Mr. Daren Blankenship, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Fred L. Bower, III, Chief Security, Emergency Preparedness and and Incident Response Branch Division of Radiological Safety and Security

Docket No. 05000244 License No. DPR-18

Enclosure:

As stated

Inspection Report

Docket Number:

05000244

License Number:

DPR-18

Report Number:

05000244/2021401

Enterprise Identifier: I-2021-401-0077

Licensee:

Exelon Generation Company, LLC

Facility:

R. E. Ginna Nuclear Power Plant

Location:

Ontario, NY

Inspection Dates:

June 21, 2021 to June 24, 2021

Inspectors:

K. Hussar, Senior Physical Security Inspector

D. Caron, Senior Physical Security Inspector

S. McCarver, Physical Security Inspector

J. Rey, Physical Security Inspector

M. Ordoyne, Physical Security Inspector (Training)

T. Eck, Physical Security Inspector (Training)

Approved By:

Fred L. Bower, III, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at R. E. Ginna Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

In response to the COVID-19 Public Health Emergency declared on January 31, 2020, by the Secretary of the United States Department of Health and Human Services on the public health risks of the coronavirus, R. E. Ginna Nuclear Power Plant pursued an exemption to security officer training and requalification requirements (ML20330A291). In addition to these exemptions, licensees implemented additional actions or alternatives allowed in response to health concerns within existing regulatory guidance available in RG 5.75 to ensure annual Force on Force exercises were conducted as safely as possible while maintaining the requirements to simulate as closely as practicable site specific conditions and minimizing the number and effects of artificialities associated with these exercises (Part 73, Appendix B, VI.C.3)

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 14 Requirements (02.06 a - d, 02.07 a, 02.08 a - i)
  • Tier III: 1 Requirement (02.09)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following inspection elements:

Protective Strategy Evaluation (2 Samples)

(1)

  • Tier I: All Requirements
  • Tier II: 18 Requirements (02.05 a, 02.06 a, d, e - n, 02.07 a-e)
  • Tier III: 4 Requirements (02.08, 02.09 a, 02.10 a, 02.11 a)
(2) The inspectors evaluated the Security Performance Evaluation Program.

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following inspection elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan (PSP) change in accordance with Title 10 of the Code of Federal Regulations 10 CFR 50.54(p)(2) since the last performance of this IP and PSP Revision 12 remains current.

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the security target set program through completion of the following inspection elements:

Review of Power Reactor Target Sets (1 Sample)

(1) 02.01, 02.02 a - e, 02.04 a, b,

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) (1 Sample)

(1) April 1, 2020 through April 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 24, 2021, the inspectors presented the security baseline inspection results to Mr. Daren Blankenship, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

4358311

4382405

4386032

4387156

4392014

4401267

4411176

4417193

21897

26006

Corrective Action

Documents

Resulting from

Inspection

4430840

4430846

4431006

Procedures

SY-AA-101-106

Control and Classification of Safeguards Information (SGI)

and Sensitive Unclassified Non-Safeguards Information

(SUNSI)

Revision 22

SY-AA-101-112

Exelon Security Search Processes

Revision 37

SY-AA-101-112-

1004

Protected Area Search Processes

Revision 4

SY-AA-101-112-

1005

Owner Controlled Area Inspection Processes

Revision 2

SY-AA-101-112-

F-06

PA Entry - Vehicle Search

Revision 9

SY-AA-101-117

Processing and Escorting or Personnel and Vehicles

Revision 32

SY-AA-101-120

Control of Security Access Control Devices

Revision 9

SY-AA-101-132

Security Assessment and Response to Unusual Activities

Revision 34

SY-GI-101-119

Ginna OCA Warehouse Search Activities

Revision 008

SY-GI-101-119-F-

Material Search Officer Checklist

Revision 007

SY-GI-101-119-F-

Vehicle Escort Officer Checklist

Revision 002

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.05

Calculations

CALC No. 2013-

S-017

LLEA Resource Response Times and Agreements

2/05/2021

CALC No. DA-

CE-16-003

Ginna Security Composite Blast Analysis 2016

Revision 0

CALC No. DA-

CE-16-004

Ginna Security Active Vehicle Barrier Analysis 2016

Revision 0

DOC. REF. #

2014-S-007

Analysis of Underground Pathways Intersecting PA

Boundaries

01/17/2014

Corrective Action

Documents

Resulting from

Inspection

4431294

4431214

Procedures

SY-GI-101-501

Station Security Defensive Strategy Procedure

Revision 12

71130.14

Corrective Action

Documents

4401267

Procedures

ER-SEC.2

Response to Intrusion by Adversary

Revision

00702.01

O-2.3.1

Draining and Operation at Reduced Inventory of the Reactor

Coolant System

Revision 092

SY-AA-500-127

Safety/Security Interface

Revision 007

SY-GI-101-502-

1001

Target Set Identification Process

Revision 0

71151

Miscellaneous

Monthly Performance Indicator Data