ML22160A396
| ML22160A396 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 06/09/2022 |
| From: | Erin Carfang Division of Operating Reactors |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| Carfang E | |
| References | |
| IR 2022010 | |
| Download: ML22160A396 (6) | |
See also: IR 05000244/2022010
Text
June 9, 2022
Mr. David P. Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
R.E. GINNA NUCLEAR POWER PLANT, LLC - REQUEST FOR
INFORMATION FOR A BIENNIAL PROBLEM IDENTIFICATION AND
RESOLUTION INSPECTION; INSPECTION REPORT 05000244/2022010
Dear Mr. Rhoades:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region I staff will conduct a biennial problem identification and resolution inspection at
R.E. Ginna Nuclear Power Plant, LLC. Niklas Floyd, a Senior Reactor Inspector from the NRCs
Region I office, will lead the inspection team. The inspection will be conducted in accordance
with Inspection Procedure 71152, Problem Identification and Resolution, dated December 14,
2021 (ADAMS Accession No. ML21281A181).
The inspection will assess the effectiveness of your problem identification and resolution (PI&R)
program in identifying, prioritizing, evaluating, and correcting problems, including the use of
operating experience, assessments, and audits. This inspection will also assess your program
for raising concerns under the established safety conscious work environment.
The onsite inspection is scheduled for the weeks of July 25 and August 8, 2022.
In order to minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for information needed for the inspection. It is
important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector by July 7, 2022.
If there are any questions about the inspection or the material requested in the enclosure,
please contact the lead inspector at 610-337-5282 or via e-mail at Niklas.Floyd@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
D. Rhoades
2
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
Erin E. Carfang, Chief
Projects Branch 1
Division of Operating Reactor Safety
Docket No. 50-244
License No. DPR-18
Enclosure:
Request for Information for Biennial
Problem Identification and Resolution
cc: Distribution via ListServ
Erin E.
Carfang
Digitally signed by Erin E.
Carfang
Date: 2022.06.09 12:13:22
-04'00'
x
SUNSI Review
x
Non-Sensitive
Sensitive
x
Publicly Available
Non-Publicly Available
OFFICE
RI/DORS
RI/DORS
NAME
NFloyd
ECarfang
DATE
6/9/22
6/9/22
REQUEST FOR INFORMATION
BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION
Enclosure
Inspection Report: 05000244/2022010
Onsite Inspection Dates:
July 25, through July 29, 2022; and
August 8, through August 12, 2022
Inspection Procedure:
71152, Problem Identification and Resolution,
dated December 14, 2021
Lead Inspector:
Niklas Floyd, Senior Reactor Inspector
610-337-5282
Niklas.Floyd@nrc.gov
The following information is requested by July 7, 2022, or sooner, to facilitate inspection
preparation. The requested information is for the period from March 5, 2020 through July 25,
2022 (Present), which covers the timeframe since the previous problem identification and
resolution (PI&R) inspection. The inspection procedure also specifies a five-year review for a
subset of selected program, system, or component issues. The selected samples for this
five-year review will be provided at a future date.
A bagman trip is currently scheduled for July 11 and 12, 2022. The purpose of this trip is for the
team lead to familiarize their self with the site organization including meetings with department
managers and overview of the corrective action program and to finalize remaining administrative
arrangements for the inspection.
Feel free to contact the lead inspector as soon as possible if you have any questions regarding
this information request. Please provide the information electronically in pdf files, Excel, or
other searchable formats, preferably on an internet database system (e.g., OneDrive) or
portable electronic media (e.g., CD-ROM, DVD, etc.). The files should contain descriptive
names, be indexed, and hyperlinked to facilitate ease of use. Information in lists should
contain enough information to be easily understood by someone who has knowledge of light
water reactor technology.
I.
General
1. Organization charts, phone list, and list of system engineers
2. List of system numbers/designations and a list of system engineers assigned to those
systems.
3. Access to a hardcopy set of system prints (P&IDs) and operator training manuals for the
team room. These will be returned at the end of the inspection.
4. Final Safety Analysis Report (FSAR), Technical Specifications (TS), and Technical
Requirements Manual (TRM) including the bases. Please provide electronically, with
one consolidated file for each of the FSAR, TS, and TRM.
5. Copy of the Quality Assurance Manual and Quality Assurance Topical Report.
6. A schedule of the date/time/location of meetings associated with implementation of the
correction action program such as Plan-of-the-Day, Station Ownership Committee
(SOC), Management Review Committee (MRC), etc.
REQUEST FOR INFORMATION
BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION
2
7. PRA risk-ranking of systems, including a chart with highest risk systems/components.
II.
Corrective Actions
1. Copy of procedures related to the corrective action program, including issue
identification, cause evaluations, corrective actions, trending, self-assessments, audits,
operability determinations, work management, operating experience, etc.
2. List of all corrective action program deficiency reports (IRs, ARs, etc.) initiated after
March 5, 2020 (last PI&R inspection) - in electronic spreadsheet format - include the
following (as applicable): system number/designation, date initiated, significance level,
status (open or closed), title/short description, department, date closed or due, and if
possible, the number of due date extensions.
3. Separate list of all corrective action program documents (IRs, ARs, etc.) initiated before
March 5, 2020 (last PI&R inspection) that remain open - in electronic spreadsheet
format - include the following (as applicable): system number/designation, date initiated,
significance level, status (open or closed), title/short description, department, date
closed or due, and if possible, the number of due date extensions.
4. List of all root cause evaluations (RCE), apparent cause evaluations (ACE), common
cause evaluations (CCE), and work group evaluations (WGE), performed after March 5,
2020 (last PI&R inspection) - include number, title, eval type, and date completed.
5. Matrix of the total number of condition report IRs generated annually and monthly for all
of 2020 and 2021, and to date for 2022 by department.
6. For all notice of violations (NOVs), non-cited violations (NCVs), and findings (FIN) issued
since March 5, 2020 (last PI&R inspection) - provide copies of the associated IRs
including all supporting information such as closeout documentation.
7. For all licensee event reports (LERs) issued since March 5, 2020 (last PI&R inspection)
- provide copies of the associated IRs including all supporting information such as
closeout documentation.
8. List of open temporary modifications, operability determinations, control room
deficiencies and operator workarounds\\challenges, and adverse condition monitoring
plans - in electronic spreadsheet format - include tracking no., system id., title/short
description, date initiated, and date corrective action(s) due / work order(s) scheduled.
9. List of rework and repeat maintenance items, and a list of maintenance performance
metrics including the backlog of corrective and elective maintenance issues - include
tracking no., unit/system id, work order no., title/short description, date initiated, date
corrective action(s) due / work order(s) scheduled, and department.
10. Copies of the system health reports for all (a)(1) systems and all systems pending
maintenance rule expert panel review for (a)(1) status determination.
11. List of all maintenance rule systems, include risk significance of system (high or low) and
whether the system is considered an (a)(1) or (a)(2). The list should indicate the trend in
overall system performance since the last PI&R inspection. For all (a)(1) systems,
please include a copy of the Action Plan and expert panel minutes.
III.
Operating Experience
1. List of operating experience reviews, including Part 21s and NRC generic
communications (i.e. Information Notices, Generic Letters, Bulletins) initiated since the
REQUEST FOR INFORMATION
BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION
3
last PI&R inspection. Provide tracking number, title/short description, date initiated, date
due or closer, significance level, evaluation class/type, status, department, and, if
possible, the number of due date extensions.
2. List of industry operating experience issues (NSSS vendor reports, EPRI Reports, and
OPEX reports from other facilities) entered into the corrective action program for review
since the last PI&R Inspection. Provide tracking number, title/short description, date
initiated, date due or closer, significance level, evaluation class/type, status, department,
and, if possible, the number of due date extensions.
3. Provide list of correction action program tracking items generated as a result of issues
identified during the OE reviews and assessment. Provide tracking number, title/short
description, date initiated, date due or closer, significance level, evaluation class/type,
status, department, and, if possible, the number of due date extensions.
IV.
Audits and Assessments
1. Copy of all QA reviews (audits, assessments, etc.) and self-assessments of the
corrective action program performed since the last PI&R inspection.
2. List of all QA reviews, self-assessments and safety culture reviews since last PI&R
inspection.
3. Copy of the corrective action program trend reports and performance indicators used by
management since the last PI&R inspection.
4. A list of IRs generated as a result of identified trends (either by station or department)
initiated since the last PI&R inspection. Provide IR number, title, and open/closed
status.
5. List of reports or specific issues identified by safety review committees (such as PORC,
NSRB, etc.) or other management oversight mechanisms since the last PI&R inspection.
Indicate whether these items are being tracked in the corrective action program or other
means.
6. Most recent PI&R functional area self-assessment (FASA) that was performed in
preparation for the upcoming PI&R inspection.
7. Hard-copy of last completed INPO evaluation and assistance report. (Will be reviewed
onsite to maintain confidentiality)
V.
Safety Conscious Work Environment and ECP
1. Procedures related to the Employee Concerns Program (ECP).
2. Procedures related to the Safety Conscious Work Environment and the stations
management of related issues.
3. Access to a list of all ECP cases and contacts initiated since the last PI&R inspection.
Include a list of IRs generated as a result of these reviews. (Will be reviewed onsite to
maintain confidentiality)
4. A copy of all safety culture reviews (audits, assessments, surveys, trend review, etc.)
initiated since the last PI&R inspection. Include a list of any NOTFs generated as a
result of these reviews. (Will be reviewed onsite to maintain confidentiality)