IR 05000302/2012403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/17/2012
| issue date = 08/17/2012
| title = IR 05000302-12-403, 7/26/2012, Crystal River Unit 3, Cover Letter
| title = IR 05000302-12-403, 7/26/2012, Crystal River Unit 3, Cover Letter
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Franke J A
| addressee name = Franke J
| addressee affiliation = Progress Energy Florida, Inc
| addressee affiliation = Progress Energy Florida, Inc
| docket = 05000302
| docket = 05000302
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES August 17, 2012
[[Issue date::August 17, 2012]]


Mr. Jon Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708
==SUBJECT:==
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT- NRC SECURITY INSPECTION REPORT 05000302/2012403


SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT- NRC SECURITY INSPECTION REPORT 05000302/2012403
==Dear Mr. Franke:==
On July 26, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Baseline inspection at your Crystal River Nuclear Plant Unit 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.


==Dear Mr. Franke:==
The enclosed Inspection Report documents the inspection results, which were discussed on July 26, 2012, with you and other members of your staff.
On July 26, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Baseline inspection at your Crystal River Nuclear Plant Unit 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed Inspection Report documents the inspection results, which were discussed on July 26, 2012, with you and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Based on the results of this inspection, no findings were identified.


Sincerely,/RA/
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-302 License No. DPR-72


===Enclosure:===
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-302 License No. DPR-72 Enclosure:
Inspection Report 05000302/2012403 w/Att: Supp Info (OUO)
Inspection Report 05000302/2012403 w/Att: Supp Info (OUO)
cc w/encl.: (See page 3)
cc w/encl.: (See page 3) ML12234A686  X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR3 SIGNATURE RA/RP RA/JW By E- RA/BD RA/AT RA/DR Mail NAME R. Patterson J. Wallo B. Desai A. True D. Rich DATE 08/15/2012 08/17/2012 08/16/2012 08/15/2012 08/16/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO 3 cc w/Encl:
Jon Joseph W. Donahue Vice President  Vice President Crystal River Nuclear Plant (NA2C) Nuclear Oversight 15760 West Power Line Street Progress Energy Crystal River, FL 34428-6708 TPP-15 100 E. Davie Street Terry Hobbs  Raleigh, NC 27601 Plant General Manager Crystal River Nuclear Plant (NA2C) Edward T. O'Neil 15760 W. Power Line Street  Director Crystal River, FL 34428-6708 Nuclear Protective Service and Emergency Preparedness Mark Rigsby  Progress Energy Manager, Support Services - Nuclear TPP-15 Crystal River Nuclear Plant (NA2C) 100 East Davie Street 15760 W. Power Line Street  Raleigh, NC 27601 Crystal River, FL 34428-6708 Matthew Widener Daniel R. Westcott  Manager Supervisor  Nuclear Security Licensing & Regulatory Programs Crystal River Nuclear Plant Crystal River Nuclear Plant (NA1B) 15760 West Power Line Street 15760 W. Power Line Street  Crystal River, FL 34428-6708 Crystal River, FL 34428-6708
}}
}}

Latest revision as of 23:31, 11 November 2019

IR 05000302-12-403, 7/26/2012, Crystal River Unit 3, Cover Letter
ML12234A686
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/17/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Franke J
Progress Energy Florida
References
IR-12-403
Download: ML12234A686 (4)


Text

UNITED STATES August 17, 2012

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT- NRC SECURITY INSPECTION REPORT 05000302/2012403

Dear Mr. Franke:

On July 26, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Baseline inspection at your Crystal River Nuclear Plant Unit 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed Inspection Report documents the inspection results, which were discussed on July 26, 2012, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-302 License No. DPR-72 Enclosure:

Inspection Report 05000302/2012403 w/Att: Supp Info (OUO)

cc w/encl.: (See page 3) ML12234A686 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR3 SIGNATURE RA/RP RA/JW By E- RA/BD RA/AT RA/DR Mail NAME R. Patterson J. Wallo B. Desai A. True D. Rich DATE 08/15/2012 08/17/2012 08/16/2012 08/15/2012 08/16/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO 3 cc w/Encl:

Jon Joseph W. Donahue Vice President Vice President Crystal River Nuclear Plant (NA2C) Nuclear Oversight 15760 West Power Line Street Progress Energy Crystal River, FL 34428-6708 TPP-15 100 E. Davie Street Terry Hobbs Raleigh, NC 27601 Plant General Manager Crystal River Nuclear Plant (NA2C) Edward T. O'Neil 15760 W. Power Line Street Director Crystal River, FL 34428-6708 Nuclear Protective Service and Emergency Preparedness Mark Rigsby Progress Energy Manager, Support Services - Nuclear TPP-15 Crystal River Nuclear Plant (NA2C) 100 East Davie Street 15760 W. Power Line Street Raleigh, NC 27601 Crystal River, FL 34428-6708 Matthew Widener Daniel R. Westcott Manager Supervisor Nuclear Security Licensing & Regulatory Programs Crystal River Nuclear Plant Crystal River Nuclear Plant (NA1B) 15760 West Power Line Street 15760 W. Power Line Street Crystal River, FL 34428-6708 Crystal River, FL 34428-6708