ML18142B387: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML18142B387 | | number = ML18142B387 | ||
| issue date = 03/05/1976 | | issue date = 03/05/1976 | ||
| title = | | title = Forwards Monthly Operating Status Report for Month of February 1976 | ||
| author name = Platt C | | author name = Platt C | ||
| author affiliation = Rochester Gas & Electric Corp | | author affiliation = Rochester Gas & Electric Corp | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NRC FqAM 106 | {{#Wiki_filter:NRC FqAM 106 U.S. NUCLEnil BEOULn TOA V COMMiSSiON DOCKET NUMOLll f2-76t SO-244 FILE NUMQFR NFIC DISTRIBUTION FoR PAR vO DOCI<I:-T MATERIAL HONTIILY REPORT FROM. Of HEST R (rA '6 ELEC CORP DATI: Ol: DOCUMENT ROCHESTER, NY 3-5<<76 NRC DATE RECEIVED C E PLATT 3-12-76 QI.ETTEB QNOTOBIZED PROP INPUT FORM NUMIIEB OF COPIES RECEIVED QOA iOINnL QUNCLnSSIFiED QCOPV 1 signed DESCRIPTION ENCLOSURF LETTER TRANS THE FOLLO>nNG: HOATIILY REPORT FOR FEBRUARY 1976 PLANT 6 COHPONENT OPERABILXTY 6c AVAILABILITY'HISREPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS 6 OPERATXONS. | ||
PLANT NAHE:. QxAAA l I, 'f,'fbi~ | |||
PLANT NAHE:. | FOR ACT ION/INFO RViATI ON HXPC CYS FOR AC ON INTERNAL D Isl Rl BUTION BP~~GS iQ)SM M ~Q,Pdd BRANCH CHXE1+L ua( ~ | ||
EXl ERNAL DISTRIBUTION CONTROL NUMBER | |||
. &1DR.'rc NAC I:OflM 166 f2.76) | |||
llilgf SS/'(igjzi zwzz////II/I/I | Rye iX llilgf SS/ | ||
///SIFT/// | '(igjzi zwzz | ||
ii ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, | ////II/I/I ///SIFT/// ii ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA cooE 7IE 546-2700 GINNA STATION March 5, 1976 | ||
$ <gi le."~"t LICCii8tQIf8, LOS tgegigq Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C, 20555 | |||
==Subject:== | ==Subject:== | ||
Monthly Report for February 1976 Operating Status Informatio'n R.E.Ginna Nuclear Power Plant Unit No.1 Docket No.50-244 Gentlemen: | Monthly Report for February 1976 Operating Status Informatio'n R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen: | ||
Pursuant to Technical Specification 6.9.l.c attached herewith is the monthly operating status report for Ginna Station for the month of February, 1976.Also, ten addition'al copies of the attachment are enclosed.Very truly yours, C~C.Charles E.Platt Superintendent CEP:bts Attachments cc: Mr.James P.O'Reilly, NRC (1)Mr.William G.McDonald, NRC (2)/'(K(j) | Pursuant to Technical Specification 6.9.l.c attached herewith is the monthly operating status report for Ginna Station for the month of February, 1976. Also, ten addition'al copies of the attachment are enclosed. | ||
OPERATING DATA REPORT DOCKET NO.50 2~4 | Very truly yours, C~ C. | ||
~~.~ | Charles E. Platt Superintendent CEP:bts Attachments cc: Mr. James P. O'Reilly, NRC (1) | ||
~~, 0 | Mr. William G. McDonald, NRC (2) /'(K(j)~ p)9)6 | ||
FORECAST | 'hAQ] | ||
~-w 8 o~V l/1 sk>> | '~ | ||
AVERAGE | * AlvR'Y E&llO'1$jQg HEI $ ~(w 2533 | ||
4 YY 4 g~41, 4 1 I f/~QY DOCKET NO.50-244 | |||
I' 0 | |||
~ | |||
OPERATING DATA REPORT DOCKET NO. 50 2~4 UNIT II1 Ginna Station DATE March 5, 1976 COMPLETED BY~~ | |||
Andrew McNama a PERATI NS AIDE TELEPHONE Ext. 291-214, at Ginna OPERATING STATUS 1, REP0RTING PERI0D: Februar 1976 GRoss'HDURs IN REPDRTING PERIQD: 696 | |||
: 2. cURRENTLY AUTHDRlzED PowER LEvEL (pwt)t 1520 MAxe DEPEND cAPAcITY (Mwe-Net)t 470 DESIGN ELECTRICAL RATING (MWe-Net)t 470 | |||
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe>et): | |||
: 4. REASONS FOR RESTRICTION (IF ANY): | |||
THIS MONTH YR TO DATE CUMULATIVE 0 41,545.59 | |||
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL ~ ~ ~ | |||
0',376.89 66.2 | |||
: 6. REACTOR RESERVE SHUTDOWN HOURS. ~ ~ | |||
0 358.33* | |||
: 7. HOURS GENERATOR ON LINE.;.... ~ ~ . ~ | |||
371 40,283.63 | |||
: 8. UNIT RESERVE SHUTDOWN HOURS 0 0 8.5* | |||
