ML12104A264: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 04/13/2012 | | issue date = 04/13/2012 | ||
| title = 4/4/12 Summary of Meeting with Omaha Public Power District, Fort Calhoun Station | | title = 4/4/12 Summary of Meeting with Omaha Public Power District, Fort Calhoun Station | ||
| author name = Clark J | | author name = Clark J | ||
| author affiliation = NRC/RGN-IV/DNMS | | author affiliation = NRC/RGN-IV/DNMS | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:April 13, 2012 LICENSEE: Omaha Public Power District (OPPD) | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 April 13, 2012 LICENSEE: Omaha Public Power District (OPPD) | ||
FACILITY: Fort Calhoun Station | FACILITY: Fort Calhoun Station | ||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF APRIL 4, 2012 MEETING WITH OMAHA PUBLIC POWER DISTRICT On April 4, 2012, a Category 1 meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and Omaha Public Power District (OPPD) at Blair High School, 440 North 10th Street, Blair, Nebraska. | OF APRIL 4, 2012 MEETING WITH OMAHA PUBLIC POWER DISTRICT On April 4, 2012, a Category 1 meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and Omaha Public Power District (OPPD) at Blair High School, 440 North 10th Street, Blair, Nebraska. A list of attendees is included as Enclosure 1. | ||
A list of attendees is included as Enclosure 1. The NRC presented an update of issues and oversight activities at Fort Calhoun Station (ADAMS Accession No. ML12102A041). OPPD presented details of the integrated performance improvement plan, plant status, corrective action program updates, and details about the June 2011 electrical fire (ADAMS Accession No. ML12102A043 | The NRC presented an update of issues and oversight activities at Fort Calhoun Station (ADAMS Accession No. ML12102A041). OPPD presented details of the integrated performance improvement plan, plant status, corrective action program updates, and details about the June 2011 electrical fire (ADAMS Accession No. ML12102A043). | ||
). A video of the public meeting | A video of the public meeting, and responses to the questions directed to the NRC, will be posted on the website devoted to the special oversight at Fort Calhoun Station, available at: | ||
, and responses to the questions directed to the NRC | http://www.nrc.gov/info-finder/reactor/fcs/special-oversight.html. | ||
, will be posted on the website devoted to the special oversight at Fort Calhoun Station, available at: http://www.nrc.gov/info | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at: | ||
-finder/reactor/fcs/special | http://www.nrc.gov/readingrm/adams.html. | ||
-oversight.html | To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. | ||
. | CONTACT: Jeff Clark, RIV/DRP (817) 200-1147 Docket No. 50-285 | ||
In accordance with 10 CFR 2.390 of the | |||
To receive a summary of future meetings and other plant | |||
-specific e | |||
-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public | |||
-involve/listserver/plants | |||
-by-region.html Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. | |||
CONTACT: | |||
-285 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Attendees | List of Attendees | ||
Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Tony.Vegel@nrc.gov) DRS Deputy Director (Tom.Blount@nrc.gov) Senior Resident Inspector (John.Kirkland@nrc.gov) Resident Inspector (Jacob.Wingebach@nrc.gov) Branch Chief, DRP (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP (Rick.Deese@nrc.gov) Project Engineer, DRP (Chris.Smith@nrc.gov) | |||
Electronic Distribution by RIV: | |||
Regional Administrator (Elmo.Collins@nrc.gov) | |||
Deputy Regional Administrator (Art.Howell@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | |||
DRP Deputy Director (Troy.Pruett@nrc.gov) | |||
DRS Director (Tony.Vegel@nrc.gov) | |||
DRS Deputy Director (Tom.Blount@nrc.gov) | |||
Senior Resident Inspector (John.Kirkland@nrc.gov) | |||
Resident Inspector (Jacob.Wingebach@nrc.gov) | |||
Branch Chief, DRP (Jeff.Clark@nrc.gov) | |||
Senior Project Engineer, DRP (Rick.Deese@nrc.gov) | |||
Project Engineer, DRP (Chris.Smith@nrc.gov) | |||