: 9. GROSS THERMAL ENERGY GENERATED (MWH) . ~ .. ~...... .. ~ | |||
0 532,560 50,903,434 | |||
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 175 205 16 981 066 | |||
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) ~......... ~ ~, 0 166,526 '.1 6,058,891 | |||
: 12. REACTOR SERVICE FACTOR 0 26% 75% | |||
: 13. REACTOR AVAILABILITYFACTOR 0 31% 76% | |||
: 14. UNIT SERVICE FACTOR 0 26% | |||
: 15. UNIT AVAILABILITYFACTOR 0 ~26'3% 73% | |||
: 16. UNIT CAPACITY FACTOR (Uslntt MDC) ... ~ ~ ~ 25% 66% | |||
: 17. UNIT CAPACITY FACTOR (Veiny Deslttn MWe) .. ' | |||
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ | |||
0 25% 66% | |||
: 18. UNIT FORCED OUTAGE RATE 0 50% 10% | |||
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)t | |||
: 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE A ri1 1 1976 2'I UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | |||
*Cumulative Date Commencing January 1, 1975 se ss Rtpv $ 0/75 | |||
~ -w 8 | |||
o~ V l/ | |||
1 sk>> | |||
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO..50 244 UNIT Nl @irma Station DATE March 5, 1976 COMPLETED BY Andrew McNamara, Operations Aide TELEPHON E 1-716-546-2700 Ext.291-214 at Ginna MONTH Februar, 1976 DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAlLY POWER LEVEL (MWe-Net) (MWe-Net) 17 0 | |||
18 20 21 22 23 24 25 10 26 11 27 12 28 13 29 14 ,30 15 31 16 INSTRUCTIONS On this form, list the average daily unit power level in MWe<'et for each.day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may.'be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). 'n such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly. | |||
4 YY 4 | |||
g ~ | |||
41, 4 | |||
1 I | |||
f/ ~ QY | |||
DOCKET NO. 50-244 | |||
==SUMMARY== | ==SUMMARY== | ||
: Annual Re-fueling Outage Began.Work Continued on f2 Low Pressure Turbine Blades Repair."A"&"B" Steam Generators, Inspection and Repair-Other Maintenance. | : Annual Re-fueling Outage Began. NAME GINNA STATION, UNIT III Work Continued on f2 Low Pressure Turbine Blades Repair. "A" & "B" Steam Generators, Inspection and Repair - Other Maintenance. | ||
COMPLETED BY TELEPH0NE | |||
<.ri" | ~~ March 5,1976 McNamara, Operations Aide | ||
'ndrew 1-716-546-2700 Ext. 291-214 at Ginna February, 1976 UNIT SHUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COMVIENTS DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2) 14 760129 $ 696 C | |||
* Continuation of this outage for entire report month. | |||
*+ Yearly outage fJl began on 1/29/76 as a forced unit shutdown. | |||
Unit shutdown hours beginning 2/1/76 at 0001 were designated as scheduled shutdown hours for annual re-fueling and other maintenance. | |||
(I) REASON: (2) METHOD: | |||
A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) | |||
E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN) | |||
H - OTHER (EXPLAIN) | |||
RKV. l 0 j75 i9 89 | |||
<.ri " | |||
~ ~ | |||
( ~ | |||
~ ~ | |||
4 | |||
(~ ) | |||
J. | |||
i I | |||
a | |||
~L u}} |
Latest revision as of 13:20, 7 November 2019
ML18142B387 | |
Person / Time | |
---|---|
Site: | Ginna |
Issue date: | 03/05/1976 |
From: | Platt C Rochester Gas & Electric Corp |
To: | NRC/IE |
References | |
Download: ML18142B387 (10) | |
Text
NRC FqAM 106 U.S. NUCLEnil BEOULn TOA V COMMiSSiON DOCKET NUMOLll f2-76t SO-244 FILE NUMQFR NFIC DISTRIBUTION FoR PAR vO DOCI<I:-T MATERIAL HONTIILY REPORT FROM. Of HEST R (rA '6 ELEC CORP DATI: Ol: DOCUMENT ROCHESTER, NY 3-5<<76 NRC DATE RECEIVED C E PLATT 3-12-76 QI.ETTEB QNOTOBIZED PROP INPUT FORM NUMIIEB OF COPIES RECEIVED QOA iOINnL QUNCLnSSIFiED QCOPV 1 signed DESCRIPTION ENCLOSURF LETTER TRANS THE FOLLO>nNG: HOATIILY REPORT FOR FEBRUARY 1976 PLANT 6 COHPONENT OPERABILXTY 6c AVAILABILITY'HISREPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS 6 OPERATXONS.
PLANT NAHE:. QxAAA l I, 'f,'fbi~
FOR ACT ION/INFO RViATI ON HXPC CYS FOR AC ON INTERNAL D Isl Rl BUTION BP~~GS iQ)SM M ~Q,Pdd BRANCH CHXE1+L ua( ~
EXl ERNAL DISTRIBUTION CONTROL NUMBER
. &1DR.'rc NAC I:OflM 166 f2.76)
Rye iX llilgf SS/
'(igjzi zwzz
////II/I/I ///SIFT/// ii ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA cooE 7IE 546-2700 GINNA STATION March 5, 1976
$ <gi le."~"t LICCii8tQIf8, LOS tgegigq Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C, 20555
Subject:
Monthly Report for February 1976 Operating Status Informatio'n R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:
Pursuant to Technical Specification 6.9.l.c attached herewith is the monthly operating status report for Ginna Station for the month of February, 1976. Also, ten addition'al copies of the attachment are enclosed.
Very truly yours, C~ C.
Charles E. Platt Superintendent CEP:bts Attachments cc: Mr. James P. O'Reilly, NRC (1)
Mr. William G. McDonald, NRC (2) /'(K(j)~ p)9)6
'hAQ]
'~
- AlvR'Y E&llO'1$jQg HEI $ ~(w 2533
I' 0
~
OPERATING DATA REPORT DOCKET NO. 50 2~4 UNIT II1 Ginna Station DATE March 5, 1976 COMPLETED BY~~
Andrew McNama a PERATI NS AIDE TELEPHONE Ext. 291-214, at Ginna OPERATING STATUS 1, REP0RTING PERI0D: Februar 1976 GRoss'HDURs IN REPDRTING PERIQD: 696
- 2. cURRENTLY AUTHDRlzED PowER LEvEL (pwt)t 1520 MAxe DEPEND cAPAcITY (Mwe-Net)t 470 DESIGN ELECTRICAL RATING (MWe-Net)t 470
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe>et):
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 0 41,545.59
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL ~ ~ ~
0',376.89 66.2
- 6. REACTOR RESERVE SHUTDOWN HOURS. ~ ~
0 358.33*
- 7. HOURS GENERATOR ON LINE.;.... ~ ~ . ~
371 40,283.63
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 8.5*
- 9. GROSS THERMAL ENERGY GENERATED (MWH) . ~ .. ~...... .. ~
0 532,560 50,903,434
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 175 205 16 981 066
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) ~......... ~ ~, 0 166,526 '.1 6,058,891
- 12. REACTOR SERVICE FACTOR 0 26% 75%
- 13. REACTOR AVAILABILITYFACTOR 0 31% 76%
- 14. UNIT SERVICE FACTOR 0 26%
- 15. UNIT AVAILABILITYFACTOR 0 ~26'3% 73%
- 16. UNIT CAPACITY FACTOR (Uslntt MDC) ... ~ ~ ~ 25% 66%
- 17. UNIT CAPACITY FACTOR (Veiny Deslttn MWe) .. '
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0 25% 66%
- 18. UNIT FORCED OUTAGE RATE 0 50% 10%
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)t
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE A ri1 1 1976 2'I UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cumulative Date Commencing January 1, 1975 se ss Rtpv $ 0/75
~ -w 8
o~ V l/
1 sk>>
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO..50 244 UNIT Nl @irma Station DATE March 5, 1976 COMPLETED BY Andrew McNamara, Operations Aide TELEPHON E 1-716-546-2700 Ext.291-214 at Ginna MONTH Februar, 1976 DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAlLY POWER LEVEL (MWe-Net) (MWe-Net) 17 0
18 20 21 22 23 24 25 10 26 11 27 12 28 13 29 14 ,30 15 31 16 INSTRUCTIONS On this form, list the average daily unit power level in MWe<'et for each.day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may.'be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). 'n such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.
4 YY 4
g ~
41, 4
1 I
f/ ~ QY
DOCKET NO. 50-244
SUMMARY
- Annual Re-fueling Outage Began. NAME GINNA STATION, UNIT III Work Continued on f2 Low Pressure Turbine Blades Repair. "A" & "B" Steam Generators, Inspection and Repair - Other Maintenance.
COMPLETED BY TELEPH0NE
~~ March 5,1976 McNamara, Operations Aide
'ndrew 1-716-546-2700 Ext. 291-214 at Ginna February, 1976 UNIT SHUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COMVIENTS DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2) 14 760129 $ 696 C
- Continuation of this outage for entire report month.
- + Yearly outage fJl began on 1/29/76 as a forced unit shutdown.
Unit shutdown hours beginning 2/1/76 at 0001 were designated as scheduled shutdown hours for annual re-fueling and other maintenance.
(I) REASON: (2) METHOD:
A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
RKV. l 0 j75 i9 89
<.ri "
~ ~
( ~
~ ~
4
(~ )
J.
i I
a
~L u