Site Administrative Assistant, DRP (Berni.Madison@nrc.gov) | Site Administrative Assistant, DRP (Berni.Madison@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov) | Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov | Regional Counsel (Karla.Fuller@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
Deputy Director, DIRS Office of NRR (John.Lubinski@nrc.gov) | Deputy Director, DIRS Office of NRR (John.Lubinski@nrc.gov) | ||
Branch Chief, PLB IV, DORL Office of NRR (Michael.Markley@nrc.gov) | Branch Chief, PLB IV, DORL Office of NRR (Michael.Markley@nrc.gov) | ||
Project Manager , PLB IV , DORL Office of NRR (Lynnea.Wilkins@nrc.gov) | Project Manager, PLB IV, DORL Office of NRR (Lynnea.Wilkins@nrc.gov) | ||
Reactor Operations | Reactor Operations Engineer, IPAB, DIRS, Office of NRR (Michael.Balazik@nrc.gov) | ||
OEMail Resource OEDO RIV Coordinator, (Michael.McCoppin@nrc.gov) ROPreports S:\DRP\PBF\MC0350\Public Meetings | OEMail Resource OEDO RIV Coordinator, (Michael.McCoppin@nrc.gov) | ||
\4-4-12\FCS MS4-4-12.docx ML0 ADAMS: | ROPreports S:\DRP\PBF\MC0350\Public Meetings\4-4-12\FCS MS4-4-12.docx ML0 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: CS Publicly Available Non-Sensitive Category A. Non-publicly Available Sensitive KEYWORD: 0350 RIV:BC:DRP/F PAO SLO D:DRP JClark VDricks WMaier KKennedy | ||
CS | /RA/ /RA/ /RA/ /RA/ | ||
Non-publicly Available Sensitive KEYWORD: | 4 /12/12 4 /12/12 4 /12/12 4/13/12/ | ||
0350 RIV: BC:DRP/F PAO SLO D:DRP JClark VDricks WMaier KKennedy /RA/ /RA/ /RA/ /RA/ 4 /12/12 | OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax}} |
Latest revision as of 06:01, 12 November 2019
ML12104A264 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 04/13/2012 |
From: | Clark J Division of Nuclear Materials Safety IV |
To: | |
References | |
Download: ML12104A264 (11) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 April 13, 2012 LICENSEE: Omaha Public Power District (OPPD)
FACILITY: Fort Calhoun Station
SUBJECT:
SUMMARY
OF APRIL 4, 2012 MEETING WITH OMAHA PUBLIC POWER DISTRICT On April 4, 2012, a Category 1 meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and Omaha Public Power District (OPPD) at Blair High School, 440 North 10th Street, Blair, Nebraska. A list of attendees is included as Enclosure 1.
The NRC presented an update of issues and oversight activities at Fort Calhoun Station (ADAMS Accession No. ML12102A041). OPPD presented details of the integrated performance improvement plan, plant status, corrective action program updates, and details about the June 2011 electrical fire (ADAMS Accession No. ML12102A043).
A video of the public meeting, and responses to the questions directed to the NRC, will be posted on the website devoted to the special oversight at Fort Calhoun Station, available at:
http://www.nrc.gov/info-finder/reactor/fcs/special-oversight.html.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at:
http://www.nrc.gov/readingrm/adams.html.
To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
CONTACT: Jeff Clark, RIV/DRP (817) 200-1147 Docket No. 50-285
Enclosure:
List of Attendees
Electronic Distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Tony.Vegel@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP (Rick.Deese@nrc.gov)
Project Engineer, DRP (Chris.Smith@nrc.gov)
Site Administrative Assistant, DRP (Berni.Madison@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Deputy Director, DIRS Office of NRR (John.Lubinski@nrc.gov)
Branch Chief, PLB IV, DORL Office of NRR (Michael.Markley@nrc.gov)
Project Manager, PLB IV, DORL Office of NRR (Lynnea.Wilkins@nrc.gov)
Reactor Operations Engineer, IPAB, DIRS, Office of NRR (Michael.Balazik@nrc.gov)
OEMail Resource OEDO RIV Coordinator, (Michael.McCoppin@nrc.gov)
ROPreports S:\DRP\PBF\MC0350\Public Meetings\4-4-12\FCS MS4-4-12.docx ML0 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: CS Publicly Available Non-Sensitive Category A. Non-publicly Available Sensitive KEYWORD: 0350 RIV:BC:DRP/F PAO SLO D:DRP JClark VDricks WMaier KKennedy
/RA/ /RA/ /RA/ /RA/
4 /12/12 4 /12/12 4 /12/12 4/13/12/
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